FORMAT REVIEW
Nomor dan Bidang Lomba :REFRIGERATION
Judul Dokumen :01. KISI-KISI SOAL
Penulis :MUHAMMAD MURSYID, NANANG NUGRAHA
Reviewer : ACHMADI, NANANG NUGRAHA
Hasil:
NO SUB-JUDUL TERTULIS KOREKSI
1 Kriteria Soal Lomba, Nilai dan Waktu
Soal Lomba, Nilai, Waktu Soal Lomba, Nilai, Waktu
a. Component Fabrication , 20
poin, 4.0 jam a. Component Fabrication , 15poin, 4.0 jam b. .Refrigeration System
Installation & Commissioning, 55 poin, 6.0 jam
b. .Refrigeration System
Installation & Commissioning, 55 poin, 8.0 jam
c. Air-Conditioning System
Installation & Commissioning, 25 pin, 5.0 jam
c. Air Conditioning System Installation, Fault Finding, Repair and Commissioning, 30 pin, 6.0 jam
2 Petunjuk untuk
Peserta Lomba ... total waktu adalah 15 jam1.Component Fabrication , 20 ... total waktu adalah 18 jam poin, 4.0 jam 1. Component Fabrication , 15poin, 4.0 jam 2. .Refrigeration System
Installation & Commissioning, 55 poin, 6.0 jam
2. .Refrigeration System
Installation & Commissioning, 55 poin, 8.0 jam
3.Air-Conditioning System
Installation & Commissioning, 25 pin, 5.0 jam
3. Air Conditioning System Installation, Fault Finding, Repair and Commissioning, 30 pin, 6.0 jam
MASUKAN-MASUKAN:
FORMAT REVIEW
Nomor dan Bidang Lomba REFRIGERATION
Judul Dokumen : 02. SOAL LOMBA
Penulis :MUHAMMAD MURSYID, NANANG NUGRAHA
Reviewer : ACHMADI, NANANG NUGRAHA
Hasil:
NO SUB-JUDUL TERTULIS KOREKSI
1 Module 1: Component Fabrication
Maximum Time Allowed-4 hours, 20 marks
Letter “COOL”
Maximum Time Allowed-4 hours, 15 marks,
Ice Rink Coil 2 Module 2:
Refrigeration System Installation and Commissioning
Maximum Time Allowed-6 hours, 55 marks
Letter “COOL”
Maximum Time Allowed-8 hours, 55 marks
Ice Rink Coil
3 Module 3: Air Conditioning System Installation, Fault Finding, Repair and Commissioning
Maximum Time Allowed-5
hours, 25 marks Maximum Time Allowed-6hours, 30 marks
4 Gambar/Drawing Drawing R.001,R.002,
R.003, R.004, R.005 Disesuaikan dengan TestProject pada Module 1 dan Module 2, tambahan gambar untuk module 3
MASUKAN-MASUKAN:
Perubahan Test Project dikarenakan project sebelumnya (soal 1 dan soal 2) sudah dua kali dilombakan yaitu pada LKS 2015 dan 2016
FORMAT REVIEW
Nomor dan Bidang Lomba :REFRIGERATION
Judul Dokumen :03. FORMAT PENILAIAN
Penulis :MUHAMMAD MURSYID, NANANG NUGRAHA
Reviewer : ACHMADI, NANANG NUGRAHA
Hasil:
NO SUB-JUDUL TERTULIS KOREKSI
1 Format Penilaian 1. Component Fabrication Total Koreksi disesuaikan dengan Test Project:
1. Component Fabrication: 15 poin
2. Refrigeration System Installation & Commissioning,
3. Air Conditioning System Installation, Fault Finding, Repair and Commissioning
2. Refrigeration System Installation &
Commissioning: 55 poin 3. Air Conditioning System
Installation, Fault Finding, Repair and
Commissioning: 30 poin
MASUKAN-MASUKAN:
FORMAT REVIEW
Nomor dan Bidang Lomba :REFRIGERATION
Judul Dokumen :04. DAFTAR KEBUTUHAN ALAT
Penulis :MUHAMMAD MURSYID, NANANG NUGRAHA
Reviewer : ACHMADI, NANANG NUGRAHA
Hasil:
NO SUB-JUDUL TERTULIS KOREKSI
MASUKAN-MASUKAN: Tidak ada perubahan
Tangerang, 29 November 2016 Reviewer,
FORMAT REVIEW
Nomor dan Bidang Lomba :REFRIGERATION
Judul Dokumen :05. DAFTAR KEBUTUHAN BAHAN
Penulis :MUHAMMAD MURSYID, NANANG NUGRAHA
Reviewer : ACHMADI, NANANG NUGRAHA
Hasil:
NO SUB-JUDUL TERTULIS KOREKSI
1 Daftar Kebutuhan
Bahan 1.2. .Refrigeration SystemComponent Fabrication Total Koreksi disesuaikandengan Test Project
Installation & Commissioning,
3. Air Conditioning System Installation, Fault Finding, Repair and Commissioning
MASUKAN-MASUKAN:
Perubahan Test Project dikarenakan project sebelumnya (soal 1 dan soal 2) sudah dua kali dilombakan yaitu pada LKS 2015 dan 2016
Mengacu pada WSC
FORMAT REVIEW
Nomor dan Bidang Lomba :REFRIGERATION
Judul Dokumen :06. LAYOUT LOMBA
Penulis :MUHAMMAD MURSYID, NANANG NUGRAHA
Reviewer : ACHMADI, NANANG NUGRAHA
Hasil:
NO SUB-JUDUL TERTULIS KOREKSI
1 Layout Lomba Gambar Layout Lomba Perubahan Gambar
MASUKAN-MASUKAN:
Agar lebih memudahkan mobilisasi dan pengawasan Juri Memperbaiki pandangan pengunjung
Tangerang, 29 November 2016 Reviewer,
FORMAT REVIEW
Nomor dan Bidang Lomba :REFRIGERATION
Judul Dokumen :07. DAFTAR PERLENGKAPAN PENUNJANG
Penulis :MUHAMMAD MURSYID, NANANG NUGRAHA
Reviewer : ACHMADI, NANANG NUGRAHA
Hasil:
NO SUB-JUDUL TERTULIS KOREKSI
1 Judul Daftar Kebutuhan
Perlengkapan Penunjang Lomba Keterampilan Siswa SMK Tingkat Nasional Tahun 2016
Daftar Kebutuhan
Perlengkapan Penunjang Lomba Keterampilan Siswa SMK Tingkat Nasional Tahun 2017
MASUKAN-MASUKAN: Tidak ada perubahan isi
Tangerang, 29 November 2016 Reviewer,
FORMAT REVIEW
Nomor dan Bidang Lomba :REFRIGERATION
Judul Dokumen :08. DAFTAR KEBUTUHAN JURI DAN USULAN JURI
Penulis :MUHAMMAD MURSYID, NANANG NUGRAHA
Reviewer : ACHMADI, NANANG NUGRAHA
Hasil:
NO SUB-JUDUL TERTULIS KOREKSI
1 Judul Daftar Kebutuhan Juri
Lomba Keterampilan Siswa SMK Tingkat Nasional Tahun 2016
Daftar Kebutuhan Juri Lomba Keterampilan Siswa SMK Tingkat Nasional Tahun 2017
2 Daftar Nama Calon Juri yang
Direkomendasikan
Ikhwanur Arif, PT Dwira Ahmadi, Mantan Juara ASC
dan Expert ASC
Sapto Widodo, P4TK BMTI Nanang Nugraha, PT
Panasonic Manufacturing Indonesia
Ahmadi, CV. Adika Engineering
Ikhwanur Arif, PT Fimar Berdaya Sinergitama
MASUKAN-MASUKAN: