No

Tipe

Keterangan

Tahun Bangun

1

45 Rumah Huni

Tahun Penilaian

2

54 Rumah Huni

Penyusutan

Nilai Tanah/m2

Spesifikasi struktur bangunan

Nilai Perumahan

Komponen

pondasi

Batu kali, Sloef, Ring balok

dinding

Batu merah, plester, aci, plamur, cat

lantai

Keramik 30x30

kusen

Kayu bayam plus panil (Kelas II)

atap

Genteng beton + rangka kayu

plafon

Triplek + cat

Fasilitas

km/wc

Tegel 20 x 25 cm

Kloset Jongkok

pdam

Sumur Bor

Pompa Air

listrik

900 watt

(2)

2006

2015

24% Sedang, 9 tahun

550000 Rp 24,750,000

Rp 29,700,000

Rp 356,289,359

Rp 7,917,541

(3)

Daftar Rekapitulasi Rencana Anggaran Biaya

No

Jenis Pekerjaan

Harga (Rp)

I

PEKERJAAN PERSIAPAN

Rp 29,195,310.00

II

PEKERJAAN TANAH

Rp 1,148,175.00

III

PEKERJAAN PONDASI

Rp 10,619,116.20

IV

PEKERJAAN DINDING

Rp 85,302,078.97

V

PEKERJAAN PLESTERAN DINDING

Rp 11,370,037.07

VI

PEKERJAAN KAYU

Rp 45,210,138.00

VII

PEKERJAAN BETON

Rp 175,728,597.92

VIII

PEKERJAAN PENUTUP ATAP

Rp 7,846,852.50

IX

PEKERJAAN PLAFON

8,437,207.50

X

PEKERJAAN PENUTUP LANTAI DAN DINDING

Rp 39,997,604.25

XI

PEKERJAAN KUNCI DAN KACA

Rp 2,851,575.00

XII

PEKERJAAN PENGECATAN

Rp 3,087,511.08

XIII

PEKERJAAN INSTALASI LISTRIK

Rp 1,499,600.00

XIV

PEKERJAAN SANITASI

Rp 13,942,195.00

TOTAL JUMLAH

Rp 436,235,998.48

(4)

Rencanana Anggaran Biaya

No

Jenis Pekerjaan

Satuan

Volume

Total Harga (Rp)

A PEKERJAAN PERSIAPAN

1 Pembersihan Lahan m²

2 Pemasangan Pagar Sementara dari kawat duri tinggi 1,8 m m¹ 20.000 1,093,755.00 21,875,100.00 3 Memasang Bouwplank m¹ 2.000 85,040.00 170,080.00 4 Membuat gudang semen dan alat-alat m² 4.000 642,170.00 2,568,680.00 5 Pembuatan jalan sementara m² 10.000 458,145.00 4,581,450.00

29,195,310.00

B PEKERJAAN TANAH

1 Galian Tanah lumpur sedalam 1 m m³

2 Urugan Kembali m³ -

3 Urugan Pasir urug m³ 4.050 283,500.00 1,148,175.00

4 memadatkan tanah m³ -

5 Memasang Lapisan Pudel campuran 1 KP: 5 TL m³ 2.430 133,672.00 87,480.00 6 memasang lapisan ijuk m³ 2.430 36,000.00 87,480.00

1,148,175.00

C PEKERJAAN PONDASI

1 Pasangan Pondasi Batu Kali 1 Pc: 5 Ps m³ 11.880 893,865.00 10,619,116.20

10,619,116.20

D PEKERJAAN DINDING

1 Memasang dinding bata merah tebal 1 bata, 1 PC : 4 PP m² 63.180 657,447.00 41,537,501.46 2 Memasang dinding bata merah tebal 1 Bata 1Pc:3Kp:10Pp m² 63.180 692,696.70 43,764,577.51

85,302,078.97

E PEKERJAAN PLESTERAN DINDING

1 Plesteran Dinding 1Pc:4Ps tebal 20 mm m² 63.180 57,462.60 3,630,487.07 2 Plesteran Dinding 1Pc:2Kp:8Pp tebal 15 mm m² 63.180 56,940.00 3,597,469.20 3 Membuat acian m² 126.360 32,780.00 4,142,080.80

11,370,037.07

F PEKERJAAN KAYU

1 Pasang Kusen Pintu dan Jendela Kayu kelas II m³ 0.492 6,739,250.00 3,315,711.00 2 Pasang pintu klamp standar kayu kelas II m² 15.000 266,675.00 4,000,125.00

Harga Satuan

(5)

3 Pasang konstruksi kuda-kuda konvensional kayu kelas II m³ 3.600 5,927,700.00 21,339,720.00 4 Pasang konstruksi gordeng, kayu kelas II m³ 3.060 5,363,500.00 16,412,310.00 5 Pasang rangka langit-langit (60 x 60) cm kayu kelas II 1.300 109,440.00 142,272.00

45,210,138.00

G PEKERJAAN BETON

1 Membuat sloof Beton Bertulang (200Kg besi+bekisting) m³ 13.200 4,789,815.00 63,225,558.00 2 Membuat Kolom Beton Bertulang (300Kg besi+bekisting) m³ 12.000 7,635,085.00 91,621,020.00 3 Membuat Ring Balok Beton Bertulang (10X15cm) m³ 13.200 99,605.00 1,314,786.00 4 Pasang plat beton bertulang (150 kg besi + bekisting) m³ 4.736 4,131,595.00 19,567,233.92

175,728,597.92

H PEKERJAAN PENUTUP ATAP

1 Pasang atap beton m¹ 51.750 151,630.00 7,846,852.50

7,846,852.50

I PEKERJAAN PLAFON

1 Pasang list plafond gypsum profil m¹ 18.000 25,800.00 464,400.00 2 Langit-langit kalsiboard m² 45.000 177,173.50 7,972,807.50

8,437,207.50

J PEKERJAAN PENUTUP LANTAI DAN DINDING

1 Pasang Lantai Keramik 30X30 cm m³ 38.250 856,650.00 32,766,862.50 2 Pasang Lantai Ubin Pc Abu-Abu 20X20 cm m² 6.750 1,071,221.00 7,230,741.75

39,997,604.25

K PEKERJAAN KUNCI DAN KACA

1 Pasang Kunci Tanam Biasa Bh 6.000 118,000.00 708,000.00 2 Pasang Engsel pintu Bh 12.000 66,162.50 793,950.00 3 Pasang Engsel Jendela Kupu-kupu Bh 6.000 38,325.00 229,950.00 4 Pasang Pegangan Pintu/Door holder Bh 6.000 91,625.00 549,750.00 5 Pasang Kaca tebal 3 mm m² 6.000 94,987.50 569,925.00

2,851,575.00

L PEKERJAAN PENGECATAN

1 Pengecatan Kayu m² 15.492 40,715.00 630,756.78 2 Pengecatan Tembok Baru m² 63.180 38,885.00 2,456,754.30

3,087,511.08

M PEKERJAAN INSTALASI LISTRIK

1 Penyambungan Listrik PLN 900 kVA LS 1.000 1,200,000.00 1,200,000.00 2 Pemasangan Sekering Group Bh 1.000 24,000.00 24,000.00 3 Pemasangan Stop Kontak Bh 5.000 21,200.00 106,000.00 4 Pemasangan Sakelar Tunggal Bh 8.000 21,200.00 169,600.00

1,499,600.00

N PEKERJAAN SANITASI

1 Memasang Kloset jongkok Bh 1.000 791,125.00

791,125.000

2 Memasang Bak Mandi Batu Bata, Vol 0.3 M³ Bh 1.000 2,732,000.00 63,300.00

(6)

3 Memasang Kran Air Ø ½" atau ¾" Bh 2.000 63,300.00 34,440.00 4 Memasang pipa PVC tipe AW Ø 1,5" m¹ 57.000 17,220.00 3,254,130.00 5 Memasang pipa PVC tipe AW Ø 4" m¹ 15.000 57,090.00 5,624,250.00 6 Memasang Bak kontrol Pas Batu Bata 45X45X50 cm Bh 1.000 374,950.00 374,950.00 7 Memasang septictank Bh 1.000 1,550,000.00 1,550,000.00 8 Memasang Sumur Bor m2 15.000 150,000.00 2,250,000.00

(7)

Analisa Harga Satuan Pekerjaan

No

Jenis Pekerjaan

Sat

Indeks

Harga Satuan (Rp)

Bahan

Upah

I

PEKERJAAN PERSIAPAN

6.8 RSNI-T-12-2002 Tenaga Pekerja Oh 0.100 14 60,000.00 Mandor Oh 0.005 14 150,000.00 Sub Total 6.1 RSNI-T-12-2002 Bahan Dolken Kayu Ø 8-10/400 cm Btg 1.250 14,000.00 Semen Portland Kg 2.000 1,240.00 Pasir Beton M³ 0.005 275,000.00 Koral Beton M³ 0.009 320,000.00 Kawat Duri Kg 25.000 41,000.00 Paku Biasa 2"-5" Kg 0.060 17,000.00 Tenaga Tukang Kayu Oh 0.200 100,000.00 Pekerja Oh 0.300 60,000.00 Kepala Tukang Oh 0.020 125,000.00 Mandor Oh 0.020 150,000.00 Sub Total 6.4 RSNI-T-12-2002 Bahan Kayu 5/7 M³ 0.012 2,350,000.00 Paku Biasa 2"-5" Kg 0.020 17,000.00

Kayu Papan Bengkirai 3/20 M³ 0.007 5,500,000.00

tenaga Tukang Kayu Oh 0.100 100,000.00 Pekerja Oh 0.100 60,000.00 Kepala Tukang Oh 0.010 125,000.00 Mandor Oh 0.005 150,000.00 Sub Total A. Pembersihan Lahan (m²)

B. Pemasangan Pagar Sementara dari kawat duri tinggi 1,8 m (m¹)

(8)

6.6 RSNI-T-12-2002 Bahan Dolken Kayu Ø 8-10/400 cm Btg 1.700 14,000.00 Kayu Meranti M³ 0.210 2,350,000.00 Paku Biasa 2"-5" Kg 0.300 17,000.00 Semen Portland Kg 10.500 1,240.00 Pasir Beton M³ 0.030 275,000.00 Koral Beton M³ 0.050 320,000.00 Seng Gelombang bwg 32 lbr 1.500 55,000.00 Tenaga Tukang Kayu Oh 2.000 100,000.00 Pekerja Oh 1.000 60,000.00 Kepala Tukang Oh 0.200 125,000.00 Mandor Oh 0.050 150,000.00 Sub Total 6.12 E. Pembuatan jalan sementara (m²) RSNI-T-12-2002 Bahan Batu Belah 15/20 M³ 0.012 300,000.00 Batu Pecah 5/7 Kg 0.020 132,500.00 pasir pasang M³ 0.007 275,000.00 tenaga Pekerja Oh 6.667 60,000.00 Mandor Oh 0.333 150,000.00

Sub Total

II

PEKERJAAN TANAH

6.1 SNI 2835-2008 Tenaga Pekerja Oh 0.750 60,000.00 Mandor Oh 0.025 150,000.00 Sub Total 6.9 SNI 2835-2008 Tenaga Pekerja Oh 0.250 60,000.00 Mandor Oh 0.008 150,000.00 Sub Total 6.11 SNI 2835-2008 Bahan Pasir Urug M³ 1.200 220,000.00 Tenaga Pekerja Oh 0.300 60,000.00 Mandor Oh 0.010 150,000.00

D. Membuat gudang semen dan alat-alat (m²)

A. Galian Tanah Biasa sedalam 1 m (m³)

B. Urugan Kembali (m³)

(9)

Sub Total 6.10 SNI 03-2835-2002 Tenaga Pekerja Oh 0.500 60,000.00 Mandor Oh 0.050 150,000.00 Sub Total 6.13 SNI 03-2835-2002 Bahan Kapur Padam M³ 0.248 64,000.00 Tanah liat M³ 1.240 95,000.00 Tenaga Pekerja Oh 0.800 100,000.00 tukang batu Oh 0.400 60,000.00 kepala tukang Oh 0.040 125,000.00 Mandor Oh 0.080 150,000.00 Sub Total 6.14 SNI 03-2835-2002 Bahan ijuk Kg 6.000 6,000.00 Tenaga Pekerja Oh 0.150 60,000.00 Mandor Oh 0.015 150,000.00 Sub Total

III

PEKERJAAN PONDASI

6.6

SNI-2836-2008 Bahan

Batu Belah 15/20 cm (batu gunung) M³ 1.200 300,000.00

Semen Portland Kg 136.000 1,240.00 Pasir Pasang M³ 0.544 275,000.00 Tenaga Pekerja Oh 1.500 100,000.00 Tukang Batu Oh 0.750 60,000.00 Kepala Tukang Oh 0.075 125,000.00 Mandor Oh 0.075 150,000.00 Sub Total

IV

PEKERJAAN DINDING

6.3 SNI 03-6897-2008 Bahan Bata Merah 5 X 11 X 22 cm Bh 140.000 4,100.00 D. Memadatkan tanah (m³)

E. Memasang Lapisan Pudel campuran 1 KP: 5 TL (m³)

F. Memasang Lapisan ijuk 10 cm (m³)

A. Pasangan Pondasi Batu Kali 1 Pc: 5 Pp (m³)

(10)

Semen Portland Kg 26.550 1,240.00 Pasir Pasang 0.093 275,000.00 Tenaga Pekerja Oh 0.600 100,000.00 Tukang Batu Oh 0.200 60,000.00 Kepala Tukang Oh 0.020 125,000.00 Mandor Oh 0.030 150,000.00 Sub Total 6.6 SNI 03-6897-2008 Bahan Bata Merah 5 X 11 X 22 cm Bh 140.000 4,100.00 Semen Portland Kg 10.080 1,240.00 Pasir Pasang 0.0925 275,000.00 Kapur Padam 0.0275 64,000.00 Tenaga Pekerja Oh 0.600 100,000.00 Tukang Batu Oh 0.200 60,000.00 Kepala Tukang Oh 0.020 125,000.00 Mandor Oh 0.030 150,000.00 Sub Total

V

PEKERJAAN PLESTERAN DINDING

6.4 SNI 03-2837-2002 Bahan Semen Portland Kg 6.240 1,240.00 Pasir Pasang 0.024 275,000.00 Tenaga Pekerja Oh 0.300 100,000.00 Tukang Batu Oh 0.150 60,000.00 Kepala Tukang Oh 0.015 125,000.00 Mandor Oh 0.015 150,000.00 Sub Total 6.10 SNI 03-2837-2008 Bahan Semen Portland Kg 3.000 1,240.00 Kapur Padam 0.005 64,000.00 Pasir Pasang 0.020 275,000.00 Tenaga Pekerja Oh 0.360 100,000.00 Tukang Batu Oh 0.120 60,000.00 Kepala Tukang Oh 0.012 125,000.00 M³

B. Memasang dinding bata merah tebal 1 Bata 1Pc:3Kp:10Pp (m²)

M³ M³

A. Plesteran Dinding 1Pc:4Pp (m²) tebal 15 mm

B. Plesteran Dinding 1Pc:2Kp:8Pp (m²) tebal 15 mm

M³ M³

(11)

Mandor Oh 0.018 150,000.00 Sub Total 6.27 C. Membuat acian (m²) SNI 03-2837-2008 Bahan Semen Portland Kg 3.250 1,240.00 Tenaga Pekerja Oh 0.200 100,000.00 Tukang Batu Oh 0.100 60,000.00 Kepala Tukang Oh 0.010 125,000.00 Mandor Oh 0.010 150,000.00 Sub Total

VI

PEKERJAAN KAYU

6.2 SNI 03-3434-2008 Bahan balok kayu 1.200 3,950,000.00 paku 10 cm Kg 1.250 17,000.00 lem kayu Kg 1.000 28,000.00 Tenaga Pekerja Oh 6.000 100,000.00 Tukang Kayu Oh 18.000 60,000.00 Kepala Tukang Oh 1.800 125,000.00 Mandor Oh 0.300 150,000.00 Sub Total 6.3 SNI 03-3434-2008 Bahan Papan kayu

0.040

3,800,000.00 paku 5-7cm Kg

0.050

17,000.00 Tenaga Pekerja Oh 0.350 100,000.00 Tukang Kayu Oh 1.050 60,000.00 Kepala Tukang Oh 0.105 125,000.00 Mandor Oh 0.018 150,000.00 Sub Total 6.13 SNI 03-3434-2008 Bahan balok kayu 1.100 3,950,000.00 besi strip 5mm Kg 15.000 12,500.00 paku 12cm Kg 5.600 17,000.00 Tenaga Pekerja Oh 4.000 100,000.00

A. Pasang Kusen Pintu dan Jendela Kayu kelas II (m³)

B. Pasang pintu klamp standar kayu kelas II (m²)

C. Pasang konstruksi kuda-kuda konvensional kayu kelas II (m³)

(12)

Tukang Kayu Oh 12.000 60,000.00 Kepala Tukang Oh 1.200 125,000.00 Mandor Oh 0.200 150,000.00 Sub Total 6.15 SNI 03-3434-2008 Bahan Kayu balok 1.100 3,950,000.00 besi strip 5mm Kg 15.000 12,500.00 Paku Biasa 12cm Kg 3.000 17,000.00 Tenaga Pekerja Oh 2.400 100,000.00 Tukang Kayu Oh 7.200 60,000.00 Kepala Tukang Oh 0.720 125,000.00 Mandor Oh 0.120 150,000.00 Sub Total 6.20 SNI 03-3434-2008 Bahan Kaso-kaso 0.016 3,800,000.00 paku 7-10 cm Kg 0.250 17,000.00 Tenaga Pekerja Oh 0.200 100,000.00 Tukang Kayu Oh 0.300 60,000.00 Kepala Tukang Oh 0.030 125,000.00 Mandor Oh 0.010 150,000.00 Sub Total

VII

PEKERJAAN BETON

6.29

SNI 7394-2008 Bahan

Kayu Kelas III M³ 0.270 2,350,000.00

Paku 5-12cm Kg 2.000 17,000.00

Minyak Bekisting Lt 0.600 10,000.00

Besi Beton polos Kg 210.000 11,500.00

Kawat Beton Kg 3.000 17,000.00 Semen Portland Kg 336.000 1,240.00 Pasir Beton M³ 0.540 275,000.00 Koral Beton M³ 0.810 320,000.00 Tenaga Pekerja Oh 5.650 100,000.00 Tukang Batu Oh 0.275 60,000.00 Tukang Kayu Oh 1.560 60,000.00

D. Pasang konstruksi gordeng, kayu kelas II (m²)

E. Pasang rangka langit-langit (60 x 60) cm kayu kelas II (m²)

(13)

Tukang Besi Oh 1.400 60,000.00 Kepala Tukang Oh 0.323 125,000.00 Mandor Oh 0.170 150,000.00 Sub Total 6.30 SNI 7394-2008 Bahan

Kayu kelas III M³ 0.400 2,350,000.00

Paku 5-12cm Kg 4.000 17,000.00

Minyak Bekisting Lt 2.000 10,000.00

Besi Beton polos Kg 315.000 11,500.00

Kawat Beton Kg 4.500 17,000.00

Semen Portland Kg 336.000 1,240.00

Pasir Beton M³ 0.540 275,000.00

kerikil M³ 0.810 102,000.00

Kayu kelas II Balok M³ 0.150 3,800,000.00

Plywood 9 mm Lbr 3.500 103,000.00 Dolken Kayu Ø 8-10/400 cm Btg 20.000 14,000.00 Tenaga Pekerja Oh 7.050 100,000.00 Tukang Batu Oh 0.275 60,000.00 Tukang Kayu Oh 1.650 60,000.00 Tukang Besi Oh 2.100 60,000.00 Kepala Tukang Oh 0.403 125,000.00 Mandor Oh 0.353 150,000.00 Sub Total 6.36 SNI 7394-2008 Bahan

Kayu kelas III M³ 0.003 2,350,000.00

Paku 5-12cm Kg 0.020 17,000.00

Besi Beton polos Kg 3.600 11,500.00

Kawat Beton Kg 0.050 17,000.00 Semen Portland Kg 5.500 1,240.00 Pasir Beton M³ 0.009 275,000.00 kerikil M³ 0.015 102,000.00 Tenaga Pekerja Oh 0.297 100,000.00 Tukang Batu Oh 0.033 60,000.00 Tukang Kayu Oh 0.033 60,000.00 Tukang Besi Oh 0.033 60,000.00 Kepala Tukang Oh 0.010 125,000.00 Mandor Oh 0.015 150,000.00

B. Membuat Kolom Beton Bertulang (300Kg besi+bekisting) (m³)

(14)

Sub Total 6.32

SNI 7394-2008 Bahan

Kayu kelas III M³ 0.320 2,350,000.00

Paku 5-12cm Kg 3.200 17,000.00

Minyak Bekisting Lt 1.600 10,000.00

Besi Beton polos Kg 157.500 11,500.00

Kawat Beton Kg 2.250 17,000.00

PC Kg 336.000 1,240.00

PB M³ 0.540 275,000.00

KR M³ 0.810 102,000.00

Plywood 9 mm Lbr 0.120 103,000.00

Dolken Kayu galam Ø 8-10/4 m Btg 2.800 14,000.00 Tenaga Pekerja Oh 5.300 100,000.00 Tukang Besi Oh 1.050 60,000.00 Tukang kayu Oh 1.300 60,000.00 Tukang Batu Oh 0.275 60,000.00 Kepala Tukang Oh 0.265 125,000.00 Mandor Oh 0.265 150,000.00 Sub Total

VIII

PEKERJAAN PENUTUP ATAP

6.4 SNI 03-3436-2002 Bahan Beton warna 1.050 85,000.00 paku hak 15 cm Kg 0.020 24,000.00 Tenaga Pekerja Oh 0.150 100,000.00 Tukang Kayu Oh 0.750 60,000.00 Kepala Tukang Oh 0.008 125,000.00 Mandor Oh 0.006 150,000.00 Sub Total

IX

PEKERJAAN PLAFON

6.80 SNI 2839:2008 Bahan

List gypsum profil 1.050 12,000.00

Tepung gypsum Kg 0.150 16,000.00

Tenaga

Pekerja Oh 0.060 100,000.00

D. Pasang plat beton bertulang (150 kg besi + bekisting)(m²)

A. Pasang atap beton (m¹)

A. Pasang list plafond gypsum profil (m¹)

(15)

Tukang Kayu Oh 0.060 60,000.00 Kepala Tukang Oh 0.006 125,000.00 Mandor Oh 0.003 150,000.00 Sub Total 6.1 SNI 03-3434-2002 Bahan Triplek 6 mm lbr 0.364 69,000.00 Rangka hollow 2x4 cm btg 1.025 80,000.00 Stifenner bh 3.000 15,600.00 Paku keling/sekrup kg 0.110 750.00

Penggantung dan Ramset bh 4.000 2,200.00

Tenaga Pekerja Oh 0.100 100,000.00 Tukang kayu Oh 0.050 60,000.00 Kepala tukang Oh 0.005 125,000.00 Mandor Oh 0.005 150,000.00 Sub Total

X

PEKERJAAN PENUTUP LANTAI DAN DINDING

6.36 SNI 7395:2008 Bahan Ubin Keramik Bh 11.870 60,000.00 Semen Portland Kg 10.000 1,240.00 Pasir Pasang M³ 0.045 275,000.00 Semen Warna Kg 1.500 12,700.00 Tenaga Pekerja Oh 0.700 100,000.00 Tukang Batu Oh 0.350 60,000.00 Kepala Tukang Oh 0.035 125,000.00 Mandor Oh 0.035 150,000.00 Sub Total 6.3 SNI 7395:2008 Bahan Ubin Abu-Abu 20X20 cm Bh 26.500 38,000.00 Semen Portland Kg 10.400 1,240.00 Pasir Pasang M³ 0.045 275,000.00 Tenaga Pekerja Oh 0.270 100,000.00 Tukang Batu Oh 0.135 60,000.00 Kepala Tukang Oh 0.014 125,000.00 Mandor Oh 0.014 150,000.00 B. Langit-langit kalsiboard (m²)

A. Pasang Lantai Keramik 30X30 cm (m²)

(16)

Sub Total

XI

PEKERJAAN KUNCI DAN KACA

A. Pasang Kunci Tanam Biasa (Bh) pt-t-30-2000 Bahan

Kunci Tanam Biasa Bh 1.000 85,000.00

Tenaga Pekerja Oh 0.010 100,000.00 Tukang Kayu Oh 0.500 60,000.00 Kepala Tukang Oh 0.010 125,000.00 Mandor Oh 0.005 150,000.00 Sub Total B. Pasang Engsel pintu (Bh)

pt-t-30-2000 Bahan Engsel Pintu Bh 1.000 35,000.00 Tenaga Pekerja Oh 0.005 100,000.00 Tukang Kayu Oh 0.500 60,000.00 Kepala Tukang Oh 0.005 125,000.00 Mandor Oh 0.000 150,000.00 Sub Total C. Pasang Engsel Jendela Kupu-kupu (Bh) pt-t-30-2000 Bahan Engsel Jendela Bh 1.000 30,000.00 Tenaga Pekerja Oh 0.010 100,000.00 Tukang Kayu Oh 0.100 60,000.00 Kepala Tukang Oh 0.010 125,000.00 Mandor Oh 0.001 150,000.00 Sub Total D. Pasang Pegangan Pintu/Door holder (Bh) pt-t-30-2000 Bahan Door holder Bh 1.000 50,000.00 Tenaga Pekerja Oh 0.050 100,000.00 Tukang Kayu Oh 0.500 60,000.00 Kepala Tukang Oh 0.050 125,000.00 Mandor Oh 0.003 150,000.00 Sub Total pt-t-30-2000 Bahan

(17)

Kaca tebal 3 mm M² 1.100 75,000.00 Tenaga Pekerja Oh 0.015 100,000.00 Tukang Kayu Oh 0.150 60,000.00 Kepala Tukang Oh 0.015 125,000.00 Mandor Oh 0.001 150,000.00 Sub Total

XII

PEKERJAAN PENGECATAN

Bahan

Cat Meni Kg 0.200 19,000.00

Kertas Gosok Lbr 0.400 5,000.00

Plamir Kg 0.150 27,000.00

Cat dasar Kg 0.170 40,000.00

Cat penutup 2 kali Kg 0.260 45,000.00

Minyak Cat Ltr 0.150 20,000.00 Kuas 3" Bh 0.050 14,000.00 Tenaga Pekerja Oh 0.070 100,000.00 Tukang Cat Oh 0.009 60,000.00 Kepala Tukang Oh 0.006 125,000.00 Mandor Oh 0.003 150,000.00 Sub Total Bahan Plamir Kg 0.100 27,000.00 Kertas gosok LBR 1.000 5,000.00 Cat Dasar Kg 0.100 40,000.00 Cat Penutup 2x Kg 0.260 78,000.00 Tenaga Pekerja Oh 0.020 100,000.00 Tukang Cat Oh 0.063 60,000.00 Kepala Tukang Oh 0.006 125,000.00 Mandor Oh 0.003 150,000.00 Sub Total

XIII

PEKERJAAN INSTALASI LISTRIK

A. Penyambungan Listrik PLN 900 kVA (LS)

Penyambungan PLN LS 1.000 1,200,000.00

B. Pemasangan Sekering Group (Bh) A. Pengecatan Kayu (m²)

(18)

Sekering Group Bh 1.000 24,000.00 C. Pemasangan Stop Kontak (Bh)

Stop kontak Bh 1.000 21,200.00

E. Pemasangan Sakelar Tunggal (Bh)

Sakelar Tunggal Bh 1.000 21,200.00

Sub Total

XIV

PEKERJAAN SANITASI

6.1 A. Memasang Kloset jongkok (Bh)

rsni-t-15-2002 Bahan

Kloset duduk/monoblok Bh 1.000 350,000.00

Perlengkapan 6% harga kloset 1.000 21,000.00

Tenaga Pekerja Oh 3.300 100,000.00 Tukang Batu Oh 1.100 60,000.00 Kepala Tukang Oh 0.001 125,000.00 Mandor Oh 0.160 150,000.00 Sub Total 6.8 rsni-t-15-2002 Bahan Batu Bata Bh 0.400 500.00 Semen Portland Kg 120.000 1,240.00 Pasir Pasang 0.300 275,000.00 Porselen (11x11) Cm Bh 360.000 4,200.00 Semen Nat Kg 6.000 21,000.00 Tenaga Pekerja Oh 6.000 100,000.00 Tukang Batu Oh 3.000 60,000.00 Kepala Tukang Oh 0.300 125,000.00 Mandor Oh 0.300 150,000.00 Sub Total 6.35 rsni-t-15-2002 Bahan Kran Air bh 1.000 56,000.00 Seal Tape Bh 0.025 2,000.00 Tenaga Pekerja Oh 100,000.00 Tukang Batu Oh 0.100 60,000.00 Kepala Tukang Oh 0.010 125,000.00 Mandor Oh 150,000.00 Sub Total

B. Memasang Bak Mandi Batu Bata, Vol 0.3 M³ (Bh)

M3

(19)

6.28

rsni-t-15-2002 Bahan

Pipa PVC m¹ 1.200 7,500.00

Perlengkapan 35 % harga pipa 2,625.00

Tenaga Pekerja Oh 0.036 100,000.00 Tukang Batu Oh 0.060 60,000.00 Kepala Tukang Oh 0.006 125,000.00 Mandor Oh 0.0018 150,000.00 Sub Total 6.32 rsni-t-15-2002 Bahan Pipa PVC m¹ 1.200 19,500.00

Perlengkapan 35 % harga pipa 6,825.00

Tenaga Pekerja Oh 0.081 100,000.00 Tukang Batu Oh 0.135 60,000.00 Kepala Tukang Oh 0.135 125,000.00 Mandor Oh 0.0041 150,000.00 Sub Total

6.17 F. Memasang Bak kontrol Pas Batu Bata 45X45X50 cm (Bh) rsni-t-15-2002 Bahan Batu Bata 0.250 500.00 Semen Portland Kg 77.000 1,240.00 Pasir Pasang 0.130 275,000.00 Batu Kerikil 0.020 102,000.00 Besi Beton Kg 2.600 11,500.00 Pasir Beton 0.090 275,000.00 Tenaga Pekerja Oh 1.420 100,000.00 Tukang Batu Oh 0.473 60,000.00 Kepala Tukang Oh 0.047 125,000.00 Mandor Oh 0.071 150,000.00 Sub Total G. Memasang septictank (Bh) Bahan septictank bh 1.000 1,550,000.00 Tenaga Pekerja Oh 100,000.00 Tukang Batu Oh 60,000.00

D. Memasang pipa PVC tipe AW Ø 1,5" (m¹)

E. Memasang pipa PVC tipe AW Ø 4" (m¹)

M3

M3

M3

(20)

Kepala Tukang Oh 125,000.00

Mandor Oh 150,000.00

Sub Total

(21)

Analisa Harga Satuan Pekerjaan

84,000.00 10,500.00 94,500.00 17500 2,480.00 1,375.00 2,880.00 1,025,000.00 1,020.00 - 20,000.00 18,000.00 2,500.00 3,000.00 1,093,755.00 - - 28,200.00 340.00 38,500.00 - 10,000.00 6,000.00 1,250.00 750.00 85,040.00

Total Harga Satuan

(22)

- - 23,800.00 493,500.00 5,100.00 13,020.00 8,250.00 16,000.00 82,500.00 - - - - - 642,170.00 - - 3,600.00 2,650.00 1,925.00 - 400,020.00 49,950.00 458,145.00 - 45,000.00 3,750.00 48,750.00 15,000.00 1,250.00 16,250.00 264,000.00 18,000.00 1,500.00

(23)

283,500.00 - - 30,000.00 7,500.00

37,500.00

- - 15,872.00 117,800.00 - 80,000.00 24,000.00 5,000.00 12,000.00 329,672.00 - - 36,000.00 - 9,000.00 2,250.00 47,250.00 - - - - 360,000.00 168,640.00 149,600.00 - 150,000.00 45,000.00 9,375.00 11,250.00 893,865.00 - - - - 574,000.00

(24)

32,922.00 25,575.00 - - 20,000.00 1,200.00 3,750.00 657,447.00 - - 574,000.00 12,499.20 25,437.50 1,760.00 - 60,000.00 12,000.00 2,500.00 4,500.00 692,696.70 - - - - 7,737.60 6,600.00 - 30,000.00 9,000.00 1,875.00 2,250.00 57,462.60 - - 3,720.00 320.00 5,500.00 - 36,000.00 7,200.00 1,500.00

(25)

2,700.00 56,940.00 - - 4,030.00 - 20,000.00 6,000.00 1,250.00 1,500.00 32,780.00 - - - - 4,740,000.00 21,250.00 28,000.00 - 600,000.00 1,080,000.00 225,000.00 45,000.00 6,739,250.00 - - 152,000.00 850.00 - 35,000.00 63,000.00 13,125.00 2,700.00 266,675.00 - - 4,345,000.00 187,500.00 95,200.00 - 400,000.00

(26)

720,000.00 150,000.00 30,000.00 5,927,700.00 - - 4,345,000.00 187,500.00 51,000.00 - 240,000.00 432,000.00 90,000.00 18,000.00 5,363,500.00 - - 61,940.00 4,250.00 - 20,000.00 18,000.00 3,750.00 1,500.00 109,440.00 - - - - 634,500.00 34,000.00 6,000.00 2,415,000.00 51,000.00 416,640.00 148,500.00 259,200.00 - 565,000.00 16,500.00 93,600.00

(27)

84,000.00 40,375.00 25,500.00 4,789,815.00 - - 940,000.00 68,000.00 20,000.00 3,622,500.00 76,500.00 416,640.00 148,500.00 82,620.00 570,000.00 360,500.00 280,000.00 - 705,000.00 16,500.00 99,000.00 126,000.00 50,375.00 52,950.00 7,635,085.00 - - 7,050.00 340.00 41,400.00 850.00 6,820.00 2,475.00 1,530.00 - 29,700.00 1,980.00 1,980.00 1,980.00 1,250.00 2,250.00

(28)

99,605.00 - - 752,000.00 54,400.00 16,000.00 1,811,250.00 38,250.00 416,640.00 148,500.00 82,620.00 12,360.00 39,200.00 - 530,000.00 63,000.00 78,000.00 16,500.00 33,125.00 39,750.00 4,131,595.00 - - - - 89,250.00 480.00 - 15,000.00 45,000.00 1,000.00 900.00 151,630.00 - - - - 12,600.00 2,400.00 - 6,000.00

(29)

3,600.00 750.00 450.00 25,800.00 25,116.00 82,000.00 46,800.00 82.50 8,800.00 - 10,000.00 3,000.00 625.00 750.00 177,173.50 - - - - 712,200.00 12,400.00 12,375.00 19,050.00 - 70,000.00 21,000.00 4,375.00 5,250.00 856,650.00 - - 1,007,000.00 12,896.00 12,375.00 - 27,000.00 8,100.00 1,750.00 2,100.00

(30)

1,071,221.00 - - - - 85,000.00 - 1,000.00 30,000.00 1,250.00 750.00 118,000.00 - - 35,000.00 - 500.00 30,000.00 625.00 37.50 66,162.50 - - 30,000.00 - 1,000.00 6,000.00 1,250.00 75.00 38,325.00 - - 50,000.00 - 5,000.00 30,000.00 6,250.00 375.00 91,625.00 - -

(31)

82,500.00 - 1,500.00 9,000.00 1,875.00 112.50 94,987.50 - - - - 3,800.00 2,000.00 4,050.00 6,800.00 11,700.00 3,000.00 700.00 - 7,000.00 540.00 750.00 375.00 40,715.00 - - 2,700.00 5,000.00 4,000.00 20,280.00 - 2,000.00 3,780.00 750.00 375.00 38,885.00 - - - 1,200,000.00 -

(32)

24,000.00 - 21,200.00 - 21,200.00 1,200,000.00 - - - - 350,000.00 21,000.00 - 330,000.00 66,000.00 125.00 24,000.00 791,125.00 - - 200.00 148,800.00 82,500.00 1,512,000.00 126,000.00 - 600,000.00 180,000.00 37,500.00 45,000.00 2,732,000.00 - - 56,000.00 50.00 - - 6,000.00 1,250.00 - 63,300.00

(33)

- - 9,000.00 - - 3,600.00 3,600.00 750.00 270.00 17,220.00 - - 23,400.00 - - 8,100.00 8,100.00 16,875.00 615.00 57,090.00 - - 125.00 95,480.00 35,750.00 2,040.00 29,900.00 24,750.00 - 142,000.00 28,380.00 5,875.00 10,650.00 374,950.00 - - 1,550,000.00 - - -

(34)

- - 1,550,000.00

2,250,000.00

(35)

Daftar Harga Bahan

Kota

Makassar

No

Bahan

Satuan

1

Asbes gelombang 240 X 105 cm, tebal 4 mm

lbr

2

Asbes gelombang 150 X 102 cm, tebal 5 mm

lbr

3

Asbes gelombang 270 X 102 cm, tebal 5 mm

lbr

4

Asbes gelombang 240 X 102 cm, tebal 5 mm

lbr

5

Bata merah

bh

6

Batu tempel hitam

m2

7

Batako putih (trass)

bh

8

Batako semen

bh

9

Bata ringan (hebel/celcon)

bh

10

Batu belah

m3

11

Batu alam / tempel

m2

12

Batu koral

m3

13

Bendrat / kawat beton

kg

14

Besi profil

kg

15

Besi profil

kg

16

kg

17

kg

18

Besi C (lip channel) / besi strip

kg

19

Besi siku (L)

kg

20

Cat meni kualitas bagus

kg

21

Cat dasar (material primer, zinc cromat, dan lain-lain)

kg

22

kg

23

kg

24

Cat tembok weathersield/eksterior kualitas baik

kg

25

Cat tembok kualitas sedang

kg

26

Cat kayu kualitas sedang

kg

27

Cat kayu kualitas baik

kg

28

Compound

kg

29

Conblock 8 x 20 x 40

bh

30

Dempul besi

kg

31

Dempul halus

kg

32

Door closer

bh

33

Door stopper kualitas baik

bh

34

Door holder

bh

35

Engsel pintu

bh

36

Engsel jendela

bh

37

Formika 120 x 240, tebal 1,5 mm

lbr

38

Genteng sirap ( 80 bh/m2 )

bh

39

Genteng plentong ( 25 bh )

bh

40

Genteng keramik glazur ( 14,5/m2 )

m2

41

Genteng keramik natural ( 14,5/m2 )

m2

42

Genteng beton warna

m2

43

Genteng metal lapis

m2

44

lbr

45

GRC tebal 5 mm

lbr

46

Glass block

bh

47

Granit jenis dan warna standar

m2

48

Hollow 4/4 zincromate

btg

Besi beton U-24

Besi beton U-39

Cat besi

Cat tembok untuk interior kualitas baik

(36)

49

Hollow 2/4 zincromate

btg

50

Injuk

ikat

51

Kaca bening (polos) tebal 3 mm

m2

52

Kaca bening (polos) tebal 5 mm

m2

53

Kait angin untuk daun jendela

bh

54

Kawat duri

rol

55

Kawat las

m'

56

Kaca rayband tebal 5 mm

m2

57

btg

58

Balok kayu borneo super / meranti

m3

59

Papan kayu borneo super / meranti

m3

60

Balok kayu kamper samarinda/damar

m3

61

Papan kayu kamper samarinda/damar

m3

62

Balok kayu kamper medan

m3

63

Papan kayu kamper medan

m3

64

Pagar BRC lengkap tiang

m2

65

Pegangan tangga profil kamper

m'

66

Papan kayu terentang

m3

67

Keramik lantai 20 x 25 cm

m2

68

Keramik lantai 10 x 20 cm

m2

69

Keramik lantai 20 x 20 cm

m2

70

Keramik lantai polos 30 x 30 cm

m2

71

Keramik ukuran 40 x 40 cm granito polished

m2

72

Keramik ukuran 40 x 40 cm granito unpolished

m2

73

m2

74

m2

75

Keramik dinding polos 10 x 20 cm

m2

76

Keramik dinding motif 10 x 20 cm

m2

77

Keramik dinding motif 20 x 20 cm

m2

78

Keramik dinding polos 20 x 20 cm

m2

79

Keramik dinding motif 20 x 25 cm

m2

80

Keramik dinding polos 20 x 25 cm

m2

81

Keramik essenza ukuran 60 x 60 cm polish

m2

82

Keramik essenza ukuran 60 x 60 cm unpolih

m2

83

Keramik dinding polos 30 x 30 cm

m2

84

Keramik dinding motif 30 x 30 cm

m2

85

Kawat duri untuk pagar

kg

86

Kuas 2 “ cat

bh

87

Kuas 3 “ cat

bh

88

Kunci pintu 2 slaag besar kualitas baik

bh

89

Kunci pintu 2 slaag kualitas standar

bh

90

Kunci pintu KM/WC putar bulat (Alpha)

bh

91

Kawat kasa 1 x 1 cm

m2

92

Kawat harmonika 4

m2

93

Lem vinyl

kg

94

Lem kayu

ltr

95

Lis kayu 1/4

m'

96

Lis profil Gipsum

m'

97

Lis profil kayu 5 x 5 cm

m'

98

Marmer setara Citatah/Padalarang 60 x 60

m2

99

Meni besi

kg

100

Meni kayu

kg

101

Minyak cat (tinner)

ltr

102

ltr

103

Multiplek 9 mm, 120 X 240

lbr

104

Multiplek 12 mm, 120 X 240

lbr

Balok dolken / stoot dia 8—10 cm

Keramik lantai 60 x 90 cm standar

Keramik lantai 60 x 60 cm standar

(37)

105

Multiplek 16 mm, 120 X 240

lbr

106

Nok genteng keramik glazur

bh

107

Nok genteng beton warna

bh

108

Nok genteng metal

m'

109

kg

110

Paku sekrup 3,5”

bh

111

Parquet jati

m2

112

Pasir pasang

m3

113

Pasir beton

m3

114

Pasir urug

m3

115

Panel lisrik standar untuk rumah

unit

116

Perancah kayu

m3

117

Pintu alumunium/pintu PVC

bh

118

Pipa galvanis Ø 1/2” kelas medium

m'

119

Pipa galvanis Ø 3/4” kelas medium

m'

120

Pipa galvanis Ø 1” kelas medium

m'

121

Pipa galvanis Ø 1 1/2” kelas medium

m'

122

Pipa PVC AW Ø 1/2’ setara maspion

m'

123

Pipa PVC AW Ø 3/4’

m'

124

Pipa PVC AW Ø 1”

m'

125

Pipa PVC AW Ø 2”

m'

126

Pipa PVC AW Ø 4”

m'

127

Penyambung pipa PVC ukuran 1/2 “

bh

128

Penyambung pipa PVC ukuran 3/4 “

bh

129

Penyambung pipa PVC ukuran 2 “

bh

130

Penyambung pipa PVC ukuran 4 “

bh

131

Plamir tembok

kg

132

Plamir/dempul plitur (impra)

kg

133

Plamir kayu

kg

134

Triplek tebal 3 mm, ukr 120 x 240 cm

lbr

135

Triplek tebal 4 mm, ukr 120 x 240 cm

lbr

136

Plint keramik ukuran 10 x 40 cm

bh

137

Pelat alumunium 0,2 mm

m'

138

Politur jadi

kg

139

Polycarbonate

m2

140

Ramset/dinabolt / piser

kh

141

Ramin (papan kayu ramin)

m3

142

Residu atau ter

ltr

143

Rooster bata merah 12 x 11,5 x 24

bh

144

Roof light (fibreglass) tebal 1 mm, lbr 1 m

m'

145

Roll cat

bh

146

Rolling door

m2

147

Semen PC (abu-abu) 50 kg

sak

148

Semen instant

kg

149

Semen warna/putih

kg

150

Seng pelat 0,0400 x 0,9 m

m'

151

Seng gelombang 180 x 90 x 0,03

lbr

152

Seng gelombang 180 x 90 x 0,05

lbr

153

Sirtu (pasir koral)

m3

154

Sisalation/alumunium foil

m2

155

Slot / grendel pintu 4 “

bh

156

Slot / grendel jendela 3 “

bh

157

Saklar / stop kontak lisrik standar

bh

158

m3

159

Split 1/2 cm (batu pecah)

m3

160

Waterproofing membran

m2

161

Waterproofing emulsion /coating/floor harderner

kg

Paku

(38)

162

Tangki air fiber glass 1 m3

bh

163

Teakwood 4 mm 120 x 240

lbr

164

Teak oil

ltr

165

Triplek tebal 4 mm ukuran pintu

lbr

166

Ubin abu-abu 30 x 30 cm, tebal 3 cm

m2

167

Ubin abu-abu 20 x 20 cm, tebal 2 cm

m2

168

Melamik impra

ltr

169

Wallpaper

m2

170

Roof drain besi 3 “

bh

171

Bak mandi fibreglass 60 x 60 cm

bh

172

Bak cuci stainless steel

bh

173

Floor drain stainles steel

bh

174

Kitchen zink stainles steel standar 1 lubang

bh

175

Kloset duduk warna standar setara TOTO

bh

176

Kloset jongkok porselen warna standar

bh

177

Kran air 1/2” kualitas sedang

bh

178

Kran air angsa 1/2” kualitas sedang

bh

179

Soap holder (tempat sabun)

bh

180

Shower lengkap + slang plastik

bh

181

Shower set dinding

bh

182

Urinoir warna standar

bh

183

Wastafel dinding/gantung

bh

184

Wastafel pedestal/kaki

bh

185

Water pump (pompa air 100 Watt)

set

186

Kabel NYA 1 x 1,5 mm ( 50 m )

rol

187

Kabel NYM 2 x 1,5 mm ( 50 m )

rol

188

Kabel NYA 2 x 2,5 mm (50 m)

rol

189

Kabel NYM 3 x 2,5 mm (50 m)

rol

190

Lampu SL / TL 36 watt

bh

191

Lampu baret 30 cm + lampu 18 watt

bh

192

Lampu taman lengkap (standar)

bh

193

Lampu pijar 40 watt

bh

194

Cotton plaster

bh

195

Profil alumunium “T”

m'

196

Pipa PVC tipe D 3 “

m'

197

Pipa PVC tipe D 4 “

m'

198

Soda api

kg

199

Tanah urug

m3

200

Plint keramik ukuran 10 x 30 cm

bh

201

Tarikan jendela

bh

202

Septictank jadi 1,5 m3 (fiber semen)

bh

203

Baja ringan untuk rangka atap (pabrikan)

m2

PASIR + BATU

SEMEN

         Pasir Pasang Rp. 260.000/m3

         Pasir Urug Rp. 260.000/m3

         Split Rp. 132.500/m3

         Batu Kali Rp. 260.000/m3

         Batu Koral Rp. 260.000/m3

         Tanah Urug Merah Rp. 95.000/m3

         Batu Bata Rp. 500/buah

         Batu Bata Jumbo Rp. 1.000/buah

         Batu Batako Rp. 1.800/buah

         Semen Gresik Rp. 56.500/40 kg (sak)

         Semen Tiga Roda Rp. 70.000/50 kg (sak)

         Semen Tiga Roda Putih Rp. 54.500/40 kg (sak)

(39)

HEBEL

BESI BETON

PAKU

A. Paku Kayu/Triplek

TRIPLEK

KACA

A. Kaca Bening

PAPAN FIBER SEMEN

Papan Fiber Semen (GRC): Ukuran Triplek :

Ukuran Papan :

PAPAN GYPSUM Ukuran Gypsum :

KAYU

A. Reng

B. Kaso

         Blok Reguler Tebal 10 mm Rp 770.000/m3

         Panel Rp. 250.000/m3

         Diameter 6mm Rp. 24.000/12m (batang)

         Diameter 8mm Rp. 40.000/12m (batang)

         Diameter 10mm Rp. 60.000/12m (batang)

         Diameter 12mm Rp. 90.000/12m (batang)

         Diameter 16mm Rp. 145.000/12m (batang)

         ukuran 1-4cm Rp. 15.000/kg

         ukuran 5-12cm Rp. 18.000/kg

         B. Paku Beton biasa (semua ukuran) Rp.20.000 – 25.000/dus

         Paku Beton bagus (semua ukuran) Rp. 38.000/dus

         C. Kawat Beton Rp. 18.500/ ikat

         D. Paku GRC Rp. 29.500/dus

         Tebal 3mm Rp. 55.000/lembar

         Tebal 4mm Rp. 65.000/lembar

         Tebal 6mm Rp. 80.000/lembar

         Tebal 8mm Rp. 130.000/lembar

         Tebal 12mm Rp. 170.000/lembar

         Tebal 15mm Rp. 210.000/lembar

         Gypsume board 9mm Rp. 110.000/lembar

         GRC BOARD Rp. 57.000/lembar

         Tebal 5mm Rp. 90.000/m2

         Big Flat Elephant (120×200) 9mm Rp. 46.000

         Big Flat Elephant (122×244) 4mm Rp. 43.000

         Big Flat Elephant (122×244) 6mm Rp. 70.000

         Big Flat Elephant (122×244) 8mm Rp. 95.000

         Wood Plank Elephant (4050×100) 8mm Rp. 50.000

         Wood Plank Elephant (4050×200) 8mm Rp. 65.000

         Wood Plank Elephant (4050×300) 10mm Rp. 75.000

         Merk Jaya (120×240) 9mm Rp. 60.000

         Merk Elephant (120×240) 9mm Rp. 50.000

         Merk Knauf (120×240) Rp. 48.000

         Meranti (2×3) Rp. 7.500/batang

         Meranti (3×4) Rp. 15.000/batang

         Borneo (2×3) Rp. 13.000/batang

         Borneo (3×4) Rp. 15.000/batang

         Kamper (4×6) Rp. 60.000/batang

         Kamper (5×7) Rp. 90.000/batang

         Meranti (4×6) Rp. 40.000/batang

         Meranti (5×7) Rp. 49.000/batang

         Borneo (4×6) Rp. 28.000/batang

         Borneo (5×7) Rp. 43.000/batang

         Kamper (4×6) Rp. 47.000/batang

(40)

C. Galar D. Balok

CAT TEMBOK

A. Interior B. Eksterior CAT KAYU C.Aquaproof

GENTENG KERAMIK

Kanmuri Milenio (Double Interlocking)

Kanmuri Espancia

M Class (Double Interlocking)

GENTENG BETON

         Kamper (5×7) Rp. 70.000/batang

         Meranti (5×10) Rp. 70.000/batang

         Borneo (5×10) Rp. 60.000/batang

         Kamper (5×10) Rp. 95.000/batang

         Meranti (6×12) Rp. 110.000/batang

         Meranti (8×12) Rp. 140.000/batang

         Dulux Rp. 150.000/2,5 liter

         Dulux Rp. 1.000.000/20 liter

         Mowilex Rp. 175.000/2,5 liter

         Mowilex Rp. 850.000/20 liter

         Catylac Rp. 89.000/5 kg

         Catylac Rp. 355.000/25 kg

         Vinilex Super Rp. 130.000/5 kg

         Vinilex Super Rp. 625.000/25 kg

         Metrolite Rp. 65.000/5 kg

         Metrolite Rp. 350.000/25 kg

         Matex Rp. 50.000/4 kg

         Matex Rp. 135.000/25 kg

         Profitex Rp. 26.500/5 kg

         Profitex Rp. 1.000.000/25 kg

         Dulux Rp. 150.000 – 200.000/2,5 lt

         Dulux Rp. 1.100.000/20 lt

         Mowilex Rp. 150.000/2,5 lt

         Mowilex Rp. 1.000.000/20 lt

         Dulux Rp. 40.000/kg

         Mowilex Rp. 58.000/kg

         Catylac Rp. 35.000/kg

         Glotex Rp. 35.000/kg

         Emco Rp. 35.000/kg

         Globe Supergloss Rp. 30.000/kg

         Aquaproof Rp. 170.000/4 kg

         Aquaproof Rp. 750.000/20 kg

         - Warna Natural Rp. 5.700/buah

         - Warna Standard Rp 6.300/buah

         - Warna Spesial Rp. 8.400/buah

         - Warna Exclusive Rp. 11.250/buah

         - Warna Natural Rp. 5.200/buah

         - Warna Standard Rp 8.500/buah

         - Warna Spesial Rp. 9.500/buah

         - Warna Exclusive Rp. 10.500/buah

         - Warna Natural Rp. 5.200/buah

         - Warna Standard Rp. 5.900/buah

         - Warna Spesial Rp. 7.750/buah

         - Warna Premium Rp. 10.700/buah

         - Genteng Knok Natural Rp. 14.000/buah

(41)

IDEAL

GENTENG METAL Sun Roof Venus

Sun Roof Pluto

ASBES Jabesmen

SENG GELOMBANG Seng Plat

Seng Gelombang

PIPA PVC

- Lucky

- Unggul

- Maspion

         - Morando Rp. 2.500 – Rp. 3.200/buah (20buah/m2)

         - Berglazur Rp. 3.000/buah

         - Natural Rp. 1.700/buah

         - Moner Rp. 4.700,- Rp. 5.200/buah (9buah/m2)

         - Berglazur Rp. 2.650/buah

         - Natural Rp. 1.750/buah

         -Ukuran 38,5 x 80 cm S/S Rp. 23.000/lembar

         -Ukuran 38,5 x 80 cm D/S Rp. 25.000/lembar

         -Ukuran 38,5 x 80 cm S/S Rp. 17.500/lembar

         -Ukuran 38,5 x 80 cm D/S Rp. 19.500/lembar

         -150×105 cm Rp. 45.000/gelombang kecil

         -180×105 cm Rp. 50.000/gelombang kecil

         -210×105 cm Rp. 70.000/gelombang kecil

         -240×105 cm Rp. 53.000/gelombang kecil

         -270×105 cm Rp. 78.000/gelombang kecil

         -300×105 cm Rp. 85.000/gelombang kecil

         -Tebal 0.20 mm Rp. 25.000/lembar

         -Tebal 0.25 mm Rp. 35.000/lembar

         -Tebal 0.30 mm Rp. 40.000/lembar

         -Tebal 0.20 mm Rp. 50.000/lembar

         -Tebal 0.30 mm Rp. 60.000/lembar

         - Wavin 0,5 inci Rp. 20.000/batang

         0,75 inci Rp. 25.000/batang

         1 inci Rp. 35.000/batang

         2 inci Rp. 50.000/batang

         3 inci Rp. 85.000/batang

         4 inci Rp 130.000/batang

         - Rucika 0,5 inci Rp 24.800/batang

         1 inci Rp. 43.500/batang

         2 inci Rp. 50.540/batang

         4 inci Rp. 168.000/batang

         8 inci Rp. 635.000/batang

         0,5 inci Rp. 8.500/batang

         0,75 inci Rp. 12.600/batang

         1 inci Rp. 15.000/batang

         2 inci Rp. 33.300/batang

         3 inci Rp. 64.000/batang

         4 inci Rp. 102.300/batang

         0,5 inci Rp. 8.300/batang

         0,75 inci Rp. 10.900/batang

         1 inci Rp. 15.000/batang

         2 inci Rp. 26.600/batang

         3 inci Rp. 39.500/batang

         4 inci Rp. 54.500/batang

         0,5 inci Rp. 12.000/batang

         0,75 inci Rp. 15.000/batang

         1 inci Rp. 20.000/batang

(42)

LANTAI KERAMIK

LANTAI KAYU KERAMIK DINDING

SANITARI

CLOSET DUDUK CLOSET JONGKOK WASTAFEL/LAVATORY GRANIT

KUNCI

         2 inci Rp. 50.000/batang

         3 inci Rp. 100.000/batang

         4 inci Rp. 150.000/batang

         20×20 cm Arwana Tua Rp. 35.000/m2

         20×20 cm Arwana Muda Rp. 34.000/m2

         30×30 cm Arwana Putih Rp. 29.000/m2

         30×30 cm Arwana Marble Rp. 32.000/m2

         30×30 cm Arwana Fancy Rp. 36.000/m2

         40×40 cm Arwana Putih Rp. 29.000/m2

         40×40 cm Arwana Marble Rp. 32.500/m2

         Kronotec Rp. 225.000/m2

         HDM Glossy Rp. 550.000/boks

         20×20 cm Roman (putih) Rp. 30.000 - Rp. 45.000/m2

         20×20 cm Roman (motif) Rp. 33.000 - Rp. 50.000/m2

         20×20 cm Masterina (putih) Rp. 40.000/m2

         Masterina (motif) Rp. 50.000/m2

         20×20 cm KIA (putih) Rp. 35.000/m2

         20×20 cm KIA (motif) Rp. 40.000/m2

         20×25cm Mulia (warna muda) Rp. 40.000/m2

         20×25cm Mulia (warna tua) Rp. 45.000/m2

         20×25cm IKAD (warna muda) Rp. 40.000/m2

         20×25cm IKAD (warna tua) Rp. 50.000/m2

         25×33 cm ROMAN Rp 45.000/m2

         33×50 cm ROMAN Rp. 75.000/m2

         30×30 cm HERCULES (putih) Rp. 40.000/m2

         30×30 cm Acura (putih) Rp. 35.000/m2

         30×30 cm KIG (warna) Rp. 40.000/m2

         30×30 cm KIA (warna) Rp. 40.000/m2

         60 x 60 cm Platinum Rp. 125.000/m2

         30 x 60 cm Platinum Rp. 75.000/m2

         58 x 58 cm Platinum Rp. 110.000/m2

         Sanremo Classis CCST Rp. 1.325.000/set

         Lexington Rp. 3.500.000/set

         Granada 3000 CCST Rp. 1.100.000/set

         Granada II Space CCST Rp. 1.500.000/set

         Projecta Rp. 1.000.000/set

         Rapi EX Squat Rp. 250.000/set

         San Remo 55 Lava & Pedestal Rp. 600.000/set

         Studio 3000 Lava & Pedestal Rp. 400.000/set

         Studio 50 Lavatory Rp. 200.000/set

         Studio 45 Lavatory Rp. 170.000/set

         Impero 40×40 cm Rp. 120.000/m2

         Granito 40×40 cm Rp. 200.000/m2

         Inesa 40×40 cm Rp. 175.000/m2

         Niro 40×40 cm Rp. 155.000/m2

         Essenza 40×40 cm Rp. 172.000/m2

         Firo Rp. 270.000/set

         Napoli Rp. 30.000/set

(43)

Per Jenis Tenaga Harian (September 2014)

Kepala Tukang

Mandor/Pengawas

Tukang

Pekerja

Pembantu Tukang (Knek)

         Romaco Rp. 65.000/set

         Ferza Rp. 32.000/set

         Top Rp. 30.000/set

         Paloma Rp 400.000

         Yale Rp. 115.000/set

         Beluci Rp. 115.000/set

         Kepala Tk.Batu Rp

125.000,00,-

         Kepala Tk.Besi Rp

125.000,00,-

         Kepala Tk.Cat Rp

125.000,00,-

         Kepala Tk.Kayu Rp

125.000,00,-

         Kepala Tk.Listrik Rp

125.000,00,-

         Kepala Tk.Mekanik Rp

125.000,00,-

         Kepala Tk.Pipa Air Rp

125.000,00,-

         Kepala Tk.Pipa BBM Rp

125.000,00,-

         Mandor Gali Rp

150.000,00,-

         Mandor Kayu Rp

150.000,00,-

         Mandor Cat Rp 90.000,00

         Mandor Besi Rp

150.000,00,-

         Mandor Pipa BBM Rp

150.000,00,-

         Mandor Tangki Rp

150.000,00,-

         Mandor Mekanik Rp

150.000,00,-

         Mandor Listrik Rp

150.000,00,-

         Tukang Gali Rp

100.000,00,-

         Tukang Batu Rp

100.000,00,-

         Tukang Besi Rp

100.000,00,-

         Tukang Cat Rp

100.000,00,-

         Tukang Kayu Rp

100.000,00,-

         Tukang Las Pipa BBM Rp

100.000,00,-

         Tukang Listrik Rp

100.000,00,-

         Tukang Mekanik Rp

100.000,00,-

         Tukang Pancang Rp

100.000,00,-

         Tukang Pipa Air Rp

100.000,00,-

         Tukang Pipa BBM Rp

100.000,00,-

         Tukang Talang Rp

100.000,00,-

         Tukang Babat Rumput Rp

100.000,00,-

         Tukang Aspal Rp

100.000,00,-

         Instalator Rp

100.000,00,-

         Operator Alat Berat Rp

100.000,00,-

         Pekerja Babat Rp

60.000,00,-

         Pekerja Bongkar Rp

60.000,00,-

         Pekerja Gali Rp

60.000,00,-

         Pekerja Kasar Rp

60.000,00,-

         Pekerja Pembersih Rp

60.000,00,-

         Pemb. Tk. Kayu Rp

60.000,00,-

         Pemb. Tk. Las Rp

60.000,00,-

         Pemb. Tk. Pipa Rp

60.000,00,-

         Pemb. Instalator Rp

60.000,00,-

         Pemb. Operator Alat Berat Rp

(44)

60.000,00,-Daftar Harga Bahan

Upah Pekerja

Harga (Rp)

No

Tenaga

Sat

Rp 65,000

1

Pekerja

Oh

Rp 48,000

2

Tukang Batu

Oh

Rp 90,000

Rp 81,000

Rp 950

Rp 120,000

Rp 4,200

Rp 4,500

8

Kepala Tukang

Oh

Rp 13,800

9

Mandor

Oh

Rp 300,000

10

Masinis/operator

Oh

Rp 160,000

11

Kernet

Oh

Rp 320,000

Rp 17,000

Rp 14,000

Rp 11,500

Rp 9,300

Rp 10,250

Rp 12,500

Rp 14,000

Rp 19,000

Rp 40,000

Rp 48,000

Rp 47,000

Rp 78,000

Rp 20,000

Rp 38,000

Rp 45,000

Rp 32,000

Rp 4,500

Rp 25,000

Rp 25,000

Rp 415,000

Rp 65,000

Rp 50,000

Rp 35,000

Rp 30,000

Rp 150,000

Rp 1,200

Rp 2,250

Rp 87,500

Rp 82,500

Rp 85,000

Rp 129,800

Rp 160,000

Rp 120,000

Rp 20,000

Rp 750,000

Rp 38,000

(45)

Rp 35,000

Rp 6,000

Rp 75,000

Rp 98,000

Rp 12,000

Rp 245,000

Rp 18,000

Rp 155,000

Rp 14,000

Rp 2,350,000

Rp 2,700,000

Rp 5,766,800

Rp 5,000,000

Rp 3,950,000

Rp 3,800,000

Rp 148,000

Rp 65,000

Rp 1,500,000

Rp 58,000

Rp 32,000

Rp 48,500

Rp 60,000

Rp 246,000

Rp 205,000

Rp 336,000

Rp 290,000

Rp 40,000

Rp 42,000

Rp 48,000

Rp 47,000

Rp 49,000

Rp 52,000

Rp 260,000

Rp 240,000

Rp 54,000

Rp 56,000

Rp 41,000

Rp 92,000

Rp 14,000

Rp 175,000

Rp 85,000

Rp 65,000

Rp 26,000

Rp 23,000

Rp 35,000

Rp 28,000

Rp 2,100

Rp 12,000

Rp 7,700

Rp 250,000

Rp 20,000

Rp 16,000

Rp 20,000

Rp 10,000

Rp 112,000

Rp 150,000

(46)

Rp 190,000

Rp 32,000

Rp 32,000

Rp 58,000

Rp 17,000

Rp 750

Rp 278,000

Rp 275,000

Rp 275,000

Rp 220,000

Rp 300,000

Rp 2,200,000

Rp 450,000

Rp 15,000

Rp 18,500

Rp 30,250

Rp 33,000

Rp 3,400

Rp 4,675

Rp 6,700

Rp 9,000

Rp 19,500

Rp 2,250

Rp 3,000

Rp 6,000

Rp 14,000

Rp 27,000

Rp 26,000

Rp 22,500

Rp 35,000

Rp 51,000

Rp 9,000

Rp 18,000

Rp 35,000

Rp 222,000

Rp 2,200

Rp 5,500,000

Rp 3,400

Rp 4,100

Rp 68,000

Rp 27,400

Rp 180,000

Rp 62,000

Rp 2,450

Rp 12,700

Rp 33,000

Rp 53,800

Rp 60,600

Rp 102,000

Rp 5,600

Rp 32,500

Rp 19,500

Rp 21,200

Rp 132,000

Rp 133,000

Rp 225,000

Rp 45,000

(47)

Rp 905,000

Rp 90,000

Rp 40,000

Rp 65,000

Rp 41,000

Rp 38,000

Rp 32,200

Rp 27,000

Rp 85,000

Rp 250,000

Rp 250,000

Rp 63,000

Rp 198,000

Rp 2,750,000

Rp 350,000

Rp 56,000

Rp 155,500

Rp 33,000

Rp 180,000

Rp 260,000

Rp 825,000

Rp 375,000

Rp 825,000

Rp 1,450,000

Rp 165,000

Rp 278,000

Rp 425,000

Rp 455,000

Rp 58,000

Rp 90,000

Rp 300,000

Rp 8,000

Rp 58,000

Rp 33,000

Rp 15,000

Rp 19,000

Rp 45,000

Rp 25,000

Rp 15,000

Rp 25,000

Rp 1,550,000

Rp 170,000

(48)
(49)
(50)
(51)
(52)
(53)

Harga

Rp 60,000.00

90 Rp 5,400,000.00

Rp 100,000.00

540 Rp 54,000,000.00

90 Rp -

90 Rp -

90 Rp -

90 Rp -

90 Rp -

Rp 125,000.00

90 Rp 11,250,000.00

Rp 150,000.00

90 Rp 13,500,000.00

Rp 100,000.00

90 Rp 9,000,000.00

Rp 60,000.00

90 Rp 5,400,000.00

90 Rp -

90 Rp -

Tukang Borongan

Rp 98,550,000.00