• Tidak ada hasil yang ditemukan

REVISI ARITMATIK TGL 8 MEI 2012

N/A
N/A
Protected

Academic year: 2017

Membagikan "REVISI ARITMATIK TGL 8 MEI 2012"

Copied!
3
0
0

Teks penuh

(1)

Kegiatan : PENINGKATAN JALAN DALAM KOTA KAB. PELALAWAN

Paket : LIX (Lima puluh sembilan)

Pekerjaan : Pembangunan Jalan Logging Km 5 - SLBN Kel. Pkl. Kerinci Barat. Kec. Pkl Kerinci - Lapis Pondasi Aggregat Kelas C

Kualifikasi : Usaha Kecil

Nilai HPS : 473,314,187.50

KOREKSI TERHADAP HPS

ARITMATIK (%)

1 3 4 5 6 7 8

1 CV. ANAK PESISIR Rp 354,846,000.00 Rp 354,846,687.15 74.97 Rp 23,665,709.38 I (Satu) 2 CV. PULAU SENANG KONTRAKTOR Rp 363,512,218.11 Rp 363,512,235.86 76.80 Rp 23,665,709.38 II (Dua)

3 CV. JAYA PERKASA Rp 369,892,859.00 Rp 369,892,859.88 78.15 Rp 23,665,709.38 III (Tiga) 4 CV. WAHYU MANDIRI SEJAHTERA Rp 377,310,379.30 Rp 377,310,387.70 79.72 Rp 23,665,709.38 IV (Empat)

5 CV. BONO SAKTI Rp 378,809,707.43 Rp 378,809,707.43 80.03 Rp 18,940,485.37 V (Lima)

6 CV. PRIMA KARYASINDO Rp 379,077,000.00 Rp 379,077,216.27 80.09 Rp 18,953,860.81 VI (Enam)

7 CV. UTUSAN SIAK BERSAUDARA Rp 380,701,000.00 Rp 380,701,231.19 80.43 Rp 19,035,061.56 VII (Tujuh) 8 CV. SAKURA JAYA Rp 382,052,763.33 Rp 382,052,730.41 80.72 Rp 19,102,636.52 VIII (Delapan)

9 CV. DINDA PUTRI Rp 384,235,748.63 Rp 384,235,748.63 81.18 Rp 19,211,787.43 IX (Sembilan) 10 CV.KESUMA ANDALAN Rp 385,459,994.82 Rp 385,460,046.37 81.44 Rp 19,273,002.32 X (Sepuluh)

11 CV. WAHYU NUR KENCANA Rp 387,220,153.38 Rp 387,220,153.38 81.81 Rp 19,361,007.67 XI (Sebelas) 12 CV. MAHKOTA TERUSAN Rp 389,915,247.87 Rp 389,915,247.87 82.38 Rp 19,495,762.39 XII (Dua belas)

13 CV. ANTARA Rp 397,533,000.00 Rp 397,533,241.41 83.99 Rp 19,876,662.07 XIII (Tiga belas)

14 CV. JURAGAN MUDA Rp 425,543,182.24 Rp 425,543,181.66 89.91 Rp 21,277,159.08 XIV(Empat belas)

15 CV. SHERLY ARLYAN SHELLA Rp 430,759,839.98 Rp 430,759,839.40 91.01 Rp 21,537,991.97 XV (Lima belas)

16 CV. RADITYA KARYA Rp 388,152,630.25 Rp - 0.00

XVI (Enam belas)

Pada Daftar kuantitas harga,

Harga satuan Tidak ada

Pangkalan Kerinci, April 2012

PANITIA PENGADAAN BARANG / JASA

ANDY FUAD, ST Ketua REKAPITULASI HASIL EVALUASI KOREKSI ARITMATIK

No. PERUSAHAAN

2

KETERANGAN PERINGKAT

HARGA PENAWARAN

(2)

Kegiatan : Pembangunan Jalan Kabupaten Pelalawan Paket : XXVII ( Dua Puluh Tujuh )

Pekerjaan : Pembangunan Jalan Poros Mak Teduh - Dusun Lubuk Salak Kec. Kerumutan - Lapis Pondasi Agregat Kelas C

Kualifikasi : Usaha Kecil

Nilai HPS : Rp 650,958,072

KOREKSI TERHADAP HPS

ARITMATIK (%)

1 3 4 5 6 7 8

1 CV. PUTRA SEJAHTERA Rp 428,977,093.15 Rp 428,977,093.15 65.90 Rp 32,547,903.58 I (Satu) 2 CV. KICIDAN MANDIRI Rp 497,480,500.00 Rp 495,242,097.89 76.08 Rp 32,547,903.58 II (Dua) 3 CV. MUDA MANDIRI SAKTI Rp 509,244,900.00 Rp 507,006,546.74 77.89 Rp 32,547,903.58 III (Tiga) 4 CV. DASTI Rp 494,704,778.74 Rp 510,825,685.71 78.47 Rp 32,547,903.58 IV (Empat) 5 CV. BULAN PURNAMA Rp 513,614,579.39 Rp 513,614,534.69 78.90 Rp 32,547,903.58 V (Lima) 6 CV. PUTERA LESUNG PERDANA Rp 518,656,500.00 Rp 516,418,105.82 79.33 Rp 32,547,903.58 VI (Enam) 7 CV. ABDI JAYA Rp 520,766,673.00 Rp 520,766,673.19 80.00 Rp 26,038,333.66 VII (Tujuh) 8 CV. FEREN Rp 520,850,444.53 Rp 520,850,399.84 80.01 Rp 26,042,519.99 VIII (Delapan) 9 CV. FAJAR KUALU RIAU Rp 520,964,418.00 Rp 520,964,418.15 80.03 Rp 26,048,220.91 IX (Sembilan) 10 CV. UKEM Rp 522,207,880.28 Rp 522,207,833.01 80.22 Rp 26,110,391.65 X (Sepuluh) 11 CV. TUAH NEGERI Rp 522,274,000.00 Rp 522,274,112.28 80.23 Rp 26,113,705.61 XI (Sebelas) 12 CV. HIKMAH PERDANA PERKASA Rp 507,869,534.37 Rp 524,348,133.28 80.55 Rp 26,217,406.66 XII (Dua Belas) 13 CV. PONGKAI SARANA Rp 525,611,000.00 Rp 525,610,645.27 80.74 Rp 26,280,532.26 XIII (Tiga Belas) 14 CV. MELLINDO JAYA CONTRACTOR Rp 531,861,775.29 Rp 531,861,783.84 81.70 Rp 26,593,089.19 XIV (Empat Belas) 15 CV. FYAT MOTOR Rp 537,401,000.00 Rp 537,400,777.14 82.56 Rp 26,870,038.86 XV (Lima belas) 16 CV. FIONA Rp 540,304,782.61 Rp 540,304,827.16 83.00 Rp 27,015,241.36 XVI (Enam belas) 17 CV. MUTIARA BUMI RIAU Rp 540,327,134.85 Rp 540,327,108.97 83.00 Rp 27,016,355.45 XVII (Tujuh Belas) 18 CV. TUAH ANAK NEGERI Rp 541,582,000.00 Rp 541,582,360.73 83.20 Rp 27,079,118.04 XVIII (Delapan Belas) 19 CV. TEGAR BERMANA Rp 546,693,947.29 Rp 546,693,991.81 83.98 Rp 27,334,699.59 XIX (Sembilan Belas) 20 CV. SINAR NAUMBAI Rp 549,633,000.00 Rp 549,632,551.42 84.43 Rp 27,481,627.57 XX (Dua Puluh) 21 CV. SUKSES MANDIRI Rp 553,296,886.26 Rp 553,296,818.54 85.00 Rp 27,664,840.93 XXI (Dua Puluh Satu) 22 CV. PELALAWAN INDAH PRATAMA Rp 553,758,655.63 Rp 553,758,700.06 85.07 Rp 27,687,935.00 XXII Dua Puluh Dua) 23 CV. PELALAWAN INDAH LESTARI Rp 554,364,489.00 Rp 554,364,489.46 85.16 Rp 27,718,224.47 XXIII (Dua Puluh Tiga) 24 CV. DINDA PUTRI Rp 578,538,590.33 Rp 577,598,967.76 88.73 Rp 28,879,948.39 XXIV (Dua Puluh Empat) 25 CV. RYAN PERKASA Rp 589,657,000.00 Rp - 0.00 Rp 32,547,903.58

Daftar Kuantitas Dan Harga Tidak Ada

Pangkalan Kerinci, April 2012 PANITIA PENGADAAN BARANG / JASA

ANDY FUAD, ST Ketua 2

REKAPITULASI HASIL EVALUASI KOREKSI ARITMATIK

No. PERUSAHAAN

HARGA BESARNYA NILAI

JAMINAN PELAKSANAAN

KETERANGAN PERINGKAT

(3)

Kegiatan

:

Pembangunan jaringan Irigasi (Pembuatan bangunan Air)

Paket

:

6 (enam)

Pekerjaan

:

DR. Teluk Beringin Pembangunan Pintu Air Type A

Kualifikasi

:

Usaha Kecil

Nilai HPS

:

219,980,000

KOREKSI

TERHADAP HPS

ARITMATIK

(%)

1

3

4

5

6

7

1

CV. PUNCAK MANDIRI FURNITURE

Rp

176,346,115.00

Rp

176,346,115.00

80.16

I (Satu)

2

CV. ARCH BUILDING CONSTRUCTION

Rp

196,556,000.00

Rp

196,556,800.00

89.35

II (Dua)

3

CV. NOFI BERSAUDARA

Rp

215,125,000.00

Rp

215,125,680.00

97.79

III (Tiga)

4

CV. MAHKOTA KERINCI

Rp

218,434,000.00

Rp

218,434,040.00

99.30

IV (Empat)

Pangkalan Kerinci, Mei 2012

PANITIA PENGADAAN BARANG / JASA

dto

ANDY FUAD, ST

Ketua

2

REKAPITULASI HASIL EVALUASI KOREKSI ARITMATIK

No.

PERUSAHAAN

HARGA

KETERANGAN

PERINGKAT

Referensi

Dokumen terkait