Clause 5.6.1.

● Top Management shall review the organization’s QMS, at planned intervals, to ensure its continuing suitability, adequacy and

effectiveness. Clause 5.6.2.

Management Review Agenda (Input) : ● 1. Results of Audit

● 2. Customer feedback

● 3. Process performance and product conformity ● 4. Status of corrective and preventive actions

● 5. Follow up actions of previous management review ● 6. Changes that could affect the QMS

● 7. Recommendation for improvement Clause 5.6.3

Out put Management Review :

● A = Related of Quality Management System

(3)

:

Category of Output Management Review :

A = Category of Related Quality Management System : - Adequacy of Work Instruction & Procedure.

- Implementation of Work Instruction & Procedure.

B = Category of Related Quality Product to Customer Requirement : - Dimension.

- Appearance.

- Electrical characteristic/function. - etc.

C = Category of Related to Resource . - Employee needed.

- Employee competence - Support facilities.

(4)

Achievement Criteria of Output

1 = Poor If Achievement 0 % ~ 69%

2 = Fair If Achievement 70% ~ 89%

(5)

1 3

3

Process performance and product conformity

3

3 3

3

Changes that could affect the QMS 6

2.2(~2) 2.3(~2)

2.8(~3) Total (Average)

3 3

3

Follow up actions of previous management review

5

2 3

2

Status of corrective and preventive actions

4

2 1

3

Customer feedback 2

2 1

3

Result of Audit 1

C B

A

OUTPUT (Achievement) INPUT

Total Output (Achievement) :

A = Related of Quality Management System Achievement : 2.8 (Satisfy)

B = Related of Quality Product to Customer Requirement Achievement : 2.3 (Fair) C = Related of Resources Achievement : 2.2 (Fair)

(6)

(Decision for Top Management)

(7)

Example : * Audit Result Data.

1 4

0 Total Dominant Problem of Audit

X

-Product

Sub Cont 2 Audit 5

-X

-Product

Sub Cont 1 Audit 4 -X -Laser, Matcon, QC

The 22nd Internal Quality

Audit 3 -X -Product, Eng, HR, ,Utility ,MIS,

GA, Pers

The 21st Internal Quality

Audit 2 -X -Top Management, QC, Prod, Eng,Whs External Audit (Surveillance Audit) 1 C B A OUTPUT/Dominant Problem

Area of Audit

Detail INPUT

Total Dominant Problem of Audit : A = 0 B = 4 C = 1

% A = 0/5 x 100 % = 0 % (No Problem) ~ Achievement = 100 % = Satisfy = 3

% B = 4/5 x 100 % = 80 % (Problem ) ~ Achievement = 20 % = Poor = 1

% C = 1/5 x 100 % = 20 % (Problem ) ~ Achievement = 80 % = Fail = 2

(8)

X = Dominant factor of problem in each item input.

- = No problem in each item input,

Why we choose the dominant problem ?

(9)

-X

-Laser, Matcon,

QC The 22nd Internal

Quality Audit 3

X

-Product

Sub cont 2 Audit

5

C

B

A

1

4

0

Total Dominant Problem of Audit

-X

-Top Management, QC, Prod, Eng,Whs External Audit (Surveillance Audit) 1

-OUTPUT/Dominant Problem

X

X

-Company name Product Sub cont 1 Audit

4

-Product, Eng, HR, Utility building, MIS, GA, Pers The 21st Internal

Quality Audit 2 Area of Audit Detail INPUT

(10)

C B

A

1 2

0 Total Dominant Problem of Customer Feedback

-X

-1st & 2nd,

Lamp, Comp

Quality 1

-OUTPUT ( Dominant Problem)

-X

X

1st & 2nd,

Lamp, Comp

Responsiveness 3

-1st & 2nd,

Lamp, Comp

Delivery 2

Relevant Section Detail

INPUT

(11)

C

B

X

-QC

Ensure the equipment/ tools that used still invalid for calibration

4

A

-QC

Zero customer complaint that it cause by outgoing inspection.

5

-X

-1st & 2nd,

Lamp, Comp Achieve number customer

complaint. 1

-OUTPUT (Dominant Problem)

-X

X

1st & 2nd ,

Lamp, Comp, WHFG, Matcon

Zero easy mistake 3

-1st & 2nd,

Achieve Lot out 2

Relevant Section Detail

(12)

C

B

A

X

-QA Ensure the production process

of subcontractor is controlled well to produce good product 6

Engineering Engineering Engineering

Relevant Section

-X

OUTPUT (Dominant Problem)

-X

Finish new or revised WI

socialization to production line 2 weeks after issued.

9

-Revise WI 1 month after received the technical information from Japan. 8

-Issue WI for new product within 1 month after finish

machine setup for each related process.

7

Detail

(13)

X

1st & 2nd,

Control of decrease material lost from last semester.

13

C B

A

-X

-1st & 2nd,

Lamp, Comp

Achieve Yield Target 10

-OUTPUT (Dominant Problem)

-X

Lamp, Comp

Zero inventory lost that caused by mishandling of production

12

X

1st & 2nd,

Lamp, Comp

Implementation Statistic Method

11

Relevant Section

Detail

(14)

-X

X

C

-B

A

-Exim

Fulfill 100% delivery schedule meet with customer schedule. 16

-1st,

2nd

Zero delay of export schedule which cause by PT responsibility. 14

-OUTPUT (Dominant Problem)

Matcon

Fulfill 100% material base on sales target. 17

Engineering

Reduce number of EJO 10% for machine

breakdown from last semester.

15

Relevant Section Detail

(15)

C

B

A

-OUTPUT (Dominant Problem)

-X

Purchasing

Finish material

complaint that supply by vendor non mother comp within 1 week & do monthly

evaluation. 19

X

Matcon

Get replacement abnormal material within 2 weeks for material purchase directly by factory 18

Relevant Section Detail

(16)

C

B

A

X

-QC Follow up the answer

outgoing inspection lot out to production not over than 2 weeks.

21

X

-QC Follow up the answer of

QC Patrol finding to

production or engineering not over than 1 month. 22

X

-QC & Prod Answer the customer

complaint from user within 1 week and implement corrective action.

20

OUTPUT (Dominant Problem)

Relevant Section Detail

(17)

C

B

A

X

-All section, Participate in 5S

24

-Building Mtn Increase effectiveness

Of utility machine

performance until less than 11 times stop support within a years

26

-MIS Provide service to support

available of system in ADM To be <1% down time

27

X

-All section, Continue conduct SGA

activity and 50% finish step PDCA

23

-OUTPUT (Dominant Problem)

-

-Building Mtn Patrol utility 100% for

Temperature, Humidity, Lighting and another Utility.

25

Relevant Section Detail

(18)

C

B

A

X

-HR

Conduct Leadership Training (for all foremen & Leader) with 100% attendance.

30

-MIS

Performing Local Area Network Down Time less than 1% total normal

work hours per month. 28

X

-HR

Increase ability

personnel by conduct skill training :

● Basic.

● 7 Tool QC,PDCA With 75% pass direct evaluation.

29

-OUTPUT (Dominant Problem)

-

X

GA Fulfill stationary request

on time delivery to requester.

31

Relevant Section Detail

(19)

C

B

A

X

-Personnel Fulfill new employee

requester on time

delivery to be requester 100% for operator & 95% for staff.

32

21

3

1

Total Performance Process & Product Conformity

(Average)

-Accounting

Maintain to provide financial report to management board within 2.5 days.

33

-OUTPUT (Dominant Problem)

-

X

QRCC Maintain Quality &

Environment System in Annually Schedule on Time.

34

Relevant Section Detail

Target

Total Achievement Process Performance & Product Conformity (Quality Objective/Target)

(20)

-Sub cont 1 &

2 Subcontractor

CPAR 5

-All Section

14001 CPAR 4

1

0

1

Total Dominant Problem of Corrective Action Status

-All Section

9001 CPAR 3

X

-All Section

QC Patrol 2

-X

All Section

5S 1

C

B

A

OUTPUT (Dominant Problem)

Relevant Section Detail

Target

(21)

-Building

mtn Make result the

preventive schedule has done for 2004 on building maintenance section

2

0

0

0

Total Follow up Last

Management Review

-PPC

Make system delivery questioner to customer. 1

C

B

A

OUTPUT (Dominant Problem)

Relevant Section Detail

(22)

-QC, QRCC,

Prod, PC Quality Confirmation Meeting

by Related Section every Friday.

2

0

0

0

Total Internal & External

Change Influence QMS

-QRCC

Change our certification body of ISO 9000

1

C

B

A

OUTPUT (Dominant Problem)

Referensi

Dokumen terkait

Dari hasil uji t yang telah dilakukan maka dapat diketahui bahwa dari semua variabel bebas dalam penelitian ini yaitu LDR,NPL,IRR,ROA dan CAR ternyata hanya

Teknologi Pengolahan Biodiesel Dari Minyak Goreng Bekas Dengan Teknik Mikrofiltrasi Dan Transesterifikasi Sebagai Bahan Bakar Mesin Diesel. balai riset dan

akurasi, kelancaran dan retensi fakta matematika.Sependapat dengan penelitian tersebut, penggunaan media flash card pada pembelajaran diharapkan dapat meningkatkan

FAKULTAS PERTANIAN UNIVERSITAS RIAU

Dapat disimpulkan bahwa siswa yang diajar dengan metode bermain peran pada siswa yang memiliki kecerdasan emosional tinggi dan rendah keterampilan berceritanya

Tips yang mudah dalam mendekorasi kamar tidur klasik dan berikut kami akan berikan beberapa Desain Kamar Set Klasik Terbaru 2017.. Kamar set mewah terbaru dengan desain klasik saat

Based on the above which describes about the use of internet and computers, the results of the needs analysis of students and teachers, the advantages of online learning,

Gas mulia adalah unsur-unsur yang terdapat dalam golongan VIIIA (dalam sistem periodik terletak dalam kolom yang paling kanan) yang memiliki kestabilan yang