NO. PAKET : 7 KEGIATAN :
HPS : Rp 300.000.000
KETERANGAN
PERSENTASE 99,39% 98,94% 99,24%
RANKING 3 1 2
PEMBULATAN HARGA TERKOREKSI 298.167.000,00 296.830.000,00 297.730.000,00
HARGA PENAWARAN 298.360.000,00 296.830.000,00 297.730.000,00 HARGA TERKOREKSI 298.167.949,80 296.836.161,75 297.736.575,55
URAIAN
DAFTAR KOREKSI ARITM ATIK
PEM BANGUNAN PARIT BETON DI DUSUN KARYA M AKM UR DESA PASIR TUNTUNG KECAM ATAN KOTAPINANG