MAIN ROADS Western Australia
Clearing Permit CPS 818 - Summary for DEC V2
Region Road Project Description Start SLK End SLK
Amount of Clearing under Purpose Permit
(ha)
Located in ESA?
Was the project at Variance to the 10 clearing
principles?
Reveg
Management Revege (ha) Date
Cleared
Coral Bay
Road Coral Bay Works 2.4 11 10 ha No No Yes 10 ha Feb-April 07
Minilya- Exmouth Rd
Warroora Station
Fencing (Stage 1) 23.39 68.64 13ha No Yes No N/A Jun-07
North West Coastal Highway
Carbla Station
Fencing (Stage 1) 313.63 289 13 ha No No No N/A Nov-07
North West Coastal Highway
723.81 749.14 No
Burkett road 0 2.53 No
Minilya- Exmouth Rd
Pit Extension Min-
Ex Rd 63.70 SLK 0.5 ha No No Yes 0.04ha Oct-07
Minilya- Exmouth Rd
Pit Extension Min-
Ex Rd 175 SLK 0.5 ha No No Yes Nil Oct-07
Pannawonic a Rd
Pannawonica Dumpsites (30.5 &
39.18 SLK)
2 ha No No Yes Nil Sep-07
Eyre Highway
Heartbreak Ridge Widen and Reconstruct
44.49 90.18 60 No No Yes 33 01/01/207
Coolgardie Esperance Highway
Norseman Hyden Road Intersection Improvements
155.95 - 4.36 No No No 0 17/01/2007
Goldfields Highway
Jeedamya Floodway Improvements
247 248 10 No No Yes 6 01/03
Goldfields Highway
Lake Raeside Reconstruction and
Realignmnet
293 300 30 No No Yes To be completed. 01/06/2007
Goldfields Highway
Re - Sheeting
Works 692 704 5.5 No No Yes 4.5 01/03/2007
Goldfields Highway
Killara Station
Fencing 716 736 12 No No No 0 30/04/2007
Great Southern
Broomehill to Jerramungu
p Rd Deadmans Curve 75.52 77.3 1.3ha n n No 0 Nov-07
Broome- Cape Leveque Rd
Broome-Cape Leveque Rd Upgrade Stage 1C
147.3 172.2 62.25 No No Yes 12.45 Apr-07
Broome Hwy
Broome Hwy Realignment Stage
2
32.64 38.74 14 No No No Nil May-07
Gibb River Rd
Bindoola Creek
Crossing 561.37 562.26 1.5 No No No Nil May-07
Gibb River
Rd Pentecost Jump-up 571.91 573.59 5.88 No No No Nil May-07
Gibb River Rd
Reconstruction Project, KDC Access, Stage 1
62.30 110.22 22.75 No No YES 10 Oct-07
Metro
Brand Highway
Brand Highway Passing Lane SLK 54.20 to SLK 56.00
54.2 56 1.8 No No No N/A Sep-07
Brand Highway
Brand Highway Passing Lane SLK
61.50 to 63.40
61.5 63.4 1.9 No No No N/A Sep-07
Brand Highway
Brand Highway Passing Lane SLK 93.80 to SLK 95.90
South Bound
93.8 95.9
3.6 ha (combined with project
below)
No No No N/A Apr-07
Brand Highway
Brand Highway Passing Lane SLK 92.60 to 94.00 (now 92.77 to 94.45 SLK)
Northbound
92.77 94.45
3.6 ha (combined with project
above)
No No No N/A Apr-07
Mid West
NO CLEARING TO REPORT 63.7
175
39.18 Gascoyne
Goldfeild Esperance
Kimberley
No Aug-07
2007 Summary for DEC V2
Vegetation Clearing Permit CPS 818/4
Marilla Station
Fencing 16.425 ha No N/A
MAIN ROADS Western Australia
Clearing Permit CPS 818 - Summary for DEC V2
Region Road Project Description Start SLK End SLK
Amount of Clearing under Purpose Permit
(ha)
Located in ESA?
Was the project at Variance to the 10 clearing
principles?
Reveg
Management Revege (ha) Date
Cleared
Pilbara
South Western Highway
South Western Highway passing
lanes Yarloop
96.6 97.9 2 Yes Yes Yes
5 Ha of revegetation is required by the DEC for rehabilitaiton of Main Roads Reserve 31901 (commencing with 2008 spraying + planting of approx. 100 seedlings (trees) followed by further planting in 2009/2010); also
Yarloop passing lane road verges will be planted 2008:
1020 seedlings)
South Western Highway
South Western Highway Donnybrook South
183.02 191.58
1.63 Ha (0.59 Ha Donnybrook North; 0.55 Ha
Donnybrook South; 0.49 Ha Brookhampton)
No No Yes
2007 Brookhampton 850 seedlings; 2008 Brookhampton replants 430 seedlings, Donnybrook-south 820 seedlings, direct seeding both sections approx. 1 Ha
South Western Highway
Peterson Road
Harvey 106.3 108.23 1.07 No No Yes
2750 seedlings planted in 2007; 510 seedlings (replants)
ordered for planting in 2008
Muirs
Highway Nyamup to Strachan 34.8 40.8 8.6 No No Yes
4 Ha to be rehabilitated (ie batters and old road) through
topsoil respreadand direct seeding with local provenance
seed 2007/2008 Caves Road Monaghan's
Roundabout 1.62 0.37 No Yes No Job not commenced as yet.
Bussell Highway
Harewoods Road
upgrade 8.61 8.76 0.225 No No Yes 0.2
Perth Bunbury Highway
Taranto - Springhill
Roads 131.35 136.93 1 No No Yes 660 seedlings planted
New Perth - Bunbury Highway
Lakes Rd East 0 2500 71 trees No No NO N/A Dec 2007
New Perth - Bunbury Highway
Macauley sand pit N/A N/A Approx. 20 trees
/ 1.1ha No No NO N/A Dec-2007
Great Eastern Highway
Upgrade 279.4 282.36 0.81 No No No N/A Jan 07
Great Eastern Highway
Clackline Bypass 75.7 77.2 3.78 Yes -
0.2587 ha Yes Yes 3+ ha Jan-Feb07
Great Eastern Highway
Upgrade 282.4 291 1.7285 No No No N/A Apr 07
Lancelin
Road Passing Lane 23 24.7 2.5 Yes Yes No N/A Oct 07
Great Eastern Highway
Upgrade 284.3 286.7 1.78 No Yes Yes 10.3 ha Dec 07
Wheatbelt South Brookton
Highway Widen and overlay 222.6 226 1.2 No Yes Yes 17.2 total for entire project not
just this section Aug-07 Wheatbelt North
South West
NO CLEARING TO REPORT