PEKERJAAN : LANJUTAN PEMBANGUNAN KANTOR KELURAHAN BENDA BARU
HARGA SATUAN JUMLAH
Rp. Rp.
1 PEKERJAAN LANTAI 1 I . PEKERJAAN PERSI APAN :
1 - 1.00 ls
2 - 1.00 ls
3 I . 009 224.00 m2
4 I . 011 122.70 m1
5 I . 002 1.00 unit
6 I . 020 224.00 m2
7 - 1.00 ls
8 I . 005 1.00 set
9 I . 017 24.00 m2
10 I . 012 102.00 m1
I I , PEKERJAAN TANAH :
1 I I I . 003 104.97 m3
2 VI . 001 3.12 m3
3 VI . 001 22.09 m3
4 I I I . 015 88.35 m3
5 I I I . 013 62.27 m3
I I I . PEK. BETON BERTULANG :
1 XI X. 003 1.57 m3
2 XI X. 163 9.36 m3
3 XI X. 163 0.39 m3
4 XI X. 163 0.25 m3
5 XI X. 166 7.32 m3
6 XI X. 164 1.11 m3
7 XI X. 005 24.03 m3
8 XI X. 182 8.46 m3
9 XI X. 183 1.72 m3
10 XI X. 183 0.86 m3
11 XI X. 170 2.21 m3
12 XI X. 170 0.88 m3
13 XI X. 172 0.98 m3
14 XI X. 172 0.14 m3
15 XI X. 001 97.85 m2
I V. PEKERJAAN PASANGAN :
1 VI I . 014 42.70 m3
2 VI I . 006 8.54 m3
3 VI I I . 005 351.71 m2
4 VI I I . 004 8.00 m2
5 X. 006 643.02 m2
6 X. 017 60.40 m2
6 - 46.28 m2
7 XI . 012 217.88 m2
8 XI . 012 32.68 m2
9 XI . 017 18.30 m2
10 XI . 018 4.65 m2
11 XI . 018 1.40 m2
12 XVI I . 001 1.00 bh
13 XVI I . 002 1.00 bh
15 XVI I . 006 1.00 bh
16 XVI I . 007 2.00 bh
17 - 2.00 bh
V. PEK.KUSEN,PI NTU & JENDELA+ PLAFOND :
1 - 5.00 Unit
2 - 2.00 Unit
3 - 2.00 Unit
4 - 1.00 Unit
5 - 1.00 Unit
6 - 12.00 Unit
7 - 1.00 Unit
8 - 1.00 Unit
9 - 1.00 Unit
10 - 17.00 Unit
11 XI I . 027 4.65 m2
12 - 217.88 m2
13 - 205.60 m1
Pas. Penutup Plafond GRC t= 5 mm Rangka Hollow 20x40 Pas. Penutup Plafond Gypsum= 9 mm Rangka Hollow 20x40 Pas. List Profil Plafond Gypsum 7 CM
Kusen Pintu PJ 1 Kusen Pintu jendela J 1 Kusen Pintu jendela J 2 (loket) Kusen Pintu jendela J 3 Kusen Pintu jendela J 4 Kusen Pintu jendela BV Pas. Jet Washer
Kusen pintu P 1 Kusen pintu P 2 Kusen pintu P 3 Kusen pintu P 4
Pas. Keramik Lantai 20/ 20 Corak/ Warna Setara Masterina KW I Pas. Keramik Meja Pantry 20/ 20 Corak/ Warna Setara Masterina KW I Pas. Closet Duduk Setara HCG
Pas. Closet Jongkok Setara Toto Pas. Kitchen Zink lengkap Accessories Pas. Bak Mandi Fiber Glass
Pas. Plesteran Biasa 1: 5 + Acian t= 25 cm Pas. Batu Alam Andesit
Pas. Lantai Keramik 40/ 40 warna setara Masterina KW I Pas. Plint Lantai 20/ 40 warna setara Masterina KW I
Pas. Keramik Dinding 20/ 25 Corak/ Warna setara Masterina KW I I Pek. Rabat Beton t= 7cm
Pas. Pondasi Batu Belah 1: 5 Pas. Batu Kosong Pas. Dinding Bata a.d 1: 5 Pas. Bata Rolag
Pas. Plesteran Biasa 1: 5 + Acian t= 15 cm
Pek. Kolom Teras 20/ 100, Beton Site Mix K-225, Besi = 120kg, (K2) Pek. Kolom Teras 20/ 50, Beton Site Mix K-225, Besi = 120kg, (K3) Pek. Kolom Praktis 15/ 15, Beton Site Mix K-175, Besi = 153kg, (KP) Pek. Balok Lintel 12/ 15, Beton Site Mix K-175, Besi = 153kg, (BL) Pek. Plat Canopy, Beton Ready Mix K-225, Besi = 88kg/ m3 Pek. Meja Pantry, Beton Ready Mix K-225, Besi = 88kg/ m3 Pek. Pondasi Plat Beton Setempat,besi 250 kg, k2 Pek. Pondasi Plat Beton Setempat,besi 250 kg, k3
Pek. Sloof Beton , uk 20x30 Beton Site Mix K-175, Besi = 200 kg, Bekisting Papan Pek. Sloof Beton , 15x20 Beton Site Mix K-175, Besi = 154 kg, Bekisting Papan 50 Pek. Beton Tumbuk Lantai Kerja 1: 3: 5
Pek. Kolom Utama 30/ 30, Beton Site Mix K-225, Besi = 195 Kg, (K1) Urugan Pasir Bawah Lantai
Urugan Tanah Merah dipadatkan tiap 20 Cm Urugan Tanah Kembali Bekas galian
Pek. Lantai Kerja Pondasi 1: 2: 4
Pek. Pondasi Plat Beton Setempat,besi 250 kg, K1 Pek. Direksikeet & Gudang
Pek. Gudang Kerja Pek. Pagar Pengaman Proyek
Galian Tanah Pondasi
Urugan Pasir Bawah Pondasi t: 10 cm. Mobilisasi dan Demobilisasi Alat Bantu Pek. Pengukuran kembali / Pematokan Pekerjaan Bouwplank
Papan Nama Proyek Uk. 60x90 cm Pembersihan Lokasi/ Perataan Tanah Pengadaan Air Kerja dan Listrik Kerja
NO. URAI AN PEKERJAAN ANALI SA VOLUME
Biaya Pengurusan I MB
VI . TANGGA :
1 XI X. 171 1.36 m3
2 XI X. 167 0.61 m3
3 XI X. 167 0.65 m3
4 XI . 012 11.88 m2
5 14.70 m1
VI I . PEKERJAAN I NSTALASI LI STRI K & AI R :
1 - 1.00 Bh
2 1.00 ls
3 XXVI I . 004 30.00 ttk
4 XXVI I . 003 10.00 ttk
5 XXVI I . 004 5.00 ttk
7 - 14.00 bh
8 - 20.00 bh
7 - 3.00 bh
9 - 1.00 bh
10
XVI I . 016 6.00 m1 XVI I . 017 10.00 m1
XVI I . 015 29.50 m1 11
XVI I . 021 25.00 m1
XVI I . 020 45.50 m1
12 XVI I . 023 7.00 bh
13 XVI I . 025 3.00 bh
14 XVI I . 029 2.00 unit
15 - 1.00 ttk
16 - 1.00 bh
VI I I . PEKERJAAN LAI N - LAI N
1 XVI I I . 012 703.42 m2
2 XVI I I . 034 222.53 m2
3 XVI I I . 034 14.39 m2
4 - 46.28 m2
5 - 28.10 m2
6 - 126.00 m1
7 - 32.50 m1
8 - 1.00 bh
9 - 30.00 hrf
10 - 29.00 hrf
Tali Air Profil t= 3 cm
Lambang Daerah Tangerang Selatan Huruf Stainless Steel t= 20 cm Huruf Stainless Steel t= 30 cm
Pengecatan Dinding setara I CI / Dulux Warna Biasa Pengecatan Plafon Setara Metrolith
Pengecatan List Plafon Setara Metrolith Pengecatan Batu Alam Dengan Vernis Water Profing Atap dan Canopy Plin Ban-Banan t= 10 Cm Pipa PVC 2 1/ 2" Pas. Kran Air
Pas. Floor Drain Ø 3" Lokal Pek. Septictank uk 2x1.5x1.5 Pek. Pengeboran Sumur + Pompa Listrik Pek. Water Torn 1000 L+ I nstalasi I nstalasi Air Bersih
Pipa PVC 3/ 4" Pipa PVC 1" Pipa PVC 1/ 2"
I nstalasi Air Kotor & Air Hujan Pipa PVC 3"
Pek. I nstalasi Stop Kontak 2x2.5 mm Eterna Pek. I nstalasi Stop Kontak AC 3x2.5 mm Eterna Pas. Lampu Neon Phillips TL 40 Watt Pas. Lampu Down Light PL 20 Watt Pas. Lampu Neon Phillips PL 20 Watt Pas. Box Panel
Pek. Balok Tangga 18x30 Beton Site Mix K-175, Besi = 105 Kg, Bekisting Papan 50 Pas. Keramik 40/ 40 Setara Masterina Warna KWI
Pas.Hand Railling Tangga Pipa Stainless Steel Ø 2.5"
Box Panel Goub
Biaya Sambung Listrik PLN 10000 Watt Pek. I nstalasi Titik Lampu 3x2.5 mm Eterna Pek. Plat Tangga Beton Ready Mix K 225 Besi 160 kg
HARGA SATUAN JUMLAH
Rp. Rp.
2 PEKERJAAN LANTAI 2
I . PEK. BETON BERTULANG :
1 XI X. 171 21.66 m3
2 XI X. 182 6.30 m3
3 XI X. 180 0.53 m3
4 XI X. 169 2.21 m3
5 XI X. 169 0.71 m3
6 XI X. 172 1.20 m3
7 XI X. 172 0.14 m3
8 XI X. 176 16.00 m3
9 XI X. 176 3.06 m3
10 XI X. 167 1.76 m3
11 XI X. 178 5.04 m3
I I . PEKERJAAN PASANGAN :
1 VI I I . 005 379.42 m2
2 X. 006 698.44 m2
3 X. 017 60.40 m2
4 XI . 012 195.78 m2
5 XI . 012 29.37 m2
6 XI . 017 27.30 m2
7 XI . 018 5.85 m2
8 XI . 018 1.40 m2
9 XVI I . 001 2.00 bh
10 XVI I . 002 1.00 bh
11 XVI I . 006 1.00 bh
12 XVI I . 007 3.00 bh
13 - 2.00 bh
14 20.00 m1
I I I . PEK.KUSEN,PI NTU & JENDELA+ PLAFOND :
1 - 5.00 Unit
2 - 1.00 Unit
3 - 3.00 Unit
4 - 24.00 Unit
5 - 12.00 Unit
6 XI I . 027 5.85 m2
7 - 195.78 m2
8 - 186.95 m1
I V. PEKERJAAN I NSTALASI LI STRI K & AI R :
1 XXVI I . 004 42.00 ttk
2 XXVI I . 003 13.00 ttk
3 XXVI I . 004 7.00 ttk
4 - 26.00 bh
5 - 25.00 bh
6 - 4.00 bh
7 - 1.00 bh
8
XVI I . 016 6.00 m1
XVI I . 017 10.00 m1
XVI I . 015 15.00 m1 9
XVI I . 021 13.00 m1
XVI I . 020 45.50 m1
10 XVI I . 023 7.00 bh
11 XVI I . 025 3.00 bh
V. PEKERJAAN ATAP
1 XI V. 087 301.18 m2
2 - 301.18 m2
3 - 301.18 m2
4 - 35.00 m1
5 XI I I . 044 15.00 m1
6 - 36.80 m2
7 XI V. 058 68.00 m1
8 XI X. 171 1.80 m3
9 - 34.00 m1
VI PEKERJAAN LAI N - LAI N
1 XVI I I . 012 758.84 m2
2 XVI I I . 028 20.40 m2
3 XVI I I . 034 201.63 m2
4 XVI I I . 034 13.09 m2
5 - 1.00 ls
6 - 1.00 ls
7 - 1.00 ls
8 I nstalasi Penangkal Petir + Grounding - 1.00 ls
Pengecatan List Plafon Setara Metrolith Pelaporan , As-Build Drawing dan Dokumentasi Pek. Perapihan & Pembersihan.
Profil Ornamen Betawi
Pek. Dak Atap Beton Beton Ready Mix K 225 Besi 160 kg Pas. Talang Air PVC Kotak 6"
Pengecatan Dinding setara I CI / Dulux Warna Biasa Pengecatan Listplank Setara Glotek
Pengecatan Plafon Setara Metrolith Pas. Genteng Model Metal Type butiran Pas. Alumunium Foil
Pas. Nok Genteng Model Metal Type butiran Pas. Talang Patahan Atap Pakai Karpet Water Profing Atap dan Canopy
Pas. Lisplank GRC, Superplank, lebar 30 cm, tebal 5 mm I nstalasi Air Kotor & Air Hujan
Pipa PVC 3" Pipa PVC 2 1/ 2" Pas. Kran Air
Pas. Floor Drain Ø 3" Lokal
Pas. Rangka Baja Atap Baja Ringan Berikut Gording, Kaso & Reng Pas. Lampu Neon Phillips PL 20 Watt
Pas. Box Panel I nstalasi Air Bersih Pipa PVC 3/ 4" Pipa PVC 1" Pipa PVC 1/ 2"
Pas. List Profil Plafond Gypsum 7 CM
Pek. I nstalasi Titik Lampu 3x2.5 mm Eterna Pek. I nstalasi Stop Kontak 2x2.5 mm Eterna Pek. I nstalasi Stop Kontak AC 3x2.5 mm Eterna Pas. Lampu Neon Phillips TL 40 Watt Pas. Lampu Down Light PL 20 Watt Kusen pintu P 2
Kusen pintu P 3 Kusen Pintu jendela J 1 Kusen Pintu jendela BV
Pas. Penutup Plafond GRC t= 5 mm Rangka Hollow 20x40 Pas. Penutup Plafond Gypsum= 9 mm Rangka Hollow 20x40 Pas. Kitchen Zink lengkap Accessories
Pas. Bak Mandi Fiber Glass Pas. Jet Washer
Pas.Hand Railling Void Pipa Stainless Steel Ø 2.5"
Kusen pintu P 1
Pas. Plint Lantai 20/ 40 warna setara Masterina KW I
Pas. Keramik Dinding 20/ 25 Corak/ Warna setara Masterina KW I I Pas. Keramik Lantai 20/ 20 Corak/ Warna Setara Masterina KW I Pas. Keramik Meja Pantry 20/ 20 Corak/ Warna Setara Masterina KW I Pas. Closet Duduk Setara HCG
Pas. Closet Jongkok Setara Toto
Pek. Ring Balok 15/ 20, Beton Ready Mix K-225, Besi = 175 Kg, (RB1) Pek. Ring Balok 20/ 40, Beton Ready Mix K-225, Besi = 212 Kg, (RB2)
Pas. Dinding Bata a.d 1: 5
Pas. Plesteran Biasa 1: 5 + Acian t= 15 cm Pas. Plesteran Biasa 1: 5 + Acian t= 25 cm
Pas. Lantai Keramik 40/ 40 warna setara Masterina KW I Pek. Kolom Praktis 15/ 15, Beton Site Mix K-175, (kp) Pek. Balok Lintel 15/ 15, Beton Site Mix K-175, (bl)
Pek. Plat Canopy, Beton Ready Mix K-225, Besi = 88kg/ m3, Bekisting Multiplex 12 Pek. Meja Pantry, Beton Ready Mix K-225, Besi = 88kg/ m3, Bekisting Multiplex 12 Pek. Balok I nduk Struktur25/ 50, Beton Ready Mix K-225, Besi = 150 kg/ m3, (BI ) Pek. Balok Anak Struktur20/ 35, Beton Ready Mix K-225, Besi = 150 kg/ m3, (BA)
ANA-VOLUME LI SA
Pek. Dak Lantai Beton Ready Mix K 225 Besi 160 kg Pek. Kolom Utama 30/ 30, Beton Site Mix K-225, (K1)
Pek. Kolom Teras 15/ 50, Beton Site Mix K-225, Besi = 153kg, (k2)
HARGA SATUAN JUMLAH
Rp. Rp.
1 PEKERJAAN HALAMAN I . PEKERJAAN PERSI APAN :
1 I . 009 944.00 m2
2 Pek. Pembersihan Lokasi / Perataan tanah I 020 944.00 m2
I I , PEKERJAAN HALAMAN
1 I I I . 015 519.20 m3
2 Galian Tanah Biasa Manual I I I 003 9.80 m3
3 Pas. Kanstin, model Kst. DKI , 15.30.40, K-300, warna Abu-Abu XXV. 027 245.00 m1 4 Pas. Paving Block t = 6 Cm K-350 Abu-abu XXV. 014 944.00 m2 5 Pek.Lapis Pondasi Macadam/ Stell Slaag XXI I I . 005 109.70 m3
`
I I I , PEKERJAAN SALURAN
1 Pek. Galian Tanah Biasa Sedalam 1 m (Manual) I I I 003 61.75 m3
2 Pek. Pasangan Batu Bata Merah tebal 1/ 2 Bata Ad 1 Pc : 5 Ps VI I I 005 50.00 m2
3 VI I . 014 27.40 m3
4 Pek. Plesteran 1Pc : 5Ps, tebal 15 mm + acian X 006 235.00 m2 5 Pas. bak kontrol pasangan batu bata ukuran ( 30x30 ) cm tinggi 35 cm XVI I 032 6.00 bh
6 Pek. Plat Decker XI X. 172 0.50 m3
Pas. Pondasi Batu Belah 1: 5
ANA-VOLUME LI SA
Pek. Pengukuran kembali / Pematokan
Urugan Tanah Merah dipadatkan tiap 20 Cm
REKAPI TULASI TOTAL : LANTAI 1
I . PEKERJAAN PERSI APAN Rp. -
I I . PEKERJAAN TANAH Rp. -
I I I . PEKERJAAN BETON Rp. -
I V. PEKERJAAN PASANGAN Rp. -
V. PEK.KUSEN,PI NTU & JENDELA + PLAFOND Rp. -
VI . PEKERJAAN TANGGA Rp. -
VI I . PEKERJAAN I NSTALASI LI STRI K Rp. -
VI I I . PEKERJAAN LAI N-LAI N : Rp. -
JUMLAH. Rp. -
LANTAI 2
I . PEK. BETON BERTULANG Rp. -
I I . PEKERJAAN PASANGAN Rp. -
I I I . PEKERJAAN KUSEN,PI NTU & JENDELA+ PLAFOND : Rp. -I V. PEKERJAAN I NSTALASI LI STRI K & AI R : Rp. -
V PEKERJAAN ATAP : Rp. -
VI . PEKERJAAN LAI N-LAI N : Rp. -
JUMLAH. Rp. -
REKAPI TULASI TOTAL : HALAMAN
I . PEKERJAAN PERSI APAN Rp. -
I I . PEKERJAAN TANAH Rp. -
I I I . PEKERJAAN BETON Rp. -
JUMLAH. Rp. -
REKAPI TULASI : LANTAI 1 + LANTAI 2 + HALAMAN
REKAPI TULASI LANTAI 1 Rp. -
REKAPI TULASI LANTAI 2 Rp. -
REKAPI TULASI AULA Rp. -
JUMLAH TOTAL Rp. -
PPN 10 % Rp. -
JUMLAH TOTAL Rp. -
DI BULATKAN. Rp. -
DOMI SI LI , TANGGAL BULAN TAHUN PENAWAR,
NAMA PERUSAHAAN
NAMA PI MPI NAN PERUSAHAAN JABATAN