• Tidak ada hasil yang ditemukan

Format Review Dokumen LKS XXV_Bidang lomba xxx

N/A
N/A
Protected

Academic year: 2017

Membagikan "Format Review Dokumen LKS XXV_Bidang lomba xxx"

Copied!
8
0
0

Teks penuh

(1)

FORMAT REVIEW

Nomor dan Bidang Lomba :REFRIGERATION

Judul Dokumen :01. KISI-KISI SOAL

Penulis :MUHAMMAD MURSYID, NANANG NUGRAHA

Reviewer : ACHMADI, NANANG NUGRAHA

Hasil:

NO SUB-JUDUL TERTULIS KOREKSI

1 Kriteria Soal Lomba, Nilai dan Waktu

Soal Lomba, Nilai, Waktu Soal Lomba, Nilai, Waktu

a. Component Fabrication , 20

poin, 4.0 jam a. Component Fabrication , 15poin, 4.0 jam b. .Refrigeration System

Installation & Commissioning, 55 poin, 6.0 jam

b. .Refrigeration System

Installation & Commissioning, 55 poin, 8.0 jam

c. Air-Conditioning System

Installation & Commissioning, 25 pin, 5.0 jam

c. Air Conditioning System Installation, Fault Finding, Repair and Commissioning, 30 pin, 6.0 jam

2 Petunjuk untuk

Peserta Lomba ... total waktu adalah 15 jam1.Component Fabrication , 20 ... total waktu adalah 18 jam poin, 4.0 jam 1. Component Fabrication , 15poin, 4.0 jam 2. .Refrigeration System

Installation & Commissioning, 55 poin, 6.0 jam

2. .Refrigeration System

Installation & Commissioning, 55 poin, 8.0 jam

3.Air-Conditioning System

Installation & Commissioning, 25 pin, 5.0 jam

3. Air Conditioning System Installation, Fault Finding, Repair and Commissioning, 30 pin, 6.0 jam

MASUKAN-MASUKAN:

(2)

FORMAT REVIEW

Nomor dan Bidang Lomba REFRIGERATION

Judul Dokumen : 02. SOAL LOMBA

Penulis :MUHAMMAD MURSYID, NANANG NUGRAHA

Reviewer : ACHMADI, NANANG NUGRAHA

Hasil:

NO SUB-JUDUL TERTULIS KOREKSI

1 Module 1: Component Fabrication

Maximum Time Allowed-4 hours, 20 marks

Letter “COOL”

Maximum Time Allowed-4 hours, 15 marks,

Ice Rink Coil 2 Module 2:

Refrigeration System Installation and Commissioning

Maximum Time Allowed-6 hours, 55 marks

Letter “COOL”

Maximum Time Allowed-8 hours, 55 marks

Ice Rink Coil

3 Module 3: Air Conditioning System Installation, Fault Finding, Repair and Commissioning

Maximum Time Allowed-5

hours, 25 marks Maximum Time Allowed-6hours, 30 marks

4 Gambar/Drawing Drawing R.001,R.002,

R.003, R.004, R.005 Disesuaikan dengan TestProject pada Module 1 dan Module 2, tambahan gambar untuk module 3

MASUKAN-MASUKAN:

 Perubahan Test Project dikarenakan project sebelumnya (soal 1 dan soal 2) sudah dua kali dilombakan yaitu pada LKS 2015 dan 2016

(3)

FORMAT REVIEW

Nomor dan Bidang Lomba :REFRIGERATION

Judul Dokumen :03. FORMAT PENILAIAN

Penulis :MUHAMMAD MURSYID, NANANG NUGRAHA

Reviewer : ACHMADI, NANANG NUGRAHA

Hasil:

NO SUB-JUDUL TERTULIS KOREKSI

1 Format Penilaian 1. Component Fabrication Total Koreksi disesuaikan dengan Test Project:

1. Component Fabrication: 15 poin

2. Refrigeration System Installation & Commissioning,

3. Air Conditioning System Installation, Fault Finding, Repair and Commissioning

2. Refrigeration System Installation &

Commissioning: 55 poin 3. Air Conditioning System

Installation, Fault Finding, Repair and

Commissioning: 30 poin

MASUKAN-MASUKAN:

(4)

FORMAT REVIEW

Nomor dan Bidang Lomba :REFRIGERATION

Judul Dokumen :04. DAFTAR KEBUTUHAN ALAT

Penulis :MUHAMMAD MURSYID, NANANG NUGRAHA

Reviewer : ACHMADI, NANANG NUGRAHA

Hasil:

NO SUB-JUDUL TERTULIS KOREKSI

MASUKAN-MASUKAN: Tidak ada perubahan

Tangerang, 29 November 2016 Reviewer,

(5)

FORMAT REVIEW

Nomor dan Bidang Lomba :REFRIGERATION

Judul Dokumen :05. DAFTAR KEBUTUHAN BAHAN

Penulis :MUHAMMAD MURSYID, NANANG NUGRAHA

Reviewer : ACHMADI, NANANG NUGRAHA

Hasil:

NO SUB-JUDUL TERTULIS KOREKSI

1 Daftar Kebutuhan

Bahan 1.2. .Refrigeration SystemComponent Fabrication Total Koreksi disesuaikandengan Test Project

Installation & Commissioning,

3. Air Conditioning System Installation, Fault Finding, Repair and Commissioning

MASUKAN-MASUKAN:

 Perubahan Test Project dikarenakan project sebelumnya (soal 1 dan soal 2) sudah dua kali dilombakan yaitu pada LKS 2015 dan 2016

 Mengacu pada WSC

(6)

FORMAT REVIEW

Nomor dan Bidang Lomba :REFRIGERATION

Judul Dokumen :06. LAYOUT LOMBA

Penulis :MUHAMMAD MURSYID, NANANG NUGRAHA

Reviewer : ACHMADI, NANANG NUGRAHA

Hasil:

NO SUB-JUDUL TERTULIS KOREKSI

1 Layout Lomba Gambar Layout Lomba Perubahan Gambar

MASUKAN-MASUKAN:

 Agar lebih memudahkan mobilisasi dan pengawasan Juri  Memperbaiki pandangan pengunjung

Tangerang, 29 November 2016 Reviewer,

(7)

FORMAT REVIEW

Nomor dan Bidang Lomba :REFRIGERATION

Judul Dokumen :07. DAFTAR PERLENGKAPAN PENUNJANG

Penulis :MUHAMMAD MURSYID, NANANG NUGRAHA

Reviewer : ACHMADI, NANANG NUGRAHA

Hasil:

NO SUB-JUDUL TERTULIS KOREKSI

1 Judul Daftar Kebutuhan

Perlengkapan Penunjang Lomba Keterampilan Siswa SMK Tingkat Nasional Tahun 2016

Daftar Kebutuhan

Perlengkapan Penunjang Lomba Keterampilan Siswa SMK Tingkat Nasional Tahun 2017

MASUKAN-MASUKAN: Tidak ada perubahan isi

Tangerang, 29 November 2016 Reviewer,

(8)

FORMAT REVIEW

Nomor dan Bidang Lomba :REFRIGERATION

Judul Dokumen :08. DAFTAR KEBUTUHAN JURI DAN USULAN JURI

Penulis :MUHAMMAD MURSYID, NANANG NUGRAHA

Reviewer : ACHMADI, NANANG NUGRAHA

Hasil:

NO SUB-JUDUL TERTULIS KOREKSI

1 Judul Daftar Kebutuhan Juri

Lomba Keterampilan Siswa SMK Tingkat Nasional Tahun 2016

Daftar Kebutuhan Juri Lomba Keterampilan Siswa SMK Tingkat Nasional Tahun 2017

2 Daftar Nama Calon Juri yang

Direkomendasikan

Ikhwanur Arif, PT Dwira Ahmadi, Mantan Juara ASC

dan Expert ASC

Sapto Widodo, P4TK BMTI Nanang Nugraha, PT

Panasonic Manufacturing Indonesia

Ahmadi, CV. Adika Engineering

Ikhwanur Arif, PT Fimar Berdaya Sinergitama

MASUKAN-MASUKAN:

Referensi

Dokumen terkait