• Tidak ada hasil yang ditemukan

Techniques of Industrial Engineering

N/A
N/A
Protected

Academic year: 2023

Membagikan "Techniques of Industrial Engineering"

Copied!
4
0
0

Teks penuh

(1)

Concept of Industrial Engineering (IE)

Industrial Engineering is concerned with the design, Improvement, and installation of integrated system of men, material, and machines for the benefit of mankind .It draws upon specialized knowledge and skills in the mathematical and physical sciences together with the principles and methods of engineering analysis and design to specify, predict and evaluate the results to be obtained from such systems.

Industrial Engineering (IE) =production↑ cost↓ proper use of all elements↑

Efficiency↑ Profit↑

Industrial Engineering

Work study Method Study Motion Study Time Study Work measurement Min.Work place Motion economy

Capacity Study Max.Work place Body movement

G S D loss time

Analytical Eng.

Historical data

SMV Cycle Time Rating Takt Time Basic Time Observe Time Efficiency%

Techniques of Industrial Engineering

The main aim of tools and techniques of industrial engineering is to improve the productivity of the organization by optimum utilization of organizations resources: men, materials, and machines. The major tools and techniques used in industrial engineering are:

1) Production planning and control.

2) Inventory control.

3) Job evaluation.

(2)

4) Facilitates planning and material handling.

5) System analysis.

6) Linear programming.

7) Simulation.

8) Network analysis.

9) Assignment.

10) Sequencing and transportation models.

11) Statistical techniques.

12) Quality control.

13) Decision making theory.

14) Replacement models.

15) Assembly line balancing.

16) ISO-TQM.etc.

Responsibilities of an Industrial Engineer:

 Operation breakdown & Machine Layout.

 Buyer & Style wise operation breakdown & Layout.

 Prepare Man machine report.

 Buyer & style wise capacity study & line balancing.

 Train up production staff on efficiency.

 Production Monitoring&Achieve the line Target.

 Daily line wise Target setup.

 Wastage control at the production floor.

 To prepare daily, weekly, monthly production plan (Cutting, Printing, and Sewing)

 Arrange trims & accessories just in time.

 Prepared daily Crisis report& SMV calculation.

 Follow up daily output per production line & achieve the line.

 Method study & Motion Study.

(3)

 Data collect & efficiency report

 Prepare skill inventory & grading of the operator

 Nonproductive time (Lost Time) record.

 Ensure optimum use of machine.

 Machine servicing report follow-up.

 Monitoring and optimize rented machine.

 Daily production, efficiency and manpower report.

 Daily quality statistical report presentation.

 Monthly production and shipment closing report.

Production planning

Department and factory inventory

 Research to improve all department of factory

TIME STUDY

Definition of time study

A work measurement technique for recording the times and rates of working for the elements within specific conditions, and for analyzing the data so as to determine the time necessary for carrying out a job at a defined level of performance (Glock and Kunz, 2009).

(4)

Time study equipments

Basic time study equipments consist of 1. Stop watch

2. Study board 3. Time study forms

Referensi

Dokumen terkait

Penelitian ini menghasilkan sebuah kesimpulan bahwa dengan menggunakan Flutter dapat memudahkan para developer frontend untuk membuat suatu aplikasi pembelajaran online

Bentuk implementasi yang dilakukan dalam membantu petani supaya terhindar dari seranggan hama wereng coklat adalah mengaplikasikan chatbot sebagai media informasi untuk