Propinsi
No Jawa Timur Rencana Realisasi Rencana Realisasi Rencana Realisasi Rencana Realisasi Rencana Realisasi Rencana Realisasi
Kabupaten/Kota
(Ha) (Ha) (Ha) (Ha) (Ha) (Ha) (Ha) (Ha) (Ha) (Ha) (Ha) (Ha)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1. Bondowoso 1.600,0 1.600,0 2.500,0 2.500,0 625,0 625,0 800,0 1.225,0 5.550,0 150,0 11.075,0 6.100,0 2. Banyuwangi 25,0 25,0 - - - - - - 8,0 8,0 33,0 33,0 3. Jember 1.675,0 1.675,0 3.500,0 3.500,0 2.375,0 2.375,0 1.000,0 1.000,0 4.600,0 - 13.150,0 8.550,0 4. Situbondo - - - - - - - - 50,0 50,0 50,0 50,0 5. Lumajang 1.200,0 1.200,0 1.700,0 1.700,0 1.330,0 1.330,0 650,0 650,0 2.450,0 - 7.330,0 4.880,0 6. Probolinggo 2.100,0 2.100,0 3.300,0 3.300,0 2.575,0 2.575,0 650,0 650,0 4.025,0 - 12.650,0 8.625,0 7. Kota Probolinggo - - - - - - - - 35,0 35,0 35,0 35,0 8. Bangkalan 368,0 368,0 350,0 350,0 750,0 750,0 275,0 275,0 - - 1.743,0 1.743,0 9. Sampang 500,0 500,0 1.175,0 1.175,0 2.020,0 2.020,0 600,0 600,0 2.300,0 100,0 6.595,0 4.395,0 10. Pamekasan 46,5 46,5 1.455,0 1.455,0 1.170,0 1.170,0 650,0 650,0 2.200,0 - 5.521,5 3.321,5 11. Sumenep 60,0 60,0 1.000,0 1.000,0 600,0 1.000,0 600,0 600,0 2.100,0 - 4.360,0 2.660,0 12. BPDAS
- Bondowoso - - - - - - - - - - -
-Jumlah 7.574,5 7.574,5 14.980,0 14.980,0 11.845,011.445,0 5.225,0 5.650,0 23.318,0 343,0 62.542,5 40.392,5 Tabel IV.2.1.1. Rekapitulasi Rencana dan Realisasi Pembuatan/Pengembangan Pengelolaan Hutan Rakyat dan Pembuatan Hutan/Kebun Rakyat
2006 2007
Tahun
2003 2004 2005 Jumlah
Di Wilayah BP DAS Sampean Madura Setiap Tahun Selama Lima Tahun Terakhir