NAMA PAKET

: PEMANFAATAN IDLE CAPASITY SPAM IKK PINOLOSIAN TENGAH

LOKASI

: KEC. PINOLOSIAN TENGAH

TAHUN ANGGARAN

: 2017

1 3

I

PEKERJAAN PERSIAPAN

1,450,000.00

II

PEKERJAAN PENGADAAN DAN PAS. JARINGAN DISTRIBUSI

445,391,551.73

III

PENGADAAN DAN PEMASANGAN SAMBUNGAN RUMAH (SR)

461,250,000.00

IV

FINISHING

1,000,000.00

A

Jumlah Harga pekerjaan (Termasuk Biaya Umum dan Keuntungan)

909,091,551.73

B

Pajak Pertambahan Nilai ( PPN ) = 10 % x ( A )

90,909,155.17

C

Jumlah Total HargaPekerjaan = ( A ) + ( B )

1,000,000,706.90

D

Dibulatkan

1,000,000,000.00

Terbilang :

………, ………..

Dibuat Oleh,

PT/CV……….

(NAMA JELAS)

(Jabatan)

2

Satu Milyar Rupiah

KOP PERUSAHAAN

BILL OF QUANTITY (BOQ)

REKAPITULASI

NO

URAIAN

JUMLAH HARGA

(2)

NAM A PAKET : PEM ANFAATAN IDLE CAPASITY SPAM IKK PINOLOSIAN TENGAH LOKASI : KEC. PINOLOSIAN TENGAH

TAHUN ANGGARAN : 2017

I PEKERJAAN PERSIAPAN 1,450,000.00

1 Papan Nam a Proyek Ls 1.00 450,000.00 450,000.00

2 Pem bersihan Aw al Ls 1.00 1,000,000.00 1,000,000.00

II PEKERJAAN PENGADAAN DAN PAS. JARINGAN DISTRIBUSI 445,391,551.73

1 Galian Tanah Unt uk Pasangan Pipa M 3 606.24 77,000.00 46,680,480.00

2 Urugan Pasir Pada Pasangan Pipa M 3 194.48 221,826.00 43,140,669.73

3 Pengadaan dan Pas Pipa PVC S-12,5 dia. 4" RR M 1 1,160.00 143,704.00 166,696,640.00

4 Pengadaan dan Pas Pipa PVC S-12,5 dia. 3" RR M 1 1,298.00 107,514.00 139,553,172.00

5 Pengadaan dan Pas Pipa PVC S-12,5 dia. 2" RR M 1 910.00 50,611.00 46,056,010.00

6 Pengadaan dan Pas. Socket Reducer PVC (All RR) Ø 6" X 4" Bh 1.00 166,760.00 166,760.00

7 Pengadaan dan Pas. Reducer Tee All RR 6" x4" Bh 1.00 584,540.00 584,540.00

8 Pengadaan dan Pas. Reducer Tee All RR 4" x3" Bh 4.00 375,540.00 1,502,160.00

9 Pengadaan dan Pas. Reducer Tee All RR 3" x2" Bh 1.00 227,040.00 227,040.00

10 Pengadaan dan Pas. End Cup All Rubber Ring 4" Bh 1.00 178,640.00 178,640.00

11 Pengadaan dan Pas. End Cup All Rubber Ring 3" Bh 2.00 121,440.00 242,880.00

12 Pengadaan dan Pas. End Cup All Rubber Ring 2" Bh 4.00 90,640.00 362,560.00

III PENGADAAN DAN PEM ASANGAN SAM BUNGAN RUM AH (SR) 450.00 461,250,000.00

1 Beugel Ø 4" x 1/ 2" Bh 450.00 42,000.00 18,900,000.00

2 M et er Drat Ø 1/ 2" Bh 1,800.00 17,000.00 30,600,000.00

3 Wat er M ur Ø 1/ 2" Bh 450.00 26,000.00 11,700,000.00

4 Knie GIP Ø 1/ 2" Bh 2,700.00 15,000.00 40,500,000.00

5 St op Kran Ø 1/ 2" Bh 450.00 54,000.00 24,300,000.00

6 Over Sock GIP Ø 3/ 4" x 1/ 2" Bh 450.00 20,000.00 9,000,000.00

7 M et er Air Ø 1/ 2" SNI (Kuningan) Bh 450.00 375,000.00 168,750,000.00

8 Kran Air Ø 1/ 2" Bh 450.00 35,000.00 15,750,000.00

9 Pipa GIP Ø 1/ 2" M 1 675.00 32,000.00 21,600,000.00

10 Pipa HDPE Ø 1/ 2" M 1 2,700.00 12,000.00 32,400,000.00

11 Biaya Penyam bungan Ls 450.00 195,000.00 87,750,000.00

IV FINISHING 1,000,000.00

1 Pem bersihan Akhir Ls 1.00 1,000,000.00 1,000,000.00

………, ……….. Dibuat Oleh, PT/ CV……….

(NAM A JELAS) (Jabat an)

KOP PERUSAHAAN

BILL OF QUANTITY (BOQ)

Referensi

Dokumen terkait

Berdasarkan latar belakang tersebut penulis tertarik untuk menulis laporan akhir dengan judul “ Analisis Perhitungan Harga Pokok Produksi Pesanan Pada CV

Data yang diperoleh berupa data kualitatif sedangkan sumber diperoleh dari observasi, wawancara, dan dokumentasi yang berkaitan dengan rumah adat Lampung (Lamban

Recently, researches concerning to this area are Archimedean screw has also found a new application operating in reverse as an energy converter for low head differences [17],

Untuk mendorong apresiasi dan kreatifitas siswa / pelajar dalam penciptaan teknologi tepat guna yang berwawasan lingkungan dan dalam rangka peringatan Hari

Chemical Engineering Handbook, McGraw-Hill Book Company, New York.. Timmerhaus dan Ronald

[r]

[r]

Puji dan syukur Penulis panjatkan kepada Tuhan Yang Maha Pemurah dan Maha Penyayang, dengan limpah karunia-Nya Penulis dapat menyelesaikan penyusunan Tugas Akhir ini dengan