• Tidak ada hasil yang ditemukan

Part 5 Tables of assessment

N/A
N/A
Protected

Academic year: 2025

Membagikan "Part 5 Tables of assessment"

Copied!
3
0
0

Teks penuh

(1)

Mackay Region Planning Scheme 2017 – Version 3.0 9 – 1

PART 9 – DEVELOPMENT CODES

Part 5 Tables of assessment

Note there are other PART 5.5 Material change of use triggers which have been omitted. The bracketed section of these will also be removed as part of a future planning scheme amendment.

5.6 Categories of development and assessment – Reconfiguring a lot

The following table identify the categories of development and assessment for reconfiguring a lot.

Table 5.6.1 – Reconfiguring a lot

Zone Categories of development and assessment

Assessment benchmarks for assessable development and requirements for accepted development

All zones Accepted development If:

 Schedule 6, Part 4, Item 21 of the Regulation; or

 the reconfiguration is for the purposes of a utility installation or other municipal facility undertaken by or on behalf of Mackay Regional Council

No assessment benchmarks apply

Code assessment

If not accepted development  Relevant zone code

 Reconfiguring a lot code

 General development requirements code

 Healthy waters code (section 9.4.2.1.

identifies when the code applies)

Editor’s note – The above categories of development and assessment apply unless otherwise prescribed in the Regulation.

5.8 Categories of development and assessment – Operational work

The following table identify the categories of development and assessment for operational work.

Table 5.8.1 – Operational work

Zone Categories of development and assessment

Assessment benchmarks for assessable development and requirements for accepted development

Operational work – infrastructure works and landscape works All zones Accepted development

Operational work – undertaking infrastructure or landscape works when

No assessment benchmarks apply

Commented [VL1]: This text will be removed because the various requirements for high, medium and low risk development are now listed in the Healthy waters code and PSP - healthy waters.

Commented [VL2R1]: This will occur for all references to the healthy waters code throughout Part 5 of the planning scheme

(2)

Mackay Region Planning Scheme 2017 – Version 3.0 9 – 2

PART 9 – DEVELOPMENT CODES

Zone Categories of development and assessment

Assessment benchmarks for assessable development and requirements for accepted development

undertaken by a public sector entity

Undertaking roadworks on a road to provide access to a lot (driveway crossovers)

No assessment benchmarks apply

Operational work involving:

 minor landscape work; or

 landscape works associated with a dwelling house or caretaker’s residence

No assessment benchmarks apply

Code assessment Operational work where associated with a ROL or MCU and not accepted development; or Operational work - infrastructure works, where not Accepted development and associated with the provision of:

 roads; or

 stormwater drainage; or

 street lighting; or

 water supply; or

 sewerage; or

 open space and recreation facilities; or

 underground service conduits; or

 reticulated gas; or

 electricity

 Relevant zone code

 General development requirements code

 Healthy waters code

Operational work – landscape works where not Accepted development

 Relevant zone code

 General development requirements code Operational work for car

parking and vehicle circulation where the area of the carpark and associated vehicle circulation area is more than 200m2

 Relevant zone code

 General development requirements code

Operational work involving waste water discharge from an urban purpose

 General development requirements code

 Healthy waters code (section 9.4.2.1.

identifies when the code applies) Code assessment

 Urban zones;

and

 Sport and recreation zone;

and

 Tourism zone;

and

Operational work for a constructed lake 250m2 in area or less

 Healthy waters code

Impact assessment Operational work for a constructed lake more than 250m2 in area

 The planning scheme

Commented [VL3]: Creates a clear trigger for constructed lakes and ensures that large constructed lakes are subject to public consultation (impact assessable).

Commented [VL4]:

(3)

Mackay Region Planning Scheme 2017 – Version 3.0 9 – 3

PART 9 – DEVELOPMENT CODES

Zone Categories of development and assessment

Assessment benchmarks for assessable development and requirements for accepted development

 Special purpose zone;

 Community facilities zone.

Operational work – excavation or filling of land

Zones within key urban areas1; and

Township zone

Code assessment Operational work for the excavation or filling of land if:

 the proposed works involve more than 20m3 or more than 200mm in depth; or

 the proposed works, combined with previously undertaken excavation or filling, exceeds 20m3 or 200mm in depth

 Relevant zone code

 General development requirements code

 Healthy waters code (section 9.4.2.1.

identifies when the code applies)

Schedule 1 – Proposed new definition of constructed lake (taken from PSP – constructed lake).

Table SC1.2.2 – Administrative definitions

Column 1

Term Column 2

Definition

Constructed lake Constructed lake means an artificial body of permanent open water that is generally land locked without a direct connection to tidal waterways with either an edge that may be fringed with emergent macrophytes or a hard edge. While submerged macrophytes may occur throughout the water column, the dominant feature is open water.

The definition of a constructed lake specifically excludes stormwater treatment measures including constructed wetlands and sediment ponds.

1 Refer to Schedule 1 for definition of “Key urban area”

Referensi

Dokumen terkait