• Tidak ada hasil yang ditemukan

DAFTAR ACUAN. Simulasi rencana..., Beta Patrianto, FT UI, 2009

N/A
N/A
Protected

Academic year: 2021

Membagikan "DAFTAR ACUAN. Simulasi rencana..., Beta Patrianto, FT UI, 2009"

Copied!
7
0
0

Teks penuh

(1)

171

DAFTAR ACUAN

1

Harold Kerzner (2001). Project Management: A Systems Approach to Planning, Scheduling, and Controlling (7th edition).

2

Clough & Sears. (1994). Construction Contracting, 6th Edition.

3

Clough & Sears (1994). Construction Contracting, 6th Edition.

4

Clough & Sears (1994). Construction Contracting, 6th Edition.

5

Clough & Sears (1994). Construction Contracting, 6th Edition.

6

Soeharto (1995). Manajemen Proyek dari konseptual sampai operasional, Jakarta : Erlangga.

7

Brandon dan Gray (1970).

8

Clough & Sears (1994). Construction Contracting, 6th Edition

9

Smith (2000)

10

Brandon dan Gray (1970).

11

Clough & Sears (1994). Construction Contracting, 6th Edition.

12

Soeharto (1995). Manajemen Proyek dari konseptual sampai operasional, Jakarta : Erlangga

13

Clough & Sears (1994). Construction Contracting, 6th Edition.

14

Clough & Sears (1994). Construction Contracting, 6th Edition.

15

A Guide to the Project Management Body Of Knowledge 3rd Edition, 2004.

16

A Guide to the Project Management Body Of Knowledge 3rd Edition, 2004.

17

An Integrated Approach for Risk Response Development in Project Planning, The Journal of the Operational Research Society, Vol. 52, No. 1, (Jan., 2001).

18

Risk Management Program Standard, The Joint Risk Management Program Standard Team, (1996).

19

Risk Management Standards Australia, AS/NZS 4360:1999.

20

Risk Management Standards Australia, AS/NZS 4360:1999.

21

Pearce II and Robinson Jr., (2000), Rabin et al., (2000), Macmillan and Tampoe, (2000).

22 R.G. Dyson / European Journal of Operational Research 152, 2004. 23

Freddy Rangkuti (2008). Analisis SWOT Teknik Membedah Kasus Bisnis.

24

Freddy Rangkuti (2008). Analisis SWOT Teknik Membedah Kasus Bisnis.

25 Freddy Rangkuti (2008). Analisis SWOT Teknik Membedah Kasus Bisnis. 26

Freddy Rangkuti (2008). Analisis SWOT Teknik Membedah Kasus Bisnis.

27

J.A. Joyce, P.A. Hobson (2006). Monte Carlo Simulation As a Tool For Technical Modelling And Project Analysis.

28

Lawrence I. Goldman (2002), Crystal Ball Professional Introdutory Tutorial, Proceedings of the 2002 Winter Simulation Conference.

29 James R. Evans dan David L. Olson (1998). Introduction to Simulation and Risk Analysis.

(2)

172

30

Dale E. Clark. Monte Carlo Analysis: Ten Years of Experience. Technical Article – Roll of

Risk Series. P. 40.

31 Dale E. Clark. Monte Carlo Analysis: Ten Years of Experience. Technical Article – Roll of Risk Series. P. 40.

32

Fente Javier dkk. (May/June 2000), Defining a Probability Distribution Function For Construction Simulation. Journal of Construction and Management.

33

Christiano Maio dkk. (July/August 2000), Probability Function For Construction Simulation. Journal of Construction and Management.

34 Fente Javier dkk. (May/June 2000), Defining a Probability Distribution Function For

Construction Simulation. Journal of Construction and Management.

35

W. Edward Back. Defining Triangular Probability Distribution From Historical Cost Data. Journal of Construction Engineering and Management.

36

W. Edward Back. Defining Triangular Probability Distribution From Historical Cost Data. Journal of Construction Engineering and Management.

37

Yusuf Latief, (2001), Perencanaan dan Penjadwalan Konstruksi. Jakarta: Jurusan Sipil FTUI.

38

David S. Christensen, Ph.D, Using The Earned Value Cost Management Report To Evaluate The Contractor's Estimate At Completion.

39

E.L. Whtiney, Ibid, (1960), P. 160.

40

Moh. Nasir, Ph.D, (Agustus 2003), Metode Penelitian, Jakarta : Ghalia Indonesia, P.54.

41

Yin, R. K., (1994 ), Case Study Research : Design and Method , Sage Publication.

42

Brown, (1998), P.7.

43

Davis, (1998), P.23.

44

Nasir, Ph.D, (Agustus 2003), Metode Penelitian, Jakarta : Ghalia Indonesia, P. 124.

45

Aryati Indah Kusumastuti, (2004 ), Pengaruh Kualitas Komunikasi Padapengelolaan Proyek Konstruksi Bangunan Gedung Terhadap Kinerja Waktu, Universitas Indonesia, Teknik Sipil Kekhususan Manajemen Konstruksi.

46

Gay & Diehl, (1996).

47

Moh. Nasir, Ph.D, (Agustus 2003), Metode Penelitian, Jakarta : Ghalia Indonesia, P. 12.

48

Thomas L. Saaty, (1983).

49

Standards Australia, Standards New Zealand. Risk Management Risk Management, (1999), AS/NZS 4360.

50

Nunnaly dan Bernstein. (1994).

51

Santoso dan Tjiptono. (2001). P. 134.

52

Bhina Patria. http://www.inparametric.com.

53 Lukman Nurzaman (2006). Simulasi Waktu dan Biaya Pada Proyek Menara Base Transceiver

Station di Wilayah Propinsi Banten Dengan Software Pertmaster . Program Sarjana, Dep. Teknik Sipil Universitas Indonesia.

(3)

173

54

James R. Evans dan David L. Olson, (1998). Introduction to Simulation and Risk Analysis. New Jersey : Prentice Hall, Inc. P.67.

55 Pertmaster Manual and Help. Interpreting The Result. 56

Pertmaster Manual and Help. Interpreting The Result.

57

Phillip Rawlings. Pertmaster Sensitivity. Euro Log Ltd.

58 Pertmaster Manual and Help. Interpreting The Result. 59

(4)

174

DAFTAR PUSTAKA

1. An Integrated Approach for Risk Response Development in Project Planning. The Journal of the Operational Research Society, Vol. 52, No. 1, (Jan., 2001). 2. A Guide to the Project Management Body Of Knowledge 3rd Edition, 2004. 3. AGC of America, (1994). Construction, Planning and Schedulling. AGC Of

America.

4. Ahuja H. N (1976). Construction Performance Control By Networks Newyork. John Wiley and Sons.

5. Ahuja, H. N. (1980). Succesful Construction Cost Control. New York, John Wiley and Sons.

6. Alin Veronica (2002). Rekomendasi Tindakan Koreksi Pada Manajemen Material Dalam Pengendalian Biaya Proyek dengan Menggunakan Expert System. Program Pasca Sarjana Manajemen Proyek, Universitas Indonesia. 7. Anna Klemetti (2006). Risk Management in Construction Project Networks.

Helsinki University of Technology.

8. Aryati Indah Kusumastuti (2004). Pengaruh Kualitas Komunikasi Padapengelolaan Proyek Konstruksi Bangunan Gedung Terhadap Kinerja Waktu. Teknik Sipil Kekhususan Manajemen Konstruksi, Universitas Indonesia.

9. Badiru, A. B. (1995). Comprehensive Project Management Singapore. Prentice Hall.

10. Barrie, S. D. (1993). Manajemen Konstruksi Profesional. Jakarta, Erlangga, Edisi Kedua: 269.

11. Benjamin S. Blanchard, Walter J. Fabrycky. Systems Engineering and Analysis 3rd Edition. Pentice Hall International Series In Industrial and Systems Engineering.

12. Budiono (2006). Simulasi Waktu dan Biaya Pada Konstruksi Pier Pada Jalan Layang Suprapto Jakarta. Program Pasca Sarjana Manajemen Konstruksi, Universitas Indonesia.

13. Burton E Lipman (1978). Successful cost reduction and control, Prentice Hall. 14. Clough & Sears (1994). Construction Contracting, 6th Edition.

(5)

175

15. Cohen, M.W., Palmer, G.R. (2004). Project Risk Identification and Management. AACE International Transactions, 2004.

16. Connolly, Joseph P. Risk (1997). Management perceptions and trends of U.S. construction. Journal of Construction Engineering and Management, American Society of Civil Engineers.

17. Dr Patrick. X.W. Zou, Dr Guomin Zhang and Professor Jia-Yuan Wang. Identifying Key Risks in Construction Projects: Life Cycle and Stakeholder Perspectives.

18. E.L. Whitney, Ibid (1960).

19. Eko Susanto (2008). Evaluasi Kinerja Manajemen Proyek Dengan Menggunakan Konsep Nilai Hasil. Program Sarjana, Dep. Teknik Industri Universitas Indonesia.

20. Gary R. Smith & Caryn M. Bohn (1999). Small to Medium Contractor Contingency and Assumption of Risk. Journal of Construction Engineering and Management. March/April, 1999.

21. Gustaf hamilton (1997). This is Risk Management.

22. Halpin, D. W. (1998). Construction Management USA. John Wiley and Sons, Inc.

23. Harold Kerzner (2001). Project Management: A Systems Approach to Planning, Scheduling, and Controlling (7th edition).

24. Harrison (1991). Synergies and Post-Acquisition Performance: Differences versus Similarities in Resource Allocations. Journal of Management, Vol. 17, No. 1, 173-190.

25. Hendrickson, C (1989). Project Management For Construction . Fundamental Concepts for Owners, Engineers, Architect and Builders. Singapore. Prentice Hall.

26. Hernandez (1993). Applications of descriptive measures in risk management. 27. Hira N Ahuja & V Nandakumar (1985). Simulation model to forecast project

completion time. Journal of Construction Engineering and Management, ASCE.

28. J.A. Joyce, P.A. Hobson (2006). Monte Carlo Simulation As a Tool For Technical Modelling And Project Analysis.

(6)

176

29. John P. Kindinger, John L.Darby (2000). Risk Factor Analysis - A New Qualitative Risk Management Tool. Proceedings of the Project Management Institute Annual Seminars & Symposium, September 7-16, 2000. Houston , Texas, USA.

30. Laufer, A. and J. D. Borcherding (1981). Financial Incentives to Raise Productivity. ASCE journal of the Construction Division Vol. 107, No. CO4: 745-752.

31. Lawrence I. Goldman (2002). Crystal Ball Professional Introdutory Tutorial. Proceedings of the 2002 Winter Simulation Conference.

32. Lenny Sagita (2002). Rekomendasi Tindakan Koreksi Pada Manajemen Tenaga Kerja Dalam Pengendalian Biaya Proyek dengan Menggunakan Expert System. Program Pasca Sarjana Manajemen Proyek, Universitas Indonesia.

33. Lukman Nurzaman (2004). Simulasi Waktu dan Biaya Pada Proyek Menara Base Transceiver Station di Wilayah Propinsi Banten Dengan Software Pertmaster . Program Sarjana, Dep. Teknik Sipil Universitas Indonesia.

34. Mills, A. (2001). A systematic approach to risk management for construction. Structural Survey, 2001, Vol. 19, No. 5.

35. Moh. Nazir, Metode Penelitian, (2003).

36. Odeh, A.M., Battaineh, H.T (2002). Causes of construction delay: traditional contracts. International Journal of Project Management, 2002, Vol. 20, No. 1. 37. Oguri, T. (1990). Project Planning and Control. Japan, JGC Corporation of

Japan.

38. OptQuest For Crystal Ball - User Manual, Decisioneering Inc (1988-2001) 39. Pearce II and Robinson Jr. (2000), Rabin et al., (2000), Macmillan and

Tampoe (2000).

40. R.G. Dyson / European Journal of Operational Research 152, 2004 41. Risk Management Standards Australia, AS/NZS 4360:1999. 42. Ritz (1994). Total construction project management. McGraw-Hill.

43. Roger Flanagan, George Norman (1993). Risk Management And Construction. Blackwell Scientific Publications, Oxford.

(7)

177

44. Rowe, K. (1975). Management Techniques for Civil Engineering Construction. London, Applied Science Publisher Ltd.

45. Schuette & Liska (1994). Construction Estimating. McGraw-Hill Education (ISE Editions).

46. Soeharto (1995). Manajemen Proyek dari konseptual sampai operasional, Jakarta, Erlangga.

47. Suriaty Paraminta Putri (2008). Pengelolaan Risiko Pembuatan Kapal Kayu Tradisional Type Phinisi. Program Pasca Sarjana Manajemen Proyek, Universitas Indonesia

48. Ward, S., Chapman (2003). Transforming project risk management into project uncertainty management. international Journal of Project Management, 2003, Vol.21.

49. Warszawski, A. (1982). Cost Control Under Inflation in Construction Company. Journal of the Construction Divisions 107 (No. CO4 December) 50. Wysocki, Beck, dan Crane (2000). Effective Project Management, 2nd

Edition.

51. Yacovy, Haimes (1998). Risk Modelling, Assesment and Management. John Wiley & Sons, Inc.

52. Yin, R. K (1994). Case Study Research : Design and Method. Sage Publication.

53. Yudiansyah (2002). Rekomendasi Tindakan Koreksi Pada Manajemen Peralatan Dalam Pengendalian Biaya Proyek dengan Menggunakan Expert System. Program Pasca Sarjana Manajemen Proyek, Universitas Indonesia. 54. Yuono Dolly (2006). Optimasi Biaya Tenaga Kerja Proyek Jalan pada

Referensi

Dokumen terkait

[r]

Dengan demikian suatu Sistem Pengendalian Interen (SPI) merupakan suatu sistem yang digunakan oleh suatu entitas untuk menjamin bahwa pelaksanaan

Alasannya, iklan yang menayangkan produk Tje Fuk kurang menarik tidak menggunakan bintang-bintang yang sudah terkenal, sehingga menimbulkan kepercayaan konsumen

Hal ini pernah dilaporkan oleh Ehlers (1996) bahwa kemampuan menyebabkan kematian dari hubungan parasitasi nematoda entomopatogen dengan inang tidak hanya ditentukan

Karya Lestari Samarinda akan mempengaruhi produktivitas kerja pada setiap karyawan dan hal ini dibuktikan dengan hasil analisis regresi bertahap bahwa tidak terdapat hubungan yang

Kepala Desa dan Ketua Badan Permusyawaratan Desa. belum ada penetapan rancangan peraturan desa yang dilakukan oleh Badan Permusyawaratan Desa di Desa Lubuk Betung

Dari hasil penelitian pemasangan inner- helical fin dengan variasi ketebalan ke dalam pipa bagian dalam penukar panas pipa ganda, Gambar 3 menunjukan bahwa

Tahap ketiga setelah didapatkan hasil perbaikan bobot untuk nilai kriteria, sistem akan melakukan penentuan nilai vektor S dari setiap alternatif data calon