No. BRACU -NCP 12022 I 0 64
A
Mr. Yuan Liang
Executive Proj ect N.{anager
BUCG-ABC JV
Subject: Fending items needed subrnissions from yorf
Dated: 20 June 2022
Several times, we have asked your concerned Engineers to submit/provide us the following items.
But we have not received those so far.
Please submit the.following items at your earliest for approval from BRACU.
L
lnstallatibn detail of Doors on Architectural Brickwall'(BKl).
2. Installation details of W04, W05, W07 including specification (TDS) of the
filler
materials to be used in the spaces/gaps between the brick wall and the jamb of the windows - W04, W05,w07
3. Installation details of the wooden door including specification (TDS) of the
filler
materials to be used in the spaces/gaps between the brick wall and the jamb of the Timber doors.4. Floor Finish Detail at grille bottom and outside grille of the Oblique fins. (angular vertical
fin
in toilet and stair area).5. Proposal of Color of MIO to be used for metal door 6. Sample of CM7 - Precast ferrocement block in MPH.
7. Specification (TDS) of EPDM to be used in Jogging track.
8. Architectural design / drawing of the Main Entrance.
9. Architectural design / drawing of the covered linkway.
For BRAC University
Shaikh
Ali /
''Project Manager
.
-' BRACU New Campus Copy to:Project
1.
Project Director, BRACU New Campus Project2.
BRACU New Campus Project Team3.
Office Copy,@
hpuh$uflwt 9'
Shaikh
Ali