LAMPIRAN 3
Titik Persentase Distribusi F untuk Probabilita = 0,05
LAMPIRAN 4
Modal Produksi Tempe
Nama Responden
Januari (Rp)
Februari (Rp)
Maret (Rp)
April (Rp)
Abeng 14474000 13903000 12601000 12660000
Suyanto 13650000 12740000 14105000 13650000
Anita 15782000 12162000 16950000 17622000
Yetno 19068000 17928000 19320000 19432000
Parno 10650000 9940000 11050000 12090000
Sugeng 16430000 15008000 15990000 15457000
Windra 15400000 16604000 17985000 16860000
Tulus 17120000 16105000 14989000 16000000
Kartika 10155000 10472000 12915000 13592000 Saniyem 11043000 11905000 12084000 12693000 Ponijan 20850000 18278000 21090000 19068000 Saring 11610000 10297000 11715000 10766000
Cipto 19350000 17690000 18910000 19995000
Idris 19426000 17572000 21150000 22120000
Bahan Baku Produksi Tempe
Nama Responden
Januari (Kg)
Februari (Kg)
Maret (Kg)
April (Kg)
Abeng 1707 1639 1492 1509
Suyanto 1500 1400 1550 1500
Anita 1826 1398 1950 2030
Yetno 2260 1962 2145 2196
Parno 1200 1120 1240 1395
Sugeng 1860 1680 1800 1740
Windra 1680 1820 1950 1860
Tulus 1970 1850 1700 1850
Kartika 1235 1390 1685 1752
Saniyem 1299 1110 1417 1460
Ponijan 2400 2080 2560 2184
Saring 1470 1330 1500 1385
Cipto 2625 2030 2170 2825
Idris 2269 2110 2750 2898
Tenaga Kerja Produksi Tempe
Nama Responden Januari Februari Maret April
Abeng 3 3 3 3
Suyanto 2 2 2 2
Anita 2 2 2 2
Yetno 3 3 3 3
Parno 2 2 2 2
Sugeng 3 3 3 3
Windra 2 2 2 2
Tulus 2 2 2 2
Kartika 0 0 0 0
Saniyem 1 1 1 1
Ponijan 3 3 3 3
Saring 0 0 0 0
Cipto 2 2 2 2
Idris 4 4 4 4
Jumlah Produksi Tempe
Nama Responden
Januari (Kg)
Februari (Kg)
Maret (Kg)
April (Kg)
Abeng 2902 2786 2536 2567
Suyanto 2550 2380 2635 2550
Anita 2739 2237 3120 3248
Yetno 2260 1982 2145 2196
Parno 1800 1680 1860 2093
Sugeng 2790 2520 2700 2610
Windra 2520 2730 2925 2790
Tulus 3152 2775 2565 2960
Kartika 1855 2087 2528 2628
Saniyem 1949 1665 2126 2190
Ponijan 3840 3328 3840 3495
Saring 2352 2128 2400 2216
Cipto 4200 3248 3472 4520
Idris 3857 3587 4505 4928
LAMPIRAN 5
Hasil Analisis Data
Descriptive Statistics
N Minimum Maximum Mean Std. Deviation
Modal 60 9940000,00 22120000,00 15265066,67 3312529,812
Bahan Baku 60 1110 2898 1794,90 426,061
Tenaga Kerja 60 0 4 2,00 1,105
Produksi 60 1665 4928 2757,07 722,641
Valid N (listwise) 60
Hasil Uji Durbin Watson
Model Summary b
Mode 1
R R Square Adjusted R Square
Std. Error of Estimate
Durbin-Watson
1 ,901a ,813 ,803 321,030 1,810
Hasil Uji Heterokedastisitas
Hasil Uji Regresi Linear Berganda
Model Unstandardized
Coefficients
Standardize d Coefficient
s
t Sig.
B Std. Error Beta
(Constant) 400,080 215,881 1,853 ,069
Modal -0,000149 ,000 -,681 -2,987 ,004
Bahan_Baku 2,491 ,347 1,469 7,171 ,000
Koefisien Determinasi (R-Square)
Uji F
ANOVAa
Model Sum of Squares df Mean Square F Sig.
1
Regression 25039067,334 3 8346355,778 80,985 ,000b
Residual 5771362,399 56 103060,043
Total 30810429,733 59
a. Dependent Variable: Produksi
b. Predictors: (Constant), Tenaga_Kerja, Bahan_Baku, Modal
Model R R Square Adjusted R
Square
Std. Error of the Estimate
1 ,901a ,813 ,803 321,030
a. Predictors: (Constant), Tenaga_Kerja, Bahan_Baku, Modal b. Dependent Variable: Produksi
Uji t Coefficientsa
Model Unstandardized
Coefficients
Standardized
Coefficients
t Sig.
B Std. Error Beta
(Constant) 400,080 215,881 1,853 ,069
Modal -0,000149 ,000 -,681 -2,987 ,004
Bahan_Baku 2,491 ,347 1,469 7,171 ,000
Tenaga_Kerja 76,324 54,051 ,117 1,412 ,163