STAFF REPORT

TO: Community Services Committee

FROM: Manager Property Services

DATE: 31 March 2009

SUBJECT: Manager Property Services Report

LEASES

New or renewed leases have been prepared for the ARK on the A&P Association grounds in Richmond, Murchison Golf Club and for the Wakefield Toy Library in the old library building in Wakefield.

RESERVES

Work has commenced with the design of the new entrance to the Collingwood boat ramp. This involves a small reclamation to provide for vehicle and boat trailer parking as well as providing a new entrance to the boat ramp from William Street, thus avoiding the need for vehicles to drive through the camping ground. The Community Services Manager and the writer met with the camp managers recently to discuss future changes to the camp.

The Ministry of Education is seeking a right of way from the end of Talbot Street, Motueka through to the rear of its land adjacent to Sports Park Motueka. The Ministry land is primarily used by a number of community groups including the Motu Weka Community Group and the Motueka Playcentre. There are no formal easements in place although the Ministry use part of the Council land and the Council use part of the Ministry land. The request is for the granting of mutual rights of way. A plan showing the extent of the proposed rights of way is attached. It is intended to agree to the rights of way on the condition that they are surrendered should the land ever be required to vest as legal road.

GENERAL

Nelson Tasman Tourism have been given approval to occupy part of the Mapua Wharf compound to park a truck with a mobile film studio on Saturday 11 April 2009.

The appointment of architects and project managers for the Richmond Library extensions have been confirmed. Arthouse Architects have been appointed to undertake the design, RDT Pacific to attend to project management and Nicki Moen to do the interior design. Lift Solutions Limited have been engaged to source a suitable lift.

(2)

A project meeting is being held on 1 April 2009 and a timeline of the development should be available shortly thereafter.

Tenders have closed for the construction of a new pound in Richmond and these are currently being evaluated.

Jim Frater

Manager Property Services

g:\tara\agendas\community services\2009\april\rcs090409 report property services manager.doc

Referensi

Dokumen terkait

STAFF REPORT TO: Councillors FROM: Community Services Manager and Corporate Services Manager REFERENCE: P953 DATE: 22 May 2006 SUBJECT: ASB Bank Aquatic Centre – Project

RESC10-07-04 – Takaka Aerodrome – Future Works STAFF REPORT TO: Chairman and Members, Engineering Services FROM: Transportation Manager, Gary Clark DATE: 29 June 2010 SUBJECT:

STAFF REPORT TO: Chair and Members, Engineering Services Committee FROM: Dugald Ley, Development Engineer REFERENCE: R858-1 SUBJECT: Development Three-Monthly Report, July to

STAFF REPORT TO: Chairman and Members, Engineering Services Committee FROM: Jeff Cuthbertson, Utilities Asset Manager and Gary Clark, Transportation Manager DATE: 9 September 2009

STAFF REPORT TO: Motueka Community Board FROM: Service Centres Manager REFERENCE: E859 DATE: 13 May 2007 SUBJECT: May 2007 Report Motueka River Bank Following the item raised

1 STAFF REPORT TO: Golden Bay Community Board FROM: Service Centres Manager REFERENCE: E855 DATE: 29 March 2007 SUBJECT: April 2007 Report Community Board Best Practice Awards

http://tdctoday:82/Shared Documents/Meetings/Council/Committees and Subcommittees/Engineering Services Committee/Reports/2006/RWK06-04-27-EngStd-Pedestrianlighting.doc STAFF REPORT

STAFF REPORT TO: Chairman and Members Engineering Services FROM: Development Engineer, Dugald Ley DATE: 17 November 2008 SUBJECT: DEVELOPMENT/CUSTOMER SERVICE – THREE- MONTHLY