NAMA PAKET
: PEMANFAATAN IDLE CAPASITY SPAM IKK PINOLOSIAN TENGAH
LOKASI
: KEC. PINOLOSIAN TENGAH
TAHUN ANGGARAN
: 2017
1 3
I
PEKERJAAN PERSIAPAN
1,450,000.00
II
PEKERJAAN PENGADAAN DAN PAS. JARINGAN DISTRIBUSI
445,391,551.73
III
PENGADAAN DAN PEMASANGAN SAMBUNGAN RUMAH (SR)
461,250,000.00
IV
FINISHING
1,000,000.00
A
Jumlah Harga pekerjaan (Termasuk Biaya Umum dan Keuntungan)
909,091,551.73
B
Pajak Pertambahan Nilai ( PPN ) = 10 % x ( A )
90,909,155.17
C
Jumlah Total HargaPekerjaan = ( A ) + ( B )
1,000,000,706.90
D
Dibulatkan
1,000,000,000.00
Terbilang :
………, ………..
Dibuat Oleh,
PT/CV……….
(NAMA JELAS)
(Jabatan)
2Satu Milyar Rupiah
KOP PERUSAHAAN
BILL OF QUANTITY (BOQ)
REKAPITULASI
NO
URAIAN
JUMLAH HARGA
NAM A PAKET : PEM ANFAATAN IDLE CAPASITY SPAM IKK PINOLOSIAN TENGAH LOKASI : KEC. PINOLOSIAN TENGAH
TAHUN ANGGARAN : 2017
I PEKERJAAN PERSIAPAN 1,450,000.00
1 Papan Nam a Proyek Ls 1.00 450,000.00 450,000.00
2 Pem bersihan Aw al Ls 1.00 1,000,000.00 1,000,000.00
II PEKERJAAN PENGADAAN DAN PAS. JARINGAN DISTRIBUSI 445,391,551.73
1 Galian Tanah Unt uk Pasangan Pipa M 3 606.24 77,000.00 46,680,480.00
2 Urugan Pasir Pada Pasangan Pipa M 3 194.48 221,826.00 43,140,669.73
3 Pengadaan dan Pas Pipa PVC S-12,5 dia. 4" RR M 1 1,160.00 143,704.00 166,696,640.00
4 Pengadaan dan Pas Pipa PVC S-12,5 dia. 3" RR M 1 1,298.00 107,514.00 139,553,172.00
5 Pengadaan dan Pas Pipa PVC S-12,5 dia. 2" RR M 1 910.00 50,611.00 46,056,010.00
6 Pengadaan dan Pas. Socket Reducer PVC (All RR) Ø 6" X 4" Bh 1.00 166,760.00 166,760.00
7 Pengadaan dan Pas. Reducer Tee All RR 6" x4" Bh 1.00 584,540.00 584,540.00
8 Pengadaan dan Pas. Reducer Tee All RR 4" x3" Bh 4.00 375,540.00 1,502,160.00
9 Pengadaan dan Pas. Reducer Tee All RR 3" x2" Bh 1.00 227,040.00 227,040.00
10 Pengadaan dan Pas. End Cup All Rubber Ring 4" Bh 1.00 178,640.00 178,640.00
11 Pengadaan dan Pas. End Cup All Rubber Ring 3" Bh 2.00 121,440.00 242,880.00
12 Pengadaan dan Pas. End Cup All Rubber Ring 2" Bh 4.00 90,640.00 362,560.00
III PENGADAAN DAN PEM ASANGAN SAM BUNGAN RUM AH (SR) 450.00 461,250,000.00
1 Beugel Ø 4" x 1/ 2" Bh 450.00 42,000.00 18,900,000.00
2 M et er Drat Ø 1/ 2" Bh 1,800.00 17,000.00 30,600,000.00
3 Wat er M ur Ø 1/ 2" Bh 450.00 26,000.00 11,700,000.00
4 Knie GIP Ø 1/ 2" Bh 2,700.00 15,000.00 40,500,000.00
5 St op Kran Ø 1/ 2" Bh 450.00 54,000.00 24,300,000.00
6 Over Sock GIP Ø 3/ 4" x 1/ 2" Bh 450.00 20,000.00 9,000,000.00
7 M et er Air Ø 1/ 2" SNI (Kuningan) Bh 450.00 375,000.00 168,750,000.00
8 Kran Air Ø 1/ 2" Bh 450.00 35,000.00 15,750,000.00
9 Pipa GIP Ø 1/ 2" M 1 675.00 32,000.00 21,600,000.00
10 Pipa HDPE Ø 1/ 2" M 1 2,700.00 12,000.00 32,400,000.00
11 Biaya Penyam bungan Ls 450.00 195,000.00 87,750,000.00
IV FINISHING 1,000,000.00
1 Pem bersihan Akhir Ls 1.00 1,000,000.00 1,000,000.00
………, ……….. Dibuat Oleh, PT/ CV……….
(NAM A JELAS) (Jabat an)
KOP PERUSAHAAN