SOUTH STREET
RICHMOND ROAD
BASIN C INCORPORATED INTO BASIN P BASIN L
INCORPORATED INTO BASIN P
BASIN D INCORPORATED INTO BASIN E
DEVELOPMENT BOUNDARY EXISTING
ELECTRICAL EASEMENT
PLATFORM FOR ELECTRICAL TOWER RELOCATION
BASIN K
BASIN P
BASIN M
BASIN G BASIN E
BASIN B
BASIN A NON
CERTIFIED VEGETATION
BASIN J
BASIN I
BASIN O. NO LONGER REQUIRED.
SEE DISCUSSION AT HEADING 6.5 "XP RAFTS MODEL"
CHANNEL TC1
CHANNEL TC4A CHANNEL TC4
CHANNEL TC6
CHANNEL TC11
CHANNEL 12
CHANNEL TC8A
CHANNEL 13
CHANNEL 8B
11 12
13 14
5 6
7 8 9 10
4 3
2
1
FUTURE
ELECTRICAL EASEMENT
FUTURE ELECTRICAL EASEMENT
CHANNEL TC7A CHANNEL
TC7B
CHANNEL TC7C
PLAN No.
CLIENT:
SCALES:
DATUM:
DESIGNED DRAWN CHECKED DATE
ISSUE AMENDMENT
FILE No.
Copyright Notice: Owners: General Owner - J.Wyndham Prince Pty. Ltd.
This plan is the property of J. Wyndham Prince Pty. Ltd. and is supplied for exclusive use on the project being the subject of the plan. It is not to be copied, used, nor passed on, in part or full, without written permission from the owner. The user must make acknowledgement of any material used at the commence of, and within, any project documentation produced, including but not limited to, letters, reports and/or drawings.
C
Plotted:1 Feb 2011 10:26:17 AM File Name: J:\8955W\Drawings\SKW - Concept Sketch Designs\8955_SK1.dwg
J. WYNDHAM PRINCE
CONSULTING CIVIL INFRASTRUCTURE ENGINEERS PO Box 4366 PENRITH WESTFIELD NSW 2750P 02 4720 3300 F 02 4721 7638Wwww.jwprince.com.au E [email protected]
& PROJECT MANAGERS
BY
THIS DRAWING MUST NOT BE USED FOR CONSTRUCTION UNLESS SIGNED AS PART OF AN
APPROVED CONSTRUCTION CERTIFICATE.
ORIGIN:
ADVANCE COPY ONLY
NOT FOR CONSTRUCTION
MARSDEN PARK DRAFT S94 BASIN REVIEW
BASIN PLAN AND CULVERT LAYOUT
8955/SK1 J
8955_SK1
DEPARTMENT OF PLANNING
C/- APP
AHD1:5000 @ A1 DJH/JC
DJH
E SOUTH STREET RELOCATED 6/05/10 DJH
F ISSUED FOR REVIEW 12/05/10 DJH
G BASIN P ILP BOUNDARY AMENDED 12/06/10 DJH H SOUTH STREET ALIGNMENT ADJUSTED 05/07/10 DJH I COUNCIL COMMENTS AMENDMENTS 30/11/10 MP
J ISSUED FOR EXHIBITION 01/02/11 GH
1
LEGEND
CULVERT LOCATION AND DESIGNATION
METRES 1:5000 (AT A1)
100 50 0 50 100 150 200 250300 350 400 450500
ILP DRAINAGE RESERVE BOUNDARY
4x2400x1200 RCBC CROSSING EXISTING "NON CERTIFIED"
LANDS RETAINED
LOW FLOW BY PASS TO RAINGARDEN. APPROX GRADE 0.2%
APPROXIMATE 0.4% GRADE ON HIGH FLOW BY PASS THROUGH THE CONSERVATION AREA.
MAKE SMOOTH CONNECTION
WITH EXISTING WATERCOURSE RL35.35
DE-WATERING LINE DETAIL TO DA
GPT
2%
2%
RL39.70 DISCHARGE CONTROL SLOTTED WEIR
GPT WITH FLOOD FLAP
ROCK ENERGY DISSIPATER
2%
HEADWALL
HEADWALL SPLITTER PIT
PLATFORM FOR RELOCATION OF TRANSMISSION TOWER.
DETAILS TO BE PROVIDED AT DA RL 39.7
3m MAINTENANCE ACCESS 1%
VAR
1%
SOUTH STREET
PLAN No.
CLIENT:
SCALES:
DATUM:
DESIGNED DRAWN CHECKED DATE
ISSUE AMENDMENT
FILE No.
Copyright Notice: Owners: General Owner - J.Wyndham Prince Pty. Ltd.
This plan is the property of J. Wyndham Prince Pty. Ltd. and is supplied for exclusive use on the project being the subject of the plan. It is not to be copied, used, nor passed on, in part or full, without written permission from the owner. The user must make acknowledgement of any material used at the commence of, and within, any project documentation produced, including but not limited to, letters, reports and/or drawings.
C
Plotted:1 Feb 2011 10:26:55 AM File Name: J:\8955W\Drawings\SKW - Concept Sketch Designs\8955_SK2.dwg
J. WYNDHAM PRINCE
CONSULTING CIVIL INFRASTRUCTURE ENGINEERS PO Box 4366 PENRITH WESTFIELD NSW 2750P 02 4720 3300 F 02 4721 7638Wwww.jwprince.com.au E [email protected]
& PROJECT MANAGERS
BY
THIS DRAWING MUST NOT BE USED FOR CONSTRUCTION UNLESS SIGNED AS PART OF AN
APPROVED CONSTRUCTION CERTIFICATE.
ORIGIN:
ADVANCE COPY ONLY
NOT FOR CONSTRUCTION
MARSDEN PARK DRAFT S94 BASIN REVIEW
BASIN A
8955/SK2 G
8955_SK2
DEPARTMENT OF PLANNING
C/- APP
AHD
1:1000 @ A1 DJH/JC
DJH
B MINOR AMENDMENTS TO BASIN 28/04/10 TK
C ISSUED FOR REVIEW 12/05/10 TK
D MINOR AMENDMENTS 24/06/10 DJH
E COUNCIL COMMENTS AMENDMENTS 30/11/10 MP
F BASIN A INVERT AMENDED 09/12/10 VG
G ISSUED FOR EXHIBITION 01/02/11 GH
METRES 1:1000 (AT A1)
20 10 0 10 20 30 40 50 60 70 80 90 100
BASIN A
92/80( Pñ
5$,1*$5'(1%('$5($ Pð
TWL = 39.2
EDL = 38.0
(;7(172)),//Pñ (;7(172)&87Pñ
APPROXIMATE EXTENT OF RAINGARDEN
3 MONTH ARI OVERLAND FLOW PATH FROM GPT TO RAINGARDEN
ALL BATTERS ARE 1:6
NOTE:
EXTENT OF RIPARIAN CORRIDOR
EXISTING ELECTRICAL EASEMENT ILP DRAINAGE
RESERVE BOUNDARY
2%
RL38.20 2%
2%
2%
1%
RL38.20
HEADWALL RL36.20
BASIN B
ROCK ENERGY DISSIPATER
1%
1%
SPLITTER PIT
TRANSMISSION EASMENT
MAKE SMOOTH CONNECTION WITH EXISTING WATER COURSE
IL35.50
PLAN No.
CLIENT:
SCALES:
DATUM:
DESIGNED DRAWN CHECKED DATE
ISSUE AMENDMENT
FILE No.
Copyright Notice: Owners: General Owner - J.Wyndham Prince Pty. Ltd.
This plan is the property of J. Wyndham Prince Pty. Ltd. and is supplied for exclusive use on the project being the subject of the plan. It is not to be copied, used, nor passed on, in part or full, without written permission from the owner. The user must make acknowledgement of any material used at the commence of, and within, any project documentation produced, including but not limited to, letters, reports and/or drawings.
C
Plotted:1 Feb 2011 10:27:40 AM File Name: J:\8955W\Drawings\SKW - Concept Sketch Designs\8955_SK3.dwg
J. WYNDHAM PRINCE
CONSULTING CIVIL INFRASTRUCTURE ENGINEERS PO Box 4366 PENRITH WESTFIELD NSW 2750P 02 4720 3300 F 02 4721 7638Wwww.jwprince.com.au E [email protected]
& PROJECT MANAGERS
BY
THIS DRAWING MUST NOT BE USED FOR CONSTRUCTION UNLESS SIGNED AS PART OF AN
APPROVED CONSTRUCTION CERTIFICATE.
ORIGIN:
ADVANCE COPY ONLY
NOT FOR CONSTRUCTION
MARSDEN PARK DRAFT S94 BASIN REVIEW
BASIN B
8955/SK3 E
8955_SK3
DEPARTMENT OF PLANNING
C/- APP
AHD1:500 @ A1 DJH/JC
DJH
A FIRST ISSUE 23/04/10 TK
B ISSUED FOR REVIEW 12/05/10 TK
C MINOR AMENDMENTS 24/06/10 DJH
D COUNCIL COMMENTS AMENDMENTS 30/11/10 MP
E ISSUED FOR EXHIBITION 01/02/11 GH
1:500 (AT A1)
BASIN B
92/80( Pñ 5$,1*$5'(1%('$5($ PðTWL = 37.70
EDL = 36.50
(;7(172)),//Pñ (;7(172)&87Pñ
APPROXIMATE EXTENT OF RAINGARDEN ALL BATTERS ARE 1:6
NOTE:
(ASSUMED UNSOUND MATERIAL
FROM EXISTING DAM)
ILP DRAINAGE RESERVE BOUNDARY
ILP DRAINAGE RESERVE BOUNDARY
RICHMOND
ROAD
HEADWALL
DISCHARGE CONTROL (SLOTTED WEIR)
ROCK ENERGY DISSIPATER
SPLITTER PIT GPT PRE-TREATED LOW FLOWS FROM GPT DIRECTED TO RAINGARDEN IN BASIN G FUTURE 100YR
CAPACITY PIPE AND OVERLAND FLOWPATH
BANK STABILISATION DETAILS TO BE PROVIDED WITH DEVELOPMENT APPLICATION
DEWATER & DESILT EXISTING DAM. RECONSTRUCT WALL AS PART OF BASIN G EMBANKMENT.
IL 31.50
ILP DRAINAGE RESERVE BOUNDARY IL 29.25
IL 32.48
PLAN No.
CLIENT:
SCALES:
DATUM:
DESIGNED DRAWN CHECKED DATE
ISSUE AMENDMENT
FILE No.
Copyright Notice: Owners: General Owner - J.Wyndham Prince Pty. Ltd.
This plan is the property of J. Wyndham Prince Pty. Ltd. and is supplied for exclusive use on the project being the subject of the plan. It is not to be copied, used, nor passed on, in part or full, without written permission from the owner. The user must make acknowledgement of any material used at the commence of, and within, any project documentation produced, including but not limited to, letters, reports and/or drawings.
C
Plotted:1 Feb 2011 10:29:44 AM File Name: J:\8955W\Drawings\SKW - Concept Sketch Designs\8955_SK6.dwg
J. WYNDHAM PRINCE
CONSULTING CIVIL INFRASTRUCTURE ENGINEERS PO Box 4366 PENRITH WESTFIELD NSW 2750P 02 4720 3300 F 02 4721 7638Wwww.jwprince.com.au E [email protected]
& PROJECT MANAGERS
BY
THIS DRAWING MUST NOT BE USED FOR CONSTRUCTION UNLESS SIGNED AS PART OF AN
APPROVED CONSTRUCTION CERTIFICATE.
ORIGIN:
ADVANCE COPY ONLY
NOT FOR CONSTRUCTION
MARSDEN PARK DRAFT S94 BASIN REVIEW
BASIN G AND CHANNEL TC8B
8955/SK6 G
8955_SK6
DEPARTMENT OF PLANNING
C/- APP
AHD1:1000 @ A1 DJH/JC
DJH
B MINOR AMENDMENTS TO BASIN 27/04/10 TK
C AMENDMENT TO BASIN BOUNDARY 29/04/10 DJH
D ISSUED FOR REVIEW 12/05/10 TK
E COUNCIL COMMENTS AMENDMENTS 30/11/10 MP F TC8A AND BASIN FLOOR AMENDMENTS 23/12/10 AS
G ISSUED FOR EXHIBITION 01/02/11 GH
METRES 1:1000 (AT A1)
20 10 0 10 20 30 40 50 60 70 80 90 100
BASIN G
92/80( Pñ5$,1*$5'(1%('$5($0$- Pð0,1Pð
TWL = 32.84
EDL = 31.6
(;7(172)),//Pñ (;7(172)&87Pñ
APPROXIMATE EXTENT OF RAINGARDEN EXTENT OF RIPARIAN CORRIDOR
ALL BATTERS ARE 1:6
NOTE:
(;7(172)),//Pñ (;7(172)&87Pñ
CHANNEL TC8B
NOTE: ALL BATTERS ARE 1:4 UNO
25.5 26.0
26.0 26.5
27.5 27.5
27.5 27.5
28.0
28.0
28.0 28.5
28.5
28.5 28.5
29.0
29.0 29.5
29.5
29.5
29.5 30.0
30.0 30.0
30.0
30.5 30.5
30.5
30.5
31.0 31.0
31.0
31.0
31.0 31.0 31.5
31.5
31.5
31.5 31.5
31.5 32.0
32.0 32.0
32.0
32.0 32.5
32.5
32.5
33.0 33.0
33.0
33.0
33.5
33.5
33.5 28.0
28.0 28.5
28.5
29.0
29.5
30.0 30.5
30.5 31.0
31.5
31.5 32.0
32.0
32.5 32.5
33.0
33.0
34.0 EXISTING RICHMOND ROAD SPILLWAY RL30.40
LENGTH MIN. 95.0m
ILP DRAINAGE RESERVE BOUNDARY
INTERIM DRAINAGE PITS AND CATCH DRAIN DIRECTED INTO CHANNEL SHAPE OVERLAND FLOW PATH INTO TC12 ILP DRAINAGE
RESERVE BOUNDARY
HEADWALL EXISTING OUTLET IL 26.94
PROPOSED DRAINAGE RESERVE BOUNDARY
FUTURE GPT BY OTHERS
APPROXIMATE LOCATION OF FUTURE ACCESS ROAD RL30.70
CHANNEL TC12
SPLITTER PIT RL28.70
RL28.60
2%
1%
1%
2%
1%
METRES 1:1000 (AT A1)
20 10 0 10 20 30 40 50 60 70 80 90 100
PLAN
SCALE 1:1000
PLAN No.
CLIENT:
SCALES:
DATUM:
DESIGNED DRAWN CHECKED DATE
ISSUE AMENDMENT
FILE No.
Copyright Notice: Owners: General Owner - J.Wyndham Prince Pty. Ltd.
This plan is the property of J. Wyndham Prince Pty. Ltd. and is supplied for exclusive use on the project being the subject of the plan. It is not to be copied, used, nor passed on, in part or full, without written permission from the owner. The user must make acknowledgement of any material used at the commence of, and within, any project documentation produced, including but not limited to, letters, reports and/or drawings.
C
Plotted:1 Feb 2011 10:30:39 AM File Name: J:\8955W\Drawings\SKW - Concept Sketch Designs\8955_SK7.dwg
J. WYNDHAM PRINCE
CONSULTING CIVIL INFRASTRUCTURE ENGINEERS PO Box 4366 PENRITH WESTFIELD NSW 2750P 02 4720 3300 F 02 4721 7638Wwww.jwprince.com.au E [email protected]
& PROJECT MANAGERS
BY
THIS DRAWING MUST NOT BE USED FOR CONSTRUCTION UNLESS SIGNED AS PART OF AN
APPROVED CONSTRUCTION CERTIFICATE.
ORIGIN:
ADVANCE COPY ONLY
NOT FOR CONSTRUCTION
MARSDEN PARK DRAFT S94 BASIN REVIEW
BASIN I & CHANNELS 12 & 13
8955/SK7 F
8955_SK7
DEPARTMENT OF PLANNING
C/- APP
AHD1:1000 @ A1 DJH/JC
DJH
A FOR DISCUSSION 15/03/10 DJH
B CHANGE TO BASIN LAYOUT 23/04/10 TK
C MINOR AMENDMENTS TO BASIN 28/04/10 TK
D ISSUED FOR REVIEW 12/05/10 TK
E COUNCIL COMMENTS AMENDMENTS 30/11/10 MP F BASIN AMENDED AS PER DA SUBMISSION 01/02/11 GH
(;7(172)),//Pñ (;7(172)&87Pñ CHANNEL TC12
(;7(172)),//Pñ (;7(172)&87Pñ CHANNEL TC13
CHANNEL BATTERS ARE 1:4
NOTE:
CHANNEL BATTERS ARE 1:4
NOTE:
BASIN I 92/80( Pñ
5$,1*$5'(1%('$5($ Pð TWL (100yr) = 30.20
TWL (500yr) = 30.40 (PROVIDES 500yr FLOOD IMMUNITY FOR RICHMOND ROAD) EDL = 28.9
(;7(172)),//Pñ (;7(172)&87Pñ EXTENT OF RAINGARDEN
BASIN BATTERS ARE 1:6
NOTE: