A *) L *) A *) L *) A *) L *) 1 SINOTECH ENGINEERING CONSULTANTS, LTD. TAIWAN-CHINA KONSULTAN PT. CATURBINA GUNA PERSADA 04/08/13
Techincal Assistance Services for Supporting the Implementation of DAM Safety Assurance and Institutional Improvement (DOISP) IBRD LOAN No. 7669-ID Jakarta Ditjen. SDA Kemeterian Pekerjaan Umum Rp. 19,452,510,000 24/11/13 N/A N/A 100% 0% 40% 60%
2 JAPAN OIL ENGINEERING
CO., LTD JAPAN KONSULTAN
PT. CONNUSA
ENERGINDO 12/02/13
South Sumatera - West Java Gas Pipeline Sumatera Selatan - Jawa Barat PT. Perusahaan Gas Negara Tbk., (PGN) Rp. 144,945,703,096 Feb 2004 s.d
Mar 2012 N/A N/A N/A N/A N/A N/A
Local government Support Program
(LSGP Project) Indonesia BAPPENAS US $ 61,876,972 30/09/09
Decentralized Basic Education Program
Objective 1 (DBE PO1) Indonesia
Kemenko Kesejahteraan Rakyat
US $ 37,528,532 11/04/10
Democratic Reform Support Program
(DRSP Project) Jakarta BAPPENAS US $ 15,436,999 19/04/09
Support for Poor and Disadvantages
Areas (SPADA Project) Jakarta The World Bank US $ 2,530,000 30/09/09
4 SSANGYONG ENGINEERING & CONSTRUCTION CO., LTD. KOREA KONTRAKTOR PT SSANGYONG KONSTRUKSI Indonesia 05/07/13
Tanjung Priok Tank Terminal
Jakarta Utara PT. Jakarta Tank
Terminal Rp. 276,750,000,000 31/07/09 95% 5% 95% 5% 95% 5%
5 OVE ARUP & PARTNERS INTERNATIONAL LTD.
UNITED
KINGDOM KONSULTAN N/A 28/04/11
Belum Ada Proyek
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Water Resources & Irrigation Sector Management Project (WISMP) - Irrigation Management Reform Implementation (IMRI) Indonesia Ditjen. SDA Kemeterian Pekerjaan Umum Rp. 33,168,381,200 31/12/09
Technical Assistance for Institutional Development in Participatory Irrigation Management (IDPIM) Water Resources and Irrigation Sector Management Project (WISMP) Indonesia Deputi Pengembangan Kawasan, Kementerian Perumahan Rakyat Rp. 17,815,049,000 31/12/09
Techincal Assistance for Jatiluhur
Irrigation Management Improvement Indonesia
Ditjen. SDA Kemeterian Pekerjaan Umum
Rp. 7,009,700,000 25/04/10
7 HUBEI HONGYUAN POWER
ENGINEERING CO., LTD CHINA KONTRAKTOR N/A 28/05/13
Coal Fired Steam Power Plant Project -
PLTU 1 Jawa Timur PT. PLN (PERSERO) Rp. 825,176,245,000 N/A N/A N/A N/A N/A N/A N/A
Project for Post-earthquake Rehabilitation of Water Resources Management Existing Facilities in Padang
Padang JICA ¥42.970.200 01/12/10
Water Resources Existing Facilities Rehabilitation and Capacity Improvement Project Jakarta Ditjen. SDA Kemeterian Kimpraswil Rp. 81,307,739,913 01/02/10 Lower Solo River Improvement Project
Phase-2 Jawa Timur
Ditjen. SDA Kemeterian Pekerjaan Umum
Rp. 79,067,577,546 Nov 2013 Urgent Disaster Reduction Project for
Mr. Bawakaraeng Sulawesi Ditjen. SDA Kemeterian Pekerjaan Umum Rp. 49,106,009,000 01/12/10 N/A N/A N/A N/A N/A 14/03/13 6 DONGSHIN ENGINEERING & CONSULTANT C. LTD. KOREA KOREA
N/A N/A N/A
N/A
8 IDEA Consultants, Inc. JAPAN KONSULTAN PT. WIRATMAN & Associates KONSULTAN
N/A N/A 30%
N/A N/A N/A N/A
70% 3 BIDANG INDONESIAN PARTNER IUJK BERLAKU S.D
NAMA PROYEK LOKASI
26/04/13 100%
NAMA NEGARA
RESEARCH TRIANGLE
INSTITUTE USA KONSULTAN N/A 21/04/12
0%
NO PENGGUNA JASA NILAI KONTRAK PERIODE M & P *)
PROYEK s.d
A *) L *) A *) L *) A *) L *) S.D 9 DONGFANG ELECTRIC CORPORATION INDONESIA PROJECTS
CHINA KONTRAKTOR PT. DALLE ENERGY 09/07/13
Coal Fired Steam Power Plant Project -
PLTU 3 BANTEN Banten PT. PLN (PERSERO) Rp. 1,890,132,127,000 N/A N/A N/A N/A N/A N/A N/A
10 TSUKISHIMA KIKAI CO.,
LTD JAPAN KONSULTAN N/A 30/05/13
Belum Ada Proyek
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
11 TSUKISHIMA KIKAI CO.,
LTD JAPAN KONTRAKTOR N/A 30/05/13
Belum Ada Proyek
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
12 Beca AMEC Indonesia Ltd. NEW
ZAELAND KONSULTAN
PT. BIMATEKNO KAYATAMA KONSULTAN
17/09/10
PT INCO ENGINEERING SERVICES
Sorowako PT International
Nickel Indonesia US $ 8,681,000 30 Nov 2010 N/A N/A N/A N/A 72% 28%
13 POLYSIUS AG GERMANY KONTRAKTOR PT. CATURBINA
GUNA PERSADA 20/02/13
Belum Ada Proyek
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Nias Roads, transport & City Development Planning Design (Badan Rehabilitasi dan Rekonstruksi NAD-Nias-BRR)
Nias, NAD BRR - NAD & Nias Rp. 29,810,115,479 01/08/09
Indonesia Sanitation Sector
Development Program (ISSDP) Jakarta WSP EAP Rp. 17,257,200,000 01/08/08
Technical Assistance for National Management Consultant (NMC) - Community Based rehabilitation and Reconstruction Project (CSRRP) In Earthquake Affected Areas of D.I. Yogyakarta and Central Java
D.I Yogyakarta, Jawa Tengah
Ditjen Cipata Karya, Kementerian Pekerjaan Umum Tahap I : Rp. 4,213,595,000 Tahap II : Rp. 2,480,925,000 Tahap I : Des 2007 Tahap II : Mei 2008
Wharf Extension Gunung Sitoli Port
Nias UNDP Euro 400,000 2006 - 2008
Sea Defense, Flood Protection, Refugees and Early Warning Strategy in Aceh and Nias
NAD BRR - NAD & Nias Euro 7,200,000 2006 - 2008
15 SUMITOMO MITSUI
CONSTRUCTION CO., LTD. JAPAN KONTRAKTOR PT HUTAMA KARYA 18/06/11
Section E-1, Rorotan - Cilincing Tanjung Priok Access Road Construction Project
(Phase 1) JBIC Loan IP-529 Jakarta
Departemen
Pekerjaan Umum Rp. 722,700,000,000 07/07/10 N/A N/A N/A N/A N/A N/A
16 OPUS INTERNATIONAL (M)
BERHAD MALAYSIA KONSULTAN N/A 21/01/11
N/A
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
17 TOKURA CORPORATION JAPAN KONTRAKTOR PT TAIYO SINAR
RAYA TEKNIK 15/04/13
New Coating Room for Employers's
Tokura Sinar Joint Operation Bekasi
PT Parker Metal Treatment Indonesia
US $ 340,000 23/03/10 95% 5% 95% 5% 95% 5%
N/A N/A 72% 28%
14 DHV BV The Netherlands NETHERLAND
S KONSULTAN PT ARKONIN ENGINEERING CONSULTANTS, PT BUANA ARCHICON, PT CIRIAJASA RANCANG BANGUN, PT DIAGRAM TRIPORPOSI, PT MITRA LINGKUNGAN DUTA CONSULT, PT PERANCANG ADHINUSA, PT PILLAR PUSAKA INTI, PT WIRATMAN & ASSOCIATES, PT AMYTHAS, PT TATA GUNA PATRIA, PT SUCOFINDO, PT BIRO INSINYUR EXACTA N/A N/A 26/04/13
A *) L *) A *) L *) A *) L *) S.D
HAKA C - LAND DEVELOPMENT (Sakura
Project) Bogor
PT Hatmohadji &
Kawan Rp. 10,180,000,000
Sept 2009 s.d Mar 2010 SAITAMA B - EXPANSION FACTORY
Karawang
PT Saitama
Stamping Indonesia Rp. 8,209,065,000 Mar 2009 s.d Mar 2010 MPIE C - Drainage Work
Karawang PT Maligi Permata
Industrial Estate Rp. 1,030,000,000
Mei 2009 s.d Des 2009 TMMIN B - Remove & Install Furnace
Sunter PT Toyota Motor Manufacturing Indonesia Rp. 149,400,000 Mar 2009 s.d Okt 2009 Bridgestone B - Renewal Roof B/B -4
Bekasi PT Bridgestone Tyre
Indonesia Rp. 617,500,000
Agt 2009 s.d Des 2009
Nissan C - Road Repair & Stock Yard
Purwakarta PT Nissan Motor Distributor Indonesia Rp. 676,400,000 Mei 2009 s.d Des 2009 FMC B - Installation Work Bekasi PT FMC Santana
Petrolium Indonesia Rp. 240,238,000 Mar 2009 s.d Nov 2009 MAPI B - repair Works
Karawang PT Molten Aluminium Producer Indonesia Rp. 4,588,000,000 Mar 2009 s.d Des 2009 KAYABA B - Additional M/E & Civil
Work Bekasi PT Kayaba Rp. 23,274,900,000
Jul 2009 s.d Feb 2010 MM2100 C - Road Widening MD 1 Bekasi PT Megalopolis Manunggal Industrial Development Rp. 3,960,000,000 Mar 2009 s.d Juli 2009
KOMODA B - NEW TRAVO ROOM EJIP West
Java PT. KOMODA Rp1.002.500.000
Mar 2008 s.d. Jul 2008
SAITAMA B - STAMPING FACTORY
EXPANSION Karawang PT. SAITAMA STAMPING INDONESIA Rp2.679.000.000 Okt 2008 s.d.Mar 2009 KIIC C - ENTRENCE ROAD
Karawang PT. MALIGI PERMATA INDUSTRIAL ESTATE Rp1.029.679.000 Mar 2008 s.d okt 2008
TMMIN B - TMC AUDIT RISK LEVEL Sunter Jakarta
utara PT. TMMIN Rp503.700.000
Apr 2008 s.d Agt 2008
Nissan C - Filling Warehouse
Purwakarta PT. NISSAN MOTOR DISTRIBUTOR INDONESIA Rp2.105.000.000 Feb 2008 s.d Mei 2008
19 TAIHEI DENGYO KAISHA,
Ltd JAPAN KONTRAKTOR
PT TRUBA JAYA
ENGINEERING 01/08/13
Paiton III expansion Project
Probolinggo PT Paiton Energy US $ 14,100,000 3 tahun 10% 90% 10% 90% 10% 90%
20 JAPAN PORT
CONSULTANTS LTD JAPAN KONSULTAN
PT WIRATMAN &
ASSOCIATES 16/07/13
Consulting Services for The Urgent Rehabilitation Project of Tanjung Priok Port
Jakarta Ditjen Tansportasi
Laut Rp. 35,964,714,005
Feb 2010 s.d Okt
2014 N/A N/A N/A N/A N/A N/A
21 INVENSYS RAIL PTY. Ltd AUSTRALIA KONTRAKTOR PT YASAPOLA
REMAJA 07/06/13
Construction of Railway Double Tracking of Kroya - Yogyakarta on Java Southline, Phase I
Kutoarjo
JFE Civil Engineering and Construction Corp. dibawah pengawasan Ditjen Perhubungan Darat Kementerian Perhubungan Rp. 84,309,262,309, Apr 2004 s.d Nov 2007 + 2 thn masa pertanggungan 75% 25% 75% 25% 50% 50% 45% 18 TOKYU CONSTRUCTION
CO., LTD JAPAN KONTRAKTOR
PT KATYA
A *) L *) A *) L *) A *) L *) S.D
Consulting Services for Urgent Disaster Reduction Project for Mt. Merapi, Progo River Basin (JBIC/JICA Loan IP No. 524) Jawa Tengah Ditjen SDA Kementerian Pekerjaan Umum US $ 9,026,000 Agt 2006 s.d Okt 2011
Consulting Services for Urgent Disaster Reduction Project for Mt. Bawakaraeng
(JBIC/JICA Loan IP No. 524) Sulawesi
Ditjen SDA Kementerian Pekerjaan Umum
US $ 8,663,000 Agt 2006 s.d Okt 2012
Consulting Services for Detailed Engineering Design and Construction Supervision of the Tanjung Priok Access Road Construction Project (JBIC/JICA Loan IP No. 529)
Jakarta
Ditjen Bina Marga Kementerian Pekerjaan Umum
US $ 13,789,000 Jan 2007 s.d Jun 2011
Consulting Services I of National Geo-spatial Data Infrastructure
Development (NSDI) Project (JBIC/JICA Loan IP No. 544)
Indonesia BAKOSURTANAL US $ 3,705,000 Jun 2008 s.d Des
2013 Consulting Services for Denpasar
Sewerage Development Project II
(DSSP-II) (JICA Loan IP No. 550) Denpasar
Ditjen Cipata Karya, Kementerian
Pekerjaan Umum US $ 4,807,000
Mei 2009 s.d Sept 2014 Consulting Services Design and
Supervision, Road Sub Project : Aceh Reconstruction Project Under JICA Loan IP-545
Aceh
Ditjen Bina Marga Kementerian Pekerjaan Umum
US $ 9,267,000 Jul 2009 s.d Feb 2016 PLTU BANTEN LABUAN (2X300MW)
Banten PT PLN (PERSERO)
KANTOR PUSAT Rp. 1,267,728,636,730 48 Bulan COAL FIRED POWER PLANT JENEPONTO
(2X125MW)
Sulawesi Selatan
PT BOSOWA
ENERGI US $ 200,000,000 30 Bulan
PLTU I JAWA BARAT 3 X 300 MW
Indramayu 72% 28%
PLTU II LABUAN BANTEN Banten 85% 15%
PLTU I JAWA TENGAH 2 X (300-400
MW) Jawa Tengah 72% 28%
PLTU TANJUNG JATI B EXPANSION 3 &
4 Jawa Tengah 72% 28%
25
China National Electric Equipment Corporation (CNEEC)
CHINA KONTRAKTOR PT. PENTA ADI
SAMUDERA 12/04/13
PLTU I JABAR
Indramayu PT. PLN (Persero) Rp1.647.300.023.978 akhir 2010 70% 30% 40% 60% 30% 70%
MODIFICATION WORK FOR WASTE
WATER TREATMENT PLANT Bekasi PT. JST INDONESIA ¥6.538.000 21 Agt 2009 N/A N/A 75% 25% 80% 20%
DEMINERALIZER PLANT
Bekasi PT. JST INDONESIA ¥26.492.000 07/10/09 N/A N/A 75% 25% 80% 20%
DI WATER TREATMENT Bekasi PT. AJINOMOTO CALPIS BEVERAGE INDONESIA $160.000 15/07/09 N/A N/A 80% 20% 85% 15%
27 MMC OIL & GAS
ENGINEERING SDN BHD MALAYSIA
KONTRAKTOR & KONSULTAN
PT.ELNUSA (PT.
PATRA TEKNIK) 25/05/13
JABUNG GAS BOOSTER STATION
PROJECT JABUNG
BARAT JAMBI PT. TGI $48.200.000
26 Jan 2007 s.d. 26 Des 2008 100% 0% 100% 0% 96% 4% PT.MURINDA IRON STEEL Rp370.153.174.703 PT.WIJAYA KARYA ¥9.312.996.742 N/A N/A YACHIYO ENGINEERINGCO., LTD
22 JAPAN KONSULTAN N/A 23/04/13
N/A N/A
N/A N/A N/A N/A
KONTRAKTOR CHINA
CHINA CHENGDA ENGINEERING CO., LTD
23 14/09/13 N/A N/A N/A N/A N/A
N/A N/A N/A
24
CHIMNEYS AND REFRACTORIES INTERNATIONAL
ITALIA KONTRAKTOR PT SATYAMITRA
SURYA PERKASA 01/02/12 N/A
26 NAKAGAWA CHEMICAL
EQUIPMENT Co.,Ltd. JAPAN KONTRAKTOR
PT. CATUR INSAN
PERTIWI 25/04/12
PT PLN (PERSERO) N/A N/A
28 JFE Civil Engineering
Construction Corporation JAPAN KONTRAKTOR
12 Maret 2012
Construction of Railway Double Tracking Kroya - Yogyakarta on Java Southline, Phase I Kutoarjo Yogyakarta Directorate General of Railways, Ministry of Transportation Apr 2004 s.d 16
A *) L *) A *) L *) A *) L *) S.D PT. PEMBANGUNAN PERUMAHAN (PERSERO) PT. PEMBANGUNAN PERUMAHAN - TAISEI INDONESIA CONSTRUCTION 30 HARBIN POWER
ENGINEERING Co.,Ltd. CHINA KONTRAKTOR
PT. MITRA SELARAS
HUTAMA ENERGI 19/02/13
N/A
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Bridge Construction in the prov. Of NTB
Sumbawa Barat NTB
Dit.Jen Bina Marga
DPU ¥675.000.000
Des 2006 s.d
Mar 2009 65% 35% 10% 90%
Urgent Disaster Reduction Project for Mt. Bawakaraeng CP 2-2, Sabo Dam No.7.2-7.3
Gowa Sulawesi
Selatan
Dit.Jen SDA DPU Rp37.202.104.172 Apr 2007 s.d.
Okt 2008 65% 35% 10% 90%
PT.MURINDA IRON STEEL
PT. Mitsuba Indonesia New Factory Serang, Banten PT. Mitsuba Indonesia Rp12.375.000.000 Okt 2007 s.d Jul 2008 90% 10% 10% 90% PT. WIJAYA KARYA
Urgent Disaster Reduction Project for Mt. Bawakaraeng CP 2-3, Sabo Dam No.7.4-7.5
Gowa Sulawesi
Selatan
Dit.Jen SDA DPU Rp43.571.951.413 Apr 2008 s.d Okt
2009 65% 35% 10% 90%
PT. Nihon Plast Indonesia
Bekasi PT. Nihon Plast
Indonesia Rp29.405.000.000
Jul 2008 s.d Apr
2009 90% 10% 10% 90%
PT. Mitsuba Indonesia Expansion Factory Serang, Banten PT. Mitsuba Indonesia Rp24.850.000.000 Okt 2008 s.d Apr 2009 90% 10% 10% 90%
PT. Mitsuba Indonesia Future Area Piling Works Serang, Banten PT. Mitsuba Indonesia N/A Okt 2008 s.d Des 2008 90% 10% 10% 90% PT.WIJAYA KARYA
Urgent Disaster Reduction Project for Mt. Bawakaraeng CP 2-4, Sabo Dam No.7.6-7.7
Gowa Dit.Jen SDA DPU Rp51.730.000.000 Apr 2009 s.d Des
2010 65% 35% 10% 90%
32 TOSHIBA PLANT SYSTEMS
& SERVICES CORPORATIONJEPANG KONTRAKTOR
PT. WASA MITRA
ENGINEERING 09/01/12
N/A
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
33 KAJIMA CORPORATION JEPANG KONTRAKTOR N/A 02/03/13 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
34 HYUNDAI ENGINEERING &
CONSTRUCTION Co., Ltd KOREA KONTRAKTOR N/A
-N/A
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
35 SHINKO PALNTECH Co., Ltd JEPANG KONTRAKTOR PT. UNEFECO 07/04/13
Maintenance Work Anyer - Cilegon PT. NIPPON SHOKUBAI INDONESIA Rp. 136,040,400 31/12/09 60% 40% 70% 30% 40% 60%
36 CHIYODA CORPORATION JEPANG KONTRAKTOR &
KONSULTAN N/A 09/02/13
N/A
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
37 PENTA OCEAN
CONSTRUCTION CO.,LTD JEPANG KONTRAKTOR
PT. MURI AGUNG
ABADI 18/03/13
Extension Factory Phase IV Project - PT.
DNP Indonesia - Karawang Karawang -
Jawa Barat DAI NIPPON PRINTING INDONESIA EXTENSION Rp. 21,600,000,000 15 Sept - 15 Jan 2011 70% 30% 70% 30% 70% 30% N/A
29 TAISEI CORPORATION JAPAN KONTRAKTOR 28/02/13
19/02/13
N/A N/A N/A N/A N/A
N/A
N/A N/A N/A N/A
31 HAZAMA CORPORATION JAPAN KONTRAKTOR & KONSULTAN
PT.WIJAYA KARYA
PT.MURINDA IRON STEEL
A *) L *) A *) L *) A *) L *) S.D
Coal Boiler Repairment
Banten PT. ASC Rp. 807,000,000 Apr 2009 - Jun
2009 Daily Maintenance (Film Plant)
Banten PT. MFI US $ 148,000 Apr 2009 - Des
2009 Modification Work For Film Plant
Banten PT. MFI US $ 34,500 Jun 2009 - Jul
2009 Tank Inspection ST - 5911B dan ST 7852
Banten PT. ASC Rp. 1,016,000,000 Jun 2009 - Agt
2009 Piping Work Wet EDC & Pump Install
OD EDP Line Banten PT. ASC Rp. 860,789,000
Jun 2009 - Agt 2009 Inspection &Repairing of ST 5911A & ST
2502 Banten PT. ASC Rp. 3,355,509,000
Jul 2009 - Nov 2009
Modification & Repairment Work Banten PT. ASC Rp. 276,6665,000 01/08/09
Supply Special Plate for ST 2101
Banten PT. ASC Rp. 100,000,000 Agt 2009 - Sept
2009
Modification Work ISK 1 & 3 Bekasi PT. NGKI Rp. 807,000,000 01/09/09
ASDM ASC 2009 (VCM Plant)
Banten PT. ASC Rp. 2,388,338,000 Okt 2009 - Nov
2009 ASDM ASC 2009 (PVC 1 & Utility)
Banten PT. ASC Rp. 2,826,471,000 Okt 2009 - Nov
2009 Inspection & Repairing Tank ST 2501C,
ST 2101, VE 5403 Banten PT. ASC Rp. 1,383,850,000
Okt 2009 - Des 2009 PTA 1 PSDM 2009
Banten PT. MCCI Rp. 1,383,850,000 Nov 2009 - Des
2009
Piping Work for WF AT Utility Plant Banten PT. ASC Rp. 200,000,000 01/12/09
39 COFFEY INTERNATIONAL
DEVELOPMENT PTY. LTD AUSTRALIA KONSULTAN
PT FORUM
BANGUN ACEH 12/07/13
Local Governance Innovations for
Communities in Aceh (LOGICA 2) Banda Aceh AusAID AUD 17,166,673 01/06/12 N/A N/A N/A N/A N/A N/A
40 RINKAI CONSTRUCTION
CO. LTD JAPAN KONTRAKTOR
PT ADHI KARYA
(PERSERO) TBK. 03/08/13
Dumai Port Development Project Phase
III Riau Ditjen.
Perhubungan laut Rp. 232,028,854,000 Feb 2005 s.d Jul 2008 USD. 1,712,87 1, Rp. 64,405,9 02,700 USD. 255,58 5 Rp. 26,391,6 02,000 5% 95% 41 YOKOGAWA BRIDGE CORP. JEPANG KONTRAKTOR & KONSULTAN PT. CIGADING HABEAM CENTRE 19/09/12 Ciputat Flyover Jakarta Obayashi
Corporation Rp. 4,839,160,956 Nov 2007 N/A N/A N/A N/A N/A N/A
N/A
38 TAKADA CORPORATION JEPANG KONTRAKTOR PT. CAHAYA
A *) L *) A *) L *) A *) L *) S.D
42 EGIS BCEOM
INTERNATIONAL PERANCIS KONSULTAN PT CIPTA STRADA 23/05/13
EASTERN INDONESIA NATIONAL ROADS
Makassar Kementerian
Pekerjaan Umum N/A N/A N/A N/A N/A N/A N/A N/A
PT WAHANA MITRA AMERTA, PT PERENTJANA DJAJA, PT TRIBINA MATRA KARYA CIPTA, PT LENGGOGENI
Technical Assisstance for Support the Project Managemnet Unit Second East Indonesia Region Transport Project
(EIRTP-2) N/A Kementerian
Pekerjaan Umum Rp. 30,279,370,000 30/06/09 PT KWARSA HEXAGON, PT CATURBINA GUNA PERSADA, PT AMYTHAS EXPERT & ASSOCIATES
Technical Assisstance in Supporting Bridging Program of DAM Operational Improvement and Safety Project
(DOISP) N/A Kementerian
Pekerjaan Umum Rp. 6,307,200,000 31/08/08
PT DENKA KRISNA CENDIKIA, PT LENGGOGENI, PT HI-WAY INDOTEK
Technical Assisstance for Support the Project Managemnet Unit Eastern Indonesia National Road Improvement Project (EINRIP)
Indonesia Kementerian
Pekerjaan Umum Rp. 23,995,500,000 N/A
PT MITRA LINGKUNGAN DUTACONSULT, PT ARKONIN ENGINEERING MANGGALA PRATAMA
Second Water and Sanitation for Low Income Communitieas(WSLIC-2) Project N/A Departemen Kesehatan Republik Indonesia Rp. 6,894,380,000 31/12/06 N/A
Consulting Services for Infrastructure Reconstruction Enabling Program
N/A Badan Rehabilitasi dan Rekonstruksi NAD (BRR) Rp. 31,861,478,220 31/10/09 44 CHINA SHANGHAI (GROUP) CORPORATION FOR FOREIGNECONOMIC & TECHNOLOGICAL COOPERATION
CHINA KONTRAKTOR & KONSULTAN
PT TRUBA ALAM MANUNGGAL ENGINEERING
16/07/13
PLTU BANGKA BELITUNG 2X30 MW
Bangka
Belitung PT PLN (PERSERO) Rp. 410,138,467,860 N/A N/A N/A N/A N/A N/A N/A
45
TAKENAKA CIVIL ENGINEERING & CONSTRUCTION CO.LTD
JAPAN KONTRAKTOR PT NINDYA KARYA
(PERSERO) 18/08/13
CONTRACT PACKAGE NO. 3 CONSTRUCTION OF DARAHA BRIDGE AND TWO (2) OF SABO DAMS (CD-1 AND CD-2) Sulawesi Selatan Kementerian Pekerjaan Umum Rp. 54,604,050,313 28/02/10 60% 40% 60% 40% 25% 75% KONSULTAN AUSTRALIA
SMEC International Pty,
Ltd. N/A N/A N/A
A *) L *) A *) L *) A *) L *) S.D
PT HOGY INDONESIA Phase-4 Project
Bekasi PT Hogy Indonesia Rp. 90,248,320,000 14/08/09 90% 10% 90% 10% 90% 10%
PT Indonesia Nippon Seiki Factory -
Hoist Crane & Road Works Rp. 2,299,407,000 Maret 2009
Concrete Road Pavement and Drainage
Rp. 11,842,000,000 April 2010 Canteen Extension, Flag Pole, Road
Renovation, Recondition Paving Road,
U-Ditch Work at Green Area Rp. 3,760,818,087 September 2009
Repairing Existing Factory Zone 4
Rp. 955, 486,982 November 2009
Repairing Existing Factory and
Additional Works Rp. 910,331,518 N/A
Repairing and Piling Works - Zone I Rp. 3,491,497,400 Januari 2010
New Machine Foundation Cap 1600
Ton Rp. 1,100,000,000 Februari 2009
PGA Storage & Modification Junction
Box Area at Factory Rp. 1,942,545,569,62 Agustus 2009
Renovation of Existing Drainage Works
at Factory Rp. 9,710,000,000 Desember 2009
Road Repairing at Factory C & D
Rp. 543,000,000 Desember 2009
PT Yamaha Motor Parts Manufacturing Indonesia, Renovation and Extension of
Office Building Rp. 11,342,605,000 Mei 2009
Variation for Canteen Rp. 200,000,000 Maret 2009
Gravity Casting Factory Extension Rp. 6,140,900,000 April 2010
Gravity Casting Renovation Works Rp. 4,230,000,000 April 2010
Add. Work of Gravity Casting Extension
Factory Rp. 1,256,000,000 Mei 2010
Add. Work of Gravity Casting Factory
Renovation Rp. 560,000,000 Mei 2010
New Gear & Acceleration Factory
Building Rp. 17,359,100,000 Mei 2010
Add. Work New Gear & Acceleration
Factory Building Rp. 1,314,000,000 Mei 2010
47 DAEWOO ENGINEERING
COMPANY KOREA KONTRAKTOR N/A 03/09/13
Belum Ada Proyek
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
48
JAPAN BRIDGE & STRUCTURE INSTITUTE, INC
JAPAN KONSULTAN N/A 09/08/13
Belum Ada Proyek
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
49 TOKYO GAS ENGINEERING
CO., LTD JAPAN KONSULTAN
PT PROSYS
BANGUN PERSADA 15/06/11
Domestic Gas Market Development
Project Jawa Barat 7 Persons Rp. 37,786,940,000 Desember 2011 N/A N/A N/A N/A N/A N/A
50 KATAHIRA & ENGINEERS
INTERNATIONAL JAPAN KONSULTAN PT VIRAMA KARYA 21/10/13
The North Java Corridor Flyover Project
Banten Kementerian
Pekerjaan Umum Rp. 34,552,399,215 2011 N/A N/A N/A N/A N/A N/A
51 JAPAN TRANSPORTATIONS
CONSULTANTS, INC. JAPAN KONSULTAN
PT DARDELA YASA
GUNA (DARDELA) 29/10/10
Railway Double Tracking of Cikampek -
Cirebon on Java North Line, Segment III Cirebon Kementerian
Perhubungan Rp. 11,194,715,000 2013 N/A N/A N/A N/A N/A N/A
PT SHIMIZU BANGUN CIPTA KONTRAKTOR 10% 10% 90% Banten Tangerang PT Mitsuba Indonesia 90% 90% 10% 46 10% 90% 10% 90% 10% KONTRAKTOR 90% 10% 90% 10% PT Indonesia Nippon Seiki 90% JAPAN SHIMIZU CORPORATION Karawang PT Yamaha Motor Parts Manufacturing Indonesia 10% 90% 09/08/13
A *) L *) A *) L *) A *) L *) S.D
52 FICHTNER GmbH & Co. KG JERMAN KONSULTAN PT KWARSA
HEXAGON 23/04/13
Tanjung Jati 'B' Coal-Fired Power Plant Expansion Project Unit 3 & 4 of 2 x 660 MW Jepara Sumitomo Corporation as an IPP (independent power producer) through PT Central Java Power (special purpose company)
USD 1,680,000,000 November 2008 -
April 2012 N/A N/A N/A N/A 52% 48%
Community Water Services and Health
Jakarta, Jambi, Bengkulu, Palangkaraya, and Pontianak Kemeterian Kesehatan Rp. 1,736,732,000 Mei 2007 s.d Mei 2011
Transaction Advisory Services for Tukad
Unda Water Supply Project Jakarta,
Klungkung, Denpasar IRSDP, Directorate PPP Development, Bappenas Rp. 4,768,750,000 Oktober 2010 s.d Januari 2012 Technical Assistance Services for
Supporting the Implementation Management and Supervision of the Dam Operational Improvement and Safety Project (DOISP)
Pulau Jawa, Lampung, NTB, Sulawesi Selatan, Kalimantan Timur Kementerian
Pekerjaan Umum Rp. 16,382,900,000 November 2013
Technical Assistance on Procurement and Financial Management for SPADA Project - Support for Poor and Disadvantaged Areas Program
Jakarta, Bengkulu, Lampung, Kalimantan Barat, Kalimantan Tengah, NTT, Maluku, Maluku Utara Kementerian Perkembangan Daerah Tertinggal Rp. 10,022,291,400 September 2010
Technical Assistance for Basin Water
Resources Management (BWRM) Pulau Jawa, Lampung, NTB, Sulawesi Selatan, Kalimantan Timur Kementerian
Pekerjaan Umum Rp. 8,332,083,000 Mei 2010
Technical Assistance for Development of Fiscal and Cost Recovery Policy on Water Resources Management
Jakarta, Pulau Jawa, Pulau Sumatera, Sulawesi Selatan, NTT BAPPENAS Rp. 872,900,000 Februari 2010
Technical Assistance for Public Private Partnership in Water Sector: Water Conveyance
Jakarta BAPPENAS - P2MPD Rp. 1,248,000 Desember 2008
56 MITSUI & CO., LTD. JAPAN KONTRAKTOR & KONSULTAN
PT TRUBA JAYA
ENGINEERING 18/02/12
Paiton III expansion Coal Fired Power
Plant Probolinggo PT Paiton Energy US $ 143,525,000 April 2012 N/A N/A N/A N/A N/A N/A
21/10/13 PT DARMA DEDANA CIPTA CONSULTANTS, PT TRITUNGGAL PATRYAKSA, PT WIRATMAN & ASSOCIATES, PT KOGAS DRIYAP KONSULTAN, PT BINA KARYA (PERSERO), PT SEHAT PRATAMA SEJATI, PT CIPTA SANITA MANDIRI, PT TRICON JAYA, PT JASA MITRA MANUNGGAL, PT MUTIARA WIYATADARMA CONSULTANT, PT REKA DESINDO MANDIRI KONSULTAN ITALIA C. LOTTI & ASSOCIATI
55 80% 20% N/A N/A 20% 80%
JERMAN POYRY ENVIRONMENT
GmbH
A *) L *) A *) L *) A *) L *) S.D
57 Euroconsult Mott
MacDonald Belanda KONSULTAN
PT INDEC INTERNUSA
07/09/10
Participation Irrigation Sector Project Jakarta, Serang, Lampung, Bandung, Cirebon, Surabaya, Sulawesi Selatan Kementerian Pekerjaan Umum Rp. 30,603,030,000 Januari 2007 s.d
April 2011 N/A N/A N/A N/A N/A N/A
58 Lahmeyer International
GmbH JERMAN KONSULTAN N/A 09/09/13
Belum Ada Proyek
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
59 RSEA Engineering Corporation
TAIWAN-CHINA KONTRAKTOR PT. SARANG TEKNIK 20/11/10
Pembangunan Kanal Timur Paket 25
DKI Jakarta Satker BBWS Ciliwung-Cisadane - Kemen Pekerjaan Umum Rp185.173.300.000 03/12/2007 s.d
14/12/2009 55% 45% N/A N/A N/A N/A
60
CHINA HARBOUR ENGINEERING COMPANY LTD.
CHINA KONTRAKTOR N/A 08/07/10
Belum Ada Proyek
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
61 BUT. CCCC SECOND HARBOR CONSULTANTS CO.,LTD CHINA KONSULTAN/ KONTRAKTOR N/A 05/11/10
PLTU 2 JAWA TIMUR (PAITON BARU)
1X550MW POWER PLANT PROJECT PAITON,
JAWA TIMUR PT PLN Persero US $ 1,453,270 Jan 2012 N/A N/A N/A N/A N/A N/A
62 EGIS BCEOM
INTERNATIONAL PERANCIS KONSULTAN PT CIPTA STRADA 23/05/13
EASTERN INDONESIA NATIONAL ROADS
Makassar Kementerian
Pekerjaan Umum Rp83.701.719.640 Mid of 2012 52,86% 47,14% N/A N/A N/A N/A
63 TOSHIBA CORPORATION JEPANG KONTRAKTOR PT TOSPLANT
ENGINEERING 18/09/10
TANJUNG JATI B EXPANTION PROJECT
(Unit 3 & 4 of Coal Fired Power Plant) Jepara-Jawa
Tengah Central Java Power US $ 59.312.000 03/07/05 N/A N/A N/A N/A N/A N/A
64 SHANGHAI ELECTRIC CHINA KONTRAKTOR PT. PLN (PERSERO) 09/10/10
FOR COAL POWER STEAM POWER PLANT PROJECT 300-400 MW CLASS FOR PLTU 2 JAWA BARAT
PELABUHAN RATU -JAWA
BARAT
PT. PLN (Persero) $623.683.412 - N/A N/A N/A N/A N/A N/A
65 TOBISHIMA CORPORATION JEPANG KONTRAKTOR - 01/09/10 - - - N/A N/A N/A N/A N/A N/A
66 NIHON SEKKEI INC. JEPANG KONSULTAN
PT. CAKRA MANGGILINGAN JAYA
18/03/10
CONSULTING SERVICE FOR DEVELOPMENT OF WORLD CLASS UNIVERSITY OF Indonesia University Of Indonesia, Depok Campus University Of
Indonesia Rp37.349.669.000 01/09/14 N/A N/A N/A N/A N/A N/A
67 MITSUBISHI HEAVY
INDUSTRIES, LTD JEPANG KONTRAKTOR PT. WIJAYA KARYA 29/12/10
DEPOK DEPOT CONSTRUSTION
PROJECT JABOTABEK RAILWAY SYSTEM DEPOK, JAWA BARAT
DINAS Pekerjaan
Umum, DEPOK ¥3.487.397.888 20/08/07 N/A N/A N/A N/A N/A N/A
68 TOSHIBA TECHNICAL SERVICES INTERNATIONAL CORPORATION JEPANG KONSULTAN/ KONTRAKTOR PT. TOSPLANT ENGINEERING Indonesia 23/10/10
TANJUNG JATI B 2X660 MW COAL FIRED POWERPLANT EXPANSION PROJECT JEPARA, JAWA TENGAH PT. CENTRAL JAVA POWER/SUMITOM O CORPORATION
¥1.003.800.000 NOV 2011 N/A N/A N/A N/A N/A N/A
Keterangan*): WC : Working Capital E : Equipment M/P : Management/Personal A : Asing L : Lokal