OPTIMASI DIMENSI PIPA PENSTOCK PADA PEMBANGKIT LISTRIK TENAGA AIR AMPEL GADING MALANG

N/A
N/A
Protected

Academic year: 2017

Membagikan "OPTIMASI DIMENSI PIPA PENSTOCK PADA PEMBANGKIT LISTRIK TENAGA AIR AMPEL GADING MALANG"

Copied!
2
0
0

Teks penuh

(1)

OPTIMASI DIMENSI PIPA PENSTOCK PADA PEMBANGKITLISTRIK

TENAGA AIR AMPELGADING MALANG

Oleh: Wasis Pambudi ( 02520017 )

Civil Engineering

Dibuat: 2007-09-07 , dengan 2 file(s).

Keywords: Optimasi, Pipa Penstock, Biaya

PLTA Ampelgading adalah program jangka panjang PT. PLN (persero) Proyek Induk Pikitring Jawa Timur dan Nusa Tenggara Bagian Proyek PLTA Wonorejo, dalam rangka mencari harga listrik yang murah serta pemanfaatan semberdaya air, maka daerah Ampelgading dianggap cocok untuk dimanfaatkan sumberdaya air Pembangkit Listrik Tenaga Air. Lokasi dari perencanaan pembangunan Pembangkit Listrik Tenaga Air (PLTA) ini berada di Kabupaten Malang yang terletak antara 112° 54´ 32,28˝ Bujur Timur dan 8° 15’ 42,62” Lintang selatan tepatnya pada Sungai Sumber Bebek, Dusun Tawangsari, Desa Tirtomarto dan pada Sungai Andengan, Dusun Pucungsari, Desa Purwoharjo pada Kecamatan Ampelgading yang berada ± 75 km di sebelah kota Malang. Dari jalan raya jurusan Malang-Lumajang menuju lokasi proyek melewati jalan desa yang berupa jalan makadam dengan lebar kira-kira 5 m sejauh ± 5 km sampai ke lokasi Kolam Penampung.

Suatu keadaan untuk mencapai biaya seminimal mungkin dengan manfaat yang sebesar mungkin, disebut optimasi. Pipa penstock adalah pipa tekan yang digunakan untuk mengalirkan air dari tangki atas (head tank) atau langsung dari bangunan pengambilan ke turbin. Fungsi penstock didisain untuk dapat menahan tekanan pukulan air (water hammer) yang ditimbulkan oleh akibat katup turbin ditutup secara tiba-tiba.

Dari hasil perhitungan, diperoleh bahwa semakin besar diameter pipa, maka semakin besar pula biaya investasi dan biaya tahunannya. energi yang hilang sangat dipengaruhi oleh diameter, dengan diameter yang kecil maka biaya dari energi yang hilang akan semakin besar. hasil taksiran model Regresi Non Linier untuk model parabola Regresi kubik didapat diameter yang optimum 1,493 m ~ 1,5 m dan biaya total yang minimum ( biaya tahunan dan biaya energi yang hilang) sebesar Rp. 11.819.194.030 ~ Rp.12.507.283.914

Abstract

Ampelgading hydropower is a long-term program of PT. PLN (Persero) Parent Project Pikitring East Java and East Nusa Tenggara Section Wonorejo Hydroelectric Project, in order to find a cheap electricity prices and utilization of water semberdaya, then Ampelgading areas deemed suitable for the use of water resources Water Power Plant. Location of development planning Hydroelectric Power Plant (HEPP)

is lo ated in Malang Regen y whi h is lo ated etween ° ' . 8 ˝ East Longitude and 8 ° ' .

(2)

A condition to achieve the minimum cost with the benefit of as much as possible, called optimization. Penstock pipe is a pipe tap that is used to drain water from the tank top (head tanks) or directly from

shooting to the turbine building. Penstock functions designed to withstand the pressure blows the water (water hammer) caused by the result of the turbine valve is closed abruptly.

From the calculation, it is obtained that the larger diameter pipe, the greater the investment costs and annual fees. energy loss is strongly influenced by the diameter, with a smaller diameter then the cost of energy loss will be even greater. Regression model estimates for Non-Linear Regression Model cubic parabola obtained the optimum diameter of 1.493 m ~ 1.5 m and a minimum total cost (annual fees and

Referensi

Dokumen terkait

Berdasarkan pernyataan di atas, guna mendapatkan kebahagiaan hidup yag hakiki maka setiap muslim harus bisa menciptakan manfaat atau maslahah , yaitu segala bentuk

BOGOR TIMUR, KOTAMAUYA BOGOR, PROPLNSI.

Pengetahuan Umum, Kosakata, Hubungan Kata, Aritmatika, Deret Angka dan Menghafal. Jadi pada hari H tanggal 2 juni 2014 tes GAT dilaksanakan di Politeknik Negeri Ujung Pandang,

Dari hasil simulasi Plaxis pemodelan lereng dengan kemiringan sudut 60 ⁰ menggunakan perkuatan Geocell yang menujukkan angka keamanan (safety factor) dapat dilihat pada

Dalam penelitian ini digunakan tiga variabel independen dan satu variabel dependen. Variabel dependen dalam penelitian ini adalah konservatisme akuntansi. Variabel independen

Dari hasil analisis data validasi naskah Panduan Penilaian Akhir bagi Warga Belajar dalam model pembelajaran mitigasi bencana banjir pada pendidikan multikeaksaraan tahun 2018,

Analisis ini dilakukan dengan hanya menggunakan variabel terpilih berdasarkan hasil analisis faktor yang telah dilakukan yaitu sebanyak 7 indikator utama sehingga dapat diketahui

Dari hasil keseluruhan hasil uji coba menunjukkan Multimedia interaktif CAI dikategorikan layak digunakan, efektif, dan sangat baik (88,44%). Oleh karena itu Multimedia