5 the resource consents have been met, Auckland Council will issue a letter confirming compliance at the consent holder's request. Within 10 working days after the first meeting, CLG informs the consent holder about the appointed building surveyor. Name, address and contact details of the complainant (unless they choose not to provide them);

3 The name, address and contact details of the complainant (unless they choose not to provide);. Identify the relevant activity and the nature of the works at the time of the. On completion of the Road Safety Audit the permittee must provide a copy to Auckland Council and Auckland Transport and consult with both Auckland Council and Auckland Transport on the recommendations made in the Road Safety Audit.

The permit holder must provide Auckland Transport for approval with an engineering plan of the detailed design which implements the recommendations of the preliminary road safety audit and includes consideration of:. A final waste management plan must be submitted to Auckland Council for certification that the service requirements for the overall area are adequately met without causing odor/visual nuisance internally or to the public. The permit holder shall ensure that the development does not increase peak flows and water levels in above-ground flow paths on any other property in the vicinity of the site.

Filter cloths or covering mats are placed over the rainwater basins in the vicinity of the excavation areas. The consent holder shall request in writing from the owners of the following properties permission for the CLG-nominated construction surveyor to conduct an architectural survey at the times specified in Condition 72:. Monitoring results will be provided to Auckland Council and the CLG within 5 working days of completion of monitoring.

Monitoring results will be used to verify the adequacy of the CNVMP and CMP. The certified Lighting Plan will be implemented as part of the construction of the development and will be maintained thereafter. The supermarket's trading hours will be limited to 6.30am to 10pm, seven days a week.

Any proposed changes to the location, dimensions, colours, materials and lighting of the signage must be submitted to Auckland Council for certification. Identify the relevant activity and the nature of the workers at the time of the complaint. The Construction Management/Construction Traffic Management Plan is intended to provide flexibility for both the permit holder and Auckland Council to manage earthworks and construction activity.

All assessments must be consistent with the stated objectives of the management plan and limited to the scope of this consent.

DRAFT SUBDIVISION CONDITIONS

A research plan is submitted to the board for approval under Section 223 of the RMA before the consent expires, and that plan is filed within three years of the date of approval in accordance with Section 224 of the RMA; or. B). The consent holder must submit a subdivision study plan to the Board for approval under section 223 of the RMA, in general agreement with the approved resource 1B subdivision scheme plans referred to in Condition 1. The consent holder must bear the costs of preparation, review and registration of the easement instruments in the relevant title deeds.

The consent holder must submit a survey plan of the subdivision to Council for approval under section 223 of the RMA generally in accordance with the approved resource consent subdivision scheme plans 2B referred to in Condition 1. The consent holder must submit a survey plan of the subdivision to Council for approval under section 223 of the RMA generally in accordance with the approved resource consent subdivision scheme plans 3B referred to in Condition 1. The application must include a completed design of the proposed water infrastructure in accordance with the current Water Care Water and Wastewater Code of Practice for Ground.

The system must be installed in accordance with the requirements of the Auckland Code of Practice for Land Development and Subdivision and the relevant grid operator. The consent holder must provide the Council with a certificate from the network operator that the system is installed in accordance with its requirements and the "as implemented" system plans. A final certificate must be provided by Auckland Transport in terms of the works at the time of the section 224(c) application.

The consent holder must submit a subdivision study plan to the Board for approval under section 223 of the RMA, in general agreement with the approved subdivision of the source consent. The permission holder must bear the costs of drafting, reviewing and registering the easement instruments on the relevant deeds. The consent holder must submit a subdivision research plan to the Board for approval under Section 223 of the RMA, in general agreement with the approved subdivision schemes for Resource Permission 5B referenced in Condition 1.

An application for a certificate under Section 224(c) of the RMA must be accompanied by a certificate from a professionally qualified surveyor or engineer that all conditions of this Subdivision Consent relating to 5B have been met and identify any conditions that have not been met and are subject to a consent notice to be issued with respect to any terms of this consent subject to section 221. A certificate pursuant to section 224(f) of the RMA will be issued upon confirmation that the units comply with section 116(a) of the Act of Construction 2004. The consent holder must submit a subdivision survey plan to Council for approval under section 223 of the RMA generally in accordance with the approved Resource Consent Scheme 6B Subdivision Plans set out in Condition 1.