OPTIMALISASI PENJADWALAN PROYEK MENGGUNAKAN FUZZY CRITICAL PATH METHOD (FUZZY CPM)

BERDASARKAN METRIC DISTANCE RANK PADA BILANGAN FUZZY

SKRIPSI

AULIA RIZKY PUTRI 100803078

DEPARTEMEN MATEMATIKA

FAKULTAS MATEMATIKA DAN ILMU PENGETAHUAN ALAM UNIVERSITAS SUMATERA UTARA

(2)

OPTIMALISASI PENJADWALAN PROYEK MENGGUNAKAN FUZZY CRITICAL PATH METHOD (FUZZY CPM)

BERDASARKAN METRIC DISTANCE RANK PADA BILANGAN FUZZY

SKRIPSI

Diajukan untuk melengkapi tugas dan memenuhi syarat mencapai gelar Sarjana Sains

AULIA RIZKY PUTRI 100803078

DEPARTEMEN MATEMATIKA

FAKULTAS MATEMATIKA DAN ILMU PENGETAHUAN ALAM UNIVERSITAS SUMATERA UTARA

(3)

PERSETUJUAN

Judul : Optimalisasi Penjadwalan Proyek

Menggunakan Fuzzy Critical Path Method (Fuzzy CPM) Berdasarkan Metric Distance Rank pada Bilangan Fuzzy

Kategori : Skripsi

Nama : Aulia Rizky Putri

Nomor Induk Mahasiswa : 100803078

Program Studi : Sarjana (S1) Matematika

Departemen : Matematika

Fakultas : Matematika Dan Ilmu Pengetahuan Alam Universitas Sumatera Utara

Disetujui di

Medan, Juli 2014

Komisi Pembimbing :

Pembimbing 2, Pembimbing 1,

Drs. Rosman Siregar, M.Si Dr. Esther S.M.Nababan, M.Sc NIP. 19610107 198601 1 001 NIP. 19610318198711 2 001

Disetujui Oleh

Departemen Matematika FMIPA USU Ketua,

Prof. Dr. Tulus, M.Si

(4)

PERNYATAAN

OPTIMALISASI PENJADWALAN PROYEK MENGGUNAKAN FUZZY CRITICAL PATH METHOD (FUZZY CPM)

BERDASARKAN METRIC DISTANCE RANK PADA BILANGAN FUZZY

SKRIPSI

Saya mengakui bahwa skripsi ini adalah hasil karya sendiri. Kecuali beberapa

kutipan dan ringkasan yang masing-masing disebutkan sumbernya

Medan, Juli 2014

AULIA RIZKY PUTRI

(5)

PENGHARGAAN

Puji dan Syukur penulis panjatkan kepada Allah SWT Yang Maha Esa, karena

dengan limpahan karunia-Nya penulis dapat menyelesaikan penyusunan skripsi

ini dengan judul Optimalisasi Penjadwalan Proyek Menggunakan Fuzzy Critical

Path Method (Fuzzy CPM) Berdasarkan Metric Distance Rank pada Bilangan

Fuzzy.

Dalam Kesempatan ini, penulis ingin mengucapkan terima kasih

sebesar-besarnya kepada semua pihak yang telah membantu

1. Dr. Esther S M Nababan, M.Sc. dan kepada Drs. Rosman Siregar, M.Si. selaku dosen pembimbing yang telah memberikan banyak bimbingan

dalam penyempurnaan Tugas Akhir ini

2. Dr. Parapat Gultom, M.SIE. dan Dra. Normalina Napitupulu, M.Sc. selaku komisi penguji atas masukan dan saran yang telah diberikan dalam

penyempurnaan Tugas Akhir ini

3. Semua Dosen dan Pegawai Departemen Matematika FMIPA USU

4. Ayahanda Sumpeno dan Ibunda Septimiati yang telah banyak membantu

atas doa, dukungan moril dan materi yang diberikan selama ini

5. Saudara Kandung Rizky Amelia

6. Rekan kuliah Nurlita, Fitri, Rara dan teman-teman seperjuangan dijurusan

matematika 2010 atas kebersamaan selama ini

7. Serta Semua Pihak yang tidak dapat ditulis satu persatu

Semoga segala kebaikan dalam bentuk bantuan yang telah diberikan mendapat

(6)

OPTIMALISASI PENJADWALAN PROYEK MENGGUNAKAN FUZZY CRITICAL PATH METHOD (FUZZY CPM)

BERDASARKAN METRIC DISTANCE RANK PADA BILANGAN FUZZY

ABSTRAK

Penjadwalan adalah hal yang penting dalam penyelenggaraan suatu proyek konstruksi. Penjadwalan dilakukan untuk memprediksi durasi waktu yang diperlukan dalam penyelesaian proyek. Metode Lintasan Kritis (Critical Path Method) adalah alat yang penting untuk perencanaan dan pengontrolan pada proyek yang kompleks. Keberhasilan dari metode lintasan kritis tersebut terlihat dari terselesaikannya setiap aktivitas dengan durasi waktu yang telah ditentukan. Dalam dunia nyata selalu ada ketidakpastian dalam menentukan durasi waktu setiap aktivitas dalam suatu jaringan proyek, dalam hal ini dihadirkan suatu bilangan fuzzy trapezoidal sebagai durasi waktu aktivitas yang fuzzy. Penelitian kali ini dihadirkan sebuah metode metric distance rank untuk menemukan lintasan kritis dari suatu jaringan proyek dan membandingkannya dengan menggunakan metode centroid. Adapun hasil perhitungan yang diperoleh dengan menggunakan metode yang diusulkan yaitu lebih efektif dalam menentukan aktivitas kritis dan menemukan lintasan kritis dari suatu jaringan proyek fuzzy.

Kata Kunci : Fuzzy Critical Path Method, Trapezoidal Fuzzy Number,

(7)

OPTIMIZATION PROJECT SCHEDULING USING FUZZY CRITICAL PATH METHOD (FUZZY CPM) BASED ON

METRIC DISTANCE RANK OF FUZZY NUMBERS

ABSTRACT

One of important things in executing project construction is scheduling, which is required in order to predict the total duration of the project should be accomplished. The Critical Path Method is a vital tool for the planning and control of complex projects. The successful implementation of Critical Path Method requires the availability of a clear determined time duration for each activity. However, in the real world there is always uncertainty about determined time durations of activities in a fuzzy project network. Hence, a trapezoidal fuzzy number is represented as time duration of each activity. In this paper a simple method namely metric distance rank for fuzzy numbers to a critical path method for fuzzy project network and also using centroid method. The comparison reveal that the method proposed in this paper is more effective in determining the activity criticalities and finding the critical path in a fuzzy project network.

Keywords : Fuzzy Critical Path Method, Trapezoidal Fuzzy Number,

(8)

DAFTAR ISI

Halaman

Persetujuan ii

Pernyataan iii

Penghargaan iv

Abstrak v

Abstract vi

Daftar Isi vii

Daftar Tabel ix

Daftar Gambar x

Bab 1. Pendahuluan

1.1 Latar Belakang 1

1.2 Perumusan Masalah 3

1.3 Batasan Masalah 3

1.4 Tujuan Penelitian 4

1.5 Kontribusi Penelitian 4

1.6 Metodologi Penelitian 4

Bab 2. Landasan Teori

2.1 Penjadwalan Proyek 6

2.2 Critical Path Method (CPM) 7

2.2.1 Jaringan Kerja CPM 8

2.2.2 Perhitungan Maju 11

2.2.3 Perhitungan Mundur 12

(9)

2.3 Teori Himpunan Fuzzy 14

2.4 Bilangan Fuzzy 16

2.5 Derajat Keanggotaan untuk Durasi Aktivitas 18

2.6 Peringkat Bilangan Fuzzy 21

2.7 Ukuran Fuzziness Menggunakan Metric Distance 22

2.7.1 Hamming Distance 23

2.7.2 Euclidean Distance 24

2.8 Metric Distance Rank 24

2.9 Formula De-fuzzifikasi dengan Menggunakan Metode

Centroid 26

Bab 3. Hasil dan Pembahasan

3.1 Fuzzy CPM Berdasarkan Metric Distance Rank pada

Bilangan Fuzzy 28

3.2 Algoritma Optimalisasi Penjadwalan Proyek Menggunakan

Fuzzy CPM Berdasarkan Metric Distance Rank pada

Bilangan Fuzzy 30

3.3 Contoh Numerik 31

Bab 4. Kesimpulan Dan Saran

4.1 Kesimpulan 74

4.2 Saran 75

(10)

DAFTAR TABEL

Halaman

Tabel 3.1 Tabel Keterangan Waktu Setiap Aktivitas Fuzzy 32

Tabel 3.2 Tabel Metric Distance Rank Total Kelonggaran Waktu

Fuzzy (Fuzzy Float Time) untuk Setiap Lintasan dalam

Jaringan Proyek Fuzzy 72

Tabel 3.3 Tabel Nilai Fuzzifikasi Kelonggaran Waktu (Float time)

(11)

DAFTAR GAMBAR

Halaman

Gambar 2.1 Kegiatan Activity on Arrow 9

Gambar 2.2 Kegiatan Activity on Node 9

Gambar 2.3 Bentuk merge event yang menggabungkan beberapa

aktivitas 11

Gambar 2.4 Bentuk burst event yang mengeluarkan beberapa aktivitas 12

Gambar 2.5 Bilangan Fuzzy Trapezoidal � = ��,�,�,�� 19

Gambar 2.6 Bilangan Fuzzy Triangular � = (�,�,�) 20

Gambar 2.7 Himpunan Fuzzy � 22

Gambar 2.8 Himpunan Fuzzy �′ 23

Gambar 2.9 Himpunan Fuzzy � dan hubungannya pada

Himpunan Crisp 23

Referensi

Dokumen terkait

Peraturan Pemerintah Nomor 41 Tahun 2007 tentang Organisasi Perangkat Daerah (Lembaran Negara Republik Indonesia Tahun 2007 Nomor 89, Tambahan Lembaran

Karena dalam pandangan Al-Ghazali anak pada usia ini sudah dapat membedakan sesuatu yang baik dan yang buruk yang diistilahkannya dengan li isyroqi nuuri al-'aqli 'alaihi

Hasil penelitian ini dapat dijadikan sebagai bahan rujukan bagi guru bimbingan dan konseling untuk meningkatkan pemahaman bahaya bullying pada siswa melalui layanan

The present study was designed to determine the quantitative dietary crude protein requirement for optimum growth of juvenile American eel using a practical fish-meal- based diet and

[r]

Ž. The preferential accumulation and partitioning of the latter fatty acids between the polar and neutral lipids of C. gigas spat were followed. Additionally, the efficiency

3) Suatu pernyataan yang dibuat sesuai dengan ketentuan ayat 1 pasal ini dan nama badan yang dibentuk atau ditunjuk sesuai dengan ketentuan ayat 2 pasal ini

Objek getaran yang terjadi pada rotor adalah selama getaran dalam batas yang dapat diterima kecepatan operasi dan kondisi beroperasi dibawah kecepatan rata- rata pada