PEKERJAAN : LANJUTAN PEMBANGUNAN KANTOR KELURAHAN BENDA BARU

HARGA SATUAN JUMLAH

Rp. Rp.

1 PEKERJAAN LANTAI 1 I. PEKERJAAN PERSIAPAN :

1 - 1.00 ls 10,000,000.00 10,000,000.00

2 - 1.00 ls 10,000,000.00 10,000,000.00

3 I. 009 224.00 m2 2,085.36 467,119.83

4 I. 011 122.70 m1 42,852.37 5,257,985.81

5 I. 002 1.00 unit 245,284.79 245,284.79

6 I. 020 224.00 m2 4,346.31 973,573.44

7 - 1.00 ls 5,000,000.00 5,000,000.00

8 I. 005 1.00 set 5,678,969.08 5,678,969.08

9 I. 017 24.00 m2 359,992.57 8,639,821.79

10 I. 012 102.00 m1 427,537.91 43,608,867.24

89,871,621.99

II, PEKERJAAN TANAH :

1 III. 003 104.97 m3 30,170.48 3,166,995.29

2 VI. 001 3.12 m3 238,660.42 744,620.51

3 VI. 001 22.09 m3 238,660.42 5,272,008.68

4 III. 015 128.10 m3 221,907.40 28,426,338.45

5 III. 013 62.27 m3 14,458.83 900,351.37

38,510,314.30

III. PEK. BETON BERTULANG :

-1 XIX. 003 1.57 m3 1,391,006.89 2,183,880.82

2 XIX. 163 9.36 m3 5,389,243.79 50,443,321.89

3 XIX. 163 0.39 m3 5,389,243.79 2,101,805.08

4 XIX. 163 0.25 m3 5,389,243.79 1,347,310.95

5 XIX. 166 7.32 m3 4,995,782.64 36,569,128.95

6 XIX. 164 1.11 m3 4,599,555.39 5,105,506.49

7 XIX. 005 24.03 m3 793,315.71 19,063,376.61

8 XIX. 182 8.46 m3 5,721,551.84 48,404,328.59

9 XIX. 183 1.72 m3 5,454,928.44 9,382,476.92

10 XIX. 183 0.86 m3 5,454,928.44 4,691,238.46

11 XIX. 170 2.21 m3 4,585,423.22 10,133,785.32

12 XIX. 170 0.88 m3 4,585,423.22 4,035,172.43

13 XIX. 172 3.76 m3 3,728,192.91 14,018,005.33

14 XIX. 172 0.14 m3 3,728,192.91 521,947.01

15 XIX. 001 97.85 m2 99,317.93 9,718,259.44

217,719,544.29

IV. PEKERJAAN PASANGAN :

-1 VII. 014 42.70 m3 733,302.47 31,312,015.51

2 VII. 006 8.54 m3 330,379.26 2,821,438.88

3 VIII. 005 351.71 m2 94,247.76 33,147,879.44

4 VIII. 004 8.00 m2 96,270.48 770,163.82

5 X. 006 643.02 m2 38,585.52 24,811,262.49

6 X. 017 60.40 m2 58,869.15 3,555,696.95

7 - 46.28 m2 240,950.00 11,151,166.00

8 XI. 012 217.88 m2 108,780.76 23,701,151.69

9 XI. 012 32.68 m2 108,780.76 3,554,955.19

10 XI. 017 18.30 m2 107,141.88 1,960,696.44

11 XI. 018 4.65 m2 83,613.26 388,801.67

12 XI. 018 1.40 m2 83,613.26 117,058.57

13 XVII. 001 1.00 bh 2,203,175.75 2,203,175.75

14 XVII. 002 1.00 bh 560,225.08 560,225.08

15 XVII. 006 1.00 bh 1,581,398.86 1,581,398.86

16 XVII. 007 2.00 bh 507,752.89 1,015,505.78

17 - 2.00 bh 100,000.00 200,000.00

142,852,592.08

V. PEK.KUSEN,PINTU & JENDELA+PLAFOND :

-1 - 5.00 Unit 2,783,966.29 13,919,831.47

2 - 2.00 Unit 4,298,332.59 8,596,665.17

3 - 2.00 Unit 609,880.54 1,219,761.07

4 - 1.00 Unit 506,000.00 506,000.00

5 - 1.00 Unit 5,904,832.14 5,904,832.14

6 - 12.00 Unit 1,773,657.21 21,283,886.51

7 - 1.00 Unit 2,297,371.87 2,297,371.87

8 - 1.00 Unit 3,072,679.46 3,072,679.46

9 - 1.00 Unit 8,327,266.90 8,327,266.90

10 - 17.00 Unit 957,710.21 16,281,073.65

11 XII. 027 4.65 m2 87,974.84 409,083.02

12 - 217.88 m2 121,488.28 26,469,867.19

13 - 205.60 m1 27,000.00 5,551,200.00

113,839,518.43

VI. TANGGA :

-1 XIX. 171 1.36 m3 4,331,560.21 5,890,921.88

2 XIX. 167 0.61 m3 3,907,079.01 2,383,318.20

3 XIX. 167 0.65 m3 3,907,079.01 2,539,601.36

4 XI. 012 11.88 m2 108,780.76 1,292,315.41

5 14.70 m1 450,000.00 6,615,000.00

18,721,156.85

Pek. Balok Tangga 18x30 Beton Site Mix K-175, Besi = 105 Kg, Bekisting Papan 50% ( Pas. Keramik 40/40 Setara Masterina Warna KWI

Pas.Hand Railling Tangga Pipa Stainless Steel Ø 2.5" Pas. Penutup Plafond GRC t=5 mm Rangka Hollow 20x40 Pas. Penutup Plafond Gypsum=9 mm Rangka Hollow 20x40 Pas. List Profil Plafond Gypsum 7 CM

Pek. Plat Tangga Beton Ready Mix K 225 Besi 160 kg

Pek. Balok Bordes 25x50 Beton Site Mix K-175, Besi = 105 Kg, Bekisting Papan 50% ( Kusen Pintu PJ 1

Kusen Pintu jendela J 1 Kusen Pintu jendela J 2 (loket) Kusen Pintu jendela J 3 Kusen Pintu jendela J 4 Kusen Pintu jendela BV Pas. Jet Washer

Kusen pintu P 1 Kusen pintu P 2 Kusen pintu P 3 Kusen pintu P 4

Pas. Keramik Lantai 20/20 Corak/Warna Setara Masterina KW I Pas. Keramik Meja Pantry 20/20 Corak/Warna Setara Masterina KW I Pas. Closet Duduk Setara HCG

Pas. Closet Jongkok Setara Toto Pas. Kitchen Zink lengkap Accessories Pas. Bak Mandi Fiber Glass

Pas. Plesteran Biasa 1:5 + Acian t=25 cm Pas. Batu Alam Andesit

Pas. Lantai Keramik 40/40 warna setara Masterina KW I Pas. Plint Lantai 20/40 warna setara Masterina KW I

Pas. Keramik Dinding 20/25 Corak/Warna setara Masterina KW II Pek. Rabat Beton t= 7cm

Pas. Pondasi Batu Belah 1:5 Pas. Batu Kosong Pas. Dinding Bata a.d 1:5 Pas. Bata Rolag

Pas. Plesteran Biasa 1:5 + Acian t=15 cm

Pek. Kolom Teras 20/100, Beton Site Mix K-225, Besi = 120kg, (K2) Pek. Kolom Teras 20/50, Beton Site Mix K-225, Besi = 120kg, (K3) Pek. Kolom Praktis 15/15, Beton Site Mix K-175, Besi = 153kg, (KP) Pek. Balok Lintel 12/15, Beton Site Mix K-175, Besi = 153kg, (BL) Pek. Plat Canopy, Beton Ready Mix K-225, Besi = 88kg/m3 Pek. Meja Pantry, Beton Ready Mix K-225, Besi = 88kg/m3 Pek. Pondasi Plat Beton Setempat,besi 250 kg, k2 Pek. Pondasi Plat Beton Setempat,besi 250 kg, k3

Pek. Sloof Beton , uk 20x30 Beton Site Mix K-175, Besi = 200 kg, Bekisting Papan 50% Pek. Sloof Beton , 15x20 Beton Site Mix K-175, Besi = 154 kg, Bekisting Papan 50% ( Pek. Beton Tumbuk Lantai Kerja 1:3:5

Pek. Kolom Utama 30/30, Beton Site Mix K-225, Besi = 195 Kg, (K1) Urugan Pasir Bawah Lantai

Urugan Tanah Merah dipadatkan tiap 20 Cm Urugan Tanah Kembali Bekas galian

Pek. Lantai Kerja Pondasi 1:2:4

Pek. Pondasi Plat Beton Setempat,besi 250 kg, K1 Pek. Direksikeet & Gudang

Pek. Gudang Kerja Pek. Pagar Pengaman Proyek

Galian Tanah Pondasi

Urugan Pasir Bawah Pondasi t:10 cm. Mobilisasi dan Demobilisasi Alat Bantu Pek. Pengukuran kembali / Pematokan Pekerjaan Bouwplank

Papan Nama Proyek Uk. 60x90 cm Pembersihan Lokasi/Perataan Tanah Pengadaan Air Kerja dan Listrik Kerja

NO. URAIAN PEKERJAAN ANA- VOLUME

LISA

Biaya Pengurusan IMB

DAFTAR KUANTITAS DAN HARGA

PEMERINTAH KOTA TANGERANG SELATAN DINAS TATA KOTA, BANGUNAN DAN PEMUKIMAN

(2)

VII. PEKERJAAN INSTALASI LISTRIK & AIR :

-1 - 1.00 Bh 14,000,000.00 14,000,000.00

2 1.00 ls 12,000,000.00 12,000,000.00

3 XXVII. 004 30.00 ttk 348,459.72 10,453,791.68

4 XXVII. 003 10.00 ttk 282,594.91 2,825,949.10

5 XXVII. 004 5.00 ttk 348,459.72 1,742,298.61

6 - 14.00 bh 100,000.00 1,400,000.00

7 - 20.00 bh 200,000.00 4,000,000.00

8 - 3.00 bh 100,000.00 300,000.00

9

-XVII. 016 6.00 m1 17,691.10 106,146.62 XVII. 017 10.00 m1 22,172.08 221,720.84 XVII. 015 29.50 m1 15,201.67 448,449.25

10

-XVII. 021 25.00 m1 77,152.24 1,928,805.96 XVII. 020 45.50 m1 44,608.61 2,029,691.62

11 XVII. 023 7.00 bh 48,652.95 340,570.63

12 XVII. 025 3.00 bh 37,922.95 113,768.86

13 XVII. 029 2.00 unit 3,441,253.50 6,882,507.01

14 - 1.00 ttk 8,500,000.00 8,500,000.00

15 - 1.00 bh 3,000,000.00 3,000,000.00

70,293,700.17

VIII. PEKERJAAN LAIN - LAIN

-1 XVIII. 012 703.42 m2 28,959.02 20,370,356.66

2 XVIII. 034 222.53 m2 29,904.43 6,654,632.76

3 XVIII. 034 14.39 m2 29,904.43 430,324.74

4 - 46.28 m2 42,000.00 1,943,760.00

5 - 28.10 m2 45,000.00 1,264,500.00

6 - 126.00 m1 60,000.00 7,560,000.00

7 - 32.50 m1 60,000.00 1,950,000.00

8 - 1.00 bh 3,000,000.00 3,000,000.00

9 - 30.00 hrf 150,000.00 4,500,000.00

10 - 20.00 hrf 225,000.00 4,500,000.00

52,173,574.17

Lambang Daerah Tangerang Selatan Huruf Stainless Steel t=20 cm Huruf Stainless Steel t=30 cm Pengecatan Plafon Setara Metrolith Pengecatan List Plafon Setara Metrolith Pengecatan Batu Alam Dengan Vernis Water Profing Atap dan Canopy Plin Ban-Banan t= 10 Cm Tali Air Profil t= 3 cm Pas. Kran Air

Pas. Floor Drain Ø 3" Lokal Pek. Septictank uk 2x1.5x1.5 Pek. Pengeboran Sumur + Pompa Listrik Pek. Water Torn 1000 L+ Instalasi

Pengecatan Dinding setara ICI/Dulux Warna Biasa Pipa PVC 3/4"

Pipa PVC 1" Pipa PVC 1/2"

Instalasi Air Kotor & Air Hujan Pipa PVC 3"

Pipa PVC 2 1/2"

Pek. Instalasi Stop Kontak 2x2.5 mm Eterna Pek. Instalasi Stop Kontak AC 3x2.5 mm Eterna Pas. Lampu Neon Phillips TL 40 Watt Pas. Lampu Down Light PL 20 Watt Pas. Lampu Neon Phillips PL 20 Watt Instalasi Air Bersih

Box Panel Groub

(3)

HARGA SATUAN JUMLAH

Rp. Rp.

2 PEKERJAAN LANTAI 2

I. PEK. BETON BERTULANG :

1 XIX. 171 21.66 m3 4,331,560.21 93,821,594.08

2 XIX. 182 6.30 m3 5,721,551.84 36,045,776.61

3 XIX. 180 0.53 m3 5,454,928.44 2,891,112.07

4 XIX. 169 2.21 m3 4,585,423.22 10,133,785.32

5 XIX. 169 0.71 m3 4,585,423.22 3,255,650.49

6 XIX. 172 1.20 m3 3,728,192.91 4,473,831.49

7 XIX. 172 0.14 m3 3,728,192.91 521,947.01

8 XIX. 176 16.00 m3 4,642,826.08 74,285,217.35

9 XIX. 177 3.06 m3 4,393,766.31 13,444,924.91

10 XIX. 167 1.76 m3 3,907,079.01 6,876,459.06

11 XIX. 178 5.04 m3 5,582,446.25 28,135,529.12

273,885,827.51

II. PEKERJAAN PASANGAN :

-1 VIII. 005 379.42 m2 94,247.76 35,759,484.85

2 X. 006 698.44 m2 38,585.52 26,949,672.13

3 X. 017 60.40 m2 58,869.15 3,555,696.95

4 XI. 012 195.78 m2 108,780.76 21,297,096.92

5 XI. 012 29.37 m2 108,780.76 3,194,890.88

6 XI. 017 27.30 m2 107,141.88 2,924,973.38

7 XI. 018 5.85 m2 83,613.26 489,137.58

8 XI. 018 1.40 m2 83,613.26 117,058.57

9 XVII. 001 2.00 bh 2,203,175.75 4,406,351.50

10 XVII. 002 1.00 bh 560,225.08 560,225.08

11 XVII. 006 1.00 bh 1,581,398.86 1,581,398.86

12 XVII. 007 3.00 bh 507,752.89 1,523,258.66

13 - 2.00 bh 100,000.00 200,000.00

14 20.00 m1 450,000.00 9,000,000.00

111,559,245.34

III. PEK.KUSEN,PINTU & JENDELA+PLAFOND :

-1 - 5.00 Unit 2,783,966.29 13,919,831.47

2 - 1.00 Unit 4,298,332.59 4,298,332.59

3 - 3.00 Unit 609,880.54 1,829,641.61

4 - 24.00 Unit 1,773,657.21 42,567,773.02

5 - 12.00 Unit 957,710.21 11,492,522.57

6 XII. 027 5.85 m2 87,974.84 514,652.83

7 - 195.78 m2 121,488.28 23,784,976.12

8 - 186.95 m1 27,000.00 5,047,650.00

103,455,380.20

IV. PEKERJAAN INSTALASI LISTRIK & AIR :

-1 XXVII. 004 42.00 ttk 348,459.72 14,635,308.35

2 XXVII. 003 13.00 ttk 282,594.91 3,673,733.83

3 XXVII. 004 7.00 ttk 348,459.72 2,439,218.06

4 - 26.00 bh 100,000.00 2,600,000.00

5 - 25.00 bh 200,000.00 5,000,000.00

6 - 4.00 bh 100,000.00 400,000.00

7

-XVII. 016 6.00 m1 17,691.10 106,146.62 XVII. 017 10.00 m1 22,172.08 221,720.84 XVII. 015 15.00 m1 15,201.67 228,025.04

8

-XVII. 021 13.00 m1 77,152.24 1,002,979.10 XVII. 020 45.50 m1 44,608.61 2,029,691.62

9 XVII. 023 7.00 bh 48,652.95 340,570.63

10 XVII. 025 3.00 bh 37,922.95 113,768.86

32,791,162.94

V. PEKERJAAN ATAP

-1 XIV. 087 301.18 m2 249,618.84 75,180,203.62

2 - 301.18 m2 95,888.16 28,879,596.03

3 - 301.18 m2 45,000.00 13,553,100.00

4 - 35.00 m1 85,000.00 2,975,000.00

5 XIII. 044 15.00 m1 133,970.23 2,009,553.49

6 - 36.80 m2 86,000.00 3,164,800.00

7 XIV. 058 68.00 m1 52,872.05 3,595,299.54

8 XIX. 171 1.80 m3 4,331,560.21 7,796,808.37

9 - 34.00 m1 52,000.00 1,768,000.00

138,922,361.05

VI PEKERJAAN LAIN - LAIN

-1 XVIII. 012 758.84 m2 28,959.02 21,975,265.77

2 XVIII. 028 20.40 m2 44,959.79 917,179.78

3 XVIII. 034 201.63 m2 29,904.43 6,029,630.18

4 XVIII. 034 13.09 m2 29,904.43 391,448.99

5 - 1.00 ls 2,500,000.00 2,500,000.00

6 - 1.00 ls 2,434,009.00 2,434,009.00

7 - 1.00 ls 15,000,000.00 15,000,000.00

8 Instalasi Penangkal Petir + Grounding - 1.00 ls 14,500,000.00 14,500,000.00

63,747,533.72

Pek. Perapihan & Pembersihan. Profil Ornamen Betawi

Pengecatan Dinding setara ICI/Dulux Warna Biasa Pengecatan Listplank Setara Glotek

Pengecatan Plafon Setara Metrolith Pengecatan List Plafon Setara Metrolith Pelaporan , As-Build Drawing dan Dokumentasi Pas. Nok Genteng Model Metal Type butiran Pas. Talang Patahan Atap Pakai Karpet Water Profing Atap dan Canopy

Pas. Lisplank GRC, Superplank, lebar 30 cm, tebal 5 mm Pek. Dak Atap Beton Beton Ready Mix K 225 Besi 160 kg Pas. Talang Air PVC Kotak 6"

Pipa PVC 2 1/2" Pas. Kran Air

Pas. Floor Drain Ø 3" Lokal

Pas. Rangka Baja Atap Baja Ringan Berikut Gording, Kaso & Reng Pas. Genteng Model Metal Type butiran

Pas. Alumunium Foil Instalasi Air Bersih Pipa PVC 3/4" Pipa PVC 1" Pipa PVC 1/2"

Instalasi Air Kotor & Air Hujan Pipa PVC 3"

Pek. Instalasi Titik Lampu 3x2.5 mm Eterna Pek. Instalasi Stop Kontak 2x2.5 mm Eterna Pek. Instalasi Stop Kontak AC 3x2.5 mm Eterna Pas. Lampu Neon Phillips TL 40 Watt Pas. Lampu Down Light PL 20 Watt Pas. Lampu Neon Phillips PL 20 Watt Kusen pintu P 3

Kusen Pintu jendela J 1 Kusen Pintu jendela BV

Pas. Penutup Plafond GRC t=5 mm Rangka Hollow 20x40 Pas. Penutup Plafond Gypsum=9 mm Rangka Hollow 20x40 Pas. List Profil Plafond Gypsum 7 CM

Pas. Bak Mandi Fiber Glass Pas. Jet Washer

Pas.Hand Railling Void Pipa Stainless Steel Ø 2.5"

Kusen pintu P 1 Kusen pintu P 2

Pas. Keramik Dinding 20/25 Corak/Warna setara Masterina KW II Pas. Keramik Lantai 20/20 Corak/Warna Setara Masterina KW I Pas. Keramik Meja Pantry 20/20 Corak/Warna Setara Masterina KW I Pas. Closet Duduk Setara HCG

Pas. Closet Jongkok Setara Toto Pas. Kitchen Zink lengkap Accessories

Pek. Ring Balok 20/40, Beton Ready Mix K-225, Besi =212 Kg, (RB2)

Pas. Dinding Bata a.d 1:5

Pas. Plesteran Biasa 1:5 + Acian t=15 cm Pas. Plesteran Biasa 1:5 + Acian t=25 cm

Pas. Lantai Keramik 40/40 warna setara Masterina KW I Pas. Plint Lantai 20/40 warna setara Masterina KW I Pek. Balok Lintel 15/15, Beton Site Mix K-175, (bl)

Pek. Plat Canopy, Beton Ready Mix K-225, Besi = 88kg/m3, Bekisting Multiplex 12 mm Pek. Meja Pantry, Beton Ready Mix K-225, Besi = 88kg/m3, Bekisting Multiplex 12 mm Pek. Balok Induk Struktur25/50, Beton Ready Mix K-225, Besi = 150 kg/m3, (BI) Pek. Balok Anak Struktur20/35, Beton Ready Mix K-225, Besi = 123 kg/m3, (BA) Pek. Ring Balok 15/20, Beton Ready Mix K-225, Besi = 175 Kg, (RB1)

VOLUME LISA

Pek. Dak Lantai Beton Ready Mix K 225 Besi 160 kg Pek. Kolom Utama 30/30, Beton Site Mix K-225, (K1)

Pek. Kolom Teras 15/50, Beton Site Mix K-225, Besi = 153kg, (k2) Pek. Kolom Praktis 15/15, Beton Site Mix K-175, (kp)

(4)

ANA-HARGA SATUAN JUMLAH

Rp. Rp.

1 PEKERJAAN HALAMAN I. PEKERJAAN PERSIAPAN :

1 I. 009 944.00 m2 2,085.36 1,968,576.43

2 Pek. Pembersihan Lokasi / Perataan tanah I 020 944.00 m2 4,346.31 4,102,916.64

4,102,916.64

II, PEKERJAAN HALAMAN

1 III. 015 509.76 m3 221,907.40 113,119,518.26

2 Galian Tanah Biasa Manual III 003 9.80 m3 30,170.48 295,670.70

3 Pas. Kanstin, model Kst. DKI, 15.30.40, K-300, warna Abu-Abu XXV. 027 245.00 m1 218,321.26 53,488,708.93 4 Pas. Paving Block t = 6 Cm K-350 Abu-abu XXV. 014 944.00 m2 93,556.75 88,317,574.01 5 Pek.Lapis Pondasi Macadam/Stell Slaag XXIII. 005 94.40 m3 239,875.93 22,644,287.44

` 277,865,759.34

III, PEKERJAAN SALURAN

1 Pek. Galian Tanah Biasa Sedalam 1 m (Manual) III 003 61.75 m3 30,170.48 1,863,027.14 2 Pek. Pasangan Batu Bata Merah tebal 1/2 Bata Ad 1 Pc : 5 Ps VIII 005 50.00 m2 94,247.76 4,712,387.97

3 VII. 014 27.40 m3 733,302.47 20,092,487.71

4 Pek. Plesteran 1Pc : 5Ps, tebal 15 mm + acian X 006 235.00 m2 38,585.52 9,067,597.72 5 Pas. bak kontrol pasangan batu bata ukuran ( 30x30 ) cm tinggi 35 cm XVII 032 6.00 bh 478,379.44 2,870,276.62

6 Pek. Plat Decker XIX. 172 0.50 m3

3,728,192.91

1,864,096.45

40,469,873.61

Pek. Pengukuran kembali / Pematokan

Urugan Tanah Merah dipadatkan tiap 20 Cm

Pas. Pondasi Batu Belah 1:5

NO. URAIAN PEKERJAAN ANA- VOLUME

(5)

REKAPITULASI TOTAL : LANTAI 1

I. PEKERJAAN PERSIAPAN Rp. 89,871,621.99

II. PEKERJAAN TANAH Rp. 38,510,314.30

III. PEKERJAAN BETON Rp. 217,719,544.29

IV. PEKERJAAN PASANGAN Rp. 142,852,592.08

V. PEK.KUSEN,PINTU & JENDELA + PLAFOND Rp. 113,839,518.43

VI. PEKERJAAN TANGGA Rp. 18,721,156.85

VII. PEKERJAAN INSTALASI LISTRIK Rp. 70,293,700.17

VIII. PEKERJAAN LAIN-LAIN : Rp. 52,173,574.17

JUMLAH. Rp. 743,982,022.28

LANTAI 2

I. PEK. BETON BERTULANG Rp. 273,885,827.51

II. PEKERJAAN PASANGAN Rp. 111,559,245.34

III. PEKERJAAN KUSEN,PINTU & JENDELA+PLAFOND : Rp. 103,455,380.20

IV. PEKERJAAN INSTALASI LISTRIK & AIR : Rp. 32,791,162.94

V PEKERJAAN ATAP : Rp. 138,922,361.05

VI. PEKERJAAN LAIN-LAIN : Rp. 63,747,533.72

JUMLAH. Rp. 724,361,510.77

REKAPITULASI TOTAL : HALAMAN

I. PEKERJAAN PERSIAPAN Rp. 4,102,916.64

II. PEKERJAAN TANAH Rp. 277,865,759.34

III. PEKERJAAN BETON Rp. 40,469,873.61

JUMLAH. Rp. 322,438,549.59

REKAPITULASI : LANTAI 1 + LANTAI 2 + HALAMAN

REKAPITULASI LANTAI 1 Rp. 743,982,022.28

REKAPITULASI LANTAI 2 Rp. 724,361,510.77

REKAPITULASI AULA Rp. 322,438,549.59

JUMLAH TOTAL Rp. 1,790,782,082.63 1,790,782,082.63

PPN 10 % Rp. 179,078,208.26

JUMLAH TOTAL Rp. 1,969,860,290.90 1,975,507,143.00

DIBULATKAN. Rp. 1,969,860,000.00 5,647,143.00

(DOMISILI PERUSAHAAN,TANGGAL BULAN TAHUN) PENAWAR,

CV/PT.

NAMA PEMIMPIN PERUSAHAAN

JABATAN KOTA TANGERANG SELATAN

SELAKU PEJABAT PELAKSANA TEKNIS KEGIATAN

RADITYA SUKMA UTAMA, ST, MT.

NIP. 19790116 200212 1 003

TERBILANG : (SATU MILYAR SEMBILAN RATUS ENAM PULUH SEMBILAN JUTA DELAPAN RATUS ENAM PULUH RIBU RUPIAH )

Referensi

Dokumen terkait

pada hasil penelitian yang menunjukkan bahwa pada kondisi klimatik lokasi penelitian konduktansi stomata dan potensial air daun Bayur (light-demander) dan

Undip dan UGM menjalin kerjasama untuk mencegah penjiplakan karya ilmiah dengan piranti lunak yang di buat

The decision to report child sexual abuse: A comparative study of psychologists in the United States and Malaysia.. PsyD Dissertation, Alliant

Hari Kamis , Tanggal 10, Bulan Juni , Tahun 2010, Halaman G Kolom --.

A study evaluating prevalence of hypertension and risk factors affecting on blood pressure control among type 2 diabetes patients attending teaching hospital in

Prevalence, smoking habit and factors related to smoking and nicotine addiction among lower secondary school male students in Kota Tinggi District, Johor, Malaysia.. Lim KH,

[r]

6 Menyelesaikan masalah harian bukan rutin melibatkan operasi asas dan operasi bergabung tambah dan tolak secara kreatif dan