Efficient Intra and Inter-city
Public Transportation System
Towards Sustainable Urban Development
in Indonesia
DR. Elly Sinaga
Director General for Research and Development Agency,
Ministry of Transportation, Republic of Indonesia
HIGH SPEED TRAIN PROJECT IN INDONESIA
(JAKARTA – SURABAYA CORRIDOR)
HERMANTO DWIATMOKO
Directorate General of Railways
Ministry of Transportation
Republic of Indonesia
Jakarta, 2010
Indonesia
• Indonesia is
the world's largest archipelagic country
(17,508 large and
small islands).
• DKI Jakarta is the capital of Indonesia
, and is located on the northwest
coast of Java island, forming the main city of Indonesia.
• The
total population of Indonesia 247 million
( 2012 ) of which 58.5% lives in Java,
the world's 4
th
most populous country (after China, India and US),
population growth of 1.2% meaning
every 2 years we build one
3
-~In 2020 productive ages reaches 70%, dependency ratio will go down significantly in
one decade
Sumber: BPS, World Population Prospect (UN)
Total Population (in
million)
237
263
Male)
119
131
Female
118
132
Productive Ages
(20–55 years)
130
(54%)
180
(68%)
2010
2020
2010
2020
Population Composition
City’s Population in Indonesia
Jakarta Surabaya9,500
Bandung Medan Tangerang Depok Semarang Palembang Bekasi Makassar Tangerang Selatan Bogor Batam Pekanbaruu Malang Denpasar Balikpapan Tasikmalaya Surakarta Manado Mataram Yogyakarta1 city
3 cities
3 cities
3 cities
1 city
15 cities
60 cities
Metropolitan Cities (11) Big Cities (15) Medium Cities (60)P
op
u
la
ti
on
Nu
m
b
e
rs
(t
h
ou
sa
n
d
p
e
op
le
)
Source: BPS, 2010Vehicle Trend by mode (in million, 2000-2012)
Source: Statistic Bureau
4.2 5.1 6.0 6.9 7.5 7.9 8.9 9.5 10.4 4.2 4.5 4.5 4.7 5.0 5.3 2.9 2.3 2.0 1.9 1.8 1.7 2.3 2.3 2.3 2.2 2.1 1.7 1.4 1.1 0.9 0.8 0.7 0.7 0.7 67.3 52.8 3.2
2000
13.6 3.02008
61.7 47.72007
54.8 42.0 19.0 +14.3%2012
94.4 76.42011
85.6 68.8 3.82002
23.0 17.0 3.42001
20.9 15.32010
76.9 61.12009
2006
43.3 32.5 3.42005
37.6 28.52004
30.5 23.12003
26.6 20.0Motor Cycle
Passanger Car
Truck
Bus
Total
CAGR (2000-12)
15.49%
10.83%
9.88%
10.77%
14.3%
Motor Cycle
Passanger Car
Truck
Bus
Urban Transportation Problems
(Jakarta Metropolitan)
• Heavy traffic congestion (average speed around 15kph)
• Low share of public transportation services (16.7%)
• Low commuter rail transport capacity
• High proportion of motorcycle traffic (>70%)
• High rate of road accident
• Air pollution
• High Transportation Cost
• Cost of Health due to pollution impact
but
• Rapid Increase in travel demand
• Steadily decrease in public transport modal
share
Rapid Increase in Travel Demand
Modal Share
%
Motorcycle
62,9
Private Car
17,4
Public Transport
16,7
Total
100
Tangerang +
Tangerang Selatan
DKI Jakarta
Kota + Kab. Bekasi
Total Travel Demand
Year 2003 arround 37,3 million/day*
Year 2010 arround 59 million/day**
58
%
Source : * JICA 2003; URDI 2011 **JAPTraTis, 2011; Ditjen Perhubungan Darat, Kementerian Perhubungan, 2010
Jakarta MRT Development
No
Intra and Intercity Railway development
Line Length
Target Year of
Operation
1
MRT Jakarta Stage I
15,1 km
2016
2
Monorel Jakarta (Green Line)
14,3 km
2016
3
Jakarta airport rail
33 km
2015
4
Double Track Cirebon - Surabaya
280 km
2014
5
Bandung Urban Railway
42 km
2016
6
Surabaya Urban Raiway
42 km
2015
7
Jakarta Commuter upgrade
152 km
2014
8
Bandar Tinggi - Kuala Tanjung North Sumatra rail
28,5 km
2014
Intercity
Public Transportation plan & implementation
(Case Study : Java Island)
• High travel demand on East - West corridor
• City, town, and other
trip generators are growing rapidly
along side of roads
• High rate of traffic accident
• Low journey speed for road transport
• High proportion of truck along Northern Java Corridor (in
some part >90%)
• Overweight and over dimensional trucks Road damage
• Low modal share of Railway Transport ( for passenger 6%)
• Frequent railway level crossing disturbing urban traffic
+ accident
12
-Sumber: State of Logistic Indonesia 2013
IN
D
27%
VI
E
25%
CH
N
18%
KO
R
16%
MA
L
13%
SG
P
8%
JP
N
11%
US
A
10%
TH
A
20%
Logistic Cost as % of GDP
13
Steel Industrial Area, Petrokimia Industrial Area Petrokimia Food Industrial Complex
Shipyard
(the biggest one in Indonesia)
Metropolitan Jakarta
Metropolitan Surabaya
Multi modes Transport Development in Java Corridor
1.
Toll Road :
Build by-pass and toll road along Northern Java Corridor --->
Intercity Bus
Services do not need to pass through city center or other urbanized areas
2.
Railway :
1.
Double track Railway line to improve railway capacity
2.
High Speed Train
3.
Elevated crossing to reduce travel time and accident at level crossing
3.
Maritime:
BANDUNG Jawa Barat JAKARTA SERANG SURABAYA SEMARANG DKI Banten Jawa Tengah Jawa Timur YOGYAKARTADIY Merak Bogor Sukabumi Cikampek Padalarang Cirebon Banjar Kroya Tegal Purwokerto Pekalongan Solo Madiun Kertosono Blitar Malang Bangil Sidoarjo Bojonegoro Jember Banyuwangi Bojonegoro Gambringan Bojonegoro Gundih Prupuk Kutoarjo BANDUNG Jawa Barat JAKARTA SERANG SURABAYA SEMARANG DKI Banten Jawa Tengah Jawa Timur YOGYAKARTADIY Merak Bogor Sukabumi Cikampek Padalarang Cirebon Banjar Kroya Tegal Purwokerto Pekalongan Solo Madiun Kertosono Blitar Malang Bangil Sidoarjo Bojonegoro Jember Banyuwangi Bojonegoro Gambringan Bojonegoro Gundih Prupuk Kutoarjo
JAKARTA CIREBON SURABAYA
TEGAL
PEKALONGAN SEMARANG BOJONEGORO BREBES BEKASI BABAT JERAKAH SEMARANG PONCOL
Status April 22, 2014
TOBO Underconstruction Operated 201 Km 72 Km 68 Km 18 Km 63 Km 35 Km 6 Km 2 Km 52,5 Km 29,5 KmOperated March 2014
659 km
Under Construction
68 km
TOTAL
727 km
2.1) Construction Of Double Tracking Of North Java Corridors
WADU UJUNG NEGORO WELERI 15 Km 34 Km 33 Km JAMBON 73,5 Km 24,5 Km 15
CIREBON SURABAYA KROYA KUTOARJO YOGYAKARTA SOLO MADIUN 56 km 76 km 123 km 71 km 69 km PRUPUK PURWOKERTO 74 km 28 km PARON KERTOSONO 26 km 97 km BANDUNG Jawa Barat JAKARTA SERANG SURABAYA SEMARANG DKI Banten Jawa Tengah Jawa Timur YOGYAKARTADIY Merak Bogor Sukabumi Cikampek Padalarang Cirebon Banjar Kroya Tegal Purwokerto Pekalongan Solo Madiun Kertosono Blitar Malang Bangil Sidoarjo Bojonegoro Jember Banyuwangi Bojonegoro Gambringan Bojonegoro Gundih Prupuk Kutoarjo BANDUNG Jawa Barat JAKARTA SERANG SURABAYA SEMARANG DKI Banten Jawa Tengah Jawa Timur YOGYAKARTADIY Merak Bogor Sukabumi Cikampek Padalarang Cirebon Banjar Kroya Tegal Purwokerto Pekalongan Solo Madiun Kertosono Blitar Malang Bangil Sidoarjo Bojonegoro Jember Banyuwangi Bojonegoro Gambringan Bojonegoro Gundih Prupuk Kutoarjo
JALUR GANDA LINTAS SELATAN JAWA (CIREBON – YOGYAKARTA – SURABAYA): 620 km
Solo - Madiun Kutoarjo Yogya -Solo Purwokerto Kroya -Kutoarjo Cirebon - Prupuk Prupuk-Purwokerto Ponorogo Slahung Ponorogo Slahung Operated 179 km Underconstruction 74 km Plan 367 km
620 km
BANDUNG JawaBarat JAKARTA SERANG SURABAYA SEMARANG DKI BantenJawaTengah JawaTimur
YOGYAKARTADIY Merak Bogor Sukabumi Cikampek Padalarang Cirebon Banjar Kroya Tegal Purwokerto Pekalongan Solo Madiun Kertosono Blitar Malang Bangil Sidoarjo Bojonegoro Jember Banyuwangi Bojonegoro Gambringan Bojonegoro Gundih Prupuk Kutoarjo BANDUNG JawaBarat JAKARTA SERANG SURABAYA SEMARANG DKI Banten
JawaTengah JawaTimur
YOGYAKARTADIY Merak Bogor Sukabumi Cikampek Padalarang Cirebon Banjar Kroya Tegal Purwokerto Pekalongan Solo Madiun Kertosono Blitar Malang Bangil Sidoarjo Bojonegoro Jember Banyuwangi Bojonegoro Gambringan Bojonegoro Gundih Prupuk Kutoarjo BANDUNG JawaBarat JAKARTA SERANG SURABAYA SEMARANG DKI Banten
JawaTengah JawaTimur
YOGYAKARTADIY Merak Bogor Sukabumi Cikampek Padalarang Cirebon Banjar Kroya Tegal Purwokerto Pekalongan Solo Madiun Kertosono Blitar Malang Bangil Sidoarjo Bojonegoro Jember Banyuwangi Bojonegoro Gambringan Bojonegoro Gundih Prupuk Kutoarjo BANDUNG JawaBarat JAKARTA SERANG SURABAYA SEMARANG DKI Banten
JawaTengah JawaTimur
YOGYAKARTADIY Merak Bogor Sukabumi Cikampek Padalarang Cirebon Banjar Kroya Tegal Purwokerto Pekalongan Solo Madiun Kertosono Blitar Malang Bangil Sidoarjo Bojonegoro Jember Banyuwangi Bojonegoro Gambringan Bojonegoro Gundih Prupuk Kutoarjo Madiun -Surabaya
High Speed Train project in Indonesia for Jakarta – Surabaya
Corridor, approximately 685 km.
Passenger Transport fuel saving
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Baseline (DN 2020) Scenario (DS 2020) M o d al S h arePassanger Transport
Modal Share Projection
(Northern Java Corridor : Jakarta - Surabaya)
Airplane High Speed Train Conventional Railway/ Double Track Intercity Bus 0 10 20 30 40 50 60 70 80 90 100 DN 2020 DS 2020 (% )
Fuel Saving
Passanger Transport Strategy in 2020
(Northern Java Corridor : Jakarta - Surabaya)
Airplane High Speed Train Conventional Railway/ Double Track
Freight Transport fuel saving
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Baseline (DN 2020) Scenario (DS 2020) M o d al S h areFreight Transport
Modal Share Projection
(Northern Java Corridor : Jakarta - Surabaya)
Airplane High Speed Train Short Sea Shipping Conventional Railway/ Double Track Truck 0 10 20 30 40 50 60 70 80 90 100 DN 2020 DS 2020 (% )
Fuel Saving
Freight Transport Strategy in 2020
(Northern Java Corridor : Jakarta - Surabaya)
Airplane High Speed Train Short Sea Shipping Conventional Railway/ Double Track
CO
2
Reduction multi modes strategy
0 10 20 30 40 50 60 70 80 90 100 DN 2020 DS 2020 (% )CO
2Reduction
Passanger Transport Strategy in 2020
(Northern Java Corridor : Jakarta - Surabaya)
Airplane High Speed Train Conventional Railway/ Double Track Intercity Bus 0 10 20 30 40 50 60 70 80 90 100 DN 2020 DS 2020 (% )
CO
2Reduction
Freight Transport Strategy in 2020
(Northern Java Corridor : Jakarta - Surabaya)
Airplane High Speed Train Short Sea Shipping Conventional Railway/ Double Track
23
CONCLUSION
Various efforts in realizing efficient intra and inter-city
public transport in Indonesia is being done and planned by
the government. From development of the double track
line, to the development of the short sea shipping.
The benefits of developing a multi modal transport system
is not only limited to Fuel and CO2 reduction, additional
benefits include reduced high road maintenance cost and
more importantly, reduction in road accident rates.
THANK YOU
TERIMA KASIH
.