INTEGRASI METODE ANALYTICAL NETWORK PROCESS (ANP)

DENGAN INTEGER LINEAR PROGRAMMING (ILP) DALAM PEMILIHAN

SUPPLIER (Study Kasus Pada PT. Marie Singa Sari Malang)

Oleh: Diah Riyani Rachmawati ( 04540029 )

Industrial Engineering Dibuat: 2009-04-20 , dengan 8 file(s).

Keywords: ANP, ILP, Supplier

ABSTRAK

PT. Marie Singa Sari Malang adalah perusahaan yang bergerak dibidang manufaktur yang memproduksi biscuit. Saat ini perusahaan telah memiliki empat Supplier tepung, yang mana tepung merupakan item kritis dalam pembuatan biskuit. Dalam hal ini perusahaan mengalami bebarapa masalah dalam pembelian ke supplier karena beberapa supplier seringkali mengirim pesanan tidak sesuai dengan jumlah yang dipesan dan juga terjadi keterlambatan pengiriman, sehingga sering terjadi stock out bahan baku di gudang yang mengakibatkan proses produksi menjadi terhambat.

Dalam penelitian ini akan dilakukan evaluasi dan pemilihan Supplier. Empat Supplier tersebut adalah PT. Eastern Pearl Flour Mills (A), PT. Indo Utama Indah (B), PT. Indofood Sukses Makmur .Tbk (C), dan PT. Sriboga Ratu Raya (D). Dalam perhitungan menggunakan metode ANP terdapat lima kluster yaitu kluster internal supplier, cost, performansi teknis, ketepatan, dan transportasi. Dalam masing-masing kluster tersebut terdapat kriteria-kriteria yang saling

mempengaruhi, baik dalam kluster itu sendiri (Inner dependence) maupun dengan kriteria dari kluster lain (Outer Dependence). Hasil pembobotan dengan menggunakan metode ANP

diperoleh urutan pembobotan Supplier yaitu untuk Supplier C= 0.4492, A= 0.1004, D= 0.2452, B= 0.2051. Sedangkan sebelum dilakukan evaluasi dan pemilihan Supplier didapatkan urutan Supplier C-D-A-B. Hal ini dikarenakan dalam metode ANP melihat hubungan saling

mempengaruhi antar kriteria dan kluster.

Setelah didapatkan bobot ANP diatas tahap selanjutnya adalah melakukan alokasi order pada masing-masing supplier dengan menggunakan ILP untuk pemesanan 3 periode mendatang. Alokasi pesan untuk bulan Desember 2008, Januari dan Februari 2009 secara berurutan ke supplier C sebesar 70kw, 70kw, 70kw. Untuk supplier A 30kw, 30kw, 30kw. Untuk supplier D sebesar 20kw, 12kw, 16kw. Untuk supplier B tidak dilakukan alokasi pesan karena dari ketiga Supplier sebelumnya telah memenuhi jumlah permintaan perusahaan.

ABSTRACT

PT. Marie Singa Sari Malang is a peripatetic company in area of manufactur which producing biscuit. In this time the company have owned four supplier flour, which flour represent critical item in making of biscuit. In this case natural company of purchasing internal issue to supplier because some supplier oftentimes send order disagree with amount of which is ordered as well as happened delay of delivery, so that often happened stock of out raw material in bond resulting production process become to be pursued

(2)

there are criterions which is influencing each other, goodness in it self kluster (Dependence Inner) and also with criterion of other kluster (Outer Dependence). Result of wight by using method of ANP obtained by wight sequence of supplier that is for the supplier of C= 0.4492, A= 0.1004, D= 0.2452, B= 0.2051. While before evaluate and election of supplier got by sequence of supplier C-D-A-B. This Matter because of in method of ANP see relation is influencing each other between and criterion of kluster.

After got by wight of ANP above phase here in after is to conduct order allocation at each

supplier by using ILP for ordering 3 period to come. Allocation order for the month of December 2008, January and of Februari 2009 alternately to C supplier equal to 70kw, 70kw, 70kw. For the supplier of A 30kw, 30kw, 30kw. For the supplier of D equal to 20kw, 12kw, 16kw. For the

supplier of B do’nt be conducted by allocation order because from third previous supplier have

Referensi

Dokumen terkait

Menurut Pratiwi (2009) ada beberapa kriteria dalam pemilihan parameter mutu untuk menentukan umur simpan suatu produk, yaitu : 1) parameter mutu yang paling

Pada penelitian Indah Suhertanti yang berjudul Perhitungan Unit Cost Tindakan Hemodialisis Tanpa Penyulit Dengan Metode Activity Based Costing Di Rumah Sakit Universitas

Perancangan Sistem yang digunakan untuk merancang atau mendesain implementasi CRM (Costumer Relationship Management) pada sistem Informasi travel x berbasis web

termokopel mencapai suatu titik temperatur yang sama/konstan maka menandakan proses adsorpsi berakhir. Dari Gambar 14 yang merupakan grafik proses desorpsi terlihat

Kelainan Jantung sebagai Faktor Risiko Terjadinya Stroke Iskemik Penyumbatan pada pembuluh darah yang merupakan penyebab terjadinya stroke iskemik dapat dikarenakan

hadir dan mencurahkan rahmat-Nya kepada setiap anggota keluarga baik dalam suka maupun dalam duka. Cinta Allah dicurahkan dan dianugerahkan ke suami isteri dan ke

Ayah dan ibuku tercinta yang selalu memberikan. do’a, dukungan dan kasih

Alternatif strategi dari kombinasi faktor kekuatan dan faktor peluang yaitu: 1) Menjaga koordinasi dan kerjasama yang baik antara Resort Bantaragung dengan Kelurahan untuk