• Tidak ada hasil yang ditemukan

SEMESTER PLAN 2021.xlsx

N/A
N/A
Protected

Academic year: 2024

Membagikan "SEMESTER PLAN 2021.xlsx"

Copied!
1
0
0

Teks penuh

(1)

T

2 Nos theory class per week

P

3 Period practical class per week

C

3 Credit hour & 1 Credit 50 Mark

Practical Content Practical Name

1

Understand the components and item of works of Multi- storied framed structure. building.Understand the earth work, brick flat soling and cement concrete in foundation and plinth.

1.1----1.3

& 2.1- -2.5

1

Introducing to different equipment which is required to perform practical experiment.

2

Understand the reinforced cement concrete work in different items of

building 3.1----3.4 2

Expt No:- 01

Estimate the earth work in excavation and earth filling for foundation trenches.

3

Understand the brick work and cement plaster work in foundation and superstructure. Understand the wood work in different types of doors and windows with grill works.

4.1----4.3

&

5.1-5.9

3

Expt No:- 02 & Expt No:- 03 2.Estimate the brick flat soling & mass concrete in foundation and floor. 3.Estimate the reinforced cement concrete work in foundation up to plinth level.

4

Understand the patent stone flooring, mosaic work, tiles & skirting.nderstand the lime terracing work over RCC roof slab.

6.1----6.5

&

7.1--7.3

4

Expt No:- 04

Estimate the reinforced cement concrete work in superstructure.

5 Understand the surface finishing

works of building. 8.1----8.9 5

Expt No:- 05

Estimate the brick work in sub-structure (foundation up to plinth level) and superstructure.

6

Understand the estimate of septic

tank. 9.1----9.7 6

Expt No:- 06

Estimate the cement plaster work on brick walls and RCC surfaces.

Semester : 5

th

, Shift: 1st & 2nd

MYMENSINGH POLYTECHNIC INSTITUTE TECHNOLOGY: CIVIL

Outline Plan of On line Teaching (Semester Plan)

Subject Name: Estimating and Costing-II

Subject Code: 66455

& Y O U T U B E C O N T E N T

W ee k Theory

Learning Materials

Practical Job No Content

Specific Objectives

walls and RCC surfaces.

7

Understand the estimate of RCC retaining wall and RCC culvert.

10.1--10.8 7

Expt No:- 07 & Expt No:- 08

7. Estimate the wood and steel work in door and window frames and shutters. 8.

Estimate the grill works.

8 Understand the estimate of roof truss

(wooden & steel). 11.1--11.9 8

Expt No:- 09 & Expt No:- 10

9.Estimate the patent stone flooring, mosaic work, tiles & skirting. 10. Estimate the lime terracing over RCC roof slab.

9

Understand the estimation of steel structure (vertical iron

column).Understand the estimation of plumbing and sanitary works.

12.1--12.4

& 13.1-

-13.3 9

Expt No:- 11

Estimate the quantity of white wash, color wash, snowcem wash, distemper, plastic paint where necessary.

10

Understanding the process of analysis of rates of various items of work as per PWD standard.

14.1---14.4 10

Expt No:- 12 & Expt No:- 13 12. Estimate the painting and varnishing

works to doors, windows, grills and skirting.

13. Prepare an estimate of a septic tank and soak well with allied connections & fixtures.

11

Understand the preliminary estimate for building project work according to

plinth area rate. 15.1---15.3 11

Expt No:- 14

Prepare an estimate of a RCC slab culvert and two span box culverts.

12

Understand the public works account and forms.

16.1---16.9 12

Expt No:- 15

Prepare an estimate of a RCC retaining wall.

13

Understand valuation of property and

building. 17.1---17.3 13

Expt No:- 16

Prepare an estimate of a wooden truss with CI sheet roofing.

14 Understand valuation of property and

building. 17.4---17.7 14

Expt No:- 17

Prepare an estimate of a steel truss with CI sheet roofing.

15 REVIEW CLASS 15

Expt No:- 18 & Expt No:- 19 18.

Prepare the cost of abstract of wooden &

steel roof truss. 19.

Prepare an estimate of a steel structure.

16 REVIEW CLASS 16 EVALUATION

M A R K E R P E N , W H IT E B O A R D , M U L T IM E D IA C O N T E N T & Y O U T U B E C O N T E N T

Referensi

Dokumen terkait

PPKM Darurat semula dilaksanakan pada tanggal 3 Juli-20 Juli 2021 lalu diperpanjang hingga 25 Juli 2021 dan akan dilonggarkan secara bertahap apabila tren kasus Covid-19

3 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 3.1 1:5:10 1 cement : 5 coarse sand

Marks distribution for 1st term & 2nd term examination Skills Total Marks Test Items Marks Part-A Reading Test 50 Seen Passage 1-3 1.. Gap filling without clues 05 Unseen Passage

sqm 18.72 2 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 1 Cement'.. cum

66.33 Cum 0.00INR Zero Only 6 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 1