• Tidak ada hasil yang ditemukan

SUNLAND RESIDENTIAL DEVELOPMENT UNDER

N/A
N/A
Protected

Academic year: 2023

Membagikan "SUNLAND RESIDENTIAL DEVELOPMENT UNDER "

Copied!
1
0
0

Teks penuh

(1)

31/01/14 ISSUE: D

Client: Rutherford Avenue Village Green • Kellyville S13-0072 SK 7

LANDSCAPE MASTER PLAN

1:500 @B1

0 10 20 30 50m

SUNLAND RESIDENTIAL DEVELOPMENT UNDER

CONSTRUCTION

FLORENCE AVENUE

RUTHERFORD A VE

Large dynamic sculptural earth form

Bridge with spillway underneath

Location of 50,000 litre underground water tank for irrigation Existing watercourse re-graded and

20m wide riparian corridor established

Sandstone drop structures located near adventure play area to allow for intimate water experience and to control velocity of water

Rain garden to treat upstream residential areas prior to re-use for irrigation

Slippery slides down embankments

Open vista through earthworks

Viewing platform at lookout vantage point

PLAY SPACE

VILLAGE GREEN

Irrigated Turf

YOUTH PLAZA

RAIN GARDEN

(1,000 sqm)

THE CUTTING

THE

WOODLAND

CREEK LINE

THE

ORCHARD

Feature shelter structures made from recycled materials

Toilets (40m2 GFA) 10 female toilets 8 male toilets

FUTURE BOULEVARD

Bushland track provides north-south connection

Existing electricity transformer retained

ADVENTURE PLAY

Large mature fig tree

Picnic area

Shelters with ‘camp kitchen’ style facilities and ‘grassy embankment’ catering for larger family groups

Stormwater outlet where treated water discharges from rain garden into creek

Possiblility to provide signage for interpretation of the

‘Evolution of a Rural Landscape’ along the path Car park with 23 spaces

including 2 disabled parking

EXISTING RESIDENTIAL DEVELOPMENT

FUTURE GREENW

AY LINK

Entry Point

Entry Point Entry Point

Entry Point

LEGEND

Managed lawn Mass planting

Feature shrub planting at entry points Non-indigenous feature trees

Indigenous tree planting Manchurian pear tree

Existing tree to be retained

Sandstone seating wall around viewing platform Concrete footpath

Concrete stiars Timber Bridge

Compacted gravel surface Bushland track

Sandstone drop structure 20m wide riparian corridor

Opportunity for interpretive signage Existing street light

Site boundary

S HARE

D B I KE P A TH LIN K

Viewing platform

Timber bridge

Timber bridge on sandstone drop structure for crossing Large feature tree to

accentuate street corner

Flat and shady area for large groups

Existing vegetation to be retained

Feature trees and shrub planting to accentuate entry point Mass planting to

embankments

Paths to remain seperated for different activities and to achieve accessible grades Large feature tree and shrub

planting to accentuate street corner Potential for future pedestrian

crossing near reserve entrance

THE HILL

Referensi

Dokumen terkait

The results showed that: (1) there were differences in mathematical literacy skills between students who attended the MASTER learning model and those who took conventional

Partially exogenous variables (Work Environment, Leadership, and Organizational Culture) on endogenous variables (Motivation) will be explained in the test results of