• Tidak ada hasil yang ditemukan

Pemodelan Rantai Suplai Berbasis Economic Production Quantity Dengan Menerapkan Kredit Per- Dagangan Dua Eselon

N/A
N/A
Protected

Academic year: 2017

Membagikan "Pemodelan Rantai Suplai Berbasis Economic Production Quantity Dengan Menerapkan Kredit Per- Dagangan Dua Eselon"

Copied!
2
0
0

Teks penuh

(1)

DAFTAR PUSTAKA

Blumenfeld, D. (2001).Operations Research Calculations Handbook. Florida: CRC Press.

Boyd, S. dan Vandenberghe, L. (2004). Convex Optimization. Cambridge: Cambridge University Press.

Chopra, S. dan Meindl, P. (2007). Supply Chain Management : Strategy, Planning, and Operation. NJ, USA: Prentice Hall.

Gitman, L. J. (2009). Principles of Managerial Finance. London: Addison-Wesley, The Prentice Hall.

Goyal, S. K. (1985). Economic Order Quantity under Conditions of Permissible Delay in Payments.Journal of The Operational Research Society 36:335-338.

Huang, Y. F. (2003). Optimal retailers ordering policies in the EOQ model under trade credit financing.Journal of the Operational Research Society 54:1011-1015.

Huang, Y. F., Hsu, K. H., Tu, Y. C., dan Huang, H. F. (2010). An EOQ Model under Retailer Partial Trade Credit in Two-echelon Supply Chain.Journal of Information and Optimization Sciences 31:913-925.

Hugos, M. (2003). Essentials of Supply Chain Management. New Jersey: John Wiley & Son, Inc.

Karush, W. (1939). Minima of Functions of Several Variables with Inequalities as Side Conditions. Master Thesis, Department of Mathematics, University of Chicago.

Kuhn, H. W. dan Tucker, A. W. (1951).Proceedings of 2nd

Berkeley Symposium. Berke-ley: University of California Press.

Li, L. (2007). Supply Chain Management − Concepts, Techniques and Practices: En-hancing Value Through Collaboration.World Scientific Publishing : 5.

Mok, C. K., Tummala, V. M. R., dan Leung, H. M. (1997). Practices, barriers and bene-fits of risk management process in building services cost estimation.Construction Management and Economics 15(2):161-175.

Shen, L. Y. (1997). Project Risk Management in Hong Kong. International Journal of Project Management 15(2):101-105.

Stock, J. R. dan Lambert, D. M. (2001). Strategic Logistics Management (4th

ed). New York: McGraw-Hill Companies, Inc.

Teng, J. T. (2002). On The Economic Order Quantity under Conditions of Permissible Delay in Payments.Journal of The Operational Research Society 53:915-918.

Terry, G. R. (1977). Principles of Management (7th

ed). Homewood: Richard D. Irwin, Inc.

Thangam, A. (2013). Mathematical Modeling of a Supply Chain with Imperfect Trans-port and Two-Echelon Trade Credits. ISRN Operations Research 2013:1-7.

Tsao, Y. C. (2011). Replenishment Policies Considering Trade Credit and Logistics Risk. Scientia Iranica18:753-758.

(2)

41

Turban, E., Rainer, R. K., dan Potter, R. E. (2004). Introduction to Information Tech-nology(2nd

ed). New York: John Wiley & Sons, Inc.

Uher, T. E. dan Toakley, A. R. (1999). Risk Management in the Conceptual Phase of a Project. International Journal of Project Management 17(3):161-169.

Vaughan, E. J. dan Elliot, C. M (1978). Fundamentals of Risk and Insurance(2nd

Referensi

Dokumen terkait