... The senior road safety audit engineer was invited and attended the coordination meeting for the Implementation Review Mission Aid Memoire for WINRIP on 20th December 2013, at the Ministry of Public Works. ... Lihat dokumen lengkap
114
WINRIP DOC MPR CTC MPR No.13 2014 01 2014 01 09 00225.
... Enhanced Disclosure Provisions and Transparency, Ministry of Public Work (MPW) will provide necessary information in the Project Implementation Plan (PIP), Project Management manual (PMM) on their website, and in the ... Lihat dokumen lengkap
124
WINRIP DOC MPR CTC MPR No.16 2014 04 2014 04 11 00225.
... A World Bank mission took place between April 28 and onward to May 13, 2014 to review the implementation status of the Western Indonesia National Roads Improvement Project (WINRIP). The mission was comprised of ... Lihat dokumen lengkap
112
WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
... This component provides consulting services to support project management and implementation so as to ensure implementation efficiency and overall quality of the works. It also includes funds for a small amount of ... Lihat dokumen lengkap
123
WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
... May 2013, technical design review which is AWP2 and AWP-3 sub-projects in aspect of road safety has been ...The CTC technical design team(highway & road safety audit) shall compile all the road safety ... Lihat dokumen lengkap
148
WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.
... Larap report of the package for Krui Biha in Lampung Province already approved the World Bank dated 4 January 2013, and approval the monitoring report dated 18 April 2013. Contract signing for the package ... Lihat dokumen lengkap
117
WINRIP DOC MPR CTC MPR No.14 2014 02 2014 02 10 00225.
... of WINRIP will be roads administered directly by the National Government, including those currently classified as Provincial, Kabupaten (District) or non-status roads which are in process of being reclassified as ... Lihat dokumen lengkap
107
WINRIP DOC MPR CTC MPR No.36 2015 12 20151231 00329
... granted No Objection Letter (NOL) from the World Bank while all the 21 social studies (LARAP) were already issued No Objection Letter (NOL) from the World ... Lihat dokumen lengkap
157
WINRIP DOC MPR CTC MPR No.46 2016 10 20161031 00435
... on CTC survey on August 2016 was found that the shoulder widening complete until 25 Km, the embankment on side river in Start project under construction, the remaining 26 Km in ... Lihat dokumen lengkap
169
WINRIP DOC MPR CTC MPR No.29 2015 05 20150531 00269
... Procurement shall be conducted under the Bank s Procurement Procedures as mentioned in the Loan Agreement. The International Competitive Bidding (ICB) based on the Bank letter Ref. WINRIP/136 will apply to the ... Lihat dokumen lengkap
140
WINRIP DOC MPR CTC MPR No.28 2015 04 20150430 00227
... Procurement shall be conducted under the Bank s Procurement Procedures as mentioned in the Loan Agreement. The International Competitive Bidding (ICB) based on the Bank letter Ref. WINRIP/136 will apply to the ... Lihat dokumen lengkap
138
WINRIP DOC MPR CTC MPR No.19 2014 07 2014 07 10 00224.
... The activity on the Community Representative Observers (CROs) during July 2014 was carried out the selection of CRO for Package 17: Simpang Gunung Kemala Pugung Tampak, Lampung Province on July 17, 2014. The CRO ... Lihat dokumen lengkap
131
WINRIP DOC MPR CTC MPR No.22 2014 10 2014 10 10 00224.
... • If DGH wants to try to include them in this project, design works need to start immediately since no new bidding processes can be started after March 31, 2015 (otherwise works implementation will go beyond the ... Lihat dokumen lengkap
172
WINRIP DOC MPR CTC MPR No.34 2015 10 20151031 00290
... On the contrary, continuing the training would also be another solution. We realized that the three (3) main components of the learning process were in hand: the trainer the trainees the subject. We then immediately ... Lihat dokumen lengkap
143
WINRIP DOC MPR CTC MPR No.1 2013 01 2013 01 11 00224.
... The CTC assignment concerns the monitoring of the aspects of Anti- Corruption Action Plan (ACAP) implementation and where required act pro- active in resolving issues when such a matter ... Lihat dokumen lengkap
73
WINRIP DOC MPR CTC MPR No.10 2013 10 2013 10 11 00225.
... the WINRIP website but in fact, to date, most complaints have been received by letter, either directly or indirectly, although a few were sent by fax or ...the WINRIP website by the CHS team of ... Lihat dokumen lengkap
99
WINRIP DOC MPR CTC MPR No.2 2013 02 2013 02 11 00225.
... the CTC. As mentioned above, on 5-7 February 2013, Environmental Specialist and Social Impact Specialist of the CTC accompanied the Bank’s Social Expert and Environmental Specialist visiting the ... Lihat dokumen lengkap
79
WINRIP DOC MPR CTC MPR No.5 2013 05 2013 05 10 00225.
... the WINRIP website but in fact, to date, most complaints have been received by letter, either directly or indirectly, although a few were sent by fax or ...the WINRIP website by the CHS team of ... Lihat dokumen lengkap
88
WINRIP DOC MPR CTC MPR No.4 2013 04 2013 04 10 00225.
... Enhanced Disclosure Provisions and Transparency, Ministry of Public Work (MPW) will provide necessary information in the Project Implementation Plan (PIP), Project Management manual (PMM) on their website, and in the ... Lihat dokumen lengkap
82