PEKERJAAN : LANJUTAN PEMBANGUNAN KANTOR KELURAHAN BENDA BARU
HARGA SATUAN JUMLAH
Rp. Rp.
1 PEKERJAAN LANTAI 1 I. PEKERJAAN PERSIAPAN :
1 - 1.00 ls 10,000,000.00 10,000,000.00
2 - 1.00 ls 10,000,000.00 10,000,000.00
3 I. 009 224.00 m2 2,085.36 467,119.83
4 I. 011 122.70 m1 42,852.37 5,257,985.81
5 I. 002 1.00 unit 245,284.79 245,284.79
6 I. 020 224.00 m2 4,346.31 973,573.44
7 - 1.00 ls 5,000,000.00 5,000,000.00
8 I. 005 1.00 set 5,678,969.08 5,678,969.08
9 I. 017 24.00 m2 359,992.57 8,639,821.79
10 I. 012 102.00 m1 427,537.91 43,608,867.24
89,871,621.99
II, PEKERJAAN TANAH :
1 III. 003 104.97 m3 30,170.48 3,166,995.29
2 VI. 001 3.12 m3 238,660.42 744,620.51
3 VI. 001 22.09 m3 238,660.42 5,272,008.68
4 III. 015 128.10 m3 221,907.40 28,426,338.45
5 III. 013 62.27 m3 14,458.83 900,351.37
38,510,314.30
III. PEK. BETON BERTULANG :
-1 XIX. 003 1.57 m3 1,391,006.89 2,183,880.82
2 XIX. 163 9.36 m3 5,389,243.79 50,443,321.89
3 XIX. 163 0.39 m3 5,389,243.79 2,101,805.08
4 XIX. 163 0.25 m3 5,389,243.79 1,347,310.95
5 XIX. 166 7.32 m3 4,995,782.64 36,569,128.95
6 XIX. 164 1.11 m3 4,599,555.39 5,105,506.49
7 XIX. 005 24.03 m3 793,315.71 19,063,376.61
8 XIX. 182 8.46 m3 5,721,551.84 48,404,328.59
9 XIX. 183 1.72 m3 5,454,928.44 9,382,476.92
10 XIX. 183 0.86 m3 5,454,928.44 4,691,238.46
11 XIX. 170 2.21 m3 4,585,423.22 10,133,785.32
12 XIX. 170 0.88 m3 4,585,423.22 4,035,172.43
13 XIX. 172 3.76 m3 3,728,192.91 14,018,005.33
14 XIX. 172 0.14 m3 3,728,192.91 521,947.01
15 XIX. 001 97.85 m2 99,317.93 9,718,259.44
217,719,544.29
IV. PEKERJAAN PASANGAN :
-1 VII. 014 42.70 m3 733,302.47 31,312,015.51
2 VII. 006 8.54 m3 330,379.26 2,821,438.88
3 VIII. 005 351.71 m2 94,247.76 33,147,879.44
4 VIII. 004 8.00 m2 96,270.48 770,163.82
5 X. 006 643.02 m2 38,585.52 24,811,262.49
6 X. 017 60.40 m2 58,869.15 3,555,696.95
7 - 46.28 m2 240,950.00 11,151,166.00
8 XI. 012 217.88 m2 108,780.76 23,701,151.69
9 XI. 012 32.68 m2 108,780.76 3,554,955.19
10 XI. 017 18.30 m2 107,141.88 1,960,696.44
11 XI. 018 4.65 m2 83,613.26 388,801.67
12 XI. 018 1.40 m2 83,613.26 117,058.57
13 XVII. 001 1.00 bh 2,203,175.75 2,203,175.75
14 XVII. 002 1.00 bh 560,225.08 560,225.08
15 XVII. 006 1.00 bh 1,581,398.86 1,581,398.86
16 XVII. 007 2.00 bh 507,752.89 1,015,505.78
17 - 2.00 bh 100,000.00 200,000.00
142,852,592.08
V. PEK.KUSEN,PINTU & JENDELA+PLAFOND :
-1 - 5.00 Unit 2,783,966.29 13,919,831.47
2 - 2.00 Unit 4,298,332.59 8,596,665.17
3 - 2.00 Unit 609,880.54 1,219,761.07
4 - 1.00 Unit 506,000.00 506,000.00
5 - 1.00 Unit 5,904,832.14 5,904,832.14
6 - 12.00 Unit 1,773,657.21 21,283,886.51
7 - 1.00 Unit 2,297,371.87 2,297,371.87
8 - 1.00 Unit 3,072,679.46 3,072,679.46
9 - 1.00 Unit 8,327,266.90 8,327,266.90
10 - 17.00 Unit 957,710.21 16,281,073.65
11 XII. 027 4.65 m2 87,974.84 409,083.02
12 - 217.88 m2 121,488.28 26,469,867.19
13 - 205.60 m1 27,000.00 5,551,200.00
113,839,518.43
VI. TANGGA :
-1 XIX. 171 1.36 m3 4,331,560.21 5,890,921.88
2 XIX. 167 0.61 m3 3,907,079.01 2,383,318.20
3 XIX. 167 0.65 m3 3,907,079.01 2,539,601.36
4 XI. 012 11.88 m2 108,780.76 1,292,315.41
5 14.70 m1 450,000.00 6,615,000.00
18,721,156.85
Pek. Balok Tangga 18x30 Beton Site Mix K-175, Besi = 105 Kg, Bekisting Papan 50% ( Pas. Keramik 40/40 Setara Masterina Warna KWI
Pas.Hand Railling Tangga Pipa Stainless Steel Ø 2.5" Pas. Penutup Plafond GRC t=5 mm Rangka Hollow 20x40 Pas. Penutup Plafond Gypsum=9 mm Rangka Hollow 20x40 Pas. List Profil Plafond Gypsum 7 CM
Pek. Plat Tangga Beton Ready Mix K 225 Besi 160 kg
Pek. Balok Bordes 25x50 Beton Site Mix K-175, Besi = 105 Kg, Bekisting Papan 50% ( Kusen Pintu PJ 1
Kusen Pintu jendela J 1 Kusen Pintu jendela J 2 (loket) Kusen Pintu jendela J 3 Kusen Pintu jendela J 4 Kusen Pintu jendela BV Pas. Jet Washer
Kusen pintu P 1 Kusen pintu P 2 Kusen pintu P 3 Kusen pintu P 4
Pas. Keramik Lantai 20/20 Corak/Warna Setara Masterina KW I Pas. Keramik Meja Pantry 20/20 Corak/Warna Setara Masterina KW I Pas. Closet Duduk Setara HCG
Pas. Closet Jongkok Setara Toto Pas. Kitchen Zink lengkap Accessories Pas. Bak Mandi Fiber Glass
Pas. Plesteran Biasa 1:5 + Acian t=25 cm Pas. Batu Alam Andesit
Pas. Lantai Keramik 40/40 warna setara Masterina KW I Pas. Plint Lantai 20/40 warna setara Masterina KW I
Pas. Keramik Dinding 20/25 Corak/Warna setara Masterina KW II Pek. Rabat Beton t= 7cm
Pas. Pondasi Batu Belah 1:5 Pas. Batu Kosong Pas. Dinding Bata a.d 1:5 Pas. Bata Rolag
Pas. Plesteran Biasa 1:5 + Acian t=15 cm
Pek. Kolom Teras 20/100, Beton Site Mix K-225, Besi = 120kg, (K2) Pek. Kolom Teras 20/50, Beton Site Mix K-225, Besi = 120kg, (K3) Pek. Kolom Praktis 15/15, Beton Site Mix K-175, Besi = 153kg, (KP) Pek. Balok Lintel 12/15, Beton Site Mix K-175, Besi = 153kg, (BL) Pek. Plat Canopy, Beton Ready Mix K-225, Besi = 88kg/m3 Pek. Meja Pantry, Beton Ready Mix K-225, Besi = 88kg/m3 Pek. Pondasi Plat Beton Setempat,besi 250 kg, k2 Pek. Pondasi Plat Beton Setempat,besi 250 kg, k3
Pek. Sloof Beton , uk 20x30 Beton Site Mix K-175, Besi = 200 kg, Bekisting Papan 50% Pek. Sloof Beton , 15x20 Beton Site Mix K-175, Besi = 154 kg, Bekisting Papan 50% ( Pek. Beton Tumbuk Lantai Kerja 1:3:5
Pek. Kolom Utama 30/30, Beton Site Mix K-225, Besi = 195 Kg, (K1) Urugan Pasir Bawah Lantai
Urugan Tanah Merah dipadatkan tiap 20 Cm Urugan Tanah Kembali Bekas galian
Pek. Lantai Kerja Pondasi 1:2:4
Pek. Pondasi Plat Beton Setempat,besi 250 kg, K1 Pek. Direksikeet & Gudang
Pek. Gudang Kerja Pek. Pagar Pengaman Proyek
Galian Tanah Pondasi
Urugan Pasir Bawah Pondasi t:10 cm. Mobilisasi dan Demobilisasi Alat Bantu Pek. Pengukuran kembali / Pematokan Pekerjaan Bouwplank
Papan Nama Proyek Uk. 60x90 cm Pembersihan Lokasi/Perataan Tanah Pengadaan Air Kerja dan Listrik Kerja
NO. URAIAN PEKERJAAN ANA- VOLUME
LISA
Biaya Pengurusan IMB
DAFTAR KUANTITAS DAN HARGA
PEMERINTAH KOTA TANGERANG SELATAN DINAS TATA KOTA, BANGUNAN DAN PEMUKIMAN
VII. PEKERJAAN INSTALASI LISTRIK & AIR :
-1 - 1.00 Bh 14,000,000.00 14,000,000.00
2 1.00 ls 12,000,000.00 12,000,000.00
3 XXVII. 004 30.00 ttk 348,459.72 10,453,791.68
4 XXVII. 003 10.00 ttk 282,594.91 2,825,949.10
5 XXVII. 004 5.00 ttk 348,459.72 1,742,298.61
6 - 14.00 bh 100,000.00 1,400,000.00
7 - 20.00 bh 200,000.00 4,000,000.00
8 - 3.00 bh 100,000.00 300,000.00
9
-XVII. 016 6.00 m1 17,691.10 106,146.62 XVII. 017 10.00 m1 22,172.08 221,720.84 XVII. 015 29.50 m1 15,201.67 448,449.25
10
-XVII. 021 25.00 m1 77,152.24 1,928,805.96 XVII. 020 45.50 m1 44,608.61 2,029,691.62
11 XVII. 023 7.00 bh 48,652.95 340,570.63
12 XVII. 025 3.00 bh 37,922.95 113,768.86
13 XVII. 029 2.00 unit 3,441,253.50 6,882,507.01
14 - 1.00 ttk 8,500,000.00 8,500,000.00
15 - 1.00 bh 3,000,000.00 3,000,000.00
70,293,700.17
VIII. PEKERJAAN LAIN - LAIN
-1 XVIII. 012 703.42 m2 28,959.02 20,370,356.66
2 XVIII. 034 222.53 m2 29,904.43 6,654,632.76
3 XVIII. 034 14.39 m2 29,904.43 430,324.74
4 - 46.28 m2 42,000.00 1,943,760.00
5 - 28.10 m2 45,000.00 1,264,500.00
6 - 126.00 m1 60,000.00 7,560,000.00
7 - 32.50 m1 60,000.00 1,950,000.00
8 - 1.00 bh 3,000,000.00 3,000,000.00
9 - 30.00 hrf 150,000.00 4,500,000.00
10 - 20.00 hrf 225,000.00 4,500,000.00
52,173,574.17
Lambang Daerah Tangerang Selatan Huruf Stainless Steel t=20 cm Huruf Stainless Steel t=30 cm Pengecatan Plafon Setara Metrolith Pengecatan List Plafon Setara Metrolith Pengecatan Batu Alam Dengan Vernis Water Profing Atap dan Canopy Plin Ban-Banan t= 10 Cm Tali Air Profil t= 3 cm Pas. Kran Air
Pas. Floor Drain Ø 3" Lokal Pek. Septictank uk 2x1.5x1.5 Pek. Pengeboran Sumur + Pompa Listrik Pek. Water Torn 1000 L+ Instalasi
Pengecatan Dinding setara ICI/Dulux Warna Biasa Pipa PVC 3/4"
Pipa PVC 1" Pipa PVC 1/2"
Instalasi Air Kotor & Air Hujan Pipa PVC 3"
Pipa PVC 2 1/2"
Pek. Instalasi Stop Kontak 2x2.5 mm Eterna Pek. Instalasi Stop Kontak AC 3x2.5 mm Eterna Pas. Lampu Neon Phillips TL 40 Watt Pas. Lampu Down Light PL 20 Watt Pas. Lampu Neon Phillips PL 20 Watt Instalasi Air Bersih
Box Panel Groub
HARGA SATUAN JUMLAH
Rp. Rp.
2 PEKERJAAN LANTAI 2
I. PEK. BETON BERTULANG :
1 XIX. 171 21.66 m3 4,331,560.21 93,821,594.08
2 XIX. 182 6.30 m3 5,721,551.84 36,045,776.61
3 XIX. 180 0.53 m3 5,454,928.44 2,891,112.07
4 XIX. 169 2.21 m3 4,585,423.22 10,133,785.32
5 XIX. 169 0.71 m3 4,585,423.22 3,255,650.49
6 XIX. 172 1.20 m3 3,728,192.91 4,473,831.49
7 XIX. 172 0.14 m3 3,728,192.91 521,947.01
8 XIX. 176 16.00 m3 4,642,826.08 74,285,217.35
9 XIX. 177 3.06 m3 4,393,766.31 13,444,924.91
10 XIX. 167 1.76 m3 3,907,079.01 6,876,459.06
11 XIX. 178 5.04 m3 5,582,446.25 28,135,529.12
273,885,827.51
II. PEKERJAAN PASANGAN :
-1 VIII. 005 379.42 m2 94,247.76 35,759,484.85
2 X. 006 698.44 m2 38,585.52 26,949,672.13
3 X. 017 60.40 m2 58,869.15 3,555,696.95
4 XI. 012 195.78 m2 108,780.76 21,297,096.92
5 XI. 012 29.37 m2 108,780.76 3,194,890.88
6 XI. 017 27.30 m2 107,141.88 2,924,973.38
7 XI. 018 5.85 m2 83,613.26 489,137.58
8 XI. 018 1.40 m2 83,613.26 117,058.57
9 XVII. 001 2.00 bh 2,203,175.75 4,406,351.50
10 XVII. 002 1.00 bh 560,225.08 560,225.08
11 XVII. 006 1.00 bh 1,581,398.86 1,581,398.86
12 XVII. 007 3.00 bh 507,752.89 1,523,258.66
13 - 2.00 bh 100,000.00 200,000.00
14 20.00 m1 450,000.00 9,000,000.00
111,559,245.34
III. PEK.KUSEN,PINTU & JENDELA+PLAFOND :
-1 - 5.00 Unit 2,783,966.29 13,919,831.47
2 - 1.00 Unit 4,298,332.59 4,298,332.59
3 - 3.00 Unit 609,880.54 1,829,641.61
4 - 24.00 Unit 1,773,657.21 42,567,773.02
5 - 12.00 Unit 957,710.21 11,492,522.57
6 XII. 027 5.85 m2 87,974.84 514,652.83
7 - 195.78 m2 121,488.28 23,784,976.12
8 - 186.95 m1 27,000.00 5,047,650.00
103,455,380.20
IV. PEKERJAAN INSTALASI LISTRIK & AIR :
-1 XXVII. 004 42.00 ttk 348,459.72 14,635,308.35
2 XXVII. 003 13.00 ttk 282,594.91 3,673,733.83
3 XXVII. 004 7.00 ttk 348,459.72 2,439,218.06
4 - 26.00 bh 100,000.00 2,600,000.00
5 - 25.00 bh 200,000.00 5,000,000.00
6 - 4.00 bh 100,000.00 400,000.00
7
-XVII. 016 6.00 m1 17,691.10 106,146.62 XVII. 017 10.00 m1 22,172.08 221,720.84 XVII. 015 15.00 m1 15,201.67 228,025.04
8
-XVII. 021 13.00 m1 77,152.24 1,002,979.10 XVII. 020 45.50 m1 44,608.61 2,029,691.62
9 XVII. 023 7.00 bh 48,652.95 340,570.63
10 XVII. 025 3.00 bh 37,922.95 113,768.86
32,791,162.94
V. PEKERJAAN ATAP
-1 XIV. 087 301.18 m2 249,618.84 75,180,203.62
2 - 301.18 m2 95,888.16 28,879,596.03
3 - 301.18 m2 45,000.00 13,553,100.00
4 - 35.00 m1 85,000.00 2,975,000.00
5 XIII. 044 15.00 m1 133,970.23 2,009,553.49
6 - 36.80 m2 86,000.00 3,164,800.00
7 XIV. 058 68.00 m1 52,872.05 3,595,299.54
8 XIX. 171 1.80 m3 4,331,560.21 7,796,808.37
9 - 34.00 m1 52,000.00 1,768,000.00
138,922,361.05
VI PEKERJAAN LAIN - LAIN
-1 XVIII. 012 758.84 m2 28,959.02 21,975,265.77
2 XVIII. 028 20.40 m2 44,959.79 917,179.78
3 XVIII. 034 201.63 m2 29,904.43 6,029,630.18
4 XVIII. 034 13.09 m2 29,904.43 391,448.99
5 - 1.00 ls 2,500,000.00 2,500,000.00
6 - 1.00 ls 2,434,009.00 2,434,009.00
7 - 1.00 ls 15,000,000.00 15,000,000.00
8 Instalasi Penangkal Petir + Grounding - 1.00 ls 14,500,000.00 14,500,000.00
63,747,533.72
Pek. Perapihan & Pembersihan. Profil Ornamen Betawi
Pengecatan Dinding setara ICI/Dulux Warna Biasa Pengecatan Listplank Setara Glotek
Pengecatan Plafon Setara Metrolith Pengecatan List Plafon Setara Metrolith Pelaporan , As-Build Drawing dan Dokumentasi Pas. Nok Genteng Model Metal Type butiran Pas. Talang Patahan Atap Pakai Karpet Water Profing Atap dan Canopy
Pas. Lisplank GRC, Superplank, lebar 30 cm, tebal 5 mm Pek. Dak Atap Beton Beton Ready Mix K 225 Besi 160 kg Pas. Talang Air PVC Kotak 6"
Pipa PVC 2 1/2" Pas. Kran Air
Pas. Floor Drain Ø 3" Lokal
Pas. Rangka Baja Atap Baja Ringan Berikut Gording, Kaso & Reng Pas. Genteng Model Metal Type butiran
Pas. Alumunium Foil Instalasi Air Bersih Pipa PVC 3/4" Pipa PVC 1" Pipa PVC 1/2"
Instalasi Air Kotor & Air Hujan Pipa PVC 3"
Pek. Instalasi Titik Lampu 3x2.5 mm Eterna Pek. Instalasi Stop Kontak 2x2.5 mm Eterna Pek. Instalasi Stop Kontak AC 3x2.5 mm Eterna Pas. Lampu Neon Phillips TL 40 Watt Pas. Lampu Down Light PL 20 Watt Pas. Lampu Neon Phillips PL 20 Watt Kusen pintu P 3
Kusen Pintu jendela J 1 Kusen Pintu jendela BV
Pas. Penutup Plafond GRC t=5 mm Rangka Hollow 20x40 Pas. Penutup Plafond Gypsum=9 mm Rangka Hollow 20x40 Pas. List Profil Plafond Gypsum 7 CM
Pas. Bak Mandi Fiber Glass Pas. Jet Washer
Pas.Hand Railling Void Pipa Stainless Steel Ø 2.5"
Kusen pintu P 1 Kusen pintu P 2
Pas. Keramik Dinding 20/25 Corak/Warna setara Masterina KW II Pas. Keramik Lantai 20/20 Corak/Warna Setara Masterina KW I Pas. Keramik Meja Pantry 20/20 Corak/Warna Setara Masterina KW I Pas. Closet Duduk Setara HCG
Pas. Closet Jongkok Setara Toto Pas. Kitchen Zink lengkap Accessories
Pek. Ring Balok 20/40, Beton Ready Mix K-225, Besi =212 Kg, (RB2)
Pas. Dinding Bata a.d 1:5
Pas. Plesteran Biasa 1:5 + Acian t=15 cm Pas. Plesteran Biasa 1:5 + Acian t=25 cm
Pas. Lantai Keramik 40/40 warna setara Masterina KW I Pas. Plint Lantai 20/40 warna setara Masterina KW I Pek. Balok Lintel 15/15, Beton Site Mix K-175, (bl)
Pek. Plat Canopy, Beton Ready Mix K-225, Besi = 88kg/m3, Bekisting Multiplex 12 mm Pek. Meja Pantry, Beton Ready Mix K-225, Besi = 88kg/m3, Bekisting Multiplex 12 mm Pek. Balok Induk Struktur25/50, Beton Ready Mix K-225, Besi = 150 kg/m3, (BI) Pek. Balok Anak Struktur20/35, Beton Ready Mix K-225, Besi = 123 kg/m3, (BA) Pek. Ring Balok 15/20, Beton Ready Mix K-225, Besi = 175 Kg, (RB1)
VOLUME LISA
Pek. Dak Lantai Beton Ready Mix K 225 Besi 160 kg Pek. Kolom Utama 30/30, Beton Site Mix K-225, (K1)
Pek. Kolom Teras 15/50, Beton Site Mix K-225, Besi = 153kg, (k2) Pek. Kolom Praktis 15/15, Beton Site Mix K-175, (kp)
ANA-HARGA SATUAN JUMLAH
Rp. Rp.
1 PEKERJAAN HALAMAN I. PEKERJAAN PERSIAPAN :
1 I. 009 944.00 m2 2,085.36 1,968,576.43
2 Pek. Pembersihan Lokasi / Perataan tanah I 020 944.00 m2 4,346.31 4,102,916.64
4,102,916.64
II, PEKERJAAN HALAMAN
1 III. 015 509.76 m3 221,907.40 113,119,518.26
2 Galian Tanah Biasa Manual III 003 9.80 m3 30,170.48 295,670.70
3 Pas. Kanstin, model Kst. DKI, 15.30.40, K-300, warna Abu-Abu XXV. 027 245.00 m1 218,321.26 53,488,708.93 4 Pas. Paving Block t = 6 Cm K-350 Abu-abu XXV. 014 944.00 m2 93,556.75 88,317,574.01 5 Pek.Lapis Pondasi Macadam/Stell Slaag XXIII. 005 94.40 m3 239,875.93 22,644,287.44
` 277,865,759.34
III, PEKERJAAN SALURAN
1 Pek. Galian Tanah Biasa Sedalam 1 m (Manual) III 003 61.75 m3 30,170.48 1,863,027.14 2 Pek. Pasangan Batu Bata Merah tebal 1/2 Bata Ad 1 Pc : 5 Ps VIII 005 50.00 m2 94,247.76 4,712,387.97
3 VII. 014 27.40 m3 733,302.47 20,092,487.71
4 Pek. Plesteran 1Pc : 5Ps, tebal 15 mm + acian X 006 235.00 m2 38,585.52 9,067,597.72 5 Pas. bak kontrol pasangan batu bata ukuran ( 30x30 ) cm tinggi 35 cm XVII 032 6.00 bh 478,379.44 2,870,276.62
6 Pek. Plat Decker XIX. 172 0.50 m3
3,728,192.91
1,864,096.45
40,469,873.61
Pek. Pengukuran kembali / Pematokan
Urugan Tanah Merah dipadatkan tiap 20 Cm
Pas. Pondasi Batu Belah 1:5
NO. URAIAN PEKERJAAN ANA- VOLUME
REKAPITULASI TOTAL : LANTAI 1
I. PEKERJAAN PERSIAPAN Rp. 89,871,621.99
II. PEKERJAAN TANAH Rp. 38,510,314.30
III. PEKERJAAN BETON Rp. 217,719,544.29
IV. PEKERJAAN PASANGAN Rp. 142,852,592.08
V. PEK.KUSEN,PINTU & JENDELA + PLAFOND Rp. 113,839,518.43
VI. PEKERJAAN TANGGA Rp. 18,721,156.85
VII. PEKERJAAN INSTALASI LISTRIK Rp. 70,293,700.17
VIII. PEKERJAAN LAIN-LAIN : Rp. 52,173,574.17
JUMLAH. Rp. 743,982,022.28
LANTAI 2
I. PEK. BETON BERTULANG Rp. 273,885,827.51
II. PEKERJAAN PASANGAN Rp. 111,559,245.34
III. PEKERJAAN KUSEN,PINTU & JENDELA+PLAFOND : Rp. 103,455,380.20
IV. PEKERJAAN INSTALASI LISTRIK & AIR : Rp. 32,791,162.94
V PEKERJAAN ATAP : Rp. 138,922,361.05
VI. PEKERJAAN LAIN-LAIN : Rp. 63,747,533.72
JUMLAH. Rp. 724,361,510.77
REKAPITULASI TOTAL : HALAMAN
I. PEKERJAAN PERSIAPAN Rp. 4,102,916.64
II. PEKERJAAN TANAH Rp. 277,865,759.34
III. PEKERJAAN BETON Rp. 40,469,873.61
JUMLAH. Rp. 322,438,549.59
REKAPITULASI : LANTAI 1 + LANTAI 2 + HALAMAN
REKAPITULASI LANTAI 1 Rp. 743,982,022.28
REKAPITULASI LANTAI 2 Rp. 724,361,510.77
REKAPITULASI AULA Rp. 322,438,549.59
JUMLAH TOTAL Rp. 1,790,782,082.63 1,790,782,082.63
PPN 10 % Rp. 179,078,208.26
JUMLAH TOTAL Rp. 1,969,860,290.90 1,975,507,143.00
DIBULATKAN. Rp. 1,969,860,000.00 5,647,143.00
(DOMISILI PERUSAHAAN,TANGGAL BULAN TAHUN) PENAWAR,
CV/PT.
NAMA PEMIMPIN PERUSAHAAN
JABATAN KOTA TANGERANG SELATAN
SELAKU PEJABAT PELAKSANA TEKNIS KEGIATAN
RADITYA SUKMA UTAMA, ST, MT.
NIP. 19790116 200212 1 003
TERBILANG : (SATU MILYAR SEMBILAN RATUS ENAM PULUH SEMBILAN JUTA DELAPAN RATUS ENAM PULUH RIBU RUPIAH )