• Tidak ada hasil yang ditemukan

road infrastructure

Economic Impact Analysis of Road Infrastructure due to Estate Crops Sector in Lampung Province.

Economic Impact Analysis of Road Infrastructure due to Estate Crops Sector in Lampung Province.

... DAFTAR ISI DAFTAR TABEL x DAFTAR GAMBAR xi DAFTAR LAMPIRAN xi 1 PENDAHULUAN 1 Latar Belakang 1 Perumusan Masalah 4 Tujuan Penelitian 7 Manfaat Penelitian 8 Ruang Lingkup Peneli[r] ...

108

Directory UMM :Data Elmu:jurnal:I:International Journal of Production Economics:Vol68.Issue3.Dec2000:

Directory UMM :Data Elmu:jurnal:I:International Journal of Production Economics:Vol68.Issue3.Dec2000:

... to infrastructure and transport issues, (2) various scenarios for future infrastructure investment priorities and policy options for the management of freight and commercial vehicle travel, (3) the freight ...

27

The Analysis Of Work Zone Road User Costs Due To The Delay Completion Of The Road Maintenance Project.

The Analysis Of Work Zone Road User Costs Due To The Delay Completion Of The Road Maintenance Project.

... The pce value for Light Vehicle (LV) is 1(one) and is required in total vehicles/hour for each type of road. Meanwhile speed is the distance traveled in a unit time, or the rate of change of distance with respect ...

6

isprsarchives XXXIX B4 79 2012

isprsarchives XXXIX B4 79 2012

... to road and road infrastructure management and evaluated in a highway mapping project combining stereovision based mobile mapping with high-resolution multispectral airborne road corridor ...

6

this PDF file Consideration of Road Management from the View Points of Long and ShortDistance Road User’s Satisfaction | A.P. | Civil Engineering Dimension 1 PB

this PDF file Consideration of Road Management from the View Points of Long and ShortDistance Road User’s Satisfaction | A.P. | Civil Engineering Dimension 1 PB

... the road infrastructure, satisfaction is a post-use evaluation in which the use of road infrastructure meets what is expected, while dissatisfaction is complaints to the provider of ...

8

Convergence Analysis of Economic Growth in East Java

Convergence Analysis of Economic Growth in East Java

... Based on the estimation result, it is known that the coefficient value 𝛽 1 = 𝛼 0 is negative value equal to -0.619959. It means that in East Java there is conditional convergence with time to eliminate all inequality ...

11

A Study of Safe and Green Infrastructure on Road Reconstruction Project.

A Study of Safe and Green Infrastructure on Road Reconstruction Project.

... The relevant aspect of the vision has been labelled with typical characteristic showing the color of the demands of the future at a more recognizable level linked to the present jargon of policy makers and engineers ...

5

Klasifikasi Spasial untuk Objek Spasial di Kota Bogor

Klasifikasi Spasial untuk Objek Spasial di Kota Bogor

... Angka-angka di dalam tanda kurung pada Gambar 8 menunjukkan jumlah dari bobot dalam node untuk mencapai leaf / jumlah kesalahan klasifikasi (jika ada) (Beck et al. 2007). Misalnya pada contoh aturan 2, jumlah bobot dalam ...

37

Underground Infrastructure CDS | OGC

Underground Infrastructure CDS | OGC

... underground infrastructure planning and assessment: Including soils, water, built materials, foundations, road and land surfaces, geology. Discussion of methods for collection of underground observations. ...

14

Perpustakaan Biro Hukum - Kementerian Pekerjaan Umum Republik Indonesia

Perpustakaan Biro Hukum - Kementerian Pekerjaan Umum Republik Indonesia

... Pejagan Pemalang Toll Road PT.. Pemalang Batang Toll Road PT.[r] ...

32

Land Value Zones Automation for Land Market Information (Case Study of Desa Nagrak Kecamatan Gunungputri Kabupaten Bogor)

Land Value Zones Automation for Land Market Information (Case Study of Desa Nagrak Kecamatan Gunungputri Kabupaten Bogor)

... Illustration of the parcels located in two or more value zones Value of the Parcel A = {Norm value zone 1 * Size} * Road class factor * Land use class factor * Infrastructure class fact[r] ...

184

Statistika 2

Statistika 2

... Probabilitas dimana seseorang menuju ring road atau menuju arah Timur adalah: Prring road atau Timur Prring road PrTimur Prring road dan Timur =2 5 = + − + − =3 5 1 5 4 5 Conto[r] ...

10

Underground Infrastructure CDS | OGC

Underground Infrastructure CDS | OGC

... Geophysical methods, especially when combined with themselves and others like vibro- acoustics offers low cost means to repeatedly survey the underground – not only buried utilities but physical properties of the ...

14

Underground Infrastructure CDS | OGC

Underground Infrastructure CDS | OGC

... Challenge UNA: Automate the Responses via REST HLC KLIP transactional REST web-service organiser REST OAuth 2.0 secured webservice communication netwerk / as-built information sy[r] ...

40

Underground Infrastructure CDS | OGC

Underground Infrastructure CDS | OGC

... KLIP regulations were adapted so that the standard time for an UNA to respond to a map request has been decreased from 15 to 7 working days. Furthermore, thanks to the automated processes implemented by most UNAs, almost ...

34

Underground Infrastructure CDS | OGC

Underground Infrastructure CDS | OGC

... The international OGC standard CityGML is an open data model and XML-based format for the storage and exchange of semantic 3D city models. By means of so-called Application Domain Extensions (ADEs) the core model of ...

3

Underground Infrastructure CDS | OGC

Underground Infrastructure CDS | OGC

... Key Post Box PB Telephone Call Box Traffic Light Control Box RWP Metal Railing Fence MRF Brick Paving Kidney Flint Cobbles Concrete Paving Slabs Soil Vent Pipe Rain Water Pipe Co[r] ...

9

Underground Infrastructure CDS | OGC

Underground Infrastructure CDS | OGC

... underground infrastructure will undoubtedly require some extra classification steps as well as a means to apply certain disclaimers about the accuracy and resolution of the data ...

4

Show all 1765 documents...

Related subjects