LAPORAN AKHIR
”Implementation of Energy Conservation and CO2 Emission Reduction In Industrial Sector (Phase 1)”
Kementerian Perindustrian Republik Indonesia 6-1
PT. Energy Management Indonesia (Persero) 2011
BAB VI
POTENSI KONSERVASI ENERGI DAN REDUKSI EMISI DI
INDUSTRI PULP DAN KERTAS
6.1
PELUANG PENGHEMATAN ENERGY DI INDUSTRI PULP DAN KERTAS
Laporan Akhir
”Implementation of Energy Conservation and CO2 Emission Reduction In Industrial Sector (Phase 1)”
Kementerian Perindustrian 6-2
PT. Energy Management Indonesia (Persero) 2011
Table 6.1 Peluang Penghematan Energi dan Reduksi Emisi di 15 industri Pulp dan Kertas
Industri
Implementasi
IPK 1 Peningkatan Total Solids Black Liquor untukMeningkatkanProduksi Steam di Recovery Boiler 428.906 10.244 30 US$ 3,6 juta US$ 900.000 High Cost
IPK 2 Aplikasisistemsuperbatch digester 1.224.908 29.256 6.030 Medium Cost
Meningkatkankinerja (performance ) evaporator dengan improving vacuums system (install bigger vacuum pump). 1.491.042 35.613 9.144 US$ 550000 High Cost Meningkatkankinerja (performance ) evaporator dengan improving vacuums system (install bigger vacuum pump). 104.500 2.496 644 US$ 900000 High Cost
IPK 3 PemanasanUdaraAwalPembakaran 35.823 856 7.598 0 Rp. 12.314.933.000 Low Cost
Blowdown Heat Recovery 24.628 588 176 Rp.156.009.000 Rp. 23.830.101 Medium Cost
Supplementary firing 195.234 4.663 13.926 Rp.39.984.000.000 Rp. 721.387.590 High Cost
IPK 4 Perawatanalat ion exchange danpemeriksaanrutinefluenuntukregenerasi resin 51.940 1.241 2.983 0 Rp. 202.779.808 No Cost
Pengisolasiandanpenutupankebocoranpipa steam 21.870 522 1.256 Rp. 20.000.000 Rp. 85.380.944 Low Cost
Penambahanalat flash tank 816,97 20 47 Rp. 44.000.000 Rp. 3.189.472 Medium Cost
Penambahanalat boiler economizer 83.367 1.991 4.773 Rp. 2.475.000.000 Rp. 320.760.851 High Cost
IPK 5 Jadualpemeliharaan boiler dari 3 bulanmenjadi 6 bulan 4.666 111 2.623 0 Rp. 8.534.754.840 No Cost Pemasangan incinerator baru 2.141.654 51.153 113.883 Rp. 366.277.500.000 Rp. 192.052.265.625 High Cost
IPK 6 Capacitor Bank 67 2 15 Rp. 119.000.000 Rp. 11.272.800 Medium Cost
Fluidized coal dryer 1.222.565 29.200 113.210 Rp. 6.140.400.000 Rp. 145.800.000 High Cost
Laporan Akhir
”Implementation of Energy Conservation and CO2 Emission Reduction In Industrial Sector (Phase 1)”
Kementerian Perindustrian 6-3
IPK 9 Pengisolasiandanpenutupankebocoranpipa steam 21.870 522 1.256 Low Cost
Pemanfaatan air buang WWT untuk PLTMH 49 1 11 Low Cost
Pemasangan metering, sistemkontrolsuhudanlajuudara -
oksigensertasistemperawatannya 1.569 37 119 Medium Cost
PemasanganEkonomiser 2.565 61 194 High Cost
Penggantianresidudengan gas alam 0 0 3.256 High Cost
Pulp danKertas
IPK 13 PengalihanBahanBakarMinyakmenjadi Natural Gas pada Lime Kiln 2.490.840 59.493 622.135 Low Cost
Pembakaran NCG pada lime kiln 84.934 2.029 7.865 Low Cost
Aplikasisistemsuperbatch digester 449.966 10.747 41.667 Medium Cost
Pemanfatan gas NCG menghasilkanmetanol 69.248 1.654 2.541 High Cost
IPK 14 Pembakaran NCG pada lime kiln 84.934 2.029 7.364 Low cost
Pemanfatan gas NCG menghasilkan gas metanoluntukmenggantiminyakbakar 69.248 1.654 2.093 High Cost
Laporan Akhir
”Implementation of Energy Conservation and CO2 Emission Reduction In Industrial Sector (Phase 1)”
Kementerian Perindustrian 6-4
PT. Energy Management Indonesia (Persero) 2011
Besar peluang penghematan energi dan reduksi emisi tiap tahunnya yang dapat
disumbangkan oleh15 industri pulp dan kertas masing-masing sebesar 4,7%
(251.947TOE) dan 9,4% (783.000 jutaton CO2eq) dengan menggunakan baseline
2010.
Besar peluang penghematan dan reduksi emisi ke 15 industri obyek bervariasi dan
bergantung pada berbagai factor, antara lain tingkat efisiensi proses dan teknologi
yang telah diimplementasikan di industry tersebut. Dengan mengasumsikan tingkat
pertumbuhan produksi pulp dan kertas sebesar 5% pertahun, maka dapat
diproyeksikan pertumbuhan konsumsi energy dan produksi emisi hingga tahun
2020 seperti yang dipresentasikan pada Gambar 6.1 dan 6.2. Dari proyeksikan,
diperkirakan dengan mengimplementasikan program konservasi energy yang
diusulkan maka 15 industri pulp dan kertas yang dikaji dapat mengurangi total
konsumsi energy dan emisinya masing-masing sebesar 2 juta TOE dan 4,8 juta ton
CO2 eq hingga tahun 2020.
Gambar 6.1 Proyeksi pertumbuhan konsumsi energy dengan pertumbuhan produksi sebesar 5% (Baseline 2010)
2010 2012 2014 2016 2018 2020 2022
Laporan Akhir
”Implementation of Energy Conservation and CO2 Emission Reduction In Industrial Sector (Phase 1)”
Kementerian Perindustrian 6-5
PT. Energy Management Indonesia (Persero) 2011 Gambar 6.2 Proyeksi Pertumbuhan Produksi Emisi CO2 eq dengan asumsi
pertumbuhan produksi sebesar 5% (Baseline 2010)
Dari 3 kluster industry pulp dan kertas, potensi penghematan energy dan reduksi
emisi terbesar disumbangkan oleh industry kertas. Hal ini disebabkan masih
tingginya penggunaan bahan bakar fosil, masih belum optimumnya tingkat efisiensi
proses serta sistem monitoring dan manajemen energy di beberapa industry kertas
obyek.
Sebaliknya peluang penghematan energy dan reduksi emisi di industry pulp dan
pulp dan kertas terintegrasi masih tergolong rendah, karena sebagian besar
industry tersebut telah menerapkan system manajemen energy yang baik dan telah
menerapkan beberapa kegiatan konservasi energy. Selain itu, sector ini merupakan
salah satu sector industry yang menggunakan energy terbarukan dengan jumlah
yang sangat signifikan, dimana 70-90% total kebutuhan energinya dapat dipenuhi
dari penggunaan by product (biomassa dan blak liquor).
6.2 Potensi KE dan RE di Industri Pulp
Industri pulp merupakan salah satu sektor industri yang mampu memenuhi hampir
keseluruhan kebutuhan energinya dengan memanfaatkan limbah dari proses
pulping, yaitu biomassa dan black liquor. Dari dua industri pulp obyek, total
konsumsi energi yang bersumber dari energi terbarukan (renewable energy)
sebesar 95% dan sisanya berasal dari bahan bakarfosil.
Salah satu peluang untuk mengurangi konsumsi energi dan produksi emisi di
industri pulp berada pada proses
chemical make up di lime kiln, dimana seluruh
energi yang digunakan pada proses ini berasal dari bahan bakar fosil. Dari konsumsi
0
2010 2012 2014 2016 2018 2020 2022
Laporan Akhir
”Implementation of Energy Conservation and CO2 Emission Reduction In Industrial Sector (Phase 1)”
Kementerian Perindustrian 6-6
PT. Energy Management Indonesia (Persero) 2011
energi total, besar penggunaan energi di lime kiln hanya sebesar 5% sehingga
peluang penghematan energi yang diperoleh dari proses di lime kiln tidak signifikan
terhadap konsumsi energi total. Selain itu, peluang untuk mengurangi produksi
emisi CO2 juga sangat kecil karena penggunaan energi terbarukan yang bersifat
carbon neutral (biogenic).
Gambar 6.3 dan 6.4 memberikan proyeksi besarnya peluang penghematan energi
dan reduksi emisi hingga tahun 2020.
Gambar 6.3 Proyeksi Pertumbuhan Konsumsi Energi di Industri Pulp dengan Pertumbuhan Produksi 5% (Baseline 2010)
Gambar 6.4 Proyeksi Produksi Emisi di Industri Pulp dengan Pertumbuhan Produksi 5% (Baseline 2010)
2010 2012 2014 2016 2018 2020 2022
Laporan Akhir
”Implementation of Energy Conservation and CO2 Emission Reduction In Industrial Sector (Phase 1)”
Kementerian Perindustrian 6-7
PT. Energy Management Indonesia (Persero) 2011
1.
TanjungEnim Lestari
GJ %
1 Peningkatan Total Solids Black Liquor untuk Meningkatkan Produksi Steam di Recovery Boiler
428906,02 20,00 31,00 US$ 900.000 US$ 3,6 juta 4,00 High Cost
428.906,0 0,6 31,0 US$ 900.000 US$ 3,6 juta
158.634,9 0,62 31,00 US$ 900.000 US$ 3,6 juta
Total
No Langkah Konservasi Energi PPE/tahun RE/tahun Penghematan
Biaya
Perkiraan Biaya
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Pertumbuhan Produksi rata-rata
5%/tahun 408.352 428.769 450.208 472.718 496.354 521.172 547.230 574.592 603.321 633.488
Kebutuhan Energi (BAU) (10,31 GJ/Ton > 2010) 12.497.873 13.122.766 13.778.905 14.467.850 15.191.242 15.950.804 16.748.345 17.585.762 18.465.050 19.388.303 Produksi Emisi (BAU) by energy
consume 65.336 68.603 72.033 75.635 79.417 83.387 87.557 91.935 96.531 101.358
Penghematan Energi dgn Implementasi KE
GJ Penghematan Energi 0,0 0 0 0 0 0 603.514 633.690 665.374 698.643
Ton CO2 Reduksi Emisi 0,0 0 0 0 0 0 44 46 48 50
GJ Penghematan Energi 0,0 0,0 0,0 0,0 0,0 0,0 603.513,8 633.689,5 665.374,0 698.642,7
Ton CO2 Reduksi Emisi 0,0 0 0 0 0 0 44 46 48 50
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Laporan Akhir
”Implementation of Energy Conservation and CO
Kementerian Perindustrian
nd CO2 Emission Reduction In Industrial Sector (Phase 1)”
Gambar 6.5 Konsumsi Energi dan Emisi CO2
Laporan Akhir
”Implementation of Energy Conservation and CO2 Emission Reduction In Industrial Sector (Phase 1)”
Kementerian Perindustrian 6-9
PT. Energy Management Indonesia (Persero) 2011
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Pertumbuhan Produksi rata-rata 5%/tahun (~753091003 ton > 2010)
178.500 187.425 196.796 206.636 216.968 227.816 239.207 251.167 263.726 276.912
Kebutuhan Energi (BAU) (10,31 GJ/Ton > 2010) 9.971.010 10.469.561 10.993.039 11.542.690 12.119.825 12.725.816 13.362.107 14.030.212 14.731.723 15.468.309 Produksi Emisi (BAU)
by energy consume (405.600,87 Ton CO2,e > 2010)
131.448 138.021 144.922 152.168 159.776 167.765 176.154 184.961 194.209 203.920
Penghematan Energi dgn Implementasi KE
GJ Penghematan Energi 0,0 0 0 0 1.563.327 1.641.494 1.723.569 1.809.747 1.900.234 1.995.246
Ton CO2 Reduksi Emisi 0,0 0 7.696 8.081 8.485 8.909 9.355 9.822
GJ Penghematan Energi 0,0 0 0 0 0 1.998.138,9 2.098.045,8 2.202.948,1 2.313.095,5 2.428.750,3 Ton CO2 Reduksi Emisi 0,0 0 0,0 0 12.254 12.866,5 13.509,9 14.185,3 14.894,6
0,0 0 0,0 0 0,0 0 0,0 154.394,1 162.113,8 170.219,5
0,0 0 951 999 1.049
GJ Penghematan Energi 0,0 0,0 0,0 0,0 1.563.327,5 3.639.632,8 3.821.614,4 4.167.089,2 4.375.443,7 4.594.215,9 Ton CO2 Reduksi Emisi 0,0 0 0 0 7.696 20.335 21.351 23.370 24.539 25.766 TOTAL PENGHEMATAN
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
1 evaporator tipe plate (lamella) yang dapat meningkatkan total solids sampai 80% pada system evaporator black liquor
TIMELINE PERKIRAAN IMPLEMENTASI
Sub Total Medium Cost
Laporan Akhir
”Implementation of Energy Conservation and CO
Kementerian Perindustrian 10
PT. Energy Management Indonesia (Persero)
nd CO2 Emission Reduction In Industrial Sector (Phase 1)”
Gambar 6.6 Konsumsi Energi dan Emisi CO2
Laporan Akhir
”Implementation of Energy Conservation and CO2 Emission Reduction In Industrial Sector (Phase 1)”
Kementerian Perindustrian 6-11
PT. Energy Management Indonesia (Persero) 2011
6.3 Potensi Konservasi Energi dan Reduksi Emisi di Industri Kertas
Dibandingkan dengan industri pulp, peluang konservasi energi dan reduksi emisi di
sektor industri kertas masih cukup signifikan. Dari 10 industri obyek yang dikaji, fokus
audit energi dilakukan di beberapa sistem, antara lain :
1.
Sistem boiler
2.
Sistem pembangkit listrik
3.
Sistem Pengukuran dan Monitoring energi
4.
Sistem Paper machine
Karena kegiatan audit energi tidak dilakukan pada keseluruhan proses di papermill,
maka kemungkinan masih banyak potensi penghematan energi lainnya yang dapat
diimplementasikan di industri kertas. Gambar 6.7 dan Gambar 6.8 memberikan
proyeksi besar konsumsi energi dan produksi emisi dengan menggunakan data 2010
sebagai baseline dan mengasumsikan pertumbuhan produksi sebesar 5%.
Dari hasil proyeksi tersebut diperkirakan besar pengurangan konsumsi energi hingga
tahun 2020 sebesar 25.515.460 GJ (609.426TOE) dengan total penurunan emisi
sebesar 2,88 Juta ton CO2 eq. Nilai total penurunan konsumsi energi dan produksi
emisi ini jauh lebih besar jika dibandingkan dengan peluang yang terdapat di industri
pulp dan industri pulp dan kertas terintegrasi.
Gambar 6.7 Proyeksikonsumsi energy di industry kertas dengan pertumbuhan produksi 5% (Baseline 2010)
2010 2012 2014 2016 2018 2020 2022
Laporan Akhir
”Implementation of Energy Conservation and CO2 Emission Reduction In Industrial Sector (Phase 1)”
Kementerian Perindustrian 6-12
PT. Energy Management Indonesia (Persero) 2011 Gambar 6.8 Proyeksi Produksi Emisi CO2 di Industri Kertas dengan pertumbuhan produksi 5%
(Baseline 2010)
2010 2012 2014 2016 2018 2020 2022
Laporan Akhir
”Implementation of Energy Conservation and CO2 Emission Reduction In Industrial Sector (Phase 1)”
Kementerian Perindustrian 6-13
PT. Energy Management Indonesia (Persero) 2011
1.
Adiprima Suraprinta
GJ
%
1
-
-
-2
-3
Penggunaan gap former
46.200,51
4,15
4.492,08
9.246,35
0,88
529,44
93.179,52
15,00
8.628,42
5
Pemasangan
closed hood
dan optimasi sistem
ventilasi
2.912,60
0,67
269,71
151.538,97
20,70
151.539,0
20,70
13.919,64
No
Langkah Konservasi Energi
PPE/tahun
RE/tahun (ton-CO2 eq)
SUB TOTAL LOW COST
SUB TOTAL MEDIUM COST
SUB TOTAL HIGH COST
TOTAL
Laporan Akhir
”Implementation of Energy Conservation and CO2 Emission Reduction In Industrial Sector (Phase 1)”
Kementerian Perindustrian 6-14
PT. Energy Management Indonesia (Persero) 2011
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
1
-2
3 Penggunaan gap former
5 Pemasangan closed hoodventilasi dan optimasi sistem
No Langkah Konservasi Energi TIMELINE PERKIRAAN IMPLEMENTASI
SUB TOTAL LOW COST
SUB TOTAL MEDIUM COST
4 Penggunaan condebelt drying
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Pertumbuhan produksi rata-rata 5%/tahun 134.950,4 141.697,9 148.782,8 156.222,0 164.033,1 172.234,7 180.846,5 189.888,8 199.383,2 209.352,4 Kebutuhan energi (BAU) 1.168.672,0 1.227.105,6 1.288.460,9 1.352.884,0 1.420.528,2 1.491.554,6 1.566.132,3 1.644.438,9 1.726.660,8 1.812.993,9
Produksi emisi (BAU) 108.219,0 113.630,0 119.311,5 125.277,1 131.540,9 138.118,0 145.023,8 152.275,0 159.888,8 167.883,2
GJ PPE - 35.655,24 53.482,86 56.157,01 58.964,86 61.913,10 65.008,75 68.259,19 71.672,15 75.255,76
Pemasangan closed hood dan optimasi sistem ventilasi
Laporan Akhir
”Implementation of Energy Conservation and CO
Kementerian Perindustrian
CO2 Emission Reduction In Industrial Sector (Phase 1)”
Gambar 6.9 Konsumsi Energi dan Emisi CO2
GJ %
35.822,8 0,80 4.062,61 12.314.933.000
35.822,8 0,8 4.062,6 12.314.933.000,0
24.628,1 0,55 2.050,64 23.830.101 156.00
24.628,1 0,6 2.050,6 23.830.101,0 156.009
ry firing 195.234,0 4,36 22.141,21 721.387.590 39.984.0
Laporan Akhir
”Implementation of Energy Conservation and CO2 Emission Reduction In Industrial Sector (Phase 1)”
Kementerian Perindustrian 6-16
PT. Energy Management Indonesia (Persero) 2011
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Pertumbuhan Produksi rata-rata 5%/tahun 391.485 411.059 431.612 453.193 475.853 499.645 524.628 550.859 578.402 607.322 Kebutuhan Energi (BAU) (12,01 GJ/Ton > 2010) 4.701.737 4.936.823 5.183.665 5.442.848 5.714.990 6.000.740 6.300.777 6.615.816 6.946.606 7.293.937
Produksi Emisi (BAU) by energy consume 533.217 559.878 587.872 617.266 648.129 680.535 714.562 750.290 787.805 827.195
Penghematan Energi dgn Implementasi KE
GJ Penghematan Energi 0,0 43.543 45.720 48.006 50.406 52.927 55.573 58.351
Ton CO2 Reduksi Emisi 0,0 2.434 2.556 2.684 2.818 2.959 3.107 3.262
GJ Penghematan Energi 0,0 0 0,0 0,0 0,0 0,0 34.654,3 36.387,0 38.206,3 40.116,7
Ton CO2 Reduksi Emisi 0,0 0 0,0 0,0 0,0 0,0 1.937,2 2.034,0 2.135,7 2.242,5
GJ Penghematan Energi 0,0 0 0,0 0,0 0,0 0,0 0,0 302.872,0 318.015,6
Ton CO2 Reduksi Emisi 0,0 0 0,0 0,0 0,0 0,0 0,0 16.930,5 17.777,1
GJ Penghematan Energi 0,0 0 0 43.543 45.720 48.006 85.060 89.314 396.651 416.484
Ton CO2 Reduksi Emisi 0,0 0 0 2.434 2.556 2.684 4.755 4.993 22.173 23.281
DESKRIPSI UNIT/KETERANGAN TIMELINE PERKIRAAN IMPLEMENTASI
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Laporan Akhir
”Implementation of Energy Conservation and CO
Kementerian Perindustrian
CO2 Emission Reduction In Industrial Sector (Phase 1)”
Gambar 6.10 Konsumsi Energi dan Emisi CO2
Laporan Akhir
”Implementation of Energy Conservation and CO2 Emission Reduction In Industrial Sector (Phase 1)”
Kementerian Perindustrian 6-18
PT. Energy Management Indonesia (Persero) 2011
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Pertumbuhan Produksi rata-rata 5%/tahun
(~59145.42 ton > 2010) 62.103 65.208 68.468 71.892 75.486 79.261 83.224 87.385 91.754 96.342
Kebutuhan Energi (BAU) (20.24 GJ/Ton > 2010) 1.256.958 1.319.806 1.385.797 1.455.087 1.527.841 1.604.233 1.684.445 1.768.667 1.857.100 1.949.955 Produksi Emisi (BAU) by energy consume (93858
Ton CO2,e > 2010) 98.551 103.478 108.652 114.085 119.789 125.779 132.068 138.671 145.605 152.885
Penghematan Energi dgn Implementasi KE
GJ Penghematan Energi 0,0 72.754 76.392 80.212 84.222 88.433 92.855 97.498
Ton CO2 Reduksi Emisi 0,0 3.626 3.808 3.998 4.198 4.408 4.628 4.860
GJ Penghematan Energi 0,0 45.835 48.127 50.533 53.060 55.713 58.499
Ton CO2 Reduksi Emisi 0,0 1.603 1.683 1.768 1.856 2.309 2.046
GJ Penghematan Energi 0,0 0 0,0 0,0 6.737,8 7.074,7 7.428,4 7.799,8
Ton CO2 Reduksi Emisi 0,0 0 0,0 0,0 66,0 66,0 66,0 66,0
GJ Penghematan Energi 0,0 0 0,0 0,0 0,0 0,0 148.568,0 155.996,4
Ton CO2 Reduksi Emisi 0,0 0 0,0 0,0 0,0 0,0 7.405,1 7.405,1
GJ Penghematan Energi 0,0 0,0 0,0 72.754,3 122.227,3 128.338,6 141.493,3 148.568,0 304.564,4 319.792,6 Ton CO2 Reduksi Emisi 0,0 0,0 0,0 3.626,4 5.411,0 5.681,5 6.031,6 6.329,9 14.408,8 14.377,0 TOTAL PENGHEMATAN ENERGI DAN REDUKSI
EMISI
Ton CO2
Perawatan alat ion exchange dan pemeriksaan rutin efluen untuk regenerasi resin
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
1
Laporan Akhir
”Implementation of Energy Conservation and CO
Kementerian Perindustrian
CO2 Emission Reduction In Industrial Sector (Phase 1)”
Gambar 6.11 Konsumsi Energi dan Emisi CO2
Laporan Akhir
”Implementation of Energy Conservation and CO2 Emission Reduction In Industrial Sector (Phase 1)”
Kementerian Perindustrian 6-20
PT. Energy Management Indonesia (Persero) 2011
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
1 Jadual pemeliharaan boiler
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Pertumbuhan Produksi rata-rata
5%/tahun 790.262 829.775 871.263 914.827 960.568 1.008.596 1.059.026 1.111.977 1.167.576 1.225.955
Kebutuhan Energi (BAU) 8.147.597 8.554.977 8.982.725 9.431.862 9.903.455 10.398.628 10.918.559 11.464.487 12.037.711 12.639.597
Produksi Emisi (BAU) 425.881 447.175 469.534 493.010 517.661 543.544 570.721 599.257 629.220 660.681
Penghematan Energi dgn Implementasi
GJ Penghematan Energi 0,0 0 51.993 58.478 61.401 64.471 67.695 71.080 74.634 78.365
Ton CO2 Reduksi Emisi 0,0 0 2.906 3.269 3.432 3.604 3.784 3.973 4.172 4.381
GJ Penghematan Energi 0,0 0 0,0 0,0 3.013.522,3 3.164.198,4 3.322.408,3 3.488.528,7
Ton CO2 Reduksi Emisi 0,0 0 0,0 0,0 168.455,9 176.878,7 185.722,6 195.008,8
GJ Penghematan Energi 0,0 0 51.993 58.478 61.401 64.471 3.081.217 3.235.278 3.397.042 3.566.894
Ton CO2 Reduksi Emisi 0,0 0 2.906 3.269 3.432 3.604 172.240 180.852 189.895 199.389
Laporan Akhir
”Implementation of Energy Conservation and CO
Kementerian Perindustrian
PT. Energy Management Indonesia (Persero)
5.
Indah KiatSerang
1 Pemasangan Kapasitor Bank Pada Motor Ball Mill 3A
2 Pemasangan Fludized Coal Dryer Sub Total Medium Cost
Total
Sub Total High Cost
No Langkah Konservasi Energi
CO2 Emission Reduction In Industrial Sector (Phase 1)”
Gambar 6.12 Konsumsi Energi dan Emisi CO2
Laporan Akhir
”Implementation of Energy Conservation and CO2 Emission Reduction In Industrial Sector (Phase 1)”
Kementerian Perindustrian 6-22
PT. Energy Management Indonesia (Persero) 2011
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Pertumbuhan Produksi rata-rata 5%/tahun 1.513.586 1.589.265 1.668.728 1.752.165 1.839.773 1.931.762 2.028.350 2.129.767 2.236.256 2.348.068 Kebutuhan Energi (BAU) (17.01 GJ/Ton > 2010) 23.597.305 24.777.170 26.016.029 27.316.830 28.682.672 30.116.805 31.622.645 33.203.778 34.863.967 36.607.165
Produksi Emisi (BAU) 2.200.887 2.310.932 2.426.478 2.547.802 2.675.192 2.808.952 2.949.400 3.096.870 3.251.713 3.414.299
Penghematan Energi dgn Implementasi KE
GJ Penghematan Energi 0,0 0 0 0 85 89 94 99 104 109
Ton CO2 Reduksi Emisi 0,0 0 0 0 9 14 18 18 18 18
GJ Penghematan Energi 0,0 0 0,0 0,0 780.168,7 1.026.954,7 1.347.878,1 1.415.272,0 1.486.035,6 1.560.337,3
Ton CO2 Reduksi Emisi 0,0 0 0,0 0,0 72.243,6 121.369,3 159.297,2 167.262,0 175.625,1 184.406,4
GJ Penghematan Energi 0,0 0 0 0 780.254 1.027.044 1.347.972 1.415.371 1.486.139 1.560.446 Ton CO2 Reduksi Emisi 0,0 0 0 0 72.253 121.384 159.315 167.280 175.643 184.424
DESKRIPSI UNIT/KETERANGAN TIMELINE PERKIRAAN IMPLEMENTASI
TOTAL PENGHEMATAN ENERGI DAN REDUKSI EMISI
Ton GJ
Ton CO2
Pemasangan Kapasitor Bank Pada Motor Ball Mill 3A
Pemasangan Fludized Coal Dryer
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
1
Jadual pemeliharaan boiler dari 3
bulan menjadi 6 bulan
2
Pemasangan incinerator baru
TIMELINE PERKIRAAN IMPLEMENTASI
Sub Total Low Cost
Laporan Akhir
”Implementation of Energy Conservation and CO2 Emiss Kementerian Perindustrian
PT. Energy Management Indonesia (Persero)
Emission Reduction In Industrial Sector (Phase 1)”
Gambar 6.13 Konsumsi Energi dan Emisi CO2
6-23
Laporan Akhir
”Implementation of Energy Conservation and CO2 Emission Reduction In Industrial Sector (Phase 1)”
Kementerian Perindustrian 6-24
2
Monitoring Energi dan Sistem Manajemen
Produksi
734,34
0,50
89,99
2014
2015
2016
2017
2018
2019
2020
Pertumbuhan produksi rata-rata 5%/tahun
39.358,1
41.326,0
43.392,3
45.561,9
47.840,0
50.232,0
52.743,6
Kebutuhan energi (BAU)
178.292,2
187.206,8
196.567,1
206.395,5
216.715,2
227.551,0
238.928,5
Produksi emisi (BAU) by energy consume
21.877,3
22.971,1
24.119,7
25.325,7
26.592,0
27.921,6
29.317,7
Laporan Akhir
”Implementation of Energy Conservation and CO2 Emiss Kementerian Perindustrian
PT. Energy Management Indonesia (Persero) 1 Perawatan preventif
2 Monitoring Energi dan Sistem Manajemen Produksi
3
4 Pengendalian proses pembakaran dalam steam boiler
No Langkah Konservasi Energi
SUB TOTAL LOW COST SUB TOTAL MEDIUM COST
Emission Reduction In Industrial Sector (Phase 1)”
Gambar 6.14 Konsumsi Energi dan Emisi CO2
2011 2012 2013 2014 2015 2016
TIMELINE PERKIRAAN IMPLEMENTASI
6-25
2011
Laporan Akhir
”Implementation of Energy Conservation and CO2 Emission Reduction In Industrial Sector (Phase 1)”
Kementerian Perindustrian 6-26
pipa steam
21.869,7
0,41
1.256,2
85.380.944
20.000.000
0,23
Low Cost
2
Pemanfaatan air buang WWT untuk PLTMH
48,9
0,0009
10,8
9.236.440
24.000.000
2,60
Low Cost
21.918,6
0,4
1.267,0
94.617.384
44.000.000
3
Penambahan alat
microturbine
7.974,44
0,15
739,2
433.608.939
776.160.000
1,79
Medium Cost
7.974,4
0,1
739,2
433.608.939
776.160.000
4
Konversi bahan bakar dari batubara ke gas
311.083,1
0,0
0,0
4.116,0
0
0
No
Langkah Konservasi Energi
PPE/tahun
RE/thn
Penghematan
Biaya (Rp)
Perkiraan
Investasi (Rp)
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Pertumbuhan Produksi rata-rata 5%/tahun 1.308.262 1.373.675 1.442.359 1.514.477 1.590.201 1.669.711 1.753.196 1.840.856 1.932.899 2.029.544
Kebutuhan Energi (BAU) (8,01 GJ/Ton > 2010) 9.890.462 10.384.985 10.904.235 11.449.446 12.021.919 12.623.015 13.254.165 13.916.874 14.612.717 15.343.353
Produksi Emisi (BAU) by energy consume 693.379 728.048 764.450 802.673 842.806 884.947 929.194 975.654 1.024.437 1.075.658
Penghematan Energi dgn Implementasi KE
GJ Penghematan Energi 0,0 12.775,4 22.356,9 46.949,5 49.297,0 51.761,8 54.349,9 57.067,4 59.920,8 62.916,8
Ton CO2 Reduksi Emisi 0,0 895,6 1.567,3 3.291,4 3.456,0 3.628,8 3.810,2 4.000,8 4.200,8 4.410,8
GJ Penghematan Energi 0,0 110 116 122 128 134 141
Ton CO2 Reduksi Emisi 0,0 0,0 0,0 0,0 8 8 9 9 9 10
GJ Penghematan Energi 0,0 0 0,0 0,0 17.975,4 18.874,2 19.817,9 20.808,8 21.849,2 22.941,6
Ton CO2 Reduksi Emisi 0,0 0 0,0 0,0 1.260,2 1.323,2 1.389,3 1.458,8 1.531,8 1.608,3
GJ Penghematan Energi 0,0 0 0 0 0 0 0 0 0 0
Ton CO2 Reduksi Emisi 201.417,3 211.488,2 222.062,6 233.165,7
GJ Penghematan Energi 0,0 12.775,4 22.356,9 46.949,5 67.382,7 70.751,8 74.289,4 78.003,9 81.904,1 85.999,3
Ton CO2 Reduksi Emisi 0,0 895,6 1.567,3 3.291,4 4.723,9 4.960,1 206.625,4 216.956,7 227.804,5 239.194,8
TOTAL PENGHEMATAN ENERGI DAN REDUKSI
Konversi bahan bakar dari batubara ke gas
GJ
DESKRIPSI UNIT/KETERANGAN TIMELINE PERKIRAAN IMPLEMENTASI
Laporan Akhir
”Implementation of Energy Conservation and CO2 Emiss Kementerian Perindustrian
PT. Energy Management Indonesia (Persero)
1
Pengisolasian dan penutupan kebocoran
pipa steam
2
Pemanfaatan air buang WWT untuk PLTMH
3
Penambahan alat
microturbine
4
Konversi bahan bakar dari batubara ke gas
No
Langkah Konservasi Energi
Emission Reduction In Industrial Sector (Phase 1)”
Gambar 6.15 Konsumsi Energi dan Emisi CO2
2011
2012
2013
2014
2015
2016
TIMELINE PERKIRAAN IMPLEMENTA
6-27
2011
Laporan Akhir
”Implementation of Energy Conservation and CO2 Emission Reduction In Industrial Sector (Phase 1)”
Kementerian Perindustrian 6-28
PT. Energy Management Indonesia (Persero) 2011
8.
Pura Nusa Persada
GJ %
1 Perawatan preventif 13.083,74 2,00 1.218,54
2 Monitoring Energi dan Sistem Manajemen 3.783,14 0,50 434,84
16.866,88
2,50 1.653,39
3 Merecovery uap blowdown 7.850,24 1,20 731,13
7.850,24
1,20 731,13
4 Pengendalian proses pembakaran dalam steam
boiler 15.046,30 2,30 1.401,33
15.046,30
2,30 1.401,33
39.763,4 6,00 3.785,84
No Langkah Konservasi Energi PPE/tahun RE/tahun (ton CO2eq)
SUB TOTAL LOW COST
SUB TOTAL MEDIUM COST
Laporan Akhir
”Implementation of Energy Conservation and CO2 Emission Reduction In Industrial Sector (Phase 1)”
Kementerian Perindustrian 6-29
PT. Energy Management Indonesia (Persero) 2011
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
1 Perawatan preventif
2 Monitoring Energi dan Sistem Manajemen
3 Merecovery uap blowdown
4 Pengendalian proses pembakaran dalam steam
boiler
No Langkah Konservasi Energi TIMELINE PERKIRAAN IMPLEMENTASI
SUB TOTAL LOW COST
SUB TOTAL MEDIUM COST
SUB TOTAL HIGH COST
TOTAL
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Pertumbuhan produksi rata-rata 5%/tahun 50.731,8 53.268,4 55.931,8 58.728,4 61.664,8 64.748,0 67.985,4 71.384,7 74.953,9 78.701,6
Kebutuhan energi (BAU) 794.459,6 834.182,6 875.891,7 919.686,3 965.670,6 1.013.954,2 1.064.651,9 1.117.884,5 1.173.778,7 1.232.467,6
Produksi emisi (BAU) 91.317,2 95.883,1 100.677,2 105.711,1 110.996,6 116.546,5 122.373,8 128.492,5 134.917,1 141.662,9
Laporan Akhir
”Implementation of Energy Conservation and CO
Kementerian Perindustrian
CO2 Emission Reduction In Industrial Sector (Phase 1)”
Gambar 6.16 Konsumsi Energi dan Emisi CO2
Laporan Akhir
”Implementation of Energy Conservation and CO2 Emission Reduction In Industrial Sector (Phase 1)”
Kementerian Perindustrian 6-31
PT. Energy Management Indonesia (Persero) 2011
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Pertumbuhan produksi rata-rata 5%/tahun 50.731,8 53.268,4 55.931,8 58.728,4 61.664,8 64.748,0 67.985,4 71.384,7 74.953,9 78.701,6
Kebutuhan energi (BAU) 520.694,2 546.728,9 574.065,4 602.768,6 632.907,1 664.552,4 697.780,0 732.669,0 769.302,5 807.767,6
Produksi emisi (BAU) by energy consume 69.341,6 72.808,7 76.449,1 80.271,6 84.285,1 88.499,4 92.924,4 97.570,6 102.449,1 107.571,6
GJ PPE 3.124,17 3.280,37 11.481,31 12.055,37 12.658,14 13.291,05 13.955,60 14.653,38 15.386,05 16.155,35
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
1 Perawatan preventif
2 Monitoring Energi dan Sistem Manajemen
3 Merecovery uap blowdown
4 Pengendalian proses pembakaran dalam
steam boiler
No Langkah Konservasi Energi TIMELINE PERKIRAAN IMPLEMENTASI
SUB TOTAL LOW COST SUB TOTAL MEDIUM COST
Laporan Akhir
”Implementation of Energy Conservation and CO
Kementerian Perindustrian dan laju udara - oksigen serta sistem perawatannya
CO2 Emission Reduction In Industrial Sector (Phase 1)”
Gambar 6.17 Konsumsi Energi dan Emisi CO2
Laporan Akhir
”Implementation of Energy Conservation and CO
Kementerian Perindustrian
PT. Energy Management Indonesia (Persero) 1 Manajemen energi dan sistem produksi
2
Pemasangan metering, sistem kontrol suhu dan laju udara - oksigen serta sistem perawatannya
3 Pemasangan Ekonomiser
4 Penggantian residu dengan gas alam
No Langkah Konservasi Energi
SUB TOTAL LOW COST
SUB TOTAL MEDIUM COST
CO2 Emission Reduction In Industrial Sector (Phase 1)”
2011 2012 2013 2014 2015 2016
l suhu
TIMELINE PERKIRAAN IMPLEMENT
6-33
2011
2016 2017 2018 2019 2020
Laporan Akhir
”Implementation of Energy Conservation and CO
Kementerian Perindustrian
PT. Energy Management Indonesia (Persero)
CO2 Emission Reduction In Industrial Sector (Phase 1)”
Gambar 6.18 Konsumsi Energi dan Emisi CO2
6-34
Laporan Akhir
”Implementation of Energy Conservation and CO2 Emission Reduction In Industrial Sector (Phase 1)”
Kementerian Perindustrian
Industri pulp dan kertas terpadu merupakan salah satu industri dengan intensitas
energi yang tinggi. Berdasarkan data tahun 2010, total konsumsi energi dan emisi
CO2 dari 3 industri pulp dan kertas terpadu masing-masing sebesar 3,6 juta TOE dan
4,2 juta ton CO2 eq.
Meskipun termasuk sebagai salah satu sektor dengan intensitas energi yang cukup
tinggi, sektor ini juga merupakan salah satu industri sebagai pengguna energi
terbarukan dengan jumlah yang sangat signifikan. Dari 3 industri obyek, besar
penggunaan biomassa dan black liquor rata-rata mencapai 71%. Adapun fokus audit di
industri pulp dan kertas terpadu meliputi:
1.
Proses
chemicalmake up di lime kiln sebagai salah satu proses yang keseluruhan
energinya berasal dari bahan bakar fosil. Konservasi energi dilakukan dengan
mengganti bahan bakar minyak dengan gas alam yang lebih ramah lingkungan.
2.
Cooking, dimana digester dimodifikasi menjadi sistem
superbatch digester
yang
lebih hemat dalam konsumsi steam.
3.
Pembakaran Non condensible Gas di Lime Kiln
Gambar 6.19 dan 6.20 mempresentasikan proyeksi penggunaan energi dan produksi
emisi CO2 di industri pulp dan kertas terintegrasi hingga tahun 2020.
Gambar 6.19 ProyeksiKonsumsiEnergi di Industri Pulp danKertasTerintegrasidenganPertumbuhanProduksi 5% (Baseline 2010)
2010 2012 2014 2016 2018 2020 2022
Laporan Akhir
”Implementation of Energy Conservation and CO2 Emission Reduction In Industrial Sector (Phase 1)”
Kementerian Perindustrian
6-36
PT. Energy Management Indonesia (Persero) 2011
Gambar 6.20 Proyeksi Produksi Emisi CO2 di Industri Pulp dan Kertas Terintegrasi dengan Pertumbuhan Produksi 5% (Baseline 2010)
2010 2012 2014 2016 2018 2020 2022
Laporan Akhir
”Implementation of Energy Conservation and CO2 Emission Reduction In Industrial Sector (Phase 1)”
Kementerian Perindustrian
6-37
PT. Energy Management Indonesia (Persero) 2011
1.
Indah KiatPerawang Pulp and Paper
GJ %
1 Pengalihan Bahan Bakar Minyak menjadi Natural
Gas pada Lime Kiln 2.490.840 50 622.135 USD. 43871165 1,00 Low Cost
2 Pembakaran NCG pada lime kiln 84.934 4,68 7.865 Rp. 11.066.387.871 0,00 Low Cost
2.575.774 630.000
3 Aplikasi sistem superbatch digester 449.966 71,4 41.667
Untuk 1000 ton/day pulp, annual energy savings $2 million.
1,00 Medium Cost
449.966 41.667
4 Pemanfatan gas NCG menghasilkan metanol 69.248 1,33 2.541Annual saving 1.283.868
USD/year 4,00 High Cost
No Langkah Konservasi Energi PPE/tahun RE/tahun Penghematan Biaya
per Tahun (Rp)
Perkiraan Biaya
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Pertumbuhan Produksi rata-rata 5%/tahun 3.182.227 3.341.338 3.508.405 3.683.826 3.868.017 4.061.418 4.264.489 4.477.713 4.701.599 4.936.679
Kebutuhan Energi (BAU) 64.440.099 67.662.104 71.045.210 74.597.470 78.327.344 82.243.711 86.355.896 90.673.691 95.207.376 99.967.744 Produksi Emisi (BAU) 3.277.694 3.441.579 3.613.658 3.794.340 3.984.057 4.183.260 4.392.423 4.612.045 4.842.647 5.084.779 Penghematan Energi dgn Implementasi KE
GJ Penghematan Energi 0 0 2.883.459 3.027.632 3.179.013 3.337.964 3.504.862 3.680.105 3.864.110 4.057.316 Ton CO2 Reduksi Emisi 0 0 720.199 756.209 794.019 833.720 875.406 919.177 965.136 1.013.392
GJ Penghematan Energi 0 93.640 98.322 103.238 108.400 113.820 119.511 125.486 131.761 138.349 Ton CO2 Reduksi Emisi 0 8.671 9.104,6 9.559,8 10.037,8 10.539,7 11.066,7 11.620,0 12.201,0 12.811,1 GJ Penghematan Energi 0 546.936 574.283,3 602.997,5 633.147,3 664.804,7 698.045,0 732.947,2 Ton CO2 Reduksi Emisi 0 0 0 50.646 53.178,6 55.837,6 58.629,4 61.560,9 64.639,0 67.870,9
GJ Penghematan Energi 0 0 0 0 0 0 0 102.310,8 107.426,4 112.797,7
Ton CO2 Reduksi Emisi 0 0 0 0 0 0 0 3.755 3.943 4.140
GJ Penghematan Energi 0 93.639,7 2.981.780,4 ######### 3.861.696,2 4.054.781,0 4.257.520,0 4.572.706,9 4.801.342,2 5.041.409,3 Ton CO2 Reduksi Emisi 0 8.671 729.304 816.415 857.236 900.098 945.103 996.112 1.045.918 1.098.214 Aplikasi sistem superbatch digester
Pemanfatan gas NCG menghasilkan metanol
TOTAL PENGHEMATAN ENERGI DAN REDUKSI EMISI
DESKRIPSI UNIT/KETERANGAN TIMELINE PERKIRAAN IMPLEMENTASI
Pengalihan Bahan Bakar Minyak menjadi Natural Gas pada Lime Kiln
Ton
GJ Ton CO2
Laporan Akhir
”Implementation of Energy Conservation and CO
Kementerian Perindustrian
PT. Energy Management Indonesia (Persero)
1 Pengalihan Bahan Bakar Minyak menja
Gas pada Lime Kiln
2 Pembakaran NCG pada lime kiln
3 Aplikasi sistem superbatch digester
4 Pemanfatan gas NCG menghasilkan m
Sub Total Low Cost
Sub Total Medium Cost
No Langkah Konservasi Energ
and CO2 Emission Reduction In Industrial Sector (Phase 1)”
Gambar 6.21
Konsumsi Energi dan Emisi
2011 2012 2013 2014 2015
ak menjadi Natural
silkan metanol
TIMELINE PERKIRAAN IMPLEM
asi Energi
6-38
2011
2016 2017 2018 2019 2020
Laporan Akhir
”Implementation of Energy Conservation and CO2 Emission Reduction In Industrial Sector (Phase 1)”
Kementerian Perindustrian
84.933,8 4,7 7.363,8 Rp. 11.066.387.871/year 3,00 No Cost
2
Pemanfatan gas NCG menghasilkan gas metanol untuk mengganti minyak bakar
69.248,0 1,33 2.092,7 Annual saving 1.283.868
USD/year 3,00 High Cost
No Langkah Konservasi Energi PPE/tahun RE/tahun Penghematan Biaya
per Tahun (Rp)
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Pertumbuhan Produksi rata-rata 5%/tahun 798.009 837.910 879.805 923.795 969.985 1.018.484 1.069.409 1.122.879 1.179.023 1.237.974
Kebutuhan Energi (BAU) 24.658.486 25.891.410 27.185.980 28.545.279 29.972.543 31.471.170 33.044.729 34.696.965 36.431.814 38.253.404 Produksi Emisi (BAU) by energy consume 829.930 871.426 914.997 960.747 1.008.785 1.059.224 1.112.185 1.167.794 1.226.184 1.287.493
Penghematan Energi dgn Implementasi KE
GJ Penghematan Energi 0,0 0 0 103.238 108.399 113.819 119.510 125.486 131.760 138.348
Ton CO2 Reduksi Emisi 0,0 0 8.951 9.398 9.868 10.362 10.880 11.424 11.995
GJ Penghematan Energi 0,0 0 0 0 0 0 0 102.310,8 107.426,4 112.797,7
Ton CO2 Reduksi Emisi 0,0 0 0 0 0 0 0 3.091,9 3.246,5 3.408,8
GJ Penghematan Energi 0,0 0,0 0,0 103.237,6 108.399,4 113.819,4 119.510,4 227.796,7 239.186,6 251.145,9
Ton CO2 Reduksi Emisi 0,0 0,0 0,0 8.950,7 9.398,3 9.868,2 10.361,6 13.971,6 14.670,1 15.403,6
TOTAL PENGHEMATAN ENERGI DAN REDUKSI
Pemanfatan gas NCG menghasilkan gas metanol untuk mengganti minyak bakar
Laporan Akhir
”Implementation of Energy Conservation and CO
Kementerian Perindustrian
PT. Energy Management Indonesia (Persero)
1 Pembakaran NCG pada lime kiln
2 Pemanfatan gas NCG menghasilkan gas metanol untuk mengganti minyak bakar
Sub Total Low Cost
No Langkah Konservasi Energi
and CO2 Emission Reduction In Industrial Sector (Phase 1)”
Gambar 6.22
Konsumsi Energi dan Emisi
2011 2012 2013 2014 2015 2016 2017
etanol
TIMELINE PERKIRAAN IMPLEMENTASI
6-40
2011
Laporan Akhir
”Implementation of Energy Conservation and CO
Kementerian Perindustrian
PT. Energy Management Indonesia (Persero)
3.
Riau Andalan Pulp and Paper
and CO2 Emission Reduction In Industrial Sector (Phase 1)”
Gambar 6.23
Konsumsi Energi dan Emisi
6-41