To the Chief Executive Officer This is an application for
[select only one option]
This application is for the category/categories of prescribed premises [Refer to DER's Guidance Statement: Licensing and works approval process for further information on activities which will be subject to works approvalnicensing.
INSTRUCTIONS
0
Works approval0
Works approval including clearing of native vegetation (Clearing Permit)0
Concurrent works approval and licence or registration0
LicenceRegistration number:[
Works approval number: [
IZI
RenewalLicence number: [L8101/2004/3]
0
AmendmentLicence or works approval number: [
0
Registration (works approval already obtained) Works approval number:[ ]0
Application for a clearing permit already submitted Clearing permit application number: [ ]1Zl
Single category of prescribed premises (specify category number): [23]0
Multiple categories of prescribed premises (specify category numbers): [ ]0
All activities on the premises within category of prescribed premises of Schedule 1 to the Environmental Protection Regulations 1987 have been specified above (tick if Yes)• The application fonn must be completed with all infonnation attached. This fonn is a statutory requirement under section 54(1 )(a} for works approval applications, section 57(1 }(a) for licence applications, and regulation 58 of the Environmental Protection Regulations 1987for registration.
• If an application fonn has been submitted which is incomplete or materially incorrect, the CEO will decline to deal with the application under the EP Act and advise the Applicant accordingly.
• The Instructions set out in this guideline to complete the application fonn are general In nature.
• A reference to 'you' In these Instructions is a reference to the Applicant.
• Works approval only applies for new works approvals. For works approvals for existing premises, please select 'Amendment'.
• Concurrent applications for works approval and licence (or registrations) are encouraged. This means a single application is submitted.
• Applicants seeking further lnfonnatlon relating to requirements under the EP Act are recommended to review the Act through the State Law Publisher (www.slp.wa.gov.au)
• For premises where activities fall within more than one category of prescribed premises, ALL categories must be licensed and Identified. This applies for existing licensed premises seeking mnewal or
amendment, as well as new licensed premises.
Department of Environment Regulation
COMPLETION MATRIX
The matrix below explains what sections are required to be completed for different types of applications.
Application Form Section New Application/ Renewal Amendment
Registration
Part 1 Applicant details- section 1.1 • • •
Part 1 section 1.2 onwards • N/A 11
Part 2 Premises • N/A 11
Part 3 Proposed Activities • N/A 11
Part 4 Other Approvals • N/A 11
Part 5 Fit and competent operator • N/A N/A
Part 6 Public health and environmental • N/A 11
risks
Part 7 Siting and location • N/A N/A
Part 8 -not in use
Part 9 Submission of any other relevant • If required . If required.
information
Part 10 Proposed fee calculation • • N/A
Part 11 Submission of application • • •
Acknowledgement and signature • • •
Attachment 1A: Proof of Applicant status • N/A N/A
Attachment 1 8: ASIC Company Extract • N/A N/A
Attachment 2: Map for proposed premises • N/A 11
Attachment 3A: Proposed activities • N/A 11
Attachment 38: Map for proposed area to • N/A N/A
be cleared (only applicable if clearing is proposed)
Attachment 4: Other approvals • N/A 11
Attachment 5: Fit and competent operator • N/A N/A
Attachment 6: Public health and • N/A l:l
environment risks
Attachment 7: Siting and location • N/A fj,
Attachment 9: Other relevant information If required. N/A If required.
Attachment 10: Proposed fee calculation • N/A N/A
Attachment 11: Request for exemption If required. N/A If required.
from publication
Key:
• Must be submitted
Department of Environment Regulation
Part 1. Applicant details
1. 1 Applicant name lnghams Enterprises Pty Limited (full legal name}
ACN (if applicable} 008 447 345
1.2 Directors details (if applicant is a small proprietary company}
1.3 Registered business address (Registered with ASIC}
1.4 Address for correspondence
1.5 Contact person details Name Mark Low
Position Feedmill Manager Telephone
Email 1.6 Authorised representative Name
(if any)
Telephone Email 1.7 Applicanfs representative Name
(if any}
Telephone Email
1.8 Occupier status Registered proprietor on certificate of title IZI
[One of the options must be Lease holder (please specify} D
selected and if you have Public authority that has care, control or management of the land D been asked to specify,
please provide details] Other {please specify - for example, joint venture operating entity or contractor. Note contractual arrangements will need to be provided to evidence land owner's consent to occupancy arrangements. If D contractual arrangements are not finalised, reason why occupancy
consent will be granted will need to be provided.)
Proof of occupier status
1.9 [Instructions set out in Attachment 1A completed D
Attachment 1A]
ASIC Company Extract
1.1 0 [Instructions set out in Attachment 1 B completed D
Attachment 1 B)
Department of Environment Regulation
INSTRUCTIONS
• Your full legal name must be inserted. Business names are not accepted. If a small proprietary company,
the Directors' full names must also be provided.
• A proprietary Is defined by ASIC as small for a financial year If It satisfies at least two of the following paragraphs:
the consolidated revenue for the financial year of the company and any entities it controls is Jess than $25 million
the value of the consolidated gross assets at the end of the financial year of the company and any entitles it controls is less than $12.5 million, and
the company and any entities it controls have fewer than 50 employees at the end of the financial year.
• The address for correspondence can be the same as the registered business address.
• Details for a contact person must be provided (where you are an individual, you would be the contact person).
• Details for any authorised representatives must be provided (e.g. consultant) but only If you authorise that person to represent you and that person can be contacted by the Department in relation to your
application.
• Details of the occupation of the premises must be provided. One of the options must be selected and if you have been asked to specify, please provide details. For example, if 'lease holder' has been selected, please specify the type of lease-e.g. pastoral lease, mining lease, general lease.
• You must provide proof of ownership In Attachment 1.1nstructlons are set out in Attachment 1.
Part 2. Premises
2.1 Premises legal description (whole or part to be specified)
[Land description: volume and folio number, lot or location number(s), Crown lease or reserve number, pastoral lease number or mining tenement number of all properties, as shown on title details registered with Landgate]
2.2 Local government authority area
[City, Town or Shire]
2.3 GIS coordinates
[GIS coordinates must be provided where cadastre are not used as the premises boundary]
2.4 An aerial photograph and map of premises
Attachment 2 completed
[Instructions set out in Attachment 2]
D
Department of Environment Regulation
Part 3. Proposed activities (including clearing) 3. 1 Description/overview
[Instructions set out below Attachment 3A completed
D
and in Attachment 3A]
3.2 Estimated operating period (based on estimated infrastructure life) 3.3 Proposed date for commencement of works
3.4 Expected production
3.5 Design capacity
3.6 Throughput (in addition to 3.4 or 3.5)
3.7 Proposed clearing area (hectares and/or number of trees) - only
required if application includes clearing I
3.8 Proposed method of clearing (if applicable)
3.9 Period within which clearing is proposed to be undertaken (e.g. May 2 015- June 2 015) (if applicable)
3.10 Map of area proposed to be cleared (if applicable)
Attachment 38 completed
D
[Instructions set out in Attachment 3B]
INSTRUCTIONS
• You must provide the scope, size and scale of all prescribed activities of Schedule 1 to the
Environmental Protection Regulations 1987 including the maximum design capacity and the expected production capacity.
• You must identify emission discharge points.
• You must also provide infonnation on any other activity undertaken on the Premises if activity poses a risk to public health or the environment
• You only need to provide infonnation on the processes or operations of prescribed activities if they are unique or non-industry standard processes or operations. Instructions are set out In Attachment 3A.
• If you are applying for a clearing penn it you must provide the period within which clearing is proposed to be undertaken (e.g. May 2015 - June 2015) and a description of the method by which it will be
undertaken.
4.1
4.2 4.3 4.4
4.5 4.6 4.7
Is the proposal a Major Resource Project (formerly known as a State Development
Project)?
D
Major Resource Projects include mining and petroleum activities or infrastructure projects which support mining and petroleum activities.
Has the proposal been referred to the Environmental Protection Authority?
Is the proposal subject to any Ministerial conditions under the Environmental Protection Act 1 986?
Has the proposal been referred or assessed under the Environment Protection and Biodiversity Conservation Act 1999 (Commonwealth)?
Has the proposal obtained all relevant planning approvals?
Has the proposal obtained all other necessary statutory approvals?
Has consultation been undertaken with parties considered to have a direct interest in the proposal?
D D
D D
D D
D D
D D
D D
D
D
D
D
D
D
D
Department of Environment Regulation
4.8 Other Approvals [Instructions set out in Attachment 4]
Part 5. Fit and competent operator
Attachment 4 completed
Note: Under this section, DER will undertake an Internal due diligence of the applicant's fitness and competency based on DER's compllance records.
D
If you wish to provide additional information for DER to consider in making this assessment, you may provide that information in Attachment 11 (where it will not be published except where an application has been made, and only In accordance with, the Freedom of Information Act 1992).
No Yes 5. 1 Has the applicant held or been part of a small proprietary company that has held a previous
licence or works approvals?
D D
If yes, specify name of company and/or licence or works approval instrument number in Attachment 5.
5.2 If Yes to 5.1 or where the applicant wishes to provide additional information for DER's consideration, Attachment 5 completed.
Note: For an applicant that is a small proprietary company, each director must complete this section
D
as an individual, and include their previous history as directors of other small propriety companies.
Part 6. Public health and environmental risks
No Yes 6.1 Is there an emission to air from the activities that poses a risk to public health or the
D D
environment?
(includes emissions from stacks, chimneys, baghouses, blow offs, dust, noise and odour emissions) 6.2 Is there an emission to surface water from the activities that poses a risk to public health
D D
or the environment?
(includes end of pipe or outfall emissions to river, lakes, estuary or seas and pollution from containment overflow)
6.3 Is there an emission to land from the activities that pose a risk to public health or the
D D
environment?
(includes point source emissions to groundwater including direct aquifer reinjection or deep well injection, as well as emissions to land through irrigation and infiltration and seepage pits.
6.4 Is there a risk of other Incidents arising from the activities that pose a risk to public health
D D
or the environment?
(includes risk of a pollution incident or unplanned event related to hazardous materials or dangerous goods stored, used or handled)
6.5 Is there waste accepted, stored or recycled on the premises?
D D
Waste type must be described with reference to Landfill Waste Classification and Waste Definitions 1996 (as amended December 2009) or the Environmental Protection (Controlled Waste) Regulations 2004. Detail must be provided on storage type (e.g. hardstand, containment infrastructure), capacity and containment features (lining, bunding).
6.6 Public health and environmental risks
Attachment 6 completed
D
[Instructions set out in Attachment 6]
Department of Environment Regulation
INSTRUCTIONS
• You must provide detail on source (e.g. kiln stack), contaminants (e.g. particulates) and quantity (mglm3) of the emission. Instructions are set out in Attachment 6.
• All material sources of emissions where there Is a risk to public health or the environment, and for which there Is a receptor must be Identified. This includes where you may consider this to be a low risk.
• The risk to public health or the environment and proposed controls are to be specified.
Part 7. Siting and location
7. 1 Are there sensitive receptors located within specified separation distances from the premises?
No Yes
0 0
In considering sensitive receptors and separation distances refer to DER's Guidance Statement: Separation Distances.
7.2 Are the premises located within or adjacent to any Specified Ecosystems such as wetlands, surface water, groundwater or terrestrial areas?
In considering Specified Ecosystems refer to DER's Guidance Statement: Environmental Siting.
7.3 Siting and Location [Instructions set out in Attachment 7}
Attachment 7 completed
Specified Ecosystems are defined in DER's Guidance Statement: Separation Distances.
Part 8. Assessment Framework-DO NOT COMPLETE: THIS SECTION NOT ACTIVE
8 1
8.2
All e ning assessments requi t:; und 1 r ,uidance Statement: Assessment Framewo andunderpinning emission guidelines com lete 1.
8.3
8.5
[I ut in Attachment co 1pleted
Part 9. Submission of any other relevant information
9 Additional information
Attachment 9 completed
submitted
Supplementary documentation submitted
List title of supplementary document/s in Attachment 9
Part 10. Proposed fee calculation
1 0.1 All information and data used for the calculation of proposed fees provided.
D
D
No es
No Yes
0 0
0 0
Detail of costs of works must include site works (e.g. levelling and drainage), construction works, plant and equipment hire and labour.
Department of Environment Regulation
1 0. 2 Fee details
[Instructions set out in Attachment 1 0]
Attachment 10 completed
INSTRUCTIONS
Fee calculators are available online to assist In completing this section.
• Licence fee calculator: www.der.wa.gov.au/LicenceFeeCalculator.
• Works approval fee calculator: www.der.wa.gov.au/WorksapprovaiFeeCalculator.
Part 11. Submission of application
All information considered exempt from public disclosure has been separately placed in Attachment 11.
Grounds for claiming exemption in accordance with Schedule 1 to the Freedom of Information Act 1992 must be specified.
A full electronic copy has been submitted via:
A full hard copy has been sent to:
APPLICATION SUBMISSIONS Department of Environment Regulation Locked Bag 33 Cloisters Square PERTH WA 6850
Acknowledgement and signature I,
Mlt/Vl..
(name) LOw
Ff:.L..rtJ
""' ' Ll fv1 A-N� ell (position)I confirm I am authorised on behalf of the applicant to submit this application.
D
I confirm that the information contained in this application is true and correct and I acknowledge that knowingly providing information which is false or misleading in a material particular commits an offence under section 112 of the Environmental Protection Act 1986 and may incur a penalty of up to $5 0, 000.
I acknowledge that this application (excluding Attachment 11) is a public document and may be published. I confirm that information considered exempt from public disclosure has been placed in Attachment 11 with reasons as to why the information should be exempt in accordance with the grounds specified In Schedule 1 to the Freedom of
Information Act 1992.
I acknowledge that subsequent information provided in relation to this application will be a public document and may be publish unless written notice has been given to the Department of Environment Regulation by the applicant, at the time the information is provided, claiming that the information is considered exempt from public disclosure.
I acknowledge that the decision to not publish information will be at the discretion of the Department of Environment Regulation and will be made consistently with the provisions of the Freedom of Information Act 1992.
Date (Signature)
Department of Environment Regulation
ATTACHMENT CHECKLIST
y th t h • "ded II f th tt h • Attachment 1A: Proof of Applicant status
"fi d b I
You must provide copies of certificate of title, lease or other instruments evincing proof of occupier status.
Attachment 1 B: ASIC Company Extract
You must provide a company extract (showing current company information only) from ASIC.
Attachment 2: Map for proposed premises
You must provide an aerial photograph of sufficient scale showing the proposed premises.
You must also provide a map of the proposed premises, identifying:
(a) layout of key infrastructure and buildings, clearly labelled; and (b) lot boundaries,
No Yes
0 0
No Yes
0 0
with a north arrow, clearly marking the area in which the activities are carried out and of reasonable clarity and visible scale.
Attachment 3A: Proposed activities
You must provide details of proposed activities, identifying:
(a) scope, size and scale, including details as to frequency, production and design capacity;
(b) key infrastructure and equipment;
(c) unique or non-industry standard processes or operations; and (d) emissions discharge points.
Attachment 38: Map for proposed area to be cleared (only applicable if clearing is proposed)
No Yes
0 0
No Yes
0 0
You must provide an aerial photograph or map of sufficient scale showing the proposed clearing area and premises boundary or
if you have facilities a digital map on CDROM of the area to clear as an ESRI shapefile with the following properties:
•Geometry type : polygon shape
•Coordinate system: GDA 1994 (Geographic latitude/longitude}
Datum: GDA 1994 (Geocentric Datum of Australia 1994)
Attachment 4: Other approvals
No
0
Yes
0
You must provide details of other approvals specified in section 4 of this application, including copies of relevant decisions and any consultation undertaken with interested parties.
No Yes
0 0
Department of Environment Regulation
Attachment 5: Fit and c ompetent operator
You must specify name of the small proprietary company/companies that you have been involved in that have previously held a licence or works approval instrument, or provide the licence or works approval instrument number.
Attachment 6: Public health and environment risks
No Yes
0 0
You must provide details of public health and environment risk (including risks you have assessed as low), identifying:
(a) Source of emissions, Specific emissions, Receptors and proximity and Proposed controls. Providing details of specific emission quantities may not be relevant for some emissions such as odour, noise and dust or emissions arising from incidents or unplanned events.
(b) Waste type (including waste generated onsite), quantity, storage and location of waste which relate to activities that fall within the category of prescribed premises in Schedule 1 to the Environmental Protection Regulations 1987.
Set out below is a suggested format for specifying waste types.
Waste Type Quantity Storage Location
You must provide a map showing siting and location of the premises to a 5km radius including identification of distances to sensitive receptors. Calculation of distance should be made in accordance with the Guidance Statement:
Environmental Siting and the Guidance Statement Separation Distances.
Should the premises be in locations identified through Guidance Statement: Environmental Siting, further information including depth to groundwater, water quality and beneficial uses must be provided.
Applicants seeking to submit further information may include information in Attachment 9.
Where supplementary documentation is submitted, please specify name of documents below.
Attachment 10: Proposed fee calculation
In the form provided: see following Attachment.
Attachment 11: Request for exemption from publication In the form provided: see following Attachment
No Yes
0 0
No Yes
0 0
No Yes
0
No Yes
0 0
Department of Environment Regulation
Attachment 10: Proposed fee calculation
Summary of proposed fees
Proposed works approval fee (see Schedule 3 of the Environmental Protection Regulations 1987)
Fee component Proposed fee
Cost of works: $ $
Proposed licence fee (see Schedule 4 of the Environmental Protection Regulations 1987) Part 1 Component
Part 2 Component Part 3 Component
Total proposed licence fees:
I
$Note: (1) DER has fee calculators available on its website:
-Licence: www.der.wa.qov.au/licenceFeeCalculator; and
-Works approval: www.der.wa.gov.auMiorksA�:mrovaiFeeCalculator.
(2) Different Fee Units apply for different fee components. Fee Units may also have different amounts depending on the period in which the calculation is made.
Detailed breakdown of proposed licence fees
Premises component
Proposed licence fee: Part 1 Premises (see Part 1 of Schedule 4 of the Environmental Protection Regulations 1987) Premises:
f+
f'JI rvl A-L Pf:-�J) MkfVV,':.A (TI.)IV N�
Sub total
bg'S'-f·rl
$Discharges to air, onto land, into waters Proposed licence fee: Part 3 Discharges to air
(see Part 3 of Schedule 4 of the Environmental Protection Regulations 1987)
Discharges to air Discharge
Discharges to air Discharge
quantity quantity
Carbon monoxide :2..·
7b9
NickelOxides of nitrogen
1·29.7
VanadiumSulphur oxides 0
·03-b
ZincParticulates (PM1o and PM2.s)
() ·2.4-IJ.
Vinyl chloride Volatile organic compounds 0·1�/
Hydrogen sulphideInorganic fluoride Benzene carbon oxysulphide
Aluminium Carbon disulphide
Arsenic Acrylates
Chromium Beryllium
Cobalt Cadmium
Copper Mercury
Lead TDI (toluene-2,
4-di-iso-cyanate)
Manganese MDI (diphenyl-methane
di-iso-cyanate)
Molybdenum Other waste
Subtotal
/f7· )�
$j)·
Industry Licensing System - Department of Environment Regulation
Government of Western Australia
Department o1 Environment RegulaUon
Fee start date
fees calculator
06/07/2016
Application Page 3 of 5 Licence Fees
Page 1 of 1
If you are applying for a licence or submitting your annual licence fee information you must provide the following details in accordance with the Environmental Protection Regulations 1987.
p
uidance on calculating licence fees is available on the OER website.ft't
ll supporting information, workings, calculations and assumptions made in the fee calculations should be attached on Application Page 4. DER officers may reject fee applications orre
quest resubmissions if information is missing or incomplete, for example, if some of the prescribed waste components have not been appropriately considered. It is the applicant's oricensees responsibility to ensure that their fee application is appropriate and complete. Rejected applications and resubmission requests could delay your application and may incur penalty
ees
Premises
f ... ... ... ... ; ... ... ...
.... , .. ...
Premises Component(s)
Category 23 - Animal feed manufacturing Selection required
Total Premises Component(s) Part
2
WasteWaste Type
004
-No Emissions Incur a Fee Selection requiredTotal Waste Component(s):
Part3Waste Discharges to Air:
Wasle Type 111
-
C�ttbon Monoxide 121- Oxides of Nitrogen 123-
Particulates 131 -Volatile Organic Compounds (VOC)122 -Sulphur Oxides Selection required
Total Air Component(s):
�
lscharges to Water:
Wasle Type 003- No Emissions Incur a Fee Selection requored
Total Water Component(s):
Discharges to Land:
Waste Type 002 - No Emissions Incur a Fee Selection required
Total land Component(s):
otal Fee
Total Licence Fee
Capacity Range More than 1 00 000 tonnes per year Select category first
$6854.58
Amount Not applicable Select waste type first
$0.00
Localion I Qualifier Anywhere In Western Australia SWan Coastal Plain or Metropolitan Region Swan Coaslal Plain or Metropolilan Region SWan Coaslal Plain or Metropolitan Region SWan Coastal Plain or Metropolitan Region Select waste lype first
$157.53
Location I Qualifier Not applicable Select wasle type first
$0.00
Location I Qualifier Not applicable Select waste type first
$0.00
$7012.11
Back
1
Exit1
Continue1
(C) Copyright 2007 Deparbnent of Environment Regulation Units g/min glmin glmin g/min g/min
Units kg/day
Units kg/day
Discharge 2.769 3.287 0.244 0.181 0.036
Discharge 0
Discharge 0
Fee
$6854.58
Fee
$0.00
Fee
$0.00
$157.53
$0.00
$0.00
$0.00
Fee
$0.00
Fee
$0.00
� �
� �
�
Add
'
�
Add]
�
Add
I
Department of Environment Regulation
Proposed licence fee: Part 3 Discharges onto land or into waters
(see Part 3 of Schedule 4 of the Environmental Protection Regulations 1987)
Discharges onto land or into waters Discharge
quantity 1. Liquid waste that can potentially deprive (a) biochemical oxygen demand (in
receiving waters of oxygen (for each kilogram the absence of chemical oxygen fVIL
discharged per day) - demand limit)
(b) chemical oxygen demand (in the
absence of total organic carbon MI.-
limit)
(c) total organic carbon Nil-
2. Biostimulants (for each kilogram discharged (a) phosphorus NIL per day)-
(b) total nitrogen «1L
3. Liquid waste that physically alters the (a) total suspended solids (for each
characteristics of naturally occurring waters- kilogram discharged per day) NIL- (b) surfactants (for each kilogram
discharged per day) NIL
(c) colour alteration (for each platinum
cobalt unit of colour above the (VI/_
ambient colour of the waters in each megalitre discharged per day)
{d) temperature alteration (for each 1"C above the ambient
temperature of the waters in each f-Ill.- megalitre discharged per day) -
(i) in the sea south of the Tropic of Capricorn
(ii) in other waters
4. Waste that can potentially accumulate in the (a) aluminium, arsenic, cadmium,
environment or living tissue (for each kilogram chromium, cobalt, copper, lead, /'fiL
discharged per day) - mercury, molybdenum, nickel,
vanadium and zinc
(b) pesticides /.II L
(c) fish tainting wastes f\[tl.-
(d) manganese NIL-
5. E coli bacteria as indicator species (in each (a) 1 000 to 5 000 organisms per 100
megalitre discharged per day) - ml ji/IL.-
(b) 5 000 to 20 000 organisms per
1 00ml NtL
(c) more than 20 000 organisms per
,'VI L
100ml
6. Other waste {per kilogram discharged per (a) oil and grease WI I.- day)-
(b) total dissolved solids NIL
(c) fluoride f'.{ll..-
(d) iron NIL
(e) total residual chlorine f\{(1.-
(f) other fi'IL---
Subtotal $
Department of Environment Regulation
Information and data used to calculate proposed fees
The detailed calculations of fee components, including all Information and data used for the calculations are provided in the specified annexures to this application.
Proposed fee for works approval Annexure No
Details for cost of works
Proposed fee for licence Annexure No
Part 1: Premises
b85'+. s-g
Part
2:
Waste types I1�7. f�
Part 3: Discharges to air, onto land, into waters 0 '()�
Prescribed fee for clearing pennit (only required If clearing deviates or extends from that proposed in works approval or licence application)
Please indicate the clearing permit application fee Area Permit:
D $50
for an area of less than one hectareD $100
for an area between one hectare and10
hectaresD $200
for an area of more than 10
hectaresPurpose Permit:
D
A$200
fee is required for all purpose permit applicationsDepartment of Environment Regulation
Attachment 11: Request for exemption from publication
Information which you consider should not be published on the grounds for claiming exemption in accordance with Schedule
1
to the Freedom of Information Act 1992 must be specified in this Attachment.NOT FOR PUBLICATION IF GROUNDS FOR EXEMPTION ARE DETERMINED
Section [x]:
I
Ground for claiming exemption:Section [x]: