• Tidak ada hasil yang ditemukan

84836 cambridge as level results statistics june 2012

N/A
N/A
Protected

Academic year: 2017

Membagikan "84836 cambridge as level results statistics june 2012"

Copied!
2
0
0

Teks penuh

(1)

% achieving % achieving % achieving % achieving % achieving % candidates

a b or above c or above d or above e or above ungraded

Accounting 19.9 35.9 51.3 65.9 78.4 21.6

Applied ICT 13.2 27.6 43.5 59.0 72.8 27.2

Art and Design 12.3 24.1 43.0 64.8 82.2 17.8

Biology 21.2 35.9 53.0 69.4 81.9 18.1

Business Studies 15.1 29.3 45.8 62.0 73.7 26.3

Chemistry 27.1 42.5 58.6 71.9 83.9 16.1

Computing 17.9 31.1 46.2 61.9 77.5 22.5

Economics 25.5 38.9 55.5 69.1 81.4 18.6

English Language 6.5 21.2 38.6 56.7 73.5 26.5

Environmental Management 10.8 36.2 52.9 73.4 85.3 14.7

French Language 24.7 40.7 54.8 68.7 77.3 22.7

General Paper 16.5 42.9 57.4 70.5 79.6 20.4

Geography 11.2 18.4 30.4 45.6 60.6 39.4

Global Perspectives 13.8 41.4 64.0 84.2 92.6 7.4

History 7.9 16.9 29.3 43.1 56.2 43.8

Language and Literature in English 10.4 27.9 47.5 62.0 75.1 24.9

Law 11.3 23.8 39.7 52.7 67.8 32.2

Literature in English 13.7 27.1 41.6 60.7 75.3 24.7

Marine Science 1.9 7.0 17.2 32.4 52.8 47.2

Mathematics 29.3 45.7 59.5 70.6 80.5 19.5

Physics 28.2 41.5 58.2 74.1 85.7 14.3

Psychology 17.3 31.0 45.6 58.0 70.8 29.2

Sociology 10.0 23.4 40.6 57.1 71.5 28.5

Spanish Language 35.8 51.1 66.4 79.8 87.9 12.1

Spanish Literature 53.2 86.4 93.2 97.3 99.1 0.9

Cambridge International AS Level candidate grades - June 2012

Cumulative world totals grades a - e

(2)

% achieving % achieving % achieving % achieving % achieving % candidates

a b or above c or above d or above e or above ungraded

Cambridge International AS Level candidate grades - June 2012

Cumulative world totals grades a - e

Thinking Skills 8.7 19.3 36.9 56.9 76.8 23.2

Travel and Tourism 2.1 15.5 34.0 61.9 77.3 22.7

Urdu Language 84.7 96.1 99.0 100.0 100.0 0.0

Referensi

Dokumen terkait

[r]

Menindaklanjuti Hasil Evaluasi Penawaran dan Evaluasi Kualifikasi, Pekerjaan Peningkatan Jalan Karang Dapo – Trans Karang Dapo, dengan ini Perusahaan Saudara memenuhi

[r]

Irigasi Kelurahan Sukamulya Kecamatan Sematang Borang 10 1 Normalisasi dan Pembuatan talud Sungai Lebong Kait Menuju Retensi Seduduk Putih ( Lanjutan ) Kecamatan Kemuning.. 11

Dari hasil penelitian yang dilakukan dalam hasil uji regresi berganda menunjukkan bahwa uji t pada variabel Alokasi Belanja modal mempunyai pengaruh

Berdasarkan hasil penelitian dan pembahasan terhadap fokus permasalahan dalam penelitian ini, maka dapat diambil kesimpulan sebagai berikut, bahwa: Evaluasi Pelaksanaan

Pada Hari Ini Kamis tanggal Dua Puluh bulan September tahun Dua Ribu Dua Belas, pada pukul 10.00 Wib s/d 12.00 Wib bertempat di Dinas Peternakan Kabupaten Tanjung Jabung Timur,

Diharapkan saudara membawa Dokumen Kualifikasi pada tabel kualifikasi yang anda tawarkan pada paket pekerjaan tersebut. Kolonen Syamsul Bahrun Padang Kempas