TWEED HEADS TOWN CENTRE MASTERPLAN IMPLEMENTATION STAGE 1 – Jack Evans Boat Harbour Design Cost Comparison between original Estimate (August 2004) and current Estimate (May 2006)

ORIGINAL PROPOSED PROJECT COMPONENT

(Based on Tweed Heads Town Centre Masterplan, August 2004) COST (original)

CURRENT PROPOSED PROJECT COMPONENT

(Based on Jack Evans Boat Harbour Concept Design, May 2006) COST (current)

COST

DIFFERENCE

1. OLD BORDER CARAVAN PARK SITE $4,194,900 $9,692,100

OBCP Additional items + $3,441,100 +$8,938,300

a. Carpark $1,606,600 a. Carpark $902,300 - $705,300

b. Indigenous Public Placemaking Project

• General landscape elements (turf, garden, trees)

• Footbridge & constructed Creek-bed

• Footpath

• Furniture

• Lighting

• Artwork & Sculpture SUB-TOTAL

$182,200

$75,700

$143,700

$172,200

$52,000

$130,000

$755,800

b. Indigenous Public Placemaking Project

• Cultural Gardens & Park

• Furniture & Signage

SUB-TOTAL

$3,736,000

$313,700

$4,049,700 + $3,293,900 Additional Items

Site Preparation (includes water playground)

Services (includes water playground)

Design Development (includes water playground)

Preliminaries (includes water playground) SUB-TOTAL

$122,400

$50,000

$952,400 1,309,600

$2,434,400 + $2,434,400 c. Swimming Lagoon & Twin Towns Interface

• General landscape elements (turf, garden, trees)

• Promenade (pavement only)

• Water Playground Elements

• Footpath

• Furniture

• Lighting

• Artwork & Sculpture SUB-TOTAL

$39,300

$1,375,400

$195,000 -

$105,300

$52,000

$65,000

$1,832,500

c. Water playground, park & Twin Towns Interface

• Water playground & Park Space

• Entry Promenade & Plaza

• Furniture & Signage

• Landscaping & Paving

SUB-TOTAL

$3,035,300

$1,038,400

$55,000

$611,400

$4,740,100 + $2,907,600

- Additional Items

Site Preparation (excludes water playground)

Kiosk

Amenities Block

Services (excludes water playground)

Design Development (excludes water playground)

Preliminaries (excludes water playground) SUB-TOTAL

$23,700

$378,300

$326,300

$20,000

$108,800

$149,600

$1,006,700 + $1,006,700

(3)

ORIGINAL PROPOSED PROJECT COMPONENT

(Based on Tweed Heads Town Centre Masterplan, August 2004) COST (original)

CURRENT PROPOSED PROJECT COMPONENT

(Based on Jack Evans Boat Harbour Concept Design, May 2006) COST (current)

COST

DIFFERENCE

2. CHRIS CUNNINGHAM PARK $2,306,200 $4,729,800

Chris Cunningham Park Additional items + $2,020,800 +$4,444,400

a. Anzac Memorial

• General Landscape

• Footpath Works

• Furniture (bollards & signage)

• Lighting

• Feature Stone Walling

• Water feature (drainage channels + planting)

• Art/Sculpture SUB-TOTAL

$120,300

$87,100

$16,300

$32,500

$13,000

$65,000

$65,000

$399,200

a. Anzac Memorial

• Minor Landscape / Paving

• Furniture & signage

• Lighting

SUB-TOTAL

$570,800

$23,000 -

$593,800 + $194,600 Additional Items

Wharf / Stage

Wharf Street Bus Interchange

Design Development

Services

Preliminaries SUB-TOTAL

$312,000

$ 334,000

$20,000

$92,500

$127,300

$824,600 + $824,600 b. Bay Street Plaza

• General Landscape

• Promenade

• Furniture (bollards & signage)

• Lighting

• Feature Stone Walling

• Art/Sculpture SUB-TOTAL

$36,200

$523,900

$26,000

$39,000

$26,000

$65,000

$716,100

b. Bay Street Plaza

• Promenade & Entry

• Bay Street Footpath Interface (north)

• Furniture & Signage (included below in item 2.c)

• Lighting

SUB-TOTAL

$1,341,500

$500,500 - -

$1,842,000

+ $1,125,900 c. Bay Street Parklands & Southern Beach

• General landscape elements (turf, garden, trees)

• Footpath

• Furniture (shelters, tables, chairs, benches, bollards, signage, drinking fountains, bins, BBQs)

• Lighting

• Naturalised Channel

• Gross Pollutant Trap

• Stone Walling

• Timber Jetty

• Artwork & Sculpture SUB-TOTAL

$112,500

$101,400

$109,100

$32,500

$7,800

$78,000

$13,000

$65,000

$65,000

$584,300

c. Bay Street Parklands and Southern Beach

• Park Landscaping / Paving

• Furniture & Signage (includes plaza area item 2.b)

SUB-TOTAL

$1,809,300

$266,200

$2,075,500 + $1,491.200

Additional Items

Site Preparation

Visitor Information Kiosk

Depot/Store

Services

Design Development

Preliminaries SUB-TOTAL

$87,000

$533,100

$124,200

$50,000

$493,000

$677,900

$1,196,200 $1,196,200

d. Carpark $606,600 d. Carpark $218,500 - $388,100

(4)

ORIGINAL PROPOSED PROJECT COMPONENT

(Based on Tweed Heads Town Centre Masterplan, August 2004) COST (original)

CURRENT PROPOSED PROJECT COMPONENT

(Based on Jack Evans Boat Harbour Concept Design, May 2006) COST (current)

COST

DIFFERENCE

3. BOARDWALK $2,330,300 $3,802,700

Chris Cunningham Park Additional items + $515,000 +$1,987,400

• Concrete Revetment

• Fill Material

• Timber Foreshore deck SUB-TOTAL

$523,300

$195,000

$1,612,000

$2,330,300

• Boardwalk

SUB-TOTAL

$3,802,700

$3,802,700

Additional Items

Furniture & Signage

Design Development Allowance SUB-TOTAL

$122,500

$392,500

$515,000

TOTAL ESTIMATE FOR JEBH OPEN SPACE (2004) (Excludes Coral Street Infull & Marina Development)

$8,831,400 TOTAL ESTIMATE FOR JEBH OPEN SPACE (2006) (based on items comparable to original estimate)

$18,224,600

Additional items not included in original estimate + $5,976,900

4. OTHER ITEMS $2,222,700 4. QUANTITY SURVEY ALLOWED EXTRAS $4,560,700 +$2,338,000

• Coral Street Infill area

• Marina Development Associated Landscape & Carpark

• Quay Area and pedestrian bridge over harbour entrance

• (no design fees included)

$225,600

$1,108,000

$889,100 -

• Minor interface works by utilities

• Special artwork

• Project Contingency

• Consultants Fees

• Statutory Fees

$100,000

$650,000

$1,261,900

$2,523,800

$25,000

TOTAL ORIGINAL ESTIMATE (Based on Masterplan – 2004)

$11,054,100 TOTAL PROPOSED ESTIMATE

(Based on Concept Design - 2006)

$28,762,200 +$17,708,100