P

PE EK KE ER RJ JA AA AN N :: T TO OIIL LE ET T M ME ES SS S K KA AR RY YA AW WA AN N L

L O O K K A A S S II :: M MO OH HU US SIIN ND DO O B BA AN NJ JA AR RB BA AR RU U

HARGA HARGA ( Rp ) ( Rp ) 1

1 3 3

MESS KARYAWAN MESS KARYAWAN

II P PE EK KE ER RJ JA AA AN N P PE ER RS SIIA AP PA AN N Rp Rp 1.452.815,50 1.452.815,50 IIII P PE EK KE ER RJ JA AA AN N T TA AN NA AH H D DA AN N P PO ON ND DA AS SII Rp Rp 6.230.406,39 6.230.406,39 IIIIII P PE EK KE ER RJ JA AA AN N B BE ET TO ON N Rp Rp 13.732.143,18 13.732.143,18 IIV V P PE EK KE ER RJ JA AA AN N D DIIN ND DIIN NG G D DA AN N L LA AN NT TA AII Rp Rp 25.836.446,53 25.836.446,53

V

V P PE EK KE ER RJ JA AA AN N P PIIN NT TU U D DA AN N J JE EN ND DE EL LA A B BA AR RU U Rp Rp 6.631.618,25 6.631.618,25 V

VII P PE EK KE ER RJ JA AA AN N A AT TA AP P D DA AN N P PL LA AF FO ON ND D Rp Rp 6.967.140,92 6.967.140,92 V

VIIII P PE EK KE ER RJ JA AA AN N C CA AT T --C CA AT TA AN N Rp Rp 3.507.246,24 3.507.246,24 V

VIIIIII P PE EK KE ER RJ JA AA AN N IIN NS ST TA AL LA AS SI I L LIIS ST TR RIIK K Rp Rp -- IIX X P PE EK KE ER RJ JA AA AN N S SA AN NIIT TA AIIR R D DA AN N IIN NS ST TA AL LA AS SI P I PL LU UM MB BIIN NG G Rp Rp 10.769.000,00 10.769.000,00

75.126.817,00 75.126.817,00 Rp

Rp

75.127.000,00 75.127.000,00 Rp

Rp

Catatan : Catatan :

Harga ini belum termasuk Ppn Harga ini belum termasuk Ppn

Banjarbaru, 19 Oktober 2012 Banjarbaru, 19 Oktober 2012

CV. Wahyu Abadi CV. Wahyu Abadi

Yuli Winnarti, SE.

Yuli Winnarti, SE.

Direktris Direktris DIBULATKAN

DIBULATKAN

Terbilang :

Terbilang : Tujuh Puluh Lima Juta Ser Tujuh Puluh Lima Juta Seratus Dua Puluh Tujuh Ribu Rupiah  atus Dua Puluh Tujuh Ribu Rupiah 

REKAPITULASI REKAPITULASI

N

NO O U UR RA AIIA AN N P PE EK KE ER RJ JA AA AN N 2

2

JUMLAH

JUMLAH

(3)

PEKERJAAN : TOILET MESS KARYAWAN LOKASI : MOHUSINDO BANJARBARU

No. HARGA SATUAN (Rp)

ANALISA BAHAN + UPAH

1 3 5 6

I

1 Pembersihan lokasi awal dan akhir pekerjaan (meratakan tanah) 1 37,50 M2 2.020,00 2.020,00

2 Pasang bouwplank dan Pengukuran 2 49,50 M' 29.309,00 1.450.795,50

Sub Total 1.452.815,5 0

II

1 Galian Tanah Pondasi (perataan tanah) 3 9,38 M3 42.214,50 395.972,01

2 UruganKembaliPondasi 4 3,02 M3 12.965,00 39.089,48

3 Pondasi Pasangan Batu Kali Camp. 1 : 6 (menerus) 7 7,54 M3 564.444,00 4.254.496,65

4 Urugan Pasir Bawah Pondasi dan lantai 5 6,10 M3 183.350,00 1.117.518,25

5 Urugantanahbawahlantai 6 3,00 M3 141.110,00 423.330,00

Sub Total 6.230.406,3 9

III

1 Rabat beton lantai 8 2,63 M3 701.621,00 1.841.755,13

2 Kolom 15/15 10 0,81 M3 3.752.621,50 3.039.623,42

3 Ringbalk Beton15/15 10 0,81 M3 3.752.621,50 3.044.429,56

4 SloofBeton15/15 10 0,75 M3 3.752.621,50 2.828.538,46

5 Bekistingkolom 12 10,80 M2 117.876,00 1.273.060,80

6 BekistingSloof 11 10,05 M2 81.695,00 821.034,75

7 BekistingRingbalk 11 10,82 M2 81.695,00 883.701,07

Sub Total 13.732.143,1 8

IV

1 Pas.DindingBatacamp.1:6 15 72,65 M2 91.841,00 6.672.680,35

2 Plesterancamp.1:6 16 145,31 M2 36.617,00 5.320.794,34

3 Aciandinding 38 145,31 M2 19.693,00 2.861.578,04

4 Keramiklantai30x30 19 27,50 M2 147.290,00 4.050.475,00

5 Keramiklantai20x20 20 10,00 M2 142.690,00 1.426.900,00

6 Keramikdinding20x25 21 33,90 M2 155.142,00 5.259.313,80

7 PasanganRoster 47 1,00 M2 244.705,00 244.705,00

Sub Total 25.836.446,5 3

V

1 PintuKamarMandi(Ulin) 44 5,00 Unit 1.326.323,65 6.631.618,25

2 JendelaBouvenlight 45 - Unit 127.143,00 -

Sub Total 6.631.618,2 5

VI

1 RangkaKuda-kudakayulanan 27 0,07 M3 4.713.514,00 317.418,10

2 Pekerjaan Gording Kayu Lanan 29 0,18 M3 3.089.627,00 556.132,86

3 PekerjaanKasauReng 28 20,78 M2 48.075,00 999.220,11

4 Pekerjaan Penutup Atap Genteng Metal 31 20,78 M2 108.561,00 2.256.398,01

5 Pemuung/Nok atap genteng metal 32 5,00 M' 57.428,00 287.140,00

7 Calsiplank 2x2/16 30 14,16 M' 20.593,00 291.533,49

8 RangkaPlafondkayukelasII 33 19,37 M2 60.363,00 1.169.296,21

9 Plafond Kalsiboard 34 19,37 M2 42.847,50 830.002,14

10 List profil plafond kayu kelas II - 26,00 M' 10.000,00 260.000,00

Sub Total 6.967.140,9 2

VII

1 Cat Plafond 35 19,37 M2 15.000,00 290.566,13

2 Cat tembok dinding (plamir + cat dasar + cat penutup) 36 145,31 M2 17.540,00 2.548.726,89 3 Cat Kilap kusen, daun pintu dan jendela (plamir + cat dasar + cat penutup) 37 26,15 M2 25.546,00 667.953,22

Sub Total 3.507.246,2 4 PEKERJAAN TANAH DAN PONDASI

PEKERJAAN BETON

PEKERJAAN DINDING DAN LANTAI

PEKERJAAN PINTU DAN JENDELA BARU

PEKERJAAN ATAP DAN PLAFOND

PEKERJAAN CAT -CATAN

2 4

PEKERJAAN PERSIAPAN

RENCANA ANGGARAN BIAYA

No. URAIAN PEKERJAAN VOLUME/

JUMLAH HARGA (Rp) SATUAN

(4)

No. HARGA SATUAN (Rp)

ANALISA BAHAN + UPAH

1 2 3 4 5 6

No. URAIAN PEKERJAAN VOLUME/

JUMLAH HARGA (Rp) SATUAN

VIII

1 InstalasiStopKontak - - Bh 130.000 -

2 InstalasititikLampu - - Bh 130.000 -

3 LampuPhilipEssential23Watt - - Bh 35.000 -

4 SaklarTunggal - - Bh 10.500 -

5 StopKontak - - Bh 11.750 -

Sub Total -

IX

1 FloorDrain - 5,00 Bh 275.000 1.375.000,00

2 Kran - 5,00 Bh 21.800 109.000,00

3 KlosetDuduk - 2,00 Bh 2.255.000 4.510.000,00

4 TempatSabun - - Bh 66.600 -

5 JetShower - - Bh 302.500 -

6 TisueHolder - - Bh 275.000 -

7 I nstalasiAirBersih - 1,00 Ls 750.000 750.000,00

8 InstalasiAirKotor - 1,00 Ls 1.000.000 1.000.000,00

9 Septiktank - 1,00 unit 3.025.000 3.025.000,00

Sub Total 10.769.000,0 0 PEKERJAAN INSTALASI LISTRIK

PEKERJAAN SANITAIR DAN INSTALASI PLUMBING

(5)

Harga Satuan Rp .

1 1 M 2 Pem b er sih an lap an gan d an p er alat an 2.020,00

2 1 M ' Pen gu ku r an d an p em asan gan b o u w p lan k 29.309,00

3 1M 3Galiant an ah 42.214,50

4 1M 3U r u gankem b ali 12.965,00

5 1 M 3 U ru gan p asir 183.350,00

6 1M 3U r u gant an ahb iasa 141.110,00

7 1 M 3 Pasan gan Po n d asi Bat u Kali Cam p . 1 : 6 564.444,00

8 1 M 3 M e m bu at Bet on 1 : 3 : 5 701.621,00

9 1 Kg Pe m b e si an d e ng an b e si p o lo s a t au u l ir 1 7. 42 6,3 0

10 1 M 3 M em b u at bet o n ber t u lan g 1 : 2 : 3 + 175 kg Besi 3.752.621,50

11 1M 2Pasan gBekist in gu n t u kSlo o f 81.695,00

12 1 M 2 Pasan g Bekist in g u n t u k Ko lo m 117.876,00

13 1 M 2 Pasan g Bekist in g u n t u k b alo k 149.816,00

14 1 M 2 Pasan gan b at a t eb al 1/ 2, 1 PC ; 2 PS 107.092,00

15 1 M 2 Pasan gan b at a t eb al 1/ 2, 1 PC ; 6 PS 91.841,00

16 1 M 2 Plest er an t e b al 15 m m cam p . 1 : 6 36.617,00

17 1 M 2 Plest er an t e b al 15 m m cam p . 1 : 2 35.828,00

18 1 M 3 Pasan gan ku sen p in t u jen d ela kayu u lin 10.746.300,00

19 1 M 2 Pasan g ker am ik lan t ai 30 x 30 cm 147.290,00

20 1 M 2 Pasan g ker am ik lan t ai 20 x 20 cm 142.690,00

21 1 M 2 Pasan g ker am ik d in d in g 2 0 x 25 cm 155.142,00

22 1 M ' Pasan g Plin t ker am ik d in d in g 10 x 30 cm 37.129,00

23 1 M 2 Pasan g p in t u p an el kayu lan an 351.198,00

24 1M 2Pasan gp in t up an elkayuU lin 555.710,00

25 1 M 2 Pasan g p in t u d an jen d ela kaca kayu lan an 360.440,00

26 1M 2M en ger jakanjalu silan an 286.222,00

27 1 M 3 Ku d a-ku d a kayu lan an b en t an g s/ d 6 m ' - 9 m ' 4.713.514,00

28 1 M 2 M em asan g kasau 5/ 7 r en g 3/ 5 at ap m e t al 48.075,00

29 1 M 3 M em asan g go r d in g kayu lan an 3.089.627,00

30 1 M 2 M em asan g list p lan k Calsip lan k 2x2/ 16 20.593,00

31 1 M 2 M em asan g at ap gen t en g m et al 108.561,00

32 1 M ' M em asan g n o k b u b u n gan at ap gen t e n g m et al 57.428,00

33 1 M 2 M em asan g ran gka plaf o n d 60 x 120 cm kayu lan an 5/ 7 60.363,00

34 1 M 2 M em asan g p en u t u p p laf o n d kalsib o ar d 42.847,50

3 5 1 M 2 Ca t p l af o n d ( 1 l ap i s c at d a sa r , 2 l ap i s c at p e n u t u p ) 1 5 .0 0 0, 00 36 1 M 2 Cat t em b o k b ar u (1 lap is p lam ir , 1 lap is cat d asar , 2 lap is cat p en u t u p ) 17.540,00 37 1 m 2 p en gecat an b id an g kayu ( 1lap is p lam ir 1 lap is cat d asar d an 2 lap is cat p en u t u p ) 25.546,00

38 1M 2Acian 19.693,00

39 1U n itPin t uDep an 2.591.277,04

40 1U n itPin t uKam ar 1.027.224,85

41 1U n itPin t uTer asBelakan g 1.488.750,48

42 1U n itJen d elaKacaDo u b le 998.810,55

43 1U n itJen d elaKacaSin gle 571.942,80

44 1U n itPin t uKam arM an d i 1.326.323,65

45 1U n itJen d elaBo u ven ligh t 127.143,00

46 1U n itAn gin -an gin 53.731,50

N oAn alisa Peker jaan

REKAP ANALISA

(6)

1 1 M2 Pembersihan lapangan dan peralatan 1. Tenaga

- Pekerja 0,0120 OH X 50.000,00 = 600,00

- Mandor 0,0200 OH X 71.000,00 = 1.420,00 +

Jumlah ( 1 ) = 2.020,00

2 1 M' Pengukuran dan pemasangan bouwplank 1. Bahan

- Kayu5/7 0,0120 M3 X 880.000,00 = 10.560,00

- Paku biasa 2" - 5" 0,0200 Kg X 24.200,00 = 484,00

- Papan lanan 3/20 0,0070 M3 X 880.000,00 = 6.160,00 +

Jumlah ( 1 ) = 17.204,00

2. Tenaga

- Pekerja 0,1000 OH X 50.000,00 = 5.000,00

- Tukang kayu 0,1000 OH X 60.500,00 = 6.050,00

- Kepala Tukang 0,0100 OH X 70.000,00 = 700,00

- Mandor 0,0050 OH X 71.000,00 = 355,00 +

Jumlah ( 2 ) = 12.105,00 Jumlah ( 1+2 ) = 29.309,00

3 1 M3 Galian tanah 1. Tenaga

- pekerja OH X 50.000,00 = -

- Tukang gali 0,6250 OH X 60.500,00 = 37.812,50

- KepalaTukang OH X 70.000,00 = -

- Mandor 0,0620 OH X 71.000,00 = 4.402,00 +

Jumlah ( 1 ) = 42.214,50

4 1 M3 Urugan kembali 1. Tenaga

- pekerja OH X 50.000,00 = -

- Tukang 0,1920 OH X 60.500,00 = 11.616,00

- KepalaTukang OH X 70.000,00 = -

- Mandor 0,0190 OH X 71.000,00 = 1.349,00 +

Jumlah ( 1 ) = 12.965,00

5 1 M3 Urugan pasir 1. Bahan

- Pasir urug 1,2000 M3 X 139.700,00 = 167.640,00

Jumlah ( 1 ) = 167.640,00

2. Tenaga

- pekerja 0,3000 OH X 50.000,00 = 15.000,00

- Tukangbatu OH X 60.500,00 = -

- KepalaTukang OH X 70.000,00 = -

- Mandor 0,0100 OH X 71.000,00 = 710,00 +

Jumlah ( 2 ) = 15.710,00 Jumlah ( 1+2 ) = 183.350,00

6 1 M3 Urugan tanah biasa 1. Bahan

- Tanah urug 1,2000 M3 X 104.500,00 = 125.400,00

Jumlah ( 1 ) = 125.400,00

2. Tenaga

- pekerja 0,3000 OH X 50.000,00 = 15.000,00

- Tukangbatu OH X 60.500,00 = -

- KepalaTukang OH X 70.000,00 = -

- Mandor 0,0100 OH X 71.000,00 = 710,00 +

Jumlah ( 2 ) = 15.710,00 Jumlah ( 1+2 ) = 141.110,00

DAFTAR ANALISA PEKERJAAN

(7)

7 1 M3 Pasangan Pondasi Batu Kali Camp. 1 : 6 1. Bahan

- Bt. Belah 15/20 cm 1,2000 M3 X 143.000,00 = 171.600,00

- Semen 117,0000 Kg X 1.500,00 = 175.500,00

- Pasir Pasang 0,5610 M3 X 154.000,00 = 86.394,00

Jumlah ( 1 ) = 433.494,00

2. Tenaga

- pekerja 1,5000 OH X 50.000,00 = 75.000,00

- Tukang batu 0,7500 OH X 60.500,00 = 45.375,00

- Kepala Tukang 0,0750 OH X 70.000,00 = 5.250,00

- Mandor 0,0750 OH X 71.000,00 = 5.325,00 +

Jumlah ( 2 ) = 130.950,00 Jumlah ( 1+2 ) = 564.444,00

8 1 M3 Membuat Beton 1 : 3 : 5 1. Bahan

- Semen Portland 218,0000 Kg X 1.500,00 = 327.000,00

- Pasircor 0,5200 M3 X 154.000,00 = 80.080,00

- Kerikil 0,8700 M3 X 217.800,00 = 189.486,00

Jumlah ( 1 ) = 596.566,00

2. Tenaga

- pekerja 1,6500 OH X 50.000,00 = 82.500,00

- Tukang batu 0,2500 OH X 60.500,00 = 15.125,00

- Kepala Tukang 0,0250 OH X 70.000,00 = 1.750,00

- Mandor 0,0800 OH X 71.000,00 = 5.680,00 +

Jumlah ( 2 ) = 105.055,00 Jumlah ( 1+2 ) = 701.621,00

9 1 Kg Pembesian dengan besi polos atau ulir 1. Bahan

- Besi Beton (polos/ulir) 1,0500 Kg X 15.400,00 = 16.170,00

- Kawat Beton 0,0150 Kg X 27.500,00 = 412,50

Jumlah ( 1 ) = 16.582,50

2. Tenaga

- pekerja 0,0070 OH X 50.000,00 = 350,00

- Tukang batu 0,0070 OH X 60.500,00 = 423,50

- Kepala Tukang 0,0007 OH X 70.000,00 = 49,00

- Mandor 0,0003 OH X 71.000,00 = 21,30 +

Jumlah ( 2 ) = 843,80 Jumlah ( 1+2 ) = 17.426,30

10 1 M3 Membuat beton bertulang 1 : 2 : 3 + 175 kg Besi 1. Bahan

- Semen Portland 232,0000 Kg X 1.500,00 = 348.000,00

- Pasircor 0,5200 m3 X 154.000,00 = 80.080,00

- Koral 0,7800 m3 X 217.800,00 = 169.884,00

- Besi beton (an. besi) 175,0000 Kg X 17.426,30 = 3.049.602,50

Jumlah ( 1 ) = 3.647.566,50

2. Tenaga

- pekerja 1,6500 OH X 50.000,00 = 82.500,00

- Tukang batu 0,2500 OH X 60.500,00 = 15.125,00

- Kepala Tukang 0,0250 OH X 70.000,00 = 1.750,00

- Mandor 0,0800 OH X 71.000,00 = 5.680,00 +

Jumlah ( 2 ) = 105.055,00 Jumlah ( 1+2 ) = 3.752.621,50

11 1 M2 Pasang Bekisting untuk Sloof 1. Bahan

- Kayu Bekisting 0,0450 M3 X 880.000,00 = 39.600,00

- Paku 0,3000 Kg X 24.200,00 = 7.260,00

- Minyak Bekisting 0,1000 Lt X 19.300,00 = 1.930,00

Jumlah ( 1 ) = 48.790,00

2. Tenaga

- pekerja 0,3000 OH X 50.000,00 = 15.000,00

- Tukang kayu 0,2600 OH X 60.500,00 = 15.730,00

- Kepala Tukang 0,0260 OH X 70.000,00 = 1.820,00

- Mandor 0,0050 OH X 71.000,00 = 355,00 +

Jumlah ( 2 ) = 32.905,00 Jumlah ( 1+2 ) = 81.695,00

(8)

12 1 M2 Pasang Bekisting untuk Kolom 1. Bahan

- Kayu Bekisting 0,0400 M3 X 880.000,00 = 35.200,00

- Paku 0,4000 Kg X 24.200,00 = 9.680,00

- Minyak Bekisting 0,1500 Lt X 19.300,00 = 2.895,00

- Balok Kayu 0,0150 M3 X 880.000,00 = 13.200,00

- Kayu galam 2,0000 M3 X 9.600,00 = 19.200,00

Jumlah ( 1 ) = 80.175,00

2. Tenaga

- pekerja 0,3000 OH X 50.000,00 = 15.000,00

- Tukang kayu 0,3300 OH X 60.500,00 = 19.965,00

- Kepala Tukang 0,0330 OH X 70.000,00 = 2.310,00

- Mandor 0,0060 OH X 71.000,00 = 426,00 +

Jumlah ( 2 ) = 37.701,00 Jumlah ( 1+2 ) = 117.876,00

13 1 M2 Pasang Bekisting untuk balok 1. Bahan

- Kayu Bekisting 0,0400 M3 X 880.000,00 = 35.200,00

- Paku 0,4000 Kg X 24.200,00 = 9.680,00

- Minyak Bekisting 0,2000 Lt X 19.300,00 = 3.860,00

- Balok Kayu 0,0180 M3 X 880.000,00 = 15.840,00

- Plywood tebal 3 mm 0,3500 M3 X 78.100,00 = 27.335,00

- Kayu galam 2,0000 M3 X 9.600,00 = 19.200,00

Jumlah ( 1 ) = 111.115,00

2. Tenaga

- pekerja 0,3200 OH X 50.000,00 = 16.000,00

- Tukang kayu 0,3300 OH X 60.500,00 = 19.965,00

- Kepala Tukang 0,0330 OH X 70.000,00 = 2.310,00

- Mandor 0,0060 OH X 71.000,00 = 426,00 +

Jumlah ( 2 ) = 38.701,00 Jumlah ( 1+2 ) = 149.816,00

14 1 M2 Pasangan bata tebal 1/2, 1 PC ; 2 PS 1. Bahan

- Batu bata 70,0000 Bh X 700,00 = 49.000,00

- Semen portland 18,9500 Kg X 1.500,00 = 28.425,00

- Pasir Pasang 0,0380 M3 X 154.000,00 = 5.852,00

Jumlah ( 1 ) = 83.277,00

2. Tenaga

- Pekerja 0,3200 OH X 50.000,00 = 16.000,00

- Tukang batu 0,1000 OH X 60.500,00 = 6.050,00

- Kepala Tukang 0,0100 OH X 70.000,00 = 700,00

- Mandor 0,0150 OH X 71.000,00 = 1.065,00 +

Jumlah ( 2 ) = 23.815,00 Jumlah ( 1+2 ) = 107.092,00

15 1 M2 Pasangan bata tebal 1/2, 1 PC ; 6 PS 1. Bahan

- Batu bata 70,0000 Bh X 700,00 = 49.000,00

- Semen portland 8,3200 Kg X 1.500,00 = 12.480,00

- Pasir Pasang 0,0490 M3 X 154.000,00 = 7.546,00

Jumlah ( 1 ) = 69.026,00

2. Tenaga

- Pekerja 0,3000 OH X 50.000,00 = 15.000,00

- Tukang batu 0,1000 OH X 60.500,00 = 6.050,00

- Kepala Tukang 0,0100 OH X 70.000,00 = 700,00

- Mandor 0,0150 OH X 71.000,00 = 1.065,00 +

Jumlah ( 2 ) = 22.815,00 Jumlah ( 1+2 ) = 91.841,00

(9)

16 1 M2 Plesteran tebal 15 mm camp. 1 : 6 1. Bahan

- Semen portland 4,4160 Kg X 1.500,00 = 6.624,00

- Pasir Pasang 0,0270 M3 X 154.000,00 = 4.158,00

Jumlah ( 1 ) = 10.782,00

2. Tenaga

- Pekerja 0,3000 OH X 50.000,00 = 15.000,00

- Tukang batu 0,1500 OH X 60.500,00 = 9.075,00

- Kepala Tukang 0,0150 OH X 70.000,00 = 1.050,00

- Mandor 0,0100 OH X 71.000,00 = 710,00 +

Jumlah ( 2 ) = 25.835,00 Jumlah ( 1+2 ) = 36.617,00

17 1 M2 Plesteran tebal 15 mm camp. 1 : 2 1. Bahan

- Semen portland 8,2500 Kg X 1.500,00 = 12.375,00

- Pasir Pasang 0,0170 M3 X 154.000,00 = 2.618,00

Jumlah ( 1 ) = 14.993,00

2. Tenaga

- Pekerja 0,2000 OH X 50.000,00 = 10.000,00

- Tukang batu 0,1500 OH X 60.500,00 = 9.075,00

- Kepala Tukang 0,0150 OH X 70.000,00 = 1.050,00

- Mandor 0,0100 OH X 71.000,00 = 710,00 +

Jumlah ( 2 ) = 20.835,00 Jumlah ( 1+2 ) = 35.828,00

18 1 M3 Pasangan kusen pintu jendela kayu ulin 1. Bahan

- Kayuulin 1,1000 M3 X 8.250.000,00 = 9.075.000,00

Jumlah ( 1 ) = 9.075.000,00

2. Tenaga

- Pekerja 6,0000 OH X 50.000,00 = 300.000,00

- Tukang kayu 20,0000 OH X 60.500,00 = 1.210.000,00

- Kepala Tukang 2,0000 OH X 70.000,00 = 140.000,00

- Mandor 0,3000 OH X 71.000,00 = 21.300,00 +

Jumlah ( 2 ) = 1.671.300,00 Jumlah ( 1+2 ) = 10.746.300,00

19 1 M2 Pasang keramik lantai 30 x 30 cm 1. Bahan

- Keramik 30 x 30 cm 1,0000 M2 X 60.500,00 = 60.500,00

- Semen portland 10,0000 Kg X 1.500,00 = 15.000,00

- Pasir pasang 0,0450 M3 X 154.000,00 = 6.930,00

- Semen warna 1,5000 Kg X 2.500,00 = 3.750,00

Jumlah ( 1 ) = 86.180,00

2. Tenaga

- Pekerja 0,7000 OH X 50.000,00 = 35.000,00

- Tukang batu 0,3500 OH X 60.500,00 = 21.175,00

- Kepala Tukang 0,0350 OH X 70.000,00 = 2.450,00

- Mandor 0,0350 OH X 71.000,00 = 2.485,00 +

Jumlah ( 2 ) = 61.110,00 Jumlah ( 1+2 ) = 147.290,00

20 1 M2 Pasang keramik lantai 20 x 20 cm 1. Bahan

- Keramik 20 x 20 cm 1,0000 M2 X 55.000,00 = 55.000,00

- Semen portland 10,4000 Kg X 1.500,00 = 15.600,00

- Pasir pasang 0,0450 M3 X 154.000,00 = 6.930,00

- Semen warna 1,6200 Kg X 2.500,00 = 4.050,00

Jumlah ( 1 ) = 81.580,00

2. Tenaga

- Pekerja 0,7000 OH X 50.000,00 = 35.000,00

- Tukang batu 0,3500 OH X 60.500,00 = 21.175,00

- Kepala Tukang 0,0350 OH X 70.000,00 = 2.450,00

- Mandor 0,0350 OH X 71.000,00 = 2.485,00

Jumlah ( 2 ) = 61.110,00 Jumlah ( 1+2 ) = 142.690,00

(10)

21 1 M2 Pasang keramik dinding 20 x 25 cm 1. Bahan

- Keramik 20 x 25 cm 1,0000 M2 X 55.000,00 = 55.000,00

- Semen portland 9,3000 Kg X 1.500,00 = 13.950,00

- Pasir pasang 0,0180 M3 X 154.000,00 = 2.772,00

- Semen warna 1,9400 Kg X 2.500,00 = 4.850,00

############## = 76.572,00

2. Tenaga

- Pekerja 0,9000 OH X 50.000,00 = 45.000,00

- Tukang batu 0,4500 OH X 60.500,00 = 27.225,00

- Kepala Tukang 0,0450 OH X 70.000,00 = 3.150,00

- Mandor 0,0450 OH X 71.000,00 = 3.195,00

Jumlah ( 2 ) = 78.570,00 Jumlah ( 1+2 ) = 155.142,00

22 1 M' Pasang Plint keramik dinding 10 x 30 cm 1. Bahan

- Plint Keramik 10 x 30 cm 1,0000 m1 X 24.000,00 = 24.000,00

- Semen portland 1,1400 Kg X 1.500,00 = 1.710,00

- Pasir pasang 0,0030 M3 X 154.000,00 = 462,00

- Semen warna 0,0250 Kg X 2.500,00 = 62,50

############## = 26.234,50

2. Tenaga

- Pekerja 0,0900 OH X 50.000,00 = 4.500,00

- Tukang batu 0,0900 OH X 60.500,00 = 5.445,00

- Kepala Tukang 0,0090 OH X 70.000,00 = 630,00

- Mandor 0,0045 OH X 71.000,00 = 319,50

Jumlah ( 2 ) = 10.894,50 Jumlah ( 1+2 ) = 37.129,00

23 1 M2 Pasang pintu panel kayu lanan 1. Bahan

- Kayu lanan 0,0400 M3 X 3.137.200,00 = 125.488,00

- Lemkayu 0,1000 Kg X 34.100,00 = 3.410,00

Jumlah ( 1 ) = 128.898,00

2. Tenaga

- Pekerja 1,0000 OH X 50.000,00 = 50.000,00

- Tukang kayu 2,5000 OH X 60.500,00 = 151.250,00

- Kepala Tukang 0,2500 OH X 70.000,00 = 17.500,00

- Mandor 0,0500 OH X 71.000,00 = 3.550,00 +

Jumlah ( 2 ) = 222.300,00 Jumlah ( 1+2 ) = 351.198,00

24 1 M2 Pasang pintu panel kayu Ulin 1. Bahan

- Kayuulin 0,0400 M3 X 8.250.000,00 = 330.000,00

- Lemkayu 0,1000 Kg X 34.100,00 = 3.410,00

Jumlah ( 1 ) = 333.410,00

2. Tenaga

- Pekerja 1,0000 OH X 50.000,00 = 50.000,00

- Tukang kayu 2,5000 OH X 60.500,00 = 151.250,00

- Kepala Tukang 0,2500 OH X 70.000,00 = 17.500,00

- Mandor 0,0500 OH X 71.000,00 = 3.550,00 +

Jumlah ( 2 ) = 222.300,00 Jumlah ( 1+2 ) = 555.710,00

25 1 M2 Pasang pintu dan jendela kaca kayu lanan 1. Bahan

- Balok lanan 0,0400 M3 X 2.310.000,00 = 92.400,00

- Kaca bening 3 mm 1,1000 M2 X 82.000,00 = 90.200,00

Jumlah ( 1 ) = 182.600,00

2. Tenaga

- Pekerja 0,8000 OH X 50.000,00 = 40.000,00

- Tukang kayu 2,0000 OH X 60.500,00 = 121.000,00

- Kepala Tukang 0,2000 OH X 70.000,00 = 14.000,00

- Mandor 0,0400 OH X 71.000,00 = 2.840,00 +

Jumlah ( 2 ) = 177.840,00 Jumlah ( 1+2 ) = 360.440,00

Referensi

Dokumen terkait

Terbilang : Dua ratus lima puluh dua juta seratus tiga puluh sembilan.

Terbilang : Seratus sembilan puluh delapan juta tujuh ratus lima puluh ribu rupiah. Pejabat Pengadaan Barang

Terbilang : Tiga milyar seratus lima puluh enam juta dua ratus delapan puluh enam ribu.

Terbilang : Seratus Tiga Puluh Tiga Juta Lima Ratus Tujuh Puluh Dua Ribu Rupiah. PEJABAT PENGADAAN BARANG/JASA RSUD SYARIFAH AMBAMI

(dua milyar seratus lima puluh tujuh juta delapan ratus empat puluh sembilan ribu Rupiah) Termasuk PPN 10 %. (dua milyar seratus lima puluh enam juta seratus tujuh puluh enam

(Seratus Dua Puluh Enam Juta Lima Ratus Tujuh Puluh Lima Ribu

Jumlah Tahun n - 1 : Rp102.258.000,00 (Seratus dua juta dua ratus lima puluh delapan ribu rupiah) Jumlah Tahun n : Rp116.700.000,00 (Seratus enam belas juta tujuh ratus ribu

113.782.500,-(Seratus tiga belas juta tujuh ratus delapan puluh dua ribu lima ratus rupiah) Provinsi, Kabupaten dan Desa Lainnya.. Jumlah :