RINGKASAN DOKUMEN PELAKSANAAN ANGGARAN
DPA-SKPD
PROVINSI JAWA BARAT
TAHUN ANGGARAN 2012
Urusan Pemerintahan
:
1.03 URUSAN WAJIB Pekerjaan Umum
Organisasi
:
1.03.02 Dinas Pengelolaan Sumber Daya Air
SATUAN KERJA PERANGKAT DAERAH
FORMULIR
KODE
REKENING
U R A I A N
JUMLAH
(Rp)
1
2
3
4
PEN D APATAN D AERAH
4
1
PEN D APATAN ASLI D AERAH
1 0 ,0 0 0 ,0 0 0 .0 0
4
1
2
Ret r ibusi Daer ah10,000,000.00
JUM LAH PEN D APATAN
1 0 ,0 0 0 ,0 0 0 .0 0
5
BELAN JA
5
1
BELAN JA TI D AK LAN GSUN G
4 8 ,4 7 2 ,0 3 6 ,8 7 2 .0 0
5
1
1
Belanj a Pegaw ai48,472,036,872.00
5
2
BELAN JA LAN GSUN G
1 6 2 ,4 8 7 ,9 8 6 ,2 0 0 .0 0
5
2
1
Belanj a Pegaw ai31,415,399,175.00
5
2
2
Belanj a Bar ang Dan Jasa42,798,908,825.00
5
2
3
Belanj a Modal88,273,678,200.00
JUM LAH BELAN JA
2 1 0 ,9 6 0 ,0 2 3 ,0 7 2 .0 0
D EFI SI T
( 2 1 0 ,9 5 0 ,0 2 3 ,0 7 2 .0 0 )
Bandung, 05 Januari 2012
KEPALA DINAS PSDA PROVINSI JAWA BARAT
SELAKU PENGGUNA ANGGARAN
NIP. 19580827 198603 1 014
Ir. DEDDI MULYADI
KodeRek. URAIAN I II III IV JUMLAH
TRIWULAN
4 Pendapatan 2,500,000.00 2,500,000.00 2,500,000.00 2,500,000.00 10,000,000.00
5.1 Belanja Tidak Langsung 12,118,009,218.00 12,118,009,218.00 12,118,009,218.00 12,118,009,218.00 48,472,036,872.00
5.2 Belanja Langsung 15,964,667,874.00 49,618,605,334.00 57,595,348,985.00 39,309,364,007.00 162,487,986,200.00
6.1 Penerimaan Pembiayaan
6.2 Pengeluaran Pembiayaan
RENCANA PELAKSANAAN ANGGARAN
SATUAN KERJA PERANGKAT DAERAH