• Tidak ada hasil yang ditemukan

PERBUP NOMOR 01 TAHUN 201721022017

N/A
N/A
Protected

Academic year: 2017

Membagikan "PERBUP NOMOR 01 TAHUN 201721022017"

Copied!
6
0
0

Teks penuh

(1)
(2)
(3)
(4)
(5)
(6)

Referensi

Dokumen terkait

Kepada peserta lelang yang akan melakukan sanggahan diberikan waktu mulai hari Senin tanggal 18 Agustus 2014 sampai dengan hari Senin tanggal 25 Agustus 2014. Kendal, 18

[r]

Factors that could cause actual results to differ include, but are not limited to, economic, social and political conditions in Indonesia; the state of the property industry

Factors that could cause actual results to differ include, but are not limited to, economic, social and political conditions in Indonesia; the state of the property industry

PRASARANA PRODUKSI PERUSAHAAN SELAMA TAHUN 1976 BLOK VI: PERLENGAKAPAN MESIN TENAGA DAN MOTOR LISTRIK PADA 31 DESEMBER 1976 ATAU PADA HARI TERAKHIR PERUSAHAAN TERSEBUT MENGGUNAKAN

(2) Pelaksana kebijakan yaitu Pejabat Eselon IV, Arsiparis, dan pegawai yang mempunyai kewenangan untuk mengakses seluruh Arsip yang berada di bawah kewenangannya

(2) Pelaku Usaha, BUMN, lembaga sosial, dan perwakilan negara asing/lembaga internasional sebagaimana dimaksud pada ayat (1) yang melakukan Impor Produk Hortikultura wajib

SSSG yang kuat sebesar 27,1%, di Semester 1 ini merupakan hasil dari pengaruh bergesernya periode Lebaran, peningkatan demand dari segmen pelanggan yang menjadi target