• Tidak ada hasil yang ditemukan

WINRIP CTC SOCIAL Monitoring LARAP Ipuh - Bantal (2) Feb 2014

N/A
N/A
Protected

Academic year: 2017

Membagikan "WINRIP CTC SOCIAL Monitoring LARAP Ipuh - Bantal (2) Feb 2014"

Copied!
253
0
0

Teks penuh

(1)

AN PEKERJAAN

UMUM

JENDERAL BINA

MARGA

KEMENT

DIREKTO

RAT

ERI

DIREKTORAT

BINA

PROGRAM

Jl.

Pattimura No.20 Keb. Baru

-

Jakarta

121'10

Telp.(O21')7200281, 7393928, Fax.

(021)

720'1760

Ref.

No

Enclosure

To:

Mrs. Elisabeth

Goller

Senior

Transport

SpecialisUTask

Team

Leader

-

WINRIP

lndonesia Sustainable Development Department

East

Asia and Pacific

Region

Jakarta

Subject

:

LARAP

lmplementation Monitoring

Reports

for

Package No.

4lpuh

-

Bantal,

Kabupaten Muko-Muko,

Bengkulu Province

and

Monitoring Report for

Package No.

3

Manggopoh

-

Pd. Sawah, Kabupaten Agam,

West

Sumatera

Province

WINRIP Loan 8043-lND

Dear

Mrs.Goller,

Reference

to

Aide

Memoire December

9-12

and

December

17,

2013 regarding

the

above

mentioned subject,

we

herewith

submit LARAP

lmplementation Monitoring Report

with

the

following explanation

:

1.

Package

No. 3 Manggopoh

-

Padang Sawah:

The

Local

Government

has

completed

the

payment

for

compensation

of 5

(five)

from

the

remaining

15

(fifteen)

PAP (attached).

2.

Package

No.4

lpuh

-

Bantal

:

The original

list

nominative

are

change

from

217

PAP

becomes

227

PAP.

The

Local

Government has completed

the

payment

of

compensation

to

the

remaining

70

of

the

total

227 PAP

up

to January

15, 2014 (attached).

We

are

waiting your response

at the

earliest

convenience.

Yours Sincerely

Cc:

1.

Director General of

Highways (as

a

report)

2.

Director

of

lmplementation Affairs Region l,

DGH

3.

Director of Technical Affairs,

DGH

4.

Head

of Sub

Directorate

of

Financing

and Foreign Cooperation,

DOP

5.

Head

of Sub

Directorate

System

and

Controlling Region

I

as OIC

PMU

WlNRlP, DIA

I

6.

Head

of Sub

Directorate

of

Environmental

and Road Safety,

DTA

7.

Core

Team Consultant

(CTC)

WINRIP

8.

File

:.Hv.0202

/sl.u

fotrt

/zota

Jakarta,

February 2-V ,2014

HARRIS

H.

BATUBARA

(2)

PUTAU SUIIATERA

$r,

lrdcd* tmlrn (l+t lrldq fst

s*t*

c&fttuu

\ \

\a

J"**.

h,n6r.

TECHNICALASSISTANCE

FOR

SUPPORT

OF

THE

PROJECT

MANAGEMENT UNIT

coRE

TEAM CONSULTANTS

(CTC)

Laporan

Monitoring

LARAP

Sub

Proyek lpuh

-

Bantal

Kabupaten Muko

-

Muko,

Provinsi

Bengkulu

Report

No.

22

(3)

DAFTAR

ISI

I.

Pendatruluan

l.l.Latar

Belakang

l.2.Maksud

dan

Tujuan

l.3.Sasaran

l.4.Ruang

Lingkup

I

.5.Metodologi

Pendekatan

tr.

Gambaran

Umum

2.l.Deskripsi

Proyek

2.2.HasilLarap

Itr.

Hasil

Monitoring

3.1. Pengadaan Tanah

a.

Inventarisasi dan Pengukuran Aset Proyek

b.

Musyawarah

c.

PembayaranKompensasi

d.

Surat Pelepasan

Hak

e.

Sertifikasi

3.2.Pemukiman

Kembali (Relokasi)

Lampiran:

Lampiran

lE:

Lampiran

lF:

Lampiran

2E:

Lampiran

2F:

Lampiran

3E:

Lampiran

3F:

Lampiran

4E

Lampiran

4F

Halaman

I

2

2

2

2

J

4

4

4

7

7

Copy

Surat Persetujuan Harga Kompensasi

WTP

Kecamatan Sungai

Rumbai

Copy

Surat Persetujuan Harga Kompensasi

WTP

Kecamatan Pondok Suguh

Daftar

Nominatif

WTP

Kecamatan Sungai

Rumbai

DaftarNominatif

WTP

Kecamatan Pondok Suguh

Copy

Bukti

Pembayaran

(Kwitansi)

Kompensasi

WTP

Kecamatan Sungai

Rumbai

CopyBukti

Pembayaran

(Kwitansi)

Kompensasi

WTP

Kecamatan Pondok

Suguh

Copy

Surat PernyataanPelepasan

Hak WTP

Kecamatan Sungai Rumbai

(4)

Bab

I

PENDAHULUAN

1.1.

Ldar

Belakang

Pemerintah Indonesia

melalui

Kementerian Pekerjaan Umum

akan

melaksanakan

proyek peningkatan

ruas

jalan

lpuh

-

Bantal yang terletak

di

Kabupaten

Muko-Muko,

Provinsi Bengkulu. Proyek

ini

merupakan

salah satu paket

pekerjaan

yang

akan

dibiayai dengan

pinjaman

dari

Bank Dunia (World Bank) melalui program

Western

Indonesia

National

Road

lmprovement

Project

(WlNRlP).

Ruas

jalan

lpuh

-

Bantal merupakan bagian

darijaringan jalan

Lintas Barat Sumatera

yang

merupakan

jalan

alternatif dalam pendistribusian kebutuhan barang dan

jasa

di

Pulau

Sumatera.

Penanganan peningkatan

ruas

jalan

lpuh

-

Bantal ini

akan mengikuti

data teknis proyek

berdasarkan

data

dari desain rinci (detail

design),

yaitu

lebar

perkerasan

7

meter, lebar

bahu

jalan kiri

kanan

masing-masing

2

meter,

dan

lebar

ruang milik

jalan

(Rumija) antara

14

-

15

meter. Untuk

keperluan

penanganan

peningkatan ruas

jalan

tersebut

tidak akan

membutuhkan

tambahan lahan

di

luar

Rumija

yang telah ada saat

ini.

Namun, diperlukan pembebasan

lahan

Rumija

tersebut

dari pemanfaatan oleh

warga

masyarakat.

Sesuai dengan kesepakatan yang terdapat

dalam

Loan Agreement Program WINRIP

antara Bank

Dunia

dan

Pemerintah Indonesia,

jika

suatu paket

pekerjaan

jalan

memerlukan

tambahan/pengadaan

lahan, maka

Rencana Pengadaan

Tanah

dan

Pemukiman

Kembali (Land

Acquisition

and

Resettlement

Plan

/

LARAP)

harus

disiapkan

dengan

mengacu

kepada

kebijakan pengadaan

tanah

dan

pemukiman

kembalididalam LARP

Framework

untuk

program

WlNRlP.

Dalam rangka memenuhi Loan Agreement tersebut

di

atas,

kegiatan

pembebasan

lahan pada

ruas

jalan

lpuh

-

Bantal tersebut

telah

dilakukan penyusunan Dokumen

LARAP (Land Acquisition

and

Resettlement

Action Plan

atau

Rencana

Kerja

Pengadaan

Tanah dan

Pemukiman Kembali),

yang telah

mendapat persetujuan

(no

(5)

PMU telah

menyelesaikan Laporan Monitoring

ISRAP

lpuh

-

Bantal

Tahap

l.

Di

dalam

laporan tersebut berisi

hasil

pelaksanaan pembayaran

ganti

kerugian

(kompensasi)

terhadap

157

dai

total217 WTP

yang dapat diselesaikan oleh Satker Pelaksanaan Jalan

Nasional

Wilayah

I

Provinsi Bengkulu hingga pertengahan

bulan

Desember

2013.

Dengan demikian, masih tersisa

60

WTP yang

belum diselesaikan

pembayaran ganti

kerugiannya.

Pada tanggal

24 Desember

2013,

Laporan Monitoring I-ARAP lpuh

-

Bantal

Tahap

ltelah

disampaikan PMU ke Bank Dunia, dan persetujuan dari Bank Dunia terhadap

laporan tersebut telah diperoleh pada

tanggal6

Januari

2014.

Selama periode waktu

Desember

2013 hingga

pertengahan Februari

2014,

Tim

Pengadaan

Tanah Satker PJN Wilayah

I

Provinsi

Bengkulu

berhasil

menyelesaikan

pembayaran

ganti

rugi terhadap

sisa

60

WTP.

Pihak

Tim

Pengadaan

Tanah

harus

menambahkan

10 WTP

baru

dikarenakan

adanya

perubahan

daftar

nominatif

warga

terkena proyek, sehingga jumlah WTP penerima

gantikerugian

menjadi

70.

Laporan

Monitoring

Larap

lpuh

-

Bantal

Tahap

ll

ini

akan berisi

pelaporan

dari

pelaksanaan pembayaran ganti kerugian (kompensasi) untuk 70 WTP tersebut.

1.2.

Maksud dan

Tujuan

1.2.1.

Maksud

Memantau kesesuaian pelaksanaan

kegiatan

pengadaan

tanah

dan

pemukiman

kembali dengan program yang tercantum dalam Rencana Kerja

Pengadaan

Tanah

dan Pemukiman Kembali atau Land Acquisition and Resettlement Action

Plan.

1.2.2.Tujuan

a.

Untuk

memastikan

bahwa

persyaratan-persyaratan Pemerintah Indonesia

dan

Bank

Dunia diterapkan

secara menyeluruh selama proses;

b.

Untuk memastikan bahwa kegiatan pengadaan tanah dilaksanakan melalui pemberian

kompensasi

yang

layak

atas aset

milik warga terkena proyek

baik

berupa

tanah,

bangunan

ataupun aset lain yang melekat;

1.3.

Sasaran

Kegiatan pengadaan

tanah dan pemukiman kembali

ruas

jalan

lpuh - Bantal

dapat berjalan

seelra

adil, partisipatif dan transparan.

1.4.

Ruang

Lingkup

(6)

1.5.

terhadap pelaksanaan program yang tercantum

dalam

Rencana

Kerja

Pengadaan Tanah

dan Pemukiman Kembali, yakni:

a.

Kegiatan pengadaan

tanah;

merupakan

kegiatan untuk

membebaskan

tanah

dengan

memberikan kompensasi kepada

yang

berhak

atas tanah,

bangunan,

tanaman serta

aset lain yang

berada

di atasnya.

Monitoring dilakukan

terhadap

pelaksanaan program pada

tahapan

pengadaan tanah sebagai berikut:

1)

Sosialisasi terhadap warga terkena

proyek;

2)

Inventarisasi dan pengukuran aset

terkena

proyek;

3)

Musyawarah/negosiasi

nilai

kompensasi;

4)

Pembayaran kompensasi/ganti

kerugian;

5)

Pelepasan hak atas tanah terkena

proyek.

b.

Monitoring

dan

pelaporan; merupakan kegiatan monitoring

dan

pelaporan

setiap

peride waktu tertentu (bulanan) yang dilakukan

oleh Tim

(Petugas)

Monitoring

LARAP yang ditunjuk atau ditetapkan

oleh

Kepala Satker PJN

Wilayah

I

Provinsi

Bengkulu

yang

bertanggung

jawab atas pelaksanaan LARAP

lpuh

-

Bantal.

Laporan

monitoring

pelaksanaan LARAP

lpuh

-

Bantal Tahap

ll

ini

dilengkapi

dengan dokumen pendukung, seperti bukti

pembayaran,

dan

berita

acaltt

pada

setiap

tahapan kegiatan pengadaan tanah dan pemukiman kembali, serta hasil pengamatan dan

wawanelra

langsung

dengan beberapa warga terkena proyek terpilih.

liletodolog

i

Pendekatan

Metode pendekatan yang dilakukan dalam monitoring pelaksanaan LARAP lpuh

-

Bantal

Tahap

ll

ini

adalah

dengan

melakukan pengumpulan

data sekunder

pelaksanaan

pengadaan tanah dari

Tim

Monitoring Proyek, dilengkapi dengan

data

primer

melalui

wawancara terhadap beberapa

warga

terkena proyek

sebagai sampel,

dan

(7)

Bab

ll

GAMBARAN

UMUM

2.1.

IleskripsiProyek

Ruas

Jalan

lpuh

-

Bantal terletak

di

Kabupaten Mukomuko Provinsi Bengkulu

adalah

salah

satu

dari

paket pekerjaan program

WlNRlP.

Ruas

jalan

ini merupakan

bagian

dari

jalan

lintas

barat Sumatera sebagai

jalan

alternatif

dalam

pendistribusian

kebutuhan

barang dan

jasa di

Pulau Sumatera.

Proyek peningkatan ruas

jalan

lpuh

-

Bantal

sepanjang

42,150

Km dimulai

dari

KM

167+270 BKS sampai dengan KM

209 + 420

BKS.

Secara administratif

lokasi

ruas

jalan lpuh

-

Bantal berada

di

dalam

wilayah

Kecamatan

lpuh,

Kecamatan

Sungai

Rumbai, Kecamatan Pondok Suguh,

dan

Kecamatan

Tramang

Jaya

di

Kabupaten

Mukomuko.

Jenis

penanganan pekerjaan

pada ruas

jalan

lpuh

-

Bantal

ini

adalah

peningkatan

kapasitas

jalan

berupa pelebaran

perkerasan

dari

kondisi lebar awal

antara 5

-

6

meter menjadi

7

meter.

Konsekuensi

dari

perenc€lnaan

teknis (engineering

design)

tersebut adalah

kebutuhan pembersihan

lahan

dari

peruntukan

lain

dikarenakan

adanya

pemanfaatan

ruang milik

jalan (Rumija) oleh

sebagian

warga

masyarakat.

2.2.

Hasil LARAP

2.2.1

Data Pengadaan Tanah

Berdasarkan

hasil survey sensus

yang

dilaksanakan

tanggal

11-16

Agustus

2011,

ringkasan

data

pengadaan tanah

adalah sebagai

berikut:

Tabel

1.

Hasil Survey

LARAP

No.

Uraian

Jumlah

Luas terkena

(m2)

Keterangan

1.

Jumlah WTP:

178

.

Peroranqan

167

o

Institusi

11

2.

Tanah

vanq akan dibebaskan

171 bidanq

2.730

.

Terkena

seluruhnya

0

0

o

Terkena

sebaqian

171

bidans

2.730

o

Sertifikat

Hak Milik

120 bidanq

.

Surat

Keteranqan

Tanah

47

bidanq

o

Neoara

4 bidanq

3.

Bangunan terkena:

195 unit

(8)

No.

Uraian

Jumlah

Luas terkena

(m2)

Keterangan

o

Permanen

3 unit

35

o

Semi

Dermanen

1 unit

8

o

Darurat

34

unit

184

1

unit

bangunan

darurat terkena

seluruhnya

o

Teras

kavu

67

unit

474

o

Teras

permanen

24 unit

221

o

Paoar kavu

67

unit

474

o

Teras

permanen

23

unit

195

o

Pondasi

6

unit

52

o

Kolam

2

unit

9,5

o

Makam

2

unit

B.

Milik institusi:

11 unit

.

Permanen

2

unit

16

1

unit

pos

jaga

permanen

terkena

seluruhnya

.

Teras

kavu

2

unit

14

.

Paqar kavu

1 unit

20

o

Paqar oermanen

5 unit

62

o

Paqar kawat

1 unit

15

4.

Tanaman

(oohon/rumoun):

32

.

Sawit

11

o

Peoava

2

o

Pisano

5

o

Jambu

1

o

Nanoka

1

o

Kelaoa

I

o

Rambutan

1

o

Manqqa

2

o

Coklat

1

Sumber: Dokumen Larap lpuh

-

Bantal, 2012.

2.2.2 Rencana Pelaksanaan

Kompensasi

Proyek

akan

mengkompensasi

tanah yang

terkena sesuai dengan

nilai nyata

dari

tanah tersebut.

Besaran kompensasi

akan

dimusyawarahkan

antara warga

terkena

proyek dengan

Tim

Pengadaan

Tanah dengan

menggunakan

hasil

penilaian

yang

dilakukan

oleh

Tim

Penilai mengikuti

aturan

mekanisme pengadaan

tanah

untuk

kepentingan umum (Perpres

Rl

No.7112012; dan Peraturan Kepala

BPN

No.

512012),

dengan

tanpa adanya pemotongan

pajak apapun.

Proyek

akan

mengkompensasi

atas

bangunan berdasarkan

harga pasar

material

bangunan dengan

tanpa

menghitung

nilai

depresiasi. Estimasi

biaya

penggantian

bangunan

yang

terkena proyek

akan

dihitung

dengan

menggunakan

perhitungan

berdasarkan harga satuan material

yang

ditetapkan

oleh

Dinas terkait

di

Provinsi

Bengkulu. Demikian

juga

penggantian untuk

aset lain

yang terkena

dihitung

dengan

metode yang

sama.

Untuk pemilik warung yang seluruh

bangunannya

terkena

(1

(9)

pengganti

selesai

dibangun

dislsa

lahannya yang

ada.

Proyek

juga akan memberikan kompensasi atas tanaman

yang

terkena sesuai dengan

tingkat

produktivitas tanaman

tersebut.

Dasar perhitungan

penggantian

tanaman akan

mengacu

pada Keputusan

Kepala

Dinas Pertanian

Kabupaten Mukomuko.

Pemerintah

akan

melakukan

penggantian

atas

bangunan kuburan terkena

@

Rp.

800.000,-,

dan bantuan

biaya

untuk upacara pemindahan

kuburan

@ Rp.

1.500.000,-.

Pihak

proyek

akan melakukan pemecahan (splitzing)

surat

tanah

baik

terhadap status

tanah sertifikat hak

milik maupun status

tanah belum sertifikat hak

milik.

Seluruh

biaya

pengurusan administrasi pertanahan tersebut sampai diterbitkannya surat tanah

yang

baru akan

ditanggung oleh

Pihak

proyeUPemerintah.

(10)

I

I

t

I

t

t

T

t

I

I

t

t

I

t

I

t

I

t

I

I

.

a

3.1.

a)

Bab

lll

HASIL

MONITORING

Pengadaan Tanah

Inventarisasi dan pengukuran

aset

terkena proyek

Tim

Pengadaan

Tanah Satker

PJN

I

Provinsi

Bengkulu

telah

melakukan

kegiatan

inventarisasi dan

pengukuran

terhadap aset terkena proyek sesuai detail engineering

design

penanganan

jalan

lpuh

-

Bantal, dan pematokan/ penandaan bersama

dengan

warga terkena proyek.

Berdasarkan

hasil

inventarisasi

dan

pengukuran

dengan

mencocokkan dokumen kepemilikan (nama, luasan dan

batas-batas)

yang

dituangkan

dalam Daftar

Nominatif

Warga Terkena Proyek, bahwa total WTP sebanyak

217

yang

merupakan pemilik bangunan dan/atau tanaman

terkena

proyek.

Berdasarkan

hasil

pengukuran terbaru ternyata terdapat

Warga Terkena

Proyek yang belum teridentifikasi

pada hasil

pengukuran sebelumnya. Dengan demikian terdapat perubahan

Daftar

Nominatif

Warga Terkena

Proyek dengan

ada

penambahan 10

WTP baru

sehingga

totaf

WTP

meryadi

227

.

Pada periode

pertama (Tahap

l)

pelaksanaan inventarisasi

dan

pengukuran

aset

terkena proyek terdiri

dari

bangunan rumah seluas 58,10

m',

teras seluas 352,04

m2,

pagar sepanjang

342,75

m,

pondasi

sepanjang

62,50

m2,

lantai

semen/perkerasan

seluas

1.369,15

m',

dan

tanaman sebanyak

23

pohon, dengan

jumlah

pemilik

aset

sebanyak

157

WTP.

Sedangkan hasil inventarisasi

dan

pengukuran berikutnya (Tahap

lf) adalah bangunan rumah

seluas

180,4

m',

teras

seluas 315,6

m2,

pagar

sepanjang

127,3

m,

tanaman sebanyak

35

batang,

lantai/perkerasan

seluas 945,00

mt,

dan

kuburan sebanyak

9

uniU4

ahli waris,

dengan

jumlah

pemilik sebanyak

70

WTP

(termasuk

4

WTP ahli waris

makam).

Dengan demikian

total dari dua

tahapan

pelaksanaan inventarisasi

dan

pengukuran

aset terkena proyek tersebut

adalah

sebagai berikut:

a)

Total

pemilik aset terkena proyek sebanyak 227

lfffP

b)

Bangunan rumah

seluas

238,5

m2

c)

Teras

seluas

667,64

m2

d)

Pagar

sepanjang

470,05

m

e)

Lantai/perkerasan seluas 2.314,21

m2

(11)

d)

e)

I

t

t

t

I

I

I

I

I

I

I

t

I

I

t

t

I

I

I

I

I

kepada

157 WTP

pada

tahap

pertama,

dan

70

WTP

pada

tahap

kedua

kecamatan yang dilalui

ruas

jalan lpuh

-

Bantal.

Tabel 2. Ringkasan Pelaksanaan Pembayaran Kompensasi

Kecamatan

Periode

Jumlah

tl

lpuh

42

0

42

Pondok Suguh

u

42

76

SungaiRumbai

57

28

85

Tramang Jaya

24

0

24

TOTAL

157

70

227

Daftar

Nominatif

Warga Terkena Proyek

pada

periode

tahap Tahap

I

disajikan

pada

Lampiran

2A,2B.,2C,2D

(telah disampaikan ke Bank Dunia pada tanggal

24

Desember

2O13);

dan pada

periode

Tahap

ll

disajikan

pada Lampiran

2E,2F

dalam

Laporan

Monitoring

ini.

Rincian bukti pembayaran (kuitansi) kompensasi kepada WTP

ditiap

desa

di 4 kecamatan pada periode tahap Tahap

I

dapat dilihat pada Lampiran 3A,

38,

3C, 3D

(telah disampaikan

ke

Bank Dunia pada tanggal

24

Desember

2013), sedangkan untuk

periode Tahap ll dapat dilihat pada

Lampiran

3E, 3F dalam Laporan Monitoring

ini.

Surat

Pelepasan Hak

Pelaksanaan pelepasan dan penyerahan hak

dari

157 pemilik bangunanftanaman terkena

proyek

di

tiap desa

di

4

kecamatan

yang dilalui Jalan lpuh

-

Bantal

dapat dilihat

pada

Lampiran

4A,

4B.,

4C,

4D

(telah disampaikan

ke

Bank

Dunia

tanggal

24

Desember

2013),

sedangkan

untuk

69

pemilik bangunan/tanaman

terkena

proyek

dapat

dilihat

pada

Lampiran

4E, 4F dalam Laporan Monitoring

ini.

Sertifikasi

Didalam Larap lpuh

-

Bantal disebutkan sertifikasi (splitzing) akan diberlakukan

untuk

semua

tanah yang

terkena proyek

baik yang

sertifikat maupun

yang

belum

bersertifikat.

Berhubung

tidak

terdapat

tanah warga yang terkena

proyek sebagaimana

diuraikan

pada

hasil inventarisasi

dan

pengukuran,

maka

kegiatan pemecahan (splitzing)

surat

tanah tidak dilakukan oleh pemerintah/proyek.

Pemukiman Kembali (Relokasi)

(12)

b)

c)

T

t

I

I

t

I

I

I

I

t

I

I

I

I

I

I

I

I

I

I

I

Di dalam Dokumen Larap lpuh

-

Bantal tertuang

bahwa

tanah terkena proyek

seluas

2.730

m'

llZl

bidang).

Namun,

berdasarkan

hasil inventarisasi

dan pengukuran

ulang

yang

dilakukan

oleh

Tim

Pengadaan

Tanah Satker

PJN

I

Provinsi

Bengkulu

menunjukkan bahwa ternyata

tidak

terdapat

tanah

milik warga/instansi

yang

terkena

proyek. Bangunan terkena proyek adalah bangunan

milik

warga/instansi

yang

menempati/menjorok ke Ruang Milik

Jalan

(RumUa).

Musyawarah

Kegiatan

musyawarah

untuk

menetapkan besarnya kompensasi

atas aset

terkena

proyek

telah

dilakukan antara

Tim

Pengadaan Tanah

dengan para WTP

selama

periode bulan Oktober

-

November

2013,

dan

Desember

2013.

Dalam

penetapan

besarnya

nilai

kompensasi bangunan

terkena proyek mengacu pada harga

satuan

bangunan

yang

dari

Dinas

Cipta

Karya Provinsi

Bengkulu.

Sedangkan

nilai

kompensasi tanaman

terkena

proyek

mengacu

pada harga satuan

tanaman dari

Dinas

Pertanian

Kabupaten Muko-muko.

Rincian

Surat

Pernyataan Persetujuan

Harga

kompensasi bangunan

dan

tanaman

terkena proyek

dari

masing-masing pemiliknya

pada periode Tahap

I

menurut

kecamatan

dapat dilihat pada Lampiran

14, 18,

1C, 1D pada

Laporan

Monitoring

Larap lpuh

-

Bantal

yang telah

disampaikan

ke

Bank

Dunia

tanggal

24

Desember

2013,

sedangkan

hasil

musyawarah

untuk

periode

tahap kedua disajikan

pada

Lampiran 1E,1F

dalam Laporan Monitoring

ini.

Pembayaran kompensasi

Pembayaran dilakukan setelah melalui proses penyepakatan

nilai

kompensasi

serta

pemerikasaan

surat-surat

atau

dokumen

kepemilikan.Cara

pembayaran

kompensasi ditakukan dengan

tranfer uang dari

rekening

Bank milik proyek

kepada

rekening Bank milik masing-masing

WTP.

Setelah

WTP

memeriksa kebenaran

uang

kompensasi

sudah

masuk

ke

rekening Bank, selanjutnya

WTP

menyerahkan

dokumen

kepemilikan

tanah terkena proyek kepada

Tim

Pengadaan

Tanah

untuk

kelengkapan penyelesaian administrasi

dalam surat

pelepasan

hak

atas tanah

dan

proses pemecahan surat tanah.

Hingga tanggal

akhir

November 2A13,

Tim

Pengadaan

Tanah

telah

melakukan

pembayaran kompensasi

kepada 157

dai

total

227

pemilik bangunan/tanaman terkena

proyek.

Sedangkan

pembayaran

kompensasi

dari

sisanya sebanyak

70

pemilik

(13)

I

I

I

I

I

t

I

I

I

I

I

t

T

I

I

I

I

t

I

t

I

dan

1

(satu)

bangunan

warung milik Jabani

di

Desa Tunggang

Kecamatan

Pondok

Suguh yang terkena

seluruhnya.

Hingga

tgl 20

Desember 2013,

Tim

Pengadaan

Tanah/pihak proyek

telah

membayar kompensasi kepada

seorang

pemilik

(a/n

Alwi)

bangunan pos

jaga

yang terkena

seluruhnya

seluas

3

m2

sebesar

Rp

1.575.000,-Bangunan

pos

jaga tersebut akan

dipindahkan/dimundurkan

oleh

pemiliknya

(Alwi)

ke

area

sisa

lahan milik WTP

tersebut

yang masih cukup luas. Bukti

pembayaran

kompensasi atas bangunan pos

jaga

terkena tersebut dapat dilihat pada

No

11

pada

Daftar

Nominatif

WTP

di

Desa

Air

Bikuk Kecamatan Pondok Suguh

Kabupaten

Muko-muko (telah disampaikan ke Bank Dunia pada

tanggal24

Desember2013).

Pada

pelaksanaan pembayaran kompensasi

Tahap

ll

ini,

Tim

Pengadaan Tanah Satker

PJN I Provinsi Bengkulu telah melakukan pembayaran kompensasi atas 9 unit bangunan

makam

terkena

proyek

dan

bantuan pemindahannya

yang

diterimakan kepada

4

orang

ahliwarisnya.

(14)

c

o

o

o

o

E

=

_o-c<

gH

g$

t9

F a

.J=JO

€E€X

H=

FE

E$Ea

Fg$g

€E

EE

E!

Bi

f,d

iE

E;

bg;s

r

o

ee;

qEe

.=o

(E

fr;E

[tt

F=.8

J|,E

2fie

xgp

6 -9.;

c

o

=

'6-E

o

Y

c

o

o

o-G

J

J

c

o

.Y (E

p

c

(!

c

(u

o

c

o

t

c

G

p

-c

o

(E ah (E

.=E

eSP

gEE

N

*tst:

i

Blg$R

IE

€fl;F#'="=t

E^3

f

FEb

E;a8.$3

iE

sf

=

3

3

s

o

"

EE

P:

F

B

5

i

*

i:

!=;€-H

P,re

E$

t

F

-Hb=

H

s

e

r'f

E

s

O- 0-(\1

.!4 . . . o o .

b

-o

tro

EE

(Uc

EO

o-5

F!

=s

oEt+

€EF

(E.o.tr

eF

(U

$$E

G(5

|

aPe

EER

Q(,)

l3

q(E

c9

qa

Y

s

o

o

s

o

o

(u

'e

o

Y(L

ef,

a<

EJ

q)

t

o

P

o

F

s

o

o

s

o

o

r

o

o) o)

c

o

F

f,

-)

161

Cr

fo

-N

o

z

lco

€r

^-o

LJ (\I

c

o

.(E

o)

o

Y

6

F

z

LrJ uJ

J

(L

*._

gggg

j

>o

P

Ea

egEEt

E

F

FE

E

tt

r

E

$

I I

E

Fs

5 8-9Er

$l

o.

t

J

(9

z

tr

o

E

z

o

=

=

t

o

lr

('

J

IJJ

o

F

-s

(UF

eER

ET

5

-Y-Ct

g

EE

c

E

o

o-(U

cO

6(L

-(U(1)

o-

E

5(l)0

-o

-Y

'E

(15)

N

c

o

o

o

o

ul

c

IE 'E E IE

J

E

go

SE

*T

€€

g;

gtgE

gsFEH

o

EE$

FgF

t*

a-igFE

E

oO

FH

F!

r.9

F

e

=-

o)J

sl$r

iD?

o€

O-- ha

''''*

Es'

gs

E<

(L$l

i

Ea

E9X

(It F=

F FI\

'='Y o

Eq,

9€o

-

(usf

E

oc\l

EEE

-

o

*a

o-s

FE

oc't

iYn

C

C

gE

ES

rC

Fa

(S

-0J

€BCE

gE

€*

FsEss

E

o

f;x

O-c

ae€

o-a=

FFr"

irr'6

g

=

8d:

PX

'E

sft

o

jY

c

ZEE

fi$6s

'6

'Eg

5;

EU

Qo

qE

EO

ct.|

?'a

=s

.d5

>,o

o-tr

6_9

o

c

o

=

'6-E

o

Y

c

o

L

o

o-o

J

J

c

o

I

(5

E

c

o

c

(!

o

c

o

t

c

(U

E

-c

o

E

o

o

ol

$

G

E

([

o-q) .Y

o-(!=

EE

o-=(5

6o

tat

=8

i:o

!5Y

ltp

Eo-

hF

d=

O

1r,'6

f;E

8E

-Y'6

frs

62

Pb

6(o

.Yts

Eg

F;

EO-

LL

8i

([o

-r

!!o

cg

EU)

Y

s

o

o

r

o

'F

c)

\.(L

rt{

-,E

a<

EJ

o

tr

o

P

o

s

o

o

r

(!

o) q)

c

o

F

(.)

o

(\l

o

z

c

o

.q

q)

o

!<

fr5

E.*E-:HEEfr

$E

tr:-EE#EE

(16)

(9

c

$

o

o

o

{,

€E

8N

9c

Es

'6

ci

E-5

f;g

€*

= (Y)

gF

Fse

d_5R

E

o

o-E$

l-E

=a

F$

E;,

'E

c

c'l

t€

E

fi55

o

a=E

€i

e

s5E

FE

g

tro(6

s*Es

'€(I'f,e

+ 9E

6

FgFE

c

Ep

E

Fa

.9'e5

- E(\l

EEo

aJ(D

F

oo

=EI

Ees

5€s"

*E€e

Erg

E

gE

re

EgEI

F-9=e

s"EFE

gEFEH

E

o

._

o-p-c

+3,

5a

IE

EF*

'=

-N

EET

EEg

I9

-s

a_f;

eE

g

5lE

EHF

E*

E*

FgFE

En

$F$

€6n

gni

E oc

(U(50

.=

e>

F-"

d.

z

P_5

$Es

'-o

.Ee

5;

EX

l!(E

F'E

=o

EO)

oJ

?'a

E3

.dE

>o.

o_tr

6g

a

c

o

=

'6'

E o) )<

c

G'

o

o.

G

J

=

c

o

L

o

p

c

o

c

o

o

c

o

E

c

o

E

E

o

i6

o

o

N'6

€E

Sg

Eg

E2

PF

6c

JE

Eg

OY

r!t

Eg

Eb

$

<v)

g

OJ

ECD

(5=

o-A

9-v

;€

E5

51

3E

6o

..Y E

EH

g:

}RE

EE

Ei

rif g

of

Eg,

(!J

o-u)

9

.,2
(17)

$

r

c

o

o

o

O

o

(f)

c(f)

(!r

EAR

!Eo

r (It

(l)

P-t o

Ef;{

Eis

EFa

E

E CDa

F-S

)x

!!€

x+i

o

E

Hg

:rEs

H$ Hx

o-.- E

C

o;.=

o

EI

E>

-c o

-,:

F

E8

U

g

6

(,,:

O

ccg

ag_aE

EE FU

E

JCE=

EE:

.n(6(E1:

F€tsg

to

-cF

Ei

-s^

o-.- (! c

(o

O

liO

(E-ET

E ER

iFd

E

s?

F€

Fgx

gAE

E?

Ff;g$g

-Y

oo--cF

53

ui

a@

t

(5$t.

--e''E

E

E

E

E

E'6.

*- J F

E

F*

E

*FH,;

F*;

E

EE

T

E

E

f c E.=

EF

E

Ff;

g$

to--cF

E= e^

O.- t

C O

O H = (5r

ET

9ER

getEg

EFEEE

Ff;gge

-Y

(uo--cF

fi=

+

ot

F'E

=

.E

E;3

E

fi EE*

F*88

6E

F

g

E3,EE

f c c.=

Ff;g$

f;o-cF

g3

(,s

(5C!

€'E

*

gE

F

tr_\F

sE

r

E d,E

fcc

8fr$

O6E

c

(I'

f

(5 E

o

:<

c

o

L

o

o-o

J

=

c

(s J

o

p

.E qt

c

([

o

c

o

t

c.

o

1f

-c.

o

o

o

o

TL

F

=F

q.r:

F:!

E

6:

E,::3

fr

i:e

S

E4F

:f;.9s

gEgE

(L

F -O

=c5

x-0N

c

lo.-

k

E

=8E

or-

=

o

86tr

6

$c€€

c.96u

(s-Cc

$EgE

(L F,L

=E

E

.R.€

E

E

rS

i

g':5P

FggR

s

398

*$eE

o-Ec

P6Fg

eE;Ex

*

c'j

,iEu

=g

6,E

or- f

c)

E

*Eg

t

sFE

*o-.u

i*

6x

$EgE

(L

t-=6

E

N(Dc

cst€

(!

Gl

.--Ca

3€

9i

F-EgR

E

3€g

;$*E

c-96u

o-Ec

E E

FE

tE*eH

(L

F

=€

.NE

9'c

o

e€q

F-Ee

H

3E

r

0E

.CE

(E

c.9

6

!IcE

tr9Jq

#E*

e

Qo

l-q(E

=u)

Y

s

o

o

o

.F

0)

Y(L

m{

EE

a<

EJ

c)

tr

6

P

o

F

s

o

o

o

q) o)

c

o

F

cr)

o

N

o

z

c

o

.(!

o,

o

Y

c

o

E

o

aC

(!(E

(u

E--v(5

oc

-cf

-o)

!Id

xi

-o

ii=

oo

dg

(18)

lo

r

c

o

o

o

o

o

$A

C(f)

O-.=o

o.sl

Eo

(5(l)

JO

Osf

PN

iiF

E5

Ea

(E

-J

E€

Hg

E

o

=

'6'

E

o

Y

C,

g

o

o.

o

J

J

'e

(u

.:

(U

!

c

o

q

o

o

c

o)

t

c

(U

E

-g

-o

o

o

o

=

d

o

$l

o

-o E

o

o

o)

o

I L

o

.ct

o

:

o

c

G .Y

f

.Y

o

p

:

(5E

HE

$

st

s

E.Y+<

ESE

E6F

aEJ >l

CEE

o96

E€€

.:zc

I

gE

E'

c

EE

I (5

'e

o

Y(L

a{

EE

a<

EJ

o

t

o

P

o

F6

rO-(U CD

o,

c

o

F

fr

<tl
(19)

Lampiran

lE

Surat

Persetujuan

Harga

Kompensasi

dari

28

WTP

Di

(20)

SURAT

PERNYATAAN

PERSETUJUAN

HARGA

Saya

yang

bertanda tangan di

bawah

ini

:

Nama

Tempat/Tgl

Lahir

Kewarganegaraan

Pekerjaan

Alamat

TAKLIM

Retak

llir, 2A-t2-I967

lndonesia

Swasta

Desa

Gading

Jaya

20.@

30.00

b. c.

d.

e.

Dengan

inimenyatakan setuju

bahwa

ganti rugi

atas

:

a.

Bangunan

L.

Permanen

seluas

2.

Semi

permanen

seluas

M2

dengan harga

M2

dengan

harga Rp.

6,(m,000.00

M2

dengan harga

M2

dengan harga

M2

dengan

harga Rp.

3,000,000.00

batang dengan harga

batang dengan harga

batang dengan harga

batang dengan harga

batang dengan harga

batang dengan harga

batang dengan harga

Teras seluas

Pagar seluas

Lahan/perkerasan

seluas

Tanam

tumbuh

1.

Mangga

2.

Kelapa

3.

Rambutan

4.

Sawit

5.

Manggis

6.

Sawo

7.

sebanyak

sebanyak

sebanyak

sebanyak

sebanyak

sebanyak

sebanyak

B u kt r Kep-bE milik-a

n/Iertif

i

kat

N o m o

r

:

Demikian persetujuan

harga

ini

saya

buat

dengan sebenarnya, dan

tidak

ada

paksaan

dari pihak

(21)

SURAT

PERNYATAAN PERSETUJUAN

HARGA

Saya

yang

bertanda

tangan

di bawah ini

:

Nama

Tempat/Tgl

Lahir

Kewarganegaraan

Pekerjaan

Alamat

M.

TASRIF

Retak

Mudik,

26-70-L97

6

lndonesia

Swasta

Desa

Gading

Jaya

Dengan

ini menyatakan setuju bahwa ganti rugiatas

:

a.

Bangunan

L.

Permanen

seluas

2.

Semi

permanen

seluas

b.

Teras

seluas

c.

Pagar seluas

d.

Lahan/perkerasanseluas

e.

Tanam

tumbuh

1.

Mangga

2.

Kelapa

3.

Rambutan

4.

Sawit

5.

Manggis

6.

Sawo

7.

-

M2

dengan

harga

15.00

M2

dengan

harga

M2

dengan

harga

M2

dengan

harga

15.00

M2

dengan

harga

Rp.

9,750,000.00

Rp.

1,500,000.00

sebanyak

sebanyak

sebanyak

sebanyak

sebanyak

sebanyak

sebanyak

batang

dengan

harga

batang

dengan

harga

batang dengan harga

batang dengan harga

batang dengan harga

batang dengan harga

batang

dengan

harga

Bukti Kepemilikan/Sertifikat Nomor

:

Demikian persetujuan

harga

ini

saya

buat

dengan sebenarnya, dan

tidak

ada paksaan

dari pihak

Gading Jaya

Desember

2013

getahui;

(22)

SURAT

PERNYATAAN

PERSETUJUAN HARGA

Saya

yang

bertanda tangan di bawah ini

:

Nama

Tempat/Tgl

Lahir

Kewarganegaraan

Pekerjaan

Alamat

AMIRUSIT

Pondok Suguh, 12-10-1953

lndonesia

Tani

Desa

Gading

Jaya

Dengan

ini menyatakan setuju

bahwa ganti rugi

atas

a.

Bangunan

L

Permanen

seluas

2.

Semi

permanen

seluas

b.

Teras

seluas

c.

Pagar

seluas

d.

Lahan/perkerasan

seluas

e.

Tanam

tumbuh

1.

Mangga

2.

Kelapa

3.

Rambutan

4.

Sawit

5.

Manggis

6.

Sawo

7.

-

M2

dengan

harga

13.00

M2

dengan

harga

M2

dengan

harga

M2

dengan

harga

13.00

M2

dengan

harga

-

batang

dengan

harga

-

batang

dengan

harga

-

batang

dengan

harga

-

batang

dengan

harga

-

batang

dengan

harga

-

batang

dengan

harga

-

batang

dengan

harga

Rp.

3,900,000.00

Rp.

1,300,000.00

sebanyak

sebanyak

sebanyak

sebanyak

sebanyak

sebanyak

sebanyak

Bukti Kepemilikan/Sertifikat Nomor

:

Demikian

persetujuan

harga

ini

saya

buat

dengan sebenarnya, dan

tidak

ada paksaan

dari pihak

manapun

Gading Jaya

Desember

2013

Pernyataan,

(23)

SURAT

PERNYATAAN

PERSETUJUAN HARGA

Saya

yang bertanda

tangan di bawah ini

:

Dengan

inimenyatakan setuju bahwa

gantirugiatas

:

a.

Bangunan

L,

Permanen seluas

2.

Semipermanen

seluas

b.

Teras

seluas

c.

Pagar seluas

d.

Lahan/perkerasanseluas

e.

Tanam

tumbuh

1. Mangga

sebanyak

2. Kelapa

sebanyak

3.

Rambutan

sebanyak

4. Sawit

sebanyak

5.

Manggis

sebanyak

6. Sawo

sebanyak

7.

sebanyak

Nama

Tempatfl-glLahir

Kewarganegaraan

Pekerjaan

Alamat

M.

YUSUF

Retak

llir,26-08-1966

Indonesia

Tani

Desa

Gading

Jaya

ng

Jaya

-

MZ

dengan

harga

11.50

M2

dengan

harga

M2

dengan

harga

M2

dengan

harga

11.50

M2

dengan

harga

Rp.

3,450,fi)0.00

Rp.

1,150,m0.00

batang

dengan

harga

batang dengan

harga

batang dengan

harga

batang dengan

harga

batang

dengan

harga

batang dengan

harga

batang

dengan

harga

Bukti Kepemilikan/Sertifikat Nomor

:

Demikian

pe_rsetujuan

harga

ini

saya

buat

dengan

sebenarnya,

dan

tidak

ada paksaan

dari pihak

ma

erre-D

Gading

Jaya

Desember

2013

Yang

Membuat

Pernyataan,

(24)

SURAT PERNYATAAN PERSETUJUAN

HARGA

Saya

yang bertanda tangan di bawah ini

:

Dengan

ini menyatakan setuju bahwa ganti rugiatas

:

a.

Bangunan

L.

Permanen

seluas

2.

Semi

permanen

seluas

b.

Teras seluas

c.

Pagar seluas

d.

Lahan/perkerasanseluas

Bukti KepemilikanlSertifikat Nomor

:

Demikian persetujuan

harga

ini

saya

buat

dengan sebenarnya, dan

tidak

ada paksaan

dari pihak

manapun

Gading Jaya

Yang

Membua

Nama

Tempatfl-gl

Lahir

Kewarganegaraan

Pekerjaan

Alamat

e.

Tanam

tumbuh

l-.

Mangga

2.

Kelapa

3.

Rambutan

4.

Sawit

5.

Manggis

6.

Sawo

7.

SUARDI

Retak

ff

ir, !7-08-1971

Indonesia

Swasta

Desa

Gading

Jaya

sebanyak

sebanyak

sebanyak

sebanyak

sebanyak

sebanyak

sebanyak

-

M2

dengan harga

8.00

M2

dengan

harga Rp.

Z,4fIO,WO.OO

M2

dengan harga

M2

dengan harga

50.00

M2

dengan

harga Rp.

5,000,000.00

-

batang dengan harga

-

batang dengan harga

-

batang dengan harga

-

batang

dengan

harga

-

batang dengan harga

-

batang dengan harga

-

batang dengan harga

Gading

jaya

GADING

JA
(25)

SURAT

PERNYATAAN PERSETUJUAN HARGA

Saya

yang

bertanda tangan di

bawah

ini

:

Nama

Tempatfi'glLahir

Kewarganegaraan

Pekerjaan

Alamat

TUKMAN

lpuh,3i-12-1957

Indonesia

Tani

Desa Gading Jaya

Dengan

ini menyatakan setuju bahwa

gantirugiatas

:

a.

Bangunan

L.

Permanen seluas

2.

Semi

permanen

seluas

b.

Teras seluas

c.

Pagar

seluas

d.

Lahan/perkerasan

seluas

e.

Tanam

tumbuh

1. Mangga

sebanyak

2. Kelapa

sebanyak

3.

Rambutan

sebanyak

4. Sawit

sebanyak

5.

Manggis

sebanyak

6. Sawo

sebanyak

7. Nangka

sebanyak

batang dengan harga

batang

dengan harga

batang

dengan harga

batang dengan harga

batang dengan harga

batang dengan harga

1

batang

dengan

harga

Rp.

12.50

M2

dengan harga

M2

dengan harga

M2

dengan

harga

M2

dengan harga

M2

dengan

harga

Rp,

3,750,d)0.00

Rp.

L250,000.00

100,000

Bukti

Kepem

ilikan/Sertifikat Nomor

:

Demikian persetujuan

harga ini

saya

buat

dengan sebenarnya, dan

tidak

ada paksaan

dari pihak

Gading

Jaya

Desember

2013

Yang

Membuat

Pernyataan,

HpWW

,4/w4

(

orzrncrtzozststt

/L. ,

@^@"@gLUKMAN

ffi

G4)rNGJarA

(26)

SURAT

PERNYATAAN

PERSETUJUAN

HARGA

Saya

yang bertanda tangan di

bawah

ini

:

Nama

Tempat/Tgl

Lahir

Kewarganegaraan

Pekerjaan

Alamat

TARMIZI

Retak

llir,01-05-1961

Indonesia

Tani

Desa

Gading

Jaya

Dengan

ini menyatakan setuju bahwa ganti rugiatas

:

a.

Bangunan

t,

Permanen seluas

2.

Semi

permanen

seluas

b.

Teras seluas

c.

Pagar

seluas

d.

Lahan/perkerasan

seluas

e.

Tanam

tumbuh

1.

Mangga

2.

Kelapa

3.

Rambutan

4.

Sawit

5.

Manggis

6.

Sawo

7.

-

M2

dengan

harga

35.00

M2

dengan

harga

M2

dengan

harga

M2

dengan

harga

35.00

M2

dengan

harga

-

batang

dengan

harga

-

batang

dengan

harga

-

batang

dengan

harga

-

batang

dengan

harga

-

batang

dengan

harga

-

batang

dengan

harga

-

batang

dengan

harga

Rp.

10,500,000.00

3,500,0m.00

Rp.

sebanyak

sebanyak

sebanyak

sebanyak

sebanyak

sebanyak

sebanyak

Bukti Kepemilikan/Sertifikat Nomor

:

Demikian persetujuan

harga

ini

saya

buat

dengan

sebenarnya,

dan

tidak

ada paksaan

dari

pihak

manapun

Gading

Jaya

Desember

2013

Yans

Membuat

Pernyataan,

*$H?H,,K3#

TARMIZI

(27)

Saya

yang bertanda tangan di bawah ini

:

Nama

Tempatfi-gl

Lahir

Kewarganegaraan

Pekerjaan

Alamat

b. c. d. e.

NURHAIMA

Tunggang, 03-11-1970

lndonesia

I

anl

Desa

Gading

Jaya

Dengan

ini menyatakan setuju bahwa ganti rugiatas

a.

Bangunan

L.

Permanen seluas

2.

Semi

permanen

seluas

Teras seluas

Pagar

seluas

Lahan/perkerasan

sel uas

Tanam

tumbuh

1.

Mangga

sebanyak

2. Kelapa

sebanyak

3.

Rambutan

sebanyak

4. Sawit

sebanyak

5.

Manggis

sebanyak

6. Sawo

sebanyak

7.

sebanyak

-

M2

dengan

harga

5.00

M2

dengan

harga

M2

dengan

harga

M2

dengan

harga

5.00

M2

dengan

harga

-

batang dengan harga

-

batang dengan harga

-

batang dengan harga

-

batang dengan harga

-

batang dengan harga

-

batang dengan harga

-

batang dengan harga

Rp.

1,500,000.00

Rp.

500,000.00

Bukti

Kepemilikan/Sertifikat Nomor

:

Demikian persetujuan

harga

ini

saya

buat

dengan sebenarnya, dan

tidak

ada paksaan

dari

pihak

Gading

Jaya

Desember

20L3

vane \4embgat Pernyataan,

,./

piru-,nsirriwrri

v(rrL.t,.y_

7F7C8ACF120751998

-#ffi,rffi*r**o,*o

e,3\I1c9

(28)

SURAT

PERNYATAAN

PERSETUJUAN HARGA

Saya

yang

bertanda tangan di bawah

ini

:

Nama

Tempat/Tgl

Lahir

Kewarganegaraan

Pekerjaan

Alamat

BAHAR

Retak

Mudik,

L6-11-L967

lndonesia

Petani Perkebunan

Desa

Gading

Jaya

Dengan

ini menyatakan setuju bahwa ganti rugiatas

:

a.

Bangunan

L.

Permanen seluas

2.

Semi

permanen

seluas

b.

Teras

seluas

c.

Pagar

seluas

d.

Lahan/perkerasan

seluas

e.

Tanam

tumbuh

L. Mangga

sebanyak

2.

Kelapa

sebanyak

3.

Rambutan

sebanyak

4. Sawit

sebanyak

5.

Manggis

sebanyak

6.

Sawo

sebanyak

7.

sebanyak

-

M2

dengan harga

-

M2

dengan harga

M2

dengan harga

M2

dengan

harga

12.50

M2

dengan harga

-

batang

dengan

harga

-

batang

dengan

harga

-

batang

dengan harga

-

batang

dengan

harga

-

batang

dengan

harga

-

batang

dengan

harga

-

batang

dengan

harga

Rp.

1,250,000.00

Bukti

Kepemil

ikan/Sertifikat Nomor

:

Demikian persetujuan

harga

ini

saya

buat

dengan sebenarnya, dan

tidak

ada paksaan

dari

pihak

manapun

AI Efi

Mengetahui;

Desa

Gading

Jaya

Gading

Jaya

Desember

2013

Y4ns

l\4or:rIUat

Pernyataan,

6P

AN

|t,i

--*]

(29)

SURAT PERNYATAAN PERSETUJUAN HARGA

Saya

yang bertanda tangan di

bawah

ini

:

Nama

Ternpat/Tgl

Lahir

Kewarganegaraan

Pekerjaan

Alamat

MINARNI

O

TAVIA

Retak

Mudik, }}-LO-L1BL

Indonesia

Mengurus

Rumah

Tangga

Desa

Gading

Jaya

Dengan

ini menyatakan setuju bahwa

gantirugiatas

:

a.

Bangunan

L.

Permanen seluas

2.

Semi

permanen

seluas

b.

Teras seluas

c.

Pagar

seluas

d.

Lahan/perkerasan

seluas

e.

Tanam

tumbuh

1.

Mangga

sebanyak

2. Kelapa

sebanyak

3.

Rambutan

sebanyak

4. Sawit

sebanyak

5.

Manggis

sebanyak

6. Sawo

sebanyak

7.

sebanyak

-

M2

dengan harga

20.00

M2

dengan harga

M2

dengan harga

M2

dengan harga

20.00

M2

dengan harga

-

batang dengan harga

-

batang dengan harga

-

batang dengan harga

-

batang dengan harga

-

batang dengan harga

-

batang dengan harga

-

batang dengan harga

Rp.

8,000,000.@

Rp.

e0O0,000.00

Bukti

Kepem

ilikan/Sertifikat Nomor

:

Demikian persetujuan

harga

ini

saya

buat

dengan sebenarnya,

dan

tidak

ada paksaan

dari pihak

Gading

Jaya

Desember

2013

Yang

Membuat

Pernyataan,

931ABACF12075

SEH'ffi

P$r Ytlqr.u]:8-rr;: I

6b-w^@

Gading

Jaya

.1i.,;*

(30)

SURAT PERNYATAAN PERSETUJUAN HARGA

Saya

yang

bertanda tangan di

bawah

ini

:

Dengan

ini menyatakan setuju bahwa ganti rugiatas

:

a.

Bangunan

-

M2

dengan narga

L7.N

M2

dengan harga

M2

dengan harga

M2

dengan harga

L7.N

M2

dengan harga

batang dengan harga

batang dengan harga

batang dengan harga

batang dengan harga

batang dengan harga

batang dengan harga

batang dengan harga

11,310,[email protected]

1,740,000.00

Nama

Tempat/Tgl

Lahir

Kewarganegaraan

Pekerjaan

Alamat

EDISON

Bukit

Putus

Luar,

A7

-OL-L979

Indonesia

Kepolisian

Rl

Desa

Sumber

Makmur

1.

Permanen seluas

2.

Semi

permanen

seluas

b.

Teras seluas

c.

Pagar

seluas

d.

Tanah/perkerasan

seluas

e.

Tanam

tumbuh

1.

.Mangga

2.

Kelapa

3.

Rambutan

4.

Sawit

5.

Manggis

6.

Sawo

7.

Rp.

Rp.

sebanyak

sebanyak

sebanyak

sebanyak

sebanyak

sebanyak

sebanyak

Bukti Kepemilikan/Sertifikat Nomor

:

Demikian Persetujuan

harga

ini

saya

buat

dengan sebenarnya, dan

tidak

ada paksaan

dari pihak

Sumber

Makmur

Desember

2013

Pernyataan,

(31)

SURAT

PERNYATAAN PERSETUJUAN

HARGA

Saya

yang

bertanda

tangan

di bawah ini

:

Nama

:

ABDUL

ROHIM

Tempat/Tgl

Lahir

Kewarganegaraan

Pekerjaan

Alamat

Muara

Aman,

LL-07-L97O

Indonesia

Tani

Desa

Gaja

Mati

Dengan

ini menyatakan setuju bahwa ganti rugi

atas

:

a.

Bangunan

L

Permanen

seluas

2.

Semi

permanen

seluas

b.

Teras

seluas

c.

Pagar seluas

d.

Lahan/perkerasanseluas

e.

Tanam

tumbuh

1.

Mangga

sebanyak

2. Kelapa

sebanyak

3.

Rambutan

sebanyak

4. Sawit

sebanyak

5.

Manggis

sebanyak

6. Sawo

sebanyak

7.

sebanyak

-

M2

dengan

harga

-

M2

dengan

harga

3.00

M2

dengan

harga

M2

dengan

harga

3.00

M2

dengan

harga

Rp.

-

batang

dengan

harga

-

batang

dengan

harga

-

batang

dengan

harga

-

batang

dengan

harga

-

batang

dengan

harga

-

batang

dengan

harga

-

batang

dengan

harga

1,350,000.00

300,000.00

Bukti Kepemilikan/Sertifikat Nomor

:

Demikian persetujuan

harga

ini

saya

buat

dengan

sebenarnya,

dan

tidak

ada paksaan

dari pihak

manapun

Gaja

Mati

Desember

2013

Mengetahjif:

Kepala

Desa Gaja

Mati

(32)
(33)

Saya

yang

bertanda

t

Nama

Tempat/Tgl

Lahir

Kewarganegaraan

Pekerjaan

Alamat

SURAT

PERNYATAAN

PERSETUJUAN HARGA

angan

di bawah ini

:

JUMADI

Sleman, 11-09-1955

lndonesia

Guru

Desa

Sumber

Makmur

Dengan

ini menyatakan setuju bahwa ganti rugi

atas

:

a.

Bangunan

1,.

Permanen

seluas

2.

Semi

permanen

seluas

b.

Teras seluas

c.

Pagar seluas

d.

Tanah/perkerasan

seluas

e.

Tanam

tumbuh

1. Mangga

sebanyak

2. Kelapa

sebanyak

3.

Rambutan

sebanyak

4. Sawit

sebanyak

5.

Manggis

sebanyak

6.

Sawo

sebanyak

7.

sebanyak

-

M2

dengan harga

-

M2

dengan harga

9.60

M2

dengan harga

M2

dengan harga

4.60

M2

dengan harga

Rp.

6,240,000.00

Rp.

460,000.00

batang dengan harga

batang dengan harga

batang dengan harga

batang dengan harga

batang dengan harga

batang dengan harga

batang dengan harga

Bukti

Kepemil

ikan/Sertifikat Nomor

:

Demikian persetujuan

harga

ini

saya

buat

dengan sebenarnya, dan

tidak

ada paksaan

dari pihak

manapun

Sumber

Makmur

Oktober

2013

Yang

Mem

Pernyataan,

mu

(34)

SURAT

PERNYATAAN

PERSETUJUAN HARGA

Saya

yang

bertanda tangan di bawah ini

:

Nama

Tempat/Tgl

Lahir

Kewarganegaraan

Pekerjaan

Alamat

YUSRIZAI

Spd

Aceh,

O2-07-1964

lndonesia

Guru

Desa

Sumber Makmur

Dengan

ini menyatakan setuju

bahwa ganti

rugi atas

:

a.

Bangunan

b. c. d. e.

Bukti Kepemilikan/Sertifikat Nomor

:

Demikian persetujuan

harga

ini

saya

manapun

Makmu

-

M2

dengan harga

-

M2

dengan

harga

4.00

M2

dengan harga

M2

dengan

harga

M2

dengan

harga

-

batang

dengan

harga

batang

dengan

harga

-

batang

dengan

harga

-

batang

dengan

harga

-

batang

dengan

harga

-

batang

dengan

harga

-

batang

dengan

harga

Rp.

1,400,000.00

buat

dengan sebenarnya, dan

tidak

ada

paksaan

dari pihak

Sumber

Makmur

Oktober

2013

1,.

Permanen

seluas

2.

Semi

permanen

seluas

Teras

seluas

Pagar seluas

Tanah/perkerasan

sel

uas

Tanam

tumbuh

1.

Mangga

2.

Kelapa

3.

Rambutan

4.

Sawit

5.

Manggis

6.

Sawo

7.

(35)

SURAT PERNYATAAN PERSETUJUAN

HARGA

Saya

yang bertanda tangan di bawah ini

:

Nama

Tempat/Tgl

Lahir

Kewarganegaraan

Pekerjaan

Alamat

MOFIEFRIANSYAH

lpuh,05-02-L983

Indonesia

Swasta

Desa

Gaja

Mati

Dengan

ini menyatakan setuju bahwa

gantirugiatas

:

a.

Bangunan

b. c.

d.

1,.

Permanen seluas

2.

Semi

permanen

seluas

Teras seluas

Pagar seluas

<

Gambar

Tabel 2. Ringkasan Pelaksanaan Pembayaran Kompensasi

Referensi

Dokumen terkait