• Tidak ada hasil yang ditemukan

KIB A - F , KIB TW-I ( 2017 )4

N/A
N/A
Protected

Academic year: 2017

Membagikan "KIB A - F , KIB TW-I ( 2017 )4"

Copied!
1
0
0

Teks penuh

(1)

Provinsi : NUSA TENGGARA BARAT Kab / Kota : LOMBOK BARAT Bidang : Kecamatan Unit Organisasi : KECAMATAN UPB : KECAMATAN LINGSAR

KODE HARGA

UPB PABRIK RANGKA MESIN POLISI BPKB SATUAN

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

1 037 02.03.01.01.03 Staion Wagon Alat Angkutan Darat Bermotor Terios TX / - besi 2011 - MHKG2CJ1J1KO16296 NFGCE-1017394 61 DL - hibah 1 181,903,857.14 181,903,857.14

2 037 02.03.01.05.01 Sepeda Motor Alat Angkutan Darat Bermotor honda / SPM R 2 campuran 2000 - MH1NFGC18YK017642 NFGCE-1017394 DR 2293 AK 8986490.0 pembelian 1 8,000,000.00 8,000,000.00

3 037 02.03.01.05.01 Sepeda Motor Alat Angkutan Darat Bermotor Thunder EN 125 / SPM R 2 campuran 2007 - MH8EN125A7J-421590 F405-ID-421910 DR 3402 DL 6386527.0 pembelian 1 13,500,000.00 13,500,000.00

4 037 02.03.01.05.01 Sepeda Motor Alat Angkutan Darat Bermotor Thunder EN 125 / SPM R 2 campuran 2007 - MH8EN125A7J-422302 F405-ID-422064 DR 3403 DL 6386528.0 pembelian 1 13,500,000.00 13,500,000.00

5 037 02.03.01.05.01 Sepeda Motor Alat Angkutan Darat Bermotor Honda Supra X 125 / SPM R 2 campuran 2007 - MH1J881177K091426 JB81E-1093310 DR 3507 DL 8425536.0 pembelian 1 13,500,000.00 13,500,000.00

6 037 02.03.01.05.01 Sepeda Motor Alat Angkutan Darat Bermotor Suzuki New Smash FK 110 / SPM R 2 campuran 2008 - MH8BE4DFA8J-545832 E451-ID-653348 DR 3574 DL 1029783.0 pembelian 1 11,776,000.00 11,776,000.00

7 037 02.03.01.05.01 Sepeda Motor Alat Angkutan Darat Bermotor Honda / SPM R2 campuran 2005 NH1HABD115K-116165 HABDE-1115703 DR 2983 DL 5191218.0 pembelian 1 9,982,500.00 9,982,500.00

8 037 02.03.01.05.01 Sepeda Motor Alat Angkutan Darat Bermotor Suzuki / FK 110 SD KG / SPM R2 campuran 2008 MH8BE4DFA8J-667796 E451-ID-690231 DR 3682 DL F.5689156.0 pembelian 1 11,776,000.00 11,776,000.00

9 037 02.03.01.05.01 Sepeda Motor Alat Angkutan Darat Bermotor Honda / SPM R2 besi 2000 MH1HABB17YKO06261 HABEBE-1006262 DR 2705 DL 9976200.0 hibah 1 8,642,000.00 8,642,000.00

10 037 02.03.01.05.01 Sepeda Motor Alat Angkutan Darat Bermotor Honda Win / SPM R2 besi 2003 MH1HABD183KO1O812 HABDE-1010627 DR 2859 DL 6079634.0 hibah 1 9,825,000.00 9,825,000.00

11 037 02.03.01.05.01 Sepeda Motor Alat Angkutan Darat Bermotor Honda Win / SPM R2 besi 2003 MH1HABD153K011075 HABDE-1011089 DR 2860 DL 6079635.0 hibah 1 9,825,000.00 9,825,000.00

12 037 02.03.01.05.01 Sepeda Motor Alat Angkutan Darat Bermotor Honda Win / SPM R2 besi 2003 MH1HABD163K009366 HABDE-1009626 DR 2861 DL 6079636.0 hibah 1 9,825,000.00 9,825,000.00

13 037 02.03.01.05.01 Sepeda Motor Alat Angkutan Darat Bermotor Honda Win / SPM R2 besi 2003 MH1HABD173K010719 HABDE-1010558 DR 2862 DL 6079637.0 hibah 1 9,825,000.00 9,825,000.00

14 037 02.03.01.05.01 Sepeda Motor Alat Rumah Tangga Honda Win / SPM R2 besi 2003 MH1HABD113K010716 HABDE-1010565 DR 2863 DL 6079638.0 hibah 1 9,825,000.00 9,825,000.00

15 037 02.03.01.06.03 Kendaraaan Bermotor Beroda Tiga

Lain-lain Alat Rumah Tangga Kaisar besi 2013 pembelian 1 27,950,000.00 27,950,000.00

16 037 02.03.01.05.01 Sepeda Motor Alat Angkutan Darat Bermotor Honda Supra X campuran 2014 MH1JB113EK161723 JBP1E-1162817 DR 4443 DL pembelian 1 17,497,000.00 17,497,000.00

367,152,357.14

367,152,357.14 BAHAN TAHUN

BELI

NOMOR JENIS / NAMA BARANG KELOMPOK JENIS BARANG NOMOR

REGISTER MERK / TYPE

UKURAN (CC/PK)

KARTU INVENTARIS BARANG (KIB) B

PERALATAN DAN MESIN

KEADAAN PER-31 Desember 2016

NO. KODE LOKASI :12.15.01.00.01.08 JMLH BARANG

(UNIT/BUAH/S ET)

HARGA

PEROLEHAN KETERANGAN

NIP. 196312311985031215 NIP. 197512312008011045

Jumlah

Camat Lingsar Pengurus Barang

RUSDITAH, S. Sos. RUSDIAWARDI

Mengetahui/mengesahkan : Lingsar, 31 Desember 2016

Referensi

Dokumen terkait

- Butir soal yang tidak baik dikembalikan pada pembuat soal untuk diperbaiki, atau di drop. Jika berdasarkan hasil penelaahan butir soal tersebut dinyatakan

Pada acara yang bertujuan meningkatkan kompetensi Pengelola dan Kader Program Pembangunan Keluarga di Jawa Timur ini, Rachmat juga menekankan bahwa komunikasi di media

- Pelaksana kegiatan sekolah yang tidak sesuai dengan RKS perlu mendapat persetujuan melalui rapat dewan guru dan stakeholder. - Tidak ada

Tujuan dari penelitian ini adalah untuk mengetahui pelaksanaan program siaran TVRI Stasiun Jawa Tengah sebagai Lembaga Penyiaran Publik dan mengetahui persepsi masyarakat

Tujuan penelitian adalah untuk menjawab mengenai pengaruh komitmen organisasional dan kepuasan kerja terhadap kinerja karyawan. Sampel yang digunakan adalah karyawan

A typical Oracle WebLogic Communication Services domain includes support for the Diameter base protocol and one or more IMS Diameter interface applications (Sh, Ro, Rf) deployed

Bila terjadi external financial shock efek yang ditimbulkan adalah tekanan yang terjadi pada kurs Rp/USD, dan bila tekanan fluktuatif yang terjadi tidak diantisipasi dengan

This chapter describes how to create, deploy and run the sample chat application with Parlay X APIs provided with Oracle User Messaging Service on OTN. The sample uses