Mackay Region Planning Scheme 2017 – Version 3.0 9 – 1
PART 9 – DEVELOPMENT CODES
Part 5 Tables of assessment
Note there are other PART 5.5 Material change of use triggers which have been omitted. The bracketed section of these will also be removed as part of a future planning scheme amendment.
5.6 Categories of development and assessment – Reconfiguring a lot
The following table identify the categories of development and assessment for reconfiguring a lot.
Table 5.6.1 – Reconfiguring a lot
Zone Categories of development and assessment
Assessment benchmarks for assessable development and requirements for accepted development
All zones Accepted development If:
Schedule 6, Part 4, Item 21 of the Regulation; or
the reconfiguration is for the purposes of a utility installation or other municipal facility undertaken by or on behalf of Mackay Regional Council
No assessment benchmarks apply
Code assessment
If not accepted development Relevant zone code
Reconfiguring a lot code
General development requirements code
Healthy waters code (section 9.4.2.1.
identifies when the code applies)
Editor’s note – The above categories of development and assessment apply unless otherwise prescribed in the Regulation.
5.8 Categories of development and assessment – Operational work
The following table identify the categories of development and assessment for operational work.
Table 5.8.1 – Operational work
Zone Categories of development and assessment
Assessment benchmarks for assessable development and requirements for accepted development
Operational work – infrastructure works and landscape works All zones Accepted development
Operational work – undertaking infrastructure or landscape works when
No assessment benchmarks apply
Commented [VL1]: This text will be removed because the various requirements for high, medium and low risk development are now listed in the Healthy waters code and PSP - healthy waters.
Commented [VL2R1]: This will occur for all references to the healthy waters code throughout Part 5 of the planning scheme
Mackay Region Planning Scheme 2017 – Version 3.0 9 – 2
PART 9 – DEVELOPMENT CODES
Zone Categories of development and assessment
Assessment benchmarks for assessable development and requirements for accepted development
undertaken by a public sector entity
Undertaking roadworks on a road to provide access to a lot (driveway crossovers)
No assessment benchmarks apply
Operational work involving:
minor landscape work; or
landscape works associated with a dwelling house or caretaker’s residence
No assessment benchmarks apply
Code assessment Operational work where associated with a ROL or MCU and not accepted development; or Operational work - infrastructure works, where not Accepted development and associated with the provision of:
roads; or
stormwater drainage; or
street lighting; or
water supply; or
sewerage; or
open space and recreation facilities; or
underground service conduits; or
reticulated gas; or
electricity
Relevant zone code
General development requirements code
Healthy waters code
Operational work – landscape works where not Accepted development
Relevant zone code
General development requirements code Operational work for car
parking and vehicle circulation where the area of the carpark and associated vehicle circulation area is more than 200m2
Relevant zone code
General development requirements code
Operational work involving waste water discharge from an urban purpose
General development requirements code
Healthy waters code (section 9.4.2.1.
identifies when the code applies) Code assessment
Urban zones;
and
Sport and recreation zone;
and
Tourism zone;
and
Operational work for a constructed lake 250m2 in area or less
Healthy waters code
Impact assessment Operational work for a constructed lake more than 250m2 in area
The planning scheme
Commented [VL3]: Creates a clear trigger for constructed lakes and ensures that large constructed lakes are subject to public consultation (impact assessable).
Commented [VL4]:
Mackay Region Planning Scheme 2017 – Version 3.0 9 – 3
PART 9 – DEVELOPMENT CODES
Zone Categories of development and assessment
Assessment benchmarks for assessable development and requirements for accepted development
Special purpose zone;
Community facilities zone.
Operational work – excavation or filling of land
Zones within key urban areas1; and
Township zone
Code assessment Operational work for the excavation or filling of land if:
the proposed works involve more than 20m3 or more than 200mm in depth; or
the proposed works, combined with previously undertaken excavation or filling, exceeds 20m3 or 200mm in depth
Relevant zone code
General development requirements code
Healthy waters code (section 9.4.2.1.
identifies when the code applies)
Schedule 1 – Proposed new definition of constructed lake (taken from PSP – constructed lake).
Table SC1.2.2 – Administrative definitions
Column 1
Term Column 2
Definition
Constructed lake Constructed lake means an artificial body of permanent open water that is generally land locked without a direct connection to tidal waterways with either an edge that may be fringed with emergent macrophytes or a hard edge. While submerged macrophytes may occur throughout the water column, the dominant feature is open water.
The definition of a constructed lake specifically excludes stormwater treatment measures including constructed wetlands and sediment ponds.
1 Refer to Schedule 1 for definition of “Key urban area”