Jam 1 Jam 2 Jam 3 Jam 4 Jam 5 ISHOMA Jam 6 Jam 7 Jam 8 ISHO Jam 9 Jam 10 07.30-08.20 08.20-09.10 09.10-10.00 10.00-10.50 10.50-11.40 11.40-12.10 12.10-13.00 13.00-13.50 13.50-14.40 14.40-15.20 15.15-16.05 16.05-16.55 1 RB 1 RB 1-A 2 RB 2 RB 2-A 3 RB 3 RB 3-A 4 RB 4 (gambar) 7 RG 2 8 L. MekTan 9 L. Bhn Bang 10 L. Konst jalan 11 L. Hidro 12 L. UT 13 L. Fis Bang 14 L. Komp A 15 L. Komp B 16 Beng. Batu 17 Beng. Beton 18 Beng. Plumbing 19 Beng. Sanitasi
20 Beng. Kayu Pr. Kerja Kayu II/2A1/Darmono-B.Suges Pr. Kerja Kayu II/2A2/Bada-Sunar
Praktik Plumbing II/6A1/Sudiyono-Lutjito Praktik Plumbing II/6A2/Sudiyono-Lutjito Pr. Kerja Baja Logam/2B2/Suparman-Dayat Pr. Kerja Baja logam/2B1/Suyitno-Suparman
Aplikasi Komputer Str./4S/Pram
CAD/2B1/Ikhwan CAD/2B2Dian
Pr. Kerja Batu II/2A2/Pusoko-Pangat Pr. Kerja Batu II/2A1/Eko-Lilik
Pr. Fisika Bang/2C2/Galeh Pr. Fisika Bang/2C1/Indah
Praktik Konst. Jalan/6A2/faqih Praktik Konst. Jalan/6A1/faqih
Pr. Geomatika 1/4B1/Sunar Pr. Geomatika 1/4A2/Sunar Geomatika 1/4A/Ilham Geomatika 1/4C/Ilham Mektek II/2B/Faqih Pr. Bahan Bang. II/2C1/Manap Pr. Bahan Bang. II/2C2/Pusoko
Pr. Mektan I/2C2/Dian Pr. Mektan I/2C1/M.Jamin
Bangunan Air/4H/Didik Perenc. Bang I/4B1/Djito
Pengajaran Mikro/6B2/Sumarjo H - Darmono
Met.penel.Pendid/6B/Jaedun Struktur Baja I/4A/Satoto Perenc. Bang I/4B2/Ikhwan Matematika Bang/2A/Didik Pend.Pancasila/4C/Halili Matematika Bang/2K/Agus Pengajaran Mikro/6B1/Dayat-Jaedun Man. Konstr/4C/Djito Pend.Pancasila/4A/Puji W Pend.Pancasila/4B/Puji W Statistik/4C/Husaini Statistik/4A/Husaini Statistik/4B/Husaini
JADWAL KULIAH SEMESTER GENAP (D3&S1) TA 2016/2017
JURUSAN PTSP FAKULTAS TEKNIK UNY
Perkuliahan dilaksanakan 13 Februari - 2 Juni 2017
No RUANG
1 RB 1 RB 1-A 2 RB 2 RB 2-A 3 RB 3 RB 3-A 4 RB 4 (gambar) 7 RG 2 8 L. MekTan 9 L. Bhn Bang 10 L. Konst jalan 11 L. Hidro 12 L. UT 13 L. Fis Bang 14 L. Komp A 15 L. Komp B 16 Beng. Batu 17 Beng. Beton 18 Beng. Plumbing 19 Beng. Sanitasi 20 Beng. Kayu
No RUANG Jam 1 Jam 2 Jam 3 Jam 4 Jam 5 ISHOMA Jam 6 Jam 7 Jam 8 ISHO Jam 9 Jam 10
07.30-08.20 08.20-09.10 09.10-10.00 10.00-10.50 10.50-11.40 11.40-12.10 12.10-13.00 13.00-13.50 13.50-14.40 14.40-15.20 15.15-16.05 16.05-16.55
Pr. Kerja Kayu II/2B1/Darmono-Galeh Pr. Kerja Kayu II/2B2/Bada-Sunar Praktik Plumbing II/6B1/Sudiyono-Suyitno Praktik Plumbing II/6B2/Sudiyono-Lutjito
Pr. Kerja Baja Logam/2K2/Lutjito-Dayat Pr. Kerja Baja Logam/2K1/Dayat-Suparman Pr. Kerja Batu II/2B2/Eko-Lilik Pr. Kerja Batu II/2B1/Pusoko-Pangat
Pr. Fisika Bang./2A2/Indah Pr. Fisika Bang./2A1/Lilik
Pr. Geomatika 1/4A1/Ilham Struktur Baja II/6A/Joko Bahan Bang II/2C/Widodo Geomatika II/4K/Ilham Praktik Konst. Jalan/6B2/faqih Praktik Konst. Jalan/6B1/faqih
Pr. Geomatika 1/4C2/Sunar
Pr. Bahan Bang II/2A1/Agus Pr. Bahan Bang II/2A2/Manap
Pr. Mektan I/2A2/Endaryanta Pr. Mektan I/2A1/M.jamin
KBM 1/2C1/B.Suges KBM 1/2C2/Ikhwan
Pengajaran Mikro/6C3/Agus-Indah Bahan Bang II/2B/Widodo
Pengajaran Mikro/6C2/Eko-galeh Met.penel.Pendid/6A/Sutarto Met.penel.Pendid/6C/Sutarto
Kewirausahaan/4B/Slamet PH Statistik/4K/Jaedun Pend. Tek Kejr/6A/Slamet PH Struktur Baja II/6B/Joko Kewirausahaan/4A/Slamet PH
SELASA
1 RB 1 RB 1-A 2 RB 2 RB 2-A 3 RB 3 RB 3-A 4 RB 4 (gambar) 7 RG 2 8 L. MekTan 9 L. Bhn Bang 10 L. Konst jalan 11 L. Hidro 12 L. UT 13 L. Fis Bang 14 L. Komp A 15 L. Komp B 16 Beng. Batu 17 Beng. Beton 18 Beng. Plumbing 19 Beng. Sanitasi 20 Beng. Kayu
No RUANG Jam 1 Jam 2 Jam 3 Jam 4 Jam 5 ISHOMA Jam 6 Jam 7 Jam 8 ISHO Jam 9 Jam 10
07.30-08.20 08.20-09.10 09.10-10.00 10.00-10.50 10.50-11.40 11.40-12.10 12.10-13.00 13.00-13.50 13.50-14.40 14.40-15.20 15.15-16.05 16.05-16.55
Pr. Kerja Kayu II/2C1/Bada-Indah Pr. Kerja Kayu II/2C2/Imam-Galeh Praktik Plumbing II/6C1/Sudiyono-Lutjito Praktik Plumbing II/6C2/Sudiyono/Suyitno
Pr. Kerja Batu II/2C1/Manap-Pusoko Pr. Kerja Baja Logam/2A1/Suparman-Dayat Pr. Kerja Baja Logam/2A2/Dayat-Lutjito
CAD/2A2/Pram CAD/2A1/Eko
Pr. Kerja Batu II/2C2/Lilik-Dian
Geomatika 1/4B/Sunar Struktur Baja I/4B/Satoto Mekanika Fluida/2K/Didik Pr. Fisika Bang/2B2/Galeh
Pr. Geomatika 1/4B2/Ilham Pr. Geomatika 1/4C1/Ilham
Pr. Bahan Bang. II/2B1/Manap Pr. Bahan Bang. II/2B2/Joko
Pr. Mektan I/2B2/Endar Pr. Mektan I/2B1/M.Jamin
Struktur Jembatan/4S/Faqih Perenc. Bang I/4A1/Djito Perenc. Bang I/4A2/Ikhwan
Pengajaran Mikro/6A3/Eko-Jaedun Pengajaran Mikro/6C1/Indah-bada Bhs Indo/6B/Satoto
Pengajaran Mikro/6B3/Lilik-Sumarjo H
Pondasi/6A/Endar Struktur Beton II/4C/Widodo Struktur Beton II/4B/Widodo Pend.SosBud/4C/Widyaningsih Pend.SosBud/2K/Grendi
Pend.SosBud./4A/Poerwanti Pend.SosBud/4B/Poerwanti Kewirausahaan/4C/Sutarto Pend.Pancasila/2K/Danar W Struktur Beton II/4A/Joko
Jam 1 Jam 2 Jam 3 Jam 4 Jam 5 ISHOMA Jam 6 Jam 7 Jam 8 ISHO Jam 9 Jam 10 07.30-08.20 08.20-09.10 09.10-10.00 10.00-10.50 10.50-11.40 11.40-12.10 12.10-13.00 13.00-13.50 13.50-14.40 14.40-15.20 15.15-16.05 16.05-16.55 1 RB 1 RB 1-A 2 RB 2 RB 2-A 3 RB 3 RB 3-A 4 RB 4 (gambar) 7 RG 2 8 L. MekTan 9 L. Bhn Bang 10 L. Konst. Jalan 11 L. Hidro 12 L. UT 13 L. Fis Bang 14 L. Komp A 15 L. Komp B 16 Beng. Batu 17 Beng. Beton 18 Beng. Plumbing 19 Beng. Sanitasi 20 Beng. Kayu 21 Beng. Furniture
Pr. Kerja Baja Logam/2C2/Dayat-Lutjito Praktik Plumbing II/4K1/Dayat-Retna
Pr. Kerja Kayu II/2K1/Imam-Galeh Pr. Kerja Kayu II/2K2/Bada-Indah CAD/2C1/Ikhwan
Pr. Kerja Batu II/2K2/Manap-Pusoko Pr. Kerja Batu II/2K1/Jaedun-Sumarjo H. Praktik Konst. Jalan/6C1/Dian Praktik Konst. Jalan/6C2/Dian
Pr. Geomatika II/4K2/Ilham Mekanika Tanah I/2B/Endaryanta Struktur Beton I/4K/Faqih Pondasi/6B/Endar KBM 1/2A2/Retna
KBM 1/2A1/B. Suges Mektek II/2C/Faqih
Hidrolika/4A/Lutjito Penelt.Tind.Kelas/6A/Eko Man. Konstr/4K/Djito Matematika Bang/2B/Didik Hidrolika/4C/Didik Man.Konstr/4B/Pusoko Sosio Antro/2C/Joko Sri Irigasi/4A/Suyitno Irigasi/4B/Suyitno Bahan Bang II/2K/Pram
No RUANG
KAMIS
1 RB 1 RB 1-A 2 RB 2 RB 2-A 3 RB 3 RB 3-A 4 RB 4 (gambar) 7 RG 2 8 L. MekTan 9 L. Bhn Bang 10 L. Konst. Jalan 11 L. Hidro 12 L. UT 13 L. Fis Bang 14 L. Komp A 15 L. Komp B 16 Beng. Batu 17 Beng. Beton 18 Beng. Plumbing 19 Beng. Sanitasi 20 Beng. Kayu 21 Beng. Furniture
No RUANG Jam 1 Jam 2 Jam 3 Jam 4 Jam 5 Istirahat Jam 6 Jam 7 Jam 8 ISHO Jam 9 Jam 10
07.30-08.20 08.20-09.10 09.10-10.00 10.00-10.50 10.50-11.40 11.40-12.10 12.10-13.00 13.00-13.50 13.50-14.40 14.40-15.20 15.15-16.05 16.05-16.55
Pr. Kerja Baja Logam/2C1/Lutjito-Suyitno Praktik Plumbing II/4K2/Retna-Dayat
Pengajaran Mikro/PKS/Galeh-Eko Pr. Fisika Bang/2B1/Lilik
CAD/2C2/Ikhwan
Pr. Geomatika II/4K1/Ilham Mek Tek IV/4A/Widodo Mek Tek II/4K/Faqih
KBM 1/2B2/Sumarjo H
Pr. Mektan I/2K2/Endaryanta Pr. Mektan I/2K1/M.Jamin
Pr. Bahan Bang. II/2K1/Slamet Pr. Bahan Bang. II/2K2/Joko
KBM 1/2B1/H. Soemardjo Hidrologi/4H/Darmono
Penel.Tind.Kelas/6C/Jaedun Struktur Baja II/6C/Joko Bhs. Indo/6C/Satoto Struktur Kayu/6A/Pram
Irigasi/4C/Didik Mek Tek IV/4B/Widodo Konst Jalan/6B/Dian Mek Tek II/2A/Suparman Bahan Bang II/2A/Pram
Pengajaran Mikro/6A1/bada-Lilik Konst Jalan/6A/Dian Struktur kayu/6C/Satoto
1 RB 1 RB 1-A 2 RB 2 RB 2-A 3 RB 3 RB 3-A 4 RB 4 (gambar) 7 RG 2 8 L. MekTan 9 L. Bhn Bang 10 L. Konst. Jalan 11 L. Hidro 12 L. UT 13 L. Fis Bang 14 L. Komp A 15 L. Komp B 16 Beng. Batu 17 Beng. Beton 18 Beng. Plumbing 19 Beng. Sanitasi 20 Beng. Kayu 21 Beng. Furniture
No RUANG Jam 1 Jam 2 Jam 3 Jam 4 Jam 5 ISHOMA Jam 6 Jam 7 Jam 8 ISHO Jam 9 Jam 10
07.30-08.20 08.20-09.10 09.10-10.00 10.00-10.50 10.50-11.40 11.40-12.10 12.10-13.00 13.00-13.50 13.50-14.40 14.40-15.20 15.15-16.05 16.05-16.55
Pengajaran Mikro/6A2/Suparman-Galeh
Mek.Tan I/2C/Endaryanta Konstruksi jalan/6C/Dian Matematika Bang/2C/Indah KBM 1/2K2/Retna
Mek Tek IV/4K/Pram Penel.Tind.Kelas/6B/Lilik Mek Tek IV/4C/Pram Mek.Tan I/2K/Endaryanta Fisika Bang/2C/Ikhwan KBM 1/2K1/B. Suges
Bhs Inggris/4K/Sunar Struktur kayu/6B/Darmono Hidrolika/4B/Didik Struktur baja I/2K/Endaryanta Struktur Kayu/4K/Pram
Fisika Bang/2B/Suges Mekanika Tanah I/2A/Dian Fisika Bang/2A/Ikhwan Man. Konstr/4A/Djito Pondasi/6C/Dian
Daftar Singkatan Nama Dosen
Sutarto Drs. Sutarto, M.Sc., Ph.D. Joko Ir. Joko Sumiyanto, M.T. Slamet PH Prof. Slamet PH,MA,MLHR,MA,PhD Retna Retna Hidayah, M.T, PhD. Pusoko Drs. Pusoko Prapto, M.T. Pram Pramudiyanto, S.Pd.T, M.Eng Manap Drs. A. Manap, M.T. Didik Didik Purwantoro, M.Eng. Husaini Prof. Dr. Husaini Usman, M.Pd, MT Ikhwan Ikhwananuddin, M.T .
Suyitno Drs. Suyitno HP, S.T., M.T. Satoto Dr. Ing. Satoto EN, M.Sc,M.Eng. B.Suges Dr. Bambang Sugestiyadi, M.T. Widodo Dr. Slamet Widodo, M.T. Lilik Dr. V . Lilik Hariyanto, M.Pd. Eko Dr. Nuryadin Eko Raharjo, M.Pd. Ilham Ir. Ilham Marsudi, M.Kom. Sativa Sativa, MT .
Sunar Dr. Sunar Rochmadi, M.E.S. Faqih Faqih Ma’arif, M.Eng. Agus Drs. Agus Santoso, M.Pd. Dian Dian Eksana Wibowo, M.Eng Jaedun Dr. Amat Jaedun, M.Pd. Dayat Nur Hidayat, M.Pd
Lutjito Drs. Lutjito, M.T. Indah Indah Wahyuni, M.Pd
Bada Drs. Bada Haryadi, M.Pd. Galih Galih Nur Indriatno Putra P., M.Pd. Suparman Drs. Suparman M.Pd. H Soemardjo Drs. H. Sumardjo, M.Pd
Sumarjo H Drs. Sumarjo H, M.T. Imam Drs. Imam Muchoyar, M.Pd Endar Ir. Endaryanta, M.T. Pangat Drs. Pangat, MT
Djito Ir. Sumardjito, M.T. Jamin Drs. M. Jamin, S.T., M.T Darmono Drs. Darmono, M.T. Sudiyono Drs. Sudiyono AD., M.Sc.
PETUNJUK:
1) Dosen dan mahasiswa diberi kebebasan untuk membuat kesepakatan ISHOMA dilaksanakan diantara jam ke-5 dengan ke-6 atau setelah jam ke-6
2) Ruang kelas khusus Micro teaching RB 1 pelaksanaannya digabung degan RB 1-A Ruang kelas khusus Micro teaching RB 2 pelaksanaannya digabung degan RB 2-A Ruang kelas khusus Micro teaching RB 3 pelaksanaannya digabung degan RB 3-A 2). Kode: Fisbang/3A1/Indah
Fisbang : Nama mata kuliah Fisika Bangunan
2 : Semester 2
A1 : kelas A1
indah : nama singkat Dosen Indah Wahyuni, M.Pd 3). Kode Mata Kuliah dan singkatan nama dosen terlampir
4). Kelas Teori : A (S1), B (S1), C (S1) dan K (D3)
5). Kelas Praktek : Kelas S1 adalah A1,A2; B1,B2; C1,C2 dan kelas D3 adalah K1,K2
6) Kelas : 5 K (sem 5 konsentrasi Struktur dan Hidro)
7). Kls Konsentrasii D3: : 5S (Struktur)
: 5H (Hidro)
Jogjakarta, Januari 2016
Ketua Jurusan PTSP Sekretaris Jurusan PTSP