W
ORLD
T
RADE
O
RGANIZATION
G/TBT/N/JPN/2576 June 2008(08-2644)
Committee on Technical Barriers to Trade Original: English
NOTIFICATION
The following notification is being circulated in accordance with Article 10.6.
1. Member to Agreement notifying: JAPAN
If applicable, name of local government involved (Articles 3.2 and 7.2):
2. Agency responsible: Ministry of Economy, Trade and Industry (METI)
Name and address (including telephone and fax numbers, e-mail and web-site addresses, if available) of agency or authority designated to handle comments regarding the notification shall be indicated if different from above:
3. Notified under Article 2.9.2 [ X ], 2.10.1 [ ], 5.6.2 [ ], 5.7.1 [ ], other:
4. Products covered (HS or CCCN where applicable, otherwise national tariff heading. ICS numbers may be provided in addition, where applicable):
Air conditioners (HS: 8415.10, 8415.81, 8415.82); Routers and Switches (HS: 8471.80)
5. Title, number of pages and language(s) of the notified document: Revision to Enforcement Regulation under the Law Concerning the Rational Use of Energy (the Law) and Ministerial Notification of the Ministry of Economy, Trade and Industry (2 pages, in English).
6. Description of content: Routers and Switches will be newly designated as "Designated machinery and equipment" and the methods of measuring their energy consumption efficiency will be established. Additionally, the air conditioners’ methods of measuring energy consumption efficiency will be reviewed.
7. Objective and rationale, including the nature of urgent problems where applicable: To promote rationalization of use of energy through prevalence of machinery and equipment with high energy consumption efficiency, in order to cope with the recent increase of energy consumption in commercial/residential sectors and global warming problem.
8. Relevant documents: This revision will appear in "KAMPO" (Official Government Gazette) when adopted.
G/TBT/N/JPN/257 Page 2
9. Proposed date of adoption: Proposed date of entry into force:
August 2008
August 2008 ( About one year will be set as a grace period for labelling)
The target fiscal year:
- House use wall hanging and direct blowing type air conditioners FY2010
- House use and other than above type air conditioners FY2012
- Business use air conditioners FY2015 - Routers FY2010
- Switches FY2011
10. Final date for comments: 60 days from date of circulation