Nomor Loan :
Nama Konsultan :
Paket : TECHNICAL MANAGEMENT CONSULTANT (TMC) PACKAGE - 5
Coverage Area : PROPINSI JAWA TIMUR, NUSA TENGGARA BARAT, NUSA TENGGARA TIMUR KALIMANTAN SELATAN, KALIMANTAN TENGAH dan KALIMANTAN TIMUR Nomor & Tanggal Kontrak : HK.02.03/TMC-5/IBRD & AIIB/SATKER-PKPBM/24/2018, Tanggal 18 Desember 2018 Nomor & Tanggal Amandemen : Amandemen No.06 tanggal 02 Juni 2022
Periode Kontrak : 18 Desember 2018 sd. 31 Desember 2022 : -
-
- - -
I REMUNERATION 26,591,520,000 1.1 PROFESSIONAL STAFF 22,244,030,000 1.2 SUPPORTING STAFF 4,347,490,000
II DIRECT REIMBURSABLE COST 8,109,784,000 2.1 MOBILIZATION / DEMOBILIZATION 19,940,000 2.2 HOUSING ALLOWANCE 378,000,000 2.3 DUTY TRAVEL EXPENSES
EAST JAVA PROVINCE 116,284,000 NTB PROVINCE 118,344,000 NTT PROVINCE 38,250,000 SOUTH KALIMANTAN PROVINCE 109,350,000 CENTRAL KALIMANTAN PROVINCE 77,670,000 EAST KALIMANTAN PROVINCE 56,678,000 2.4 OFFICE OPERATIONAL EXPENSES 1,037,333,000 2.5 OFFICE EQUIPMENT EXPENSES 638,500,000 2.6 RENTAL EXPENSES 5,472,845,000 2.7 REPORTING EXPENSES 46,590,000 III COORDINATION MEETING 90,000,000 3.1 WITH CITY TEAM 90,000,000 3.2 TOPOGRAPHIC SURVEY - 34,791,304,000
The extension of the assignment time for the core team until December 31, 2022 and district team until the end of October 2022 is adjusted to the status of physical work;
Adjusting the need for operational costs during the time of assignment and the need for monitoring activities during the time of carrying out physical work;
Optimization and reallocation of contract budgets with additional costs such as additional Operational Cost and Adjustment Duty Travel and Rentals
Increase the duration of the assignment of each personnel (Core Team) TMC-4 from 42,5 PM to 48,5 PM and district from 42,5 PM to 46,5 PM.
CONTRACT AMANDEMENT NO. 6 AMOUNT (IDR)
NATIONAL SLUM UPGRADING PROGRAM (NSUP) - FY 2022 KOTA TANPA KUMUH "KOTAKU"
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN (PKP) KEMENTERIAN PEKERJAAN UMUM & PERUMAHAN RAKYAT
Perihal Amendemen
Loan NCEP-Urban No. 8213-ID, NSUP IBRD No. 8636-ID,
NSUP Asian Infrastructure Investment Bank (AIIB) Loan No. 0004-IDN PT.Prospera Consulting Engineers
The extension of assignment is until December 31, 2022 with possibility for further assignment as consultant for NSUP
NO
GRAND TOTAL (I + II + III) DESCRIPTION
MM UNIT RATE AMOUNT (IDR)
I.1 PROFESSIONAL STAFF 22,244,030,000
A REGIONAL LEVEL
East Java Province - Regional Level
A-1 PROFESSIONAL STAFF (Regional Level) 4,164,440,000
1 Team Leader Moh. Yusnan, ST, MT 48.50 P/M
2 Infrastructure Specialist Ichsan Hadjar, ST 6.00 P/M
2 Infrastructure Specialist Arif Syafrudi 29.35 P/M
Infrastructure Specialist Abdul Rozak 7.15 P/M
3 Architect Specialist Daniel Enamau, ST 1.00 P/M
3 Architect Specialist Marudut Lumban B 34.77 P/M
to be name 4.00 P/M
4 Safeguard Specialist Harsono, ST, M.Si 3.00 P/M
4 Safeguard Specialist Arianik S 43.50 P/M
5 Additional Expert as needed 1.00 P/M
6 Team Asisstant - P/M
A-2 CITY LEVEL (18 Priority Cities) 18,079,590,000
Kota Surabaya
1 Civil Engineer (Lead) Ari Munandar 38.00 P/M
2 Cost Estimator - P/M
3 Inspector - P/M
4 Surveyor - P/M
5 Drafter Muhammad Taqwim 8.00 P/M
6 Quality Engineer - P/M
7 Administrasi dan Manajemen Kontrak - P/M
8 Sub Safeguards - P/M
Kab. Tulungagung
1 Civil Engineer (Lead) Didik Wahyudi 41.00 P/M
2 Cost Estimator Denny Putranto Maris 11.24 P/M
3 Inspector -1 Denny Putranto Maris 10.00 P/M
3 Inspector -2 Budi Sutrisno 11.00 P/M
4 Surveyor Dhika Handika 9.00 P/M
5 Drafter Dhika Handika 11.24 P/M
6 Quality Engineer Raras Septiandi Dwi 9.00 P/M
7 Administrasi dan Manajemen Kontrak Dea Christiana 10.00 P/M
8 Sub Safeguards Leni Tripolisa 7.00 P/M
Kab. Sidoarjo
1 Civil Engineer (Lead) Sulistyoati 1.00 P/M
1 Civil Engineer (Lead) Ms Setyabudi 22.00 P/M
2 Cost Estimator - P/M
3 Inspector - P/M
4 Surveyor - P/M
5 Drafter - P/M
6 Quality Engineer - P/M
7 Administrasi dan Manajemen Kontrak - P/M
8 Sub Safeguards - P/M
Kab. Gresik
1 Civil Engineer (Lead) Deddy Teguh S. 6.00 P/M
1 Civil Engineer (Lead) Z. Agus Pujianto 39.75 P/M
2 Cost Estimator Boy Hold Chablullah 3.65 P/M
3 Inspector Boy Hold Chablullah 20.25 P/M
4 Surveyor Lukmanul Khakim 19.25 P/M
CONTRACT AMANDEMENT NO. 6
I. BREAKDOWN OF REMUNERATION
NO DESCRIPTION NAME
MM UNIT RATE AMOUNT (IDR) CONTRACT AMANDEMENT NO. 6
I. BREAKDOWN OF REMUNERATION
NO DESCRIPTION NAME
5 Drafter Boy Hold Chablullah 9.00 P/M
5 Drafter Lukmanul Khakim - P/M
6 Quality Engineer 8.00 P/M
7 Administrasi dan Manajemen Kontrak 8.00 P/M
8 Sub Safeguards 8.00 P/M
Kota Malang
1 Civil Engineer (Lead) Alif Riwidya 27.00 P/M
2 Cost Estimator - P/M
3 Inspector Warjo 13.00 P/M
4 Surveyor Farchan Safri Banna 2.00 P/M
4 Surveyor Suhartono 11.00 P/M
5 Drafter Dedy Yohana 11.00 P/M
6 Quality Engineer - P/M
7 Administrasi dan Manajemen Kontrak - P/M
8 Sub Safeguards - P/M
Kota Probolinggo
1 Civil Engineer (Lead) Bambang Tri Leksono 36.32 P/M
Civil Engineer (Lead) Teguh Aryanto 5.18 P/M
2 Cost Estimator Andr Sefri Hendriawan 11.24 P/M
3 Inspector Wahyu Hadiningsih 10.00 P/M
4 Surveyor Muhamad Ali Kadafi 10.00 P/M
5 Drafter Wildan Sukma Wijaya 1.00 P/M
5 Drafter Muhammad 12.85 P/M
5 Drafter Wildan Sukma W 2.15 P/M
6 Quality Engineer Rahadian Winarno 11.00 P/M
7 Administrasi dan Manajemen Kontrak Risqi Arif Hadiputra 11.00 P/M
8 Sub Safeguards Fajar Bima Sakti 9.00 P/M
Kab Lombok Timur
1 Civil Engineer (Lead) Zainuri 35.00 P/M
2 Cost Estimator - P/M
3 Inspector 13.00 P/M
4 Surveyor 11.00 P/M
5 Drafter Muksin 11.45 P/M
6 Quality Engineer Muh. Ihsanul Hamdi - P/M
7 Administrasi dan Manajemen Kontrak Lia Desmalia Russady 12.00 P/M
8 Sub Safeguards Muhammad Rusdi 9.00 P/M
Kota Bima
1 Civil Engineer (Lead) Jaidin 16.00 P/M
1 Civil Engineer (Lead) Takdir Ilahi 14.48 P/M
1 Civil Engineer (Lead) Burhanuddin 4.52 P/M
2 Cost Estimator - P/M
3 Inspector Burhanuddin 5.00 P/M
3 Inspector Radiman 6.00 P/M
4 Surveyor Sunardi 9.00 P/M
5 Drafter Jainul Arif 7.00 P/M
5 Drafter Erwisusanto 3.00 P/M
6 Quality Engineer Suhardin 11.00 P/M
7 Administrasi dan Manajemen Kontrak Zikrul Muttaqin 11.63 P/M
8 Sub Safeguards Slamet Riyadi 9.00 P/M
MM UNIT RATE AMOUNT (IDR) CONTRACT AMANDEMENT NO. 6
I. BREAKDOWN OF REMUNERATION
NO DESCRIPTION NAME
Kota Mataram
1 Civil Engineer (Lead) Nazamuddin 23.00 P/M
1 Civil Engineer (Lead) Nazamuddin 19.00 P/M
2 Cost Estimator Akhmad Nurib Harjan 4.00 P/M
3 Inspector Akhmad Nurib Harjan 8.76 P/M
3 Inspector -1 Prandita Satria Kusuma 11.50 P/M
3 Inspector -2 - P/M
4 Surveyor Rahmat Surkana 18.50 P/M
5 Drafter Ilham Hapsari 5.25 P/M
5 Drafter Syarif Hidayatullah 4.00 P/M
6 Quality Engineer 8.00 P/M
7 Administrasi dan Manajemen Kontrak 11.00 P/M
8 Sub Safeguards 9.00 P/M
Kota Kupang
1 Civil Engineer (Lead) Eko Pudjono W 2.00 P/M
1 Civil Engineer (Lead) Oktaniaviuas 27.3 P/M
2 Cost Estimator Ralno Robson Klau 8.72 P/M
3 Inspector Nuno da Costa P 11.00 P/M
4 Surveyor Ferdinandus Maleng 11.00 P/M
5 Drafter Yapy Ndaomanu 7.72 P/M
6 Quality Engineer John Jupiter D. B. 10.82 P/M
7 Administrasi dan Manajemen Kontrak Christiani Chandra M 10.82 P/M
8 Sub Safeguards Ralno Robson Klau 8.83 P/M
Kab Manggarai Barat
1 Civil Engineer (Lead) - P/M
2 Cost Estimator - P/M
3 Inspector - P/M
4 Surveyor - P/M
5 Drafter - P/M
6 Quality Engineer - P/M
7 Administrasi dan Manajemen Kontrak - P/M
8 Sub Safeguards - P/M
Kab. Kota Baru
1 Civil Engineer (Lead) Bambang Sutiyono 7.00 P/M
1 Civil Engineer (Lead) Bakir Mulyadi 13.00 P/M
1 Civil Engineer (Lead) Zulvan 21.00 P/M
2 Cost Estimator - P/M
3 Inspector Crise Purnama Putra 14.00 P/M
4 Surveyor Muhammad Fajar 12.00 P/M
5 Drafter Juliansyah 1.70 P/M
5 Drafter Muh. Khaidir Amin 9.00 P/M
6 Quality Engineer Rahmatullah 11.00 P/M
7 Administrasi dan Manajemen Kontrak Reza Ferdian 13.00 P/M
8 Sub Safeguards Ahmad Chatib 6.00 P/M
Kab. Banjar
1 Civil Engineer (Lead) Suriansyah 19.00 P/M
1 Civil Engineer (Lead) Tubagus Surya Wikandi 26.00 P/M
2 Cost Estimator Badruddin 4.00 P/M
3 Inspector Alfiannor 16.00 P/M
4 Surveyor Erwin Adrianto 16.00 P/M
MM UNIT RATE AMOUNT (IDR) CONTRACT AMANDEMENT NO. 6
I. BREAKDOWN OF REMUNERATION
NO DESCRIPTION NAME
5 Drafter Anditya Purnomo 0.45 P/M
5 Drafter Badruddin 6.00 P/M
5 Drafter Erwin Adrianto 4.00 P/M
6 Quality Engineer Anditya Purnomo 16.00 P/M
7 Administrasi dan Manajemen Kontrak Muhammad Noor 16.00 P/M
8 Sub Safeguards Roro Menna Ayu A 16.00 P/M
Kota Banjarbaru
1 Civil Engineer (Lead) Bambang Sutiyono - P/M
2 Cost Estimator - P/M
3 Inspector - P/M
4 Surveyor - P/M
5 Drafter - P/M
Kota Banjarmasin
1 Civil Engineer (Lead) Parina 1.00 P/M
1 Civil Engineer (Lead) Joko Sunaryo 34.00 P/M
2 Cost Estimator - P/M
3 Inspector 1 Bahrain 12.00 P/M
3 Inspector 1 Alfiannor 6.00 P/M
Inspector 2 - P/M
4 Surveyor 1 Aris Sutarko 17.00 P/M
Surveyor 2 - P/M
5 Drafter Syaiful Rahman 16.00 P/M
6 Quality Engineer Andi Setiawan 9.00 P/M
7 Administrasi dan Manajemen Kontrak Sa'adillah Noor 12.00 P/M
8 Sub Safeguards - P/M
Kota Palangkaraya
1 Civil Engineer (Lead) Sularso 20.43 P/M
1 Civil Engineer (Lead) Ahmad Riyadi 14.57 P/M
1 Civil Engineer (Lead) Zain Rahman 10.00 P/M
2 Cost Estimator Norkamali 8.00 P/M
2 Cost Estimator Hasan 2.39 P/M
3 Inspector M. Rasyid Sidik 13.00 P/M
3 Inspector Darmono 6.00 P/M
4 Surveyor Henri R. D. Siregar 5.00 P/M
4 Surveyor Andi Prasetyo 7.00 P/M
5 Drafter Julio Andrea 12.00 P/M
6 Quality Engineer M. Nur Arianto 12.00 P/M
7 Administrasi dan Manajemen Kontrak Daryandi 12.00 P/M
8 Sub Safeguards Novi Priliantini 11.70 P/M
Kota Samarinda
1 Civil Engineer (Lead) Muh. Agus Susanto 1.00 P/M
1 Civil Engineer (Lead) Joni Setiawan 22.00 P/M
2 Cost Estimator - P/M
3 Inspector Dani Rosyandi 12.00 P/M
4 Surveyor Jasmani 10.00 P/M
5 Drafter Dwija Supangat 9.00 P/M
MM UNIT RATE AMOUNT (IDR) CONTRACT AMANDEMENT NO. 6
I. BREAKDOWN OF REMUNERATION
NO DESCRIPTION NAME
Kota Bontang
1 Civil Engineer (Lead) Bambang Sutiyono 1.00 P/M
1 Civil Engineer (Lead) Eko Yudianto 10.00 P/M
1 Civil Engineer (Lead) Ririn Herdi Suyono 17.00 P/M
1 Civil Engineer (Lead) Joni Setiawan 6.00 P/M
2 Cost Estimator Arif Sugiarto, ST 6.00 P/M
3 Inspector Abdul Zaenal B 13.00 P/M
4 Surveyor I Ketut Subagiarta 10.00 P/M
5 Drafter Nur Rachmad S 1.00 P/M
6 Quality Engineer - P/M
7 Administrasi dan Manajemen Kontrak - P/M
8 Sub Safeguards - P/M
Kota Balikpapan
1 Civil Engineer (Lead) Eko Yudianto 1.00 P/M
1 Civil Engineer (Lead) Yulianti 5.00 P/M
1 Civil Engineer (Lead) Sulya Hadiriyanto 16.92 P/M
2 Cost Estimator - P/M
3 Inspector - P/M
4 Surveyor - P/M
5 Drafter Fadhil Alfajri 10.00 P/M
I.2 SUPPORTING STAFF 4,347,490,000
Regional Level East Java Province 1,479,250,000
1 Office Manager Muhshan 48.50 P/M
2 Secretary Iin Dahniar 48.50 P/M
3 Computer Operator-1 Dwi Wahyu 48.50 P/M
4 Computer Operator-2 Deni Supriadi 48.50 P/M
5 Office Boy Ariq Robbani 48.50 P/M
6 Security 1 Agus Salim 48.50 P/M
7 Security 2 Bayu 48.50 P/M
City Level Office at 18 Kota/Kab 2,868,240,000
1 Secretary / Operator Comp. Kota Surabaya Rizky Abrial M 37.00 P/M 2 Secretary / Operator Comp. Kab. Tulungagung Deni Sri Astuti 40.00 P/M 3 Secretary / Operator Comp. Kab. Sidoarjo Renggar Ma'aris 23.00 P/M 4 Secretary / Operator Comp. Kab. Gresik Lila Imang Puspitasari 45.75 P/M
5 Secretary / Operator Comp. Kota Malang Lukman Wiji W 27.00 P/M
6 Secretary / Operator Comp. Kota Probolinggo Fajar Bima Sakti 40.00 P/M 7 Secretary / Operator Comp. Kab Lombok Timur Lia Desmalia R 34.50 P/M
8 Secretary / Operator Comp. Kota Bima Siti Nur Arfah 35.04 P/M
9 Secretary / Operator Comp. Kota Mataram Mutia 41.50 P/M
10 Secretary / Operator Comp. Kota Kupang Adriana Rambu Pedi 37.72 P/M
11 Secretary / Operator Comp. Kab Manggarai Barat - P/M
12 Secretary / Operator Comp. Kab. Kotabaru Rohimah K 39.68 P/M
13 Secretary / Operator Comp. Kab. Banjar Zulfikarrahman 43.00 P/M
14 Secretary / Operator Comp. Kota Banjarbaru - P/M
15 Secretary / Operator Comp. Kota Banjarmasin M. Syahrial Akbar 35.68 P/M 16 Secretary / Operator Comp. Kota Palangkaraya Merry Susrianing 43.00 P/M 17 Secretary / Operator Comp. Kota Samarinda Yogi Edwin Aldrial Yahya 23.00 P/M
18 Secretary / Operator Comp. Kota Bontang Nur Alamsyah 29.00 P/M
19 Secretary / Operator Comp. Kota Balikpapan Muhammaad Wahid H 22.68 P/M
26,591,520,000
TOTAL REMUNERATION
PERSONS VOL RATE AMOUNT (IDR)
1 MOBILIZATION / DEMOBILIZATION 19,940,000
1 Jakarta - Surabaya (return) Trip 3 1,600,000 4,800,000 2 Jakarta - Mataram (return)
Jakarta/ Kantor Regional-Mataram (return) Trip 1 3,000,000 3,000,000 3 Jakarta - Kupang (return)
Jakarta/ Kantor Regional-Kupang (return) Trip 1 3,100,000 3,100,000 4 Jakarta - Banjarmasin (return)
Jakarta/ Kantor Regional-Banjarmasin (return) Trip 2 1,800,000 3,600,000 5 Jakarta - Palangkaraya (return)
Jakarta/ Kantor Regional-Palangkaraya (return) Trip 1 3,140,000 3,140,000 6 Jakarta - Balikpapan (return)
Jakarta/ Kantor Regional-Balikpapan (return) Trip 1 2,300,000 2,300,000
TOTAL OF MOBILIZATION / DEMOBILIZATION 19,940,000 AMANDEMENT NO. 6
2.1. MOBILIZATION / DEMOBILIZATION
NO DESCRIPTION
UNIT RATE AMOUNT (IDR)
1
A
1 Team Leader 1 35 P/M 700,000 24,150,000
2 Infrastructure Specialist 1 30 P/M 700,000 21,000,000
3 Architect Specialist 1 32 P/M 700,000 22,050,000
4 Safeguard Specialist 1 34 P/M 700,000 23,800,000
5 Additional Expert as needed 1 0 P/M 700,000 -
B City Team
Civil Engineering (Lead)
1 Kota Surabaya 1 26 P/M 700,000 17,850,000
2 Kab Tulungagung 1 30 P/M 700,000 21,000,000
3 Kab Sidoarjo 1 12 P/M 700,000 8,400,000
4 Kab Gresik 1 33 P/M 700,000 23,100,000
5 Kota Malang 1 16 P/M 700,000 11,200,000
6 Kota Probolinggo 1 29 P/M 700,000 20,300,000
7 Kab Lombok Timur 1 25 P/M 700,000 17,500,000
8 Kota Bima 1 24 P/M 700,000 16,800,000
9 Kota Mataram 1 30 P/M 700,000 20,650,000
10 Kota Kupang 1 26 P/M 700,000 18,200,000
11 Kab Manggarai Barat 1 0 P/M 700,000 -
12 Kab Kotabaru 1 25 P/M 700,000 17,500,000
13 Kab Banjar 1 34 P/M 700,000 23,800,000
14 Kota Banjarbaru 1 0 P/M 700,000 -
15 Kota Banjarmasin 1 25 P/M 700,000 17,500,000
16 Kota Palangkaraya 1 34 P/M 700,000 23,800,000
17 Kota Samarinda 1 12 P/M 700,000 8,400,000
18 Kota Bontang 1 18 P/M 700,000 12,600,000
19 Kota Balikpapan 1 12 P/M 700,000 8,400,000
378,000,000
2.2. HOUSING ALLOWANCE
NO
Regional Team East Java Province
TOTAL OF HOUSING ALLOWANCE
AMANDEMENT NO. 6 VOL
HOUSING ALLOWANCE
DESCRIPTION
VOL UNIT RATE AMOUNT (IDR)
2.3 DUTY TRAVEL IN PROVINCE
2.3.1 For Spotcheck Regional For Progres East Java
Province 53,480,000
1 From Kota Surabaya to Kab. Tulungagung
Inland Transport 9 trip 350,000 3,150,000
Acomodation 9 m/d 600,000 5,400,000
OSA 16 m/d 160,000 2,560,000
2 From Kota Surabaya to Kab. Sidoarjo
Inland Transport 5 trip 350,000 1,750,000
Acomodation 1 m/d 600,000 600,000
OSA 10 m/d 160,000 1,600,000
3 From Kota Surabaya to Kab. Gresik
Inland Transport 11 trip 350,000 3,850,000
Acomodation 11 m/d 600,000 6,600,000
OSA 22 m/d 160,000 3,520,000
4 From Kota Surabaya to Kab. Malang
Inland Transport 3 trip 350,000 1,050,000
Acomodation 3 m/d 600,000 1,800,000
OSA 6 m/d 160,000 960,000
5 From Kota Surabaya to Kab. Probolinggo
Inland Transport 16 trip 350,000 5,600,000
Acomodation 16 m/d 600,000 9,600,000
OSA 34 m/d 160,000 5,440,000
2.3.1.1A From Kab/Kota To Province/Satker PKP For
Coordination Meeting 13,366,000
1 From Kab. Tulungagung to Kota Surabaya
Inland Transport 4 trip 350,000 1,400,000
OSA 12 m/d 160,000 1,920,000
2 From Kab. Sidoarjo to Kota Surabaya
Inland Transport 2 trip 350,000 700,000
OSA 4 m/d 160,000 636,000
3 From Kab. Gresik to Kota Surabaya
Inland Transport 10 trip 350,000 3,500,000
OSA 20 m/d 160,000 3,200,000
2.3. DUTY TRAVEL EXPENSES EAST JAVA PROVINCE
DESCRIPTION
AMANDEMENT NO. 6 NO
VOL UNIT RATE AMOUNT (IDR) DESCRIPTION
AMANDEMENT NO. 6 NO
4 From Kota Malang to Kota Surabaya
Inland Transport 2 trip 350,000 700,000
OSA 4 m/d 160,000 640,000
5 From Kota Probolinggo to Kota Surabaya
Inland Transport 1 trip 350,000 350,000
OSA 2 m/d 160,000 320,000
2.3.1.1B From Kab/Kota To Regional For Coordination Meeting 3,350,000
1 From Kab. Tulungagung to Kota Surabaya
Inland Transport - trip 350,000 -
OSA - m/d 160,000 -
2 From Kab. Sidoarjo to Kota Surabaya
Inland Transport - trip 350,000 -
OSA - m/d 160,000 -
3 From Kab. Gresik to Kota Surabaya
Inland Transport 5 trip 350,000 1,750,000
OSA 10 m/d 160,000 1,600,000
4 From Kota Malang to Kota Surabaya -
Inland Transport - trip 350,000 -
OSA - m/d 160,000 -
5 From Kota Probolinggo to Kota Surabaya
Inland Transport - trip 350,000 -
OSA - m/d 160,000 -
2.3.1.2 TO JAKARTA
For Several Training And Coordination to Jakarta By
Request 32,720,000
Air Transport (4 times) 8 trip 2,000,000 16,000,000
Inland Travel In Jakarta 8 trip 250,000 2,000,000
Hotel Acomodation 24 trip 400,000 9,600,000
OSA 32 trip 160,000 5,120,000
2.3.1.3 TO OTHER PROVINCE BY REQUEST
For Several Training And Coordination to Location By
Request 13,368,000
Banyuwangi
Inland Travel by location (2 pers x 6 city) - trip 350,000 - OSA (2 pers x 6 city x 3 day) - trip 160,000 -
VOL UNIT RATE AMOUNT (IDR) DESCRIPTION
AMANDEMENT NO. 6 NO
Denpasar Bali
Air Transport (2 pers x 1 time) - trip 1,970,000 - Inland Travel by location (2 pers x 1 time) - trip 350,000 - OSA (2 pers x 1 time x 3 day) - trip 160,000 -
By Request
Air Transport (6 pers x 1 time) 2 trip 5,134,000 10,268,000 Inland Travel by location (6 pers x 1 time) 2 trip 350,000 700,000 Hotel Acomodation (6 pers x 1 time x 3 day) 4 trip 400,000 1,600,000 OSA (6 pers x 1 time x 4 day) 5 trip 160,000 800,000
TOTAL DUTY TRAVEL EAST JAVA PROVINCE 116,284,000
VOL UNIT RATE AMOUNT (IDR)
2.3 IN PROVINCE
2.3.2 For Spotcheck Regional For Progres Status NTB Province 64,340,000 1 From Kota Surabaya to Kab. Lombok Timur
Air Transport Kota Surabaya to Lombok 3 trip 1,600,000 4,800,000 Inland Transport From Kab Lombok to Lombok Timur 3 trip 250,000 750,000
Acomodation 6 m/d 550,000 3,300,000
OSA 9 m/d 180,000 1,620,000
2 From Kota Surabaya to Kota Bima -
Air Transport 5 trip 3,300,000 16,500,000
Inland Transport From Kota Surabaya to Kota Bima 5 trip 250,000 1,250,000
Acomodation 10 trip 550,000 5,500,000
OSA 15 m/d 180,000 2,700,000
3 From Kota Surabaya to Kota Mataram -
Air Transport Kota Surabaya to Mataram 8 trip 1,600,000 12,800,000 Inland Transport From Kab Lombok to Kota Mataram 8 trip 250,000 2,000,000
Acomodation 16 trip 550,000 8,800,000
OSA 24 trip 180,000 4,320,000
2.3.2.1A From Kab/Kota To Province/Satker PKP For Coordination
Meeting 4,290,000
1 From Kab. Lombok Timur to Kota Mataram
Transport - trip 300,000 -
OSA - m/d 180,000 -
-
2 From Kota Bima to Kota Mataram -
Air Transport Kota Bima to Lombok 3 trip 1,000,000 3,000,000 Inland Transport From Lombok to Kota Mataram 3 trip 250,000 750,000
OSA 3 trip 180,000 540,000
2.3.2.1B From Kab/Kota To Regional For Coordination Meeting 6,980,000 1 From Kota Kab. Lombok Timur to Kota Surabaya
Air Transport Lombok to Kota Surabaya - trip 1,600,000 - Inland Transport From Lombok Timur to Surabaya - trip 250,000 -
Acomodation - m/d 550,000 -
OSA - m/d 180,000 -
2 From Kota Bima to Kota Surabaya - -
Air Transport - trip 3,300,000 -
Inland Transport From Kota Surabaya to Kota Bima - trip 250,000 -
Acomodation - trip 550,000 -
OSA - m/d 180,000 -
2.3. DUTY TRAVEL EXPENSES NTB PROVINCE
NO DESCRIPTION
AMANDEMENT 6
VOL UNIT RATE AMOUNT (IDR)
NO DESCRIPTION
AMANDEMENT 6
3 From Kota Mataram to Kota Surabaya - - Air Transport Mataram to Kota Surabaya 2 trip 1,600,000 3,200,000 Inland Transport From Kota Mataram to Surabaya 2 trip 250,000 500,000
Acomodation 4 m/d 550,000 2,200,000
OSA 6 m/d 180,000 1,080,000
2.3.2.2 From Regional To Province For Coordination Meeting 16,730,000 From Kota Surabaya to Kota Mataram
Air Transport Kota Surabaya to Lombok 7 Trip 1,600,000 11,200,000 Inland Transport From Lombok to Kota Mataram Man/Days7 250,000 1,750,000
OSA 21 Trip 180,000 3,780,000
2.3.2.3
For Several Training And Coordination to Jakarta By Request 18,360,000
Air Transport (4 times) 4 trip 2,600,000 10,400,000
Inland Travel In Jakarta 4 trip 250,000 1,000,000
Hotel Acomodation 11 trip 400,000 4,400,000
OSA 16 trip 160,000 2,560,000
2.3.2.4 TO OTHER PROVINCE BY REQUEST
For Several Training And Coordination to Location By Request 7,644,000 Air Transport (3 pers x 1 time) 1 trip 5,134,000 5,134,000 Inland Travel by location (3 pers x 1 time) 1 trip 350,000 350,000 Hotel Acomodation (3 pers x 1 time x 3 day) 3 trip 400,000 1,200,000 OSA (3 pers x 1 time x 4 day) 6 trip 160,000 960,000
TOTAL DUTY TRAVEL NTB PROVINCE 118,344,000
TO JAKARTA
VOL UNIT RATE AMOUNT (IDR)
2.3 IN PROVINCE
2.3.3 For Spotcheck Regional For Progres Status NTT
Province 14,440,000
1 From Kota Surabaya to Kota Kupang
Air Transport 4 trip 2,000,000 8,000,000
Acomodation 8 trip 550,000 4,400,000
OSA 12 m/d 170,000 2,040,000
2 From Kota Surabaya to Kab Manggarai Barat
Air Transport - trip 3,300,000 - Acomodation - trip 550,000 -
OSA - m/d 170,000 -
2.3.3.1 From Regional To Province For Coordination Meeting 18,720,000
From Kota Surabaya to Kota Kupang
Air Transport 8 trip 2,000,000 16,000,000
OSA 16 m/d 170,000 2,720,000
From Kota Surabaya to Kab Manggarai Barat
Air Transport - trip 2,000,000 -
OSA - m/d 170,000 -
2.3.3.2
For Several Training And Coordination to Jakarta By
Request 5,090,000
Air Transport (4 times) 1 trip 3,000,000 3,000,000 Inland Travel In Jakarta 1 trip 250,000 250,000
Hotel Acomodation 3 m/d 400,000 1,200,000
OSA 4 trip 160,000 640,000
2.3.3.3 TO OTHER PROVINCE BY REQUEST
For Several Training And Coordination to Location By
Request -
Air Transport (1 pers x 1 time x 1 day) - trip 5,134,000 - Inland Travel by location (1 pers x 1 time x 1 day) - trip 250,000 - Hotel Acomodation (1 pers x 1 time x 3 day) - trip 400,000 - OSA (1 pers x 1 time x 4 day) - trip 160,000 -
TOTAL DUTY TRAVEL NTT PROVINCE 38,250,000
AMANDEMENT 6
TO JAKARTA
2.3. DUTY TRAVEL EXPENSES NTT PROVINCE
NO DESCRIPTION
VOL UNIT RATE AMOUNT (IDR)
2.3 IN PROVINCE
2.3.4 For Spotcheck Regional For Progres Status South
Kalimantan Province 73,530,000
1 From Kota Surabaya to Kab. Kotabaru
Air Transport Kota Surabaya to Banjarmasin 5 trip 3,000,000 15,000,000 Inland Transport From Kota Banjarmasin to Kab
Kotabaru 5 trip 300,000 1,500,000
Acomodation 10 m/d 540,000 5,400,000
OSA 15 m/d 150,000 2,250,000
2 From Kota Surabaya to Kab. Banjar
Air Transport Kota Surabaya to Banjarmasin 7 trip 3,000,000 21,000,000 Inland Transport From Kota Banjarmasin to Kab. Banjar 7 trip 300,000 2,100,000
Acomodation 14 m/d 540,000 7,560,000
OSA 21 m/d 150,000 3,150,000
3 From Kota Surabaya to Kab. Banjarbaru
Air Transport Kota Surabaya to Banjarmasin 3 trip 3,000,000 9,000,000 Inland Transport From Kota Banjarmasin to Kab. Banjarbaru 2 trip 300,000 600,000
Acomodation 2 m/d 540,000 1,080,000
OSA 6 m/d 150,000 900,000
4 From Kota Surabaya to Kota Banjarmasin
Air Transport 1 trip 3,000,000 3,000,000
Acomodation - trip 300,000 -
Inland Transport From Kota Surabaya to Kab. Banjarbaru 1 trip 540,000 540,000
OSA 3 m/d 150,000 450,000
2.3.4.1A From Kab/Kota ToProvince/Satker PKP For Coordination
Meeting 3,000,000
From Kab. Kotabaru to Kota Banjamasin
Air Transport - trip 300,000 -
OSA - m/d 150,000 -
From Kab. Banjar to Kota Banjamasin
Air Transport 5 trip 300,000 1,500,000
OSA 10 m/d 150,000 1,500,000
2.3. DUTY TRAVEL EXPENSES SOUTH KALIMANTAN PROVINCE
NO
AMANDEMENT 6 DESCRIPTION
VOL UNIT RATE AMOUNT (IDR) NO
AMANDEMENT 6 DESCRIPTION
From Kota Banjarbaru to Kota Banjamasin
Air Transport - trip 300,000 -
OSA - m/d 150,000 -
2.3.4.1B From Kab/Kota To Regional For Coordination Meeting 4,830,000
1 From Kab. Kotabaru to Kota Surabaya
Air Transport Banjarmasin to Kota Surabaya - trip 3,000,000 - Inland Transport From Kab Kotabaru to Kota
Banjarmasin - trip 300,000 -
Acomodation - m/d 540,000 -
OSA - m/d 150,000 -
2 From Kab. Banjar to Kota Surabaya
Air Transport Banjarmasin to Kota Surabaya 1 trip 3,000,000 3,000,000 Inland Transport From Kab. Banjar to Kota Banjarmasin 1 trip 300,000 300,000
Acomodation 2 m/d 540,000 1,080,000
OSA 3 m/d 150,000 450,000
3 From Kab. Banjarbaru to Kota Surabaya
Air Transport Banjarmasin to Kota Surabaya - trip 3,000,000 - Inland Transport From Kab. Banjarbaru to Kota Banjarmasin - trip 300,000 -
Acomodation - m/d 540,000 -
OSA - m/d 150,000 -
4 From Kota Banjarmasin to Kota Surabaya
Air Transport - trip 3,000,000 -
Inland Transport From Kota Banjarmasin to surabaya - trip 300,000 -
Acomodation - trip 540,000 -
OSA - m/d 150,000 -
2.3.4.2 From Kab/Kota ToProvince/Satker PKP For Coordination
Meeting 3,450,000
From Kota Surabaya to Kota Banjarmasin
Air Transport 1 trip 3,000,000 3,000,000
OSA 3 m/d 150,000 450,000
VOL UNIT RATE AMOUNT (IDR) NO
AMANDEMENT 6 DESCRIPTION
2.3.4.3
For Several Training And Coordination to Jakarta By
Request 24,540,000
Air Transport (4 times) 6 trip 2,000,000 12,000,000
Inland Travel In Jakarta 6 trip 250,000 1,500,000
Hotel Acomodation 18 m/d 400,000 7,200,000
OSA 24 trip 160,000 3,840,000
2.3.4.4 TO OTHER PROVINCE BY REQUEST
For Several Training And Coordination to Location By
Request -
Air Transport (3 pers x 1 time x 1 day) - trip 5,134,000 - Inland Travel by location (3 pers x 1 time x 1 day) - trip 250,000 - Hotel Acomodation (3 pers x 1 time x 3 day) - trip 400,000 - OSA (3 pers x 1 time x 4 day) - trip 160,000 -
109,350,000
TOTAL DUTY TRAVEL SOUTH KALIMANTAN PROVINCE TO JAKARTA
VOL UNIT RATE AMOUNT (IDR)
2.3 IN PROVINCE
2.3.5 For Spotcheck Regional For Progres Status
Central Kalimantan Province 40,610,000
1 From Kota Surabaya to Kota Palangkaraya
Air Transport 8 trip 3,200,000 25,600,000
Inland Travel Kota Surabaya tp Palangkaraya 5 trip 250,000 1,250,000
Acomodation 16 trip 650,000 10,400,000
OSA 24 m/d 140,000 3,360,000
2.3.5.1A From Regional To Province For Coordination
Meeting 24,360,000
From Kota Surabaya to Kota Palangkaraya
Air Transport 7 trip 3,200,000 22,400,000
OSA 14 m/d 140,000 1,960,000
2.3.5.1B From Kab/Kota To Regional For Coordination
Meeting 8,610,000
From Kota Palangkaraya to Kota Surabaya
Air Transport 1 trip 3,200,000 3,200,000 Inland Travel In Jakarta 1 trip 250,000 250,000
Acomodation 6 trip 650,000 3,900,000
OSA 9 m/d 140,000 1,260,000
2.3.5.2
For Several Training And Coordination to
Jakarta By Request 4,090,000
Air Transport (4 times) 1 trip 2,000,000 2,000,000 Inland Travel In Jakarta 1 trip 250,000 250,000 Hotel Acomodation 3 m/d 400,000 1,200,000
OSA 4 trip 160,000 640,000
2.3. DUTY TRAVEL EXPENSES CENTRAL KALIMANTAN PROVINCE
TO JAKARTA NO
AMANDEMENT 6 DESCRIPTION
VOL UNIT RATE AMOUNT (IDR) NO
AMANDEMENT 6 DESCRIPTION
2.3.5.3 TO OTHER PROVINCE BY REQUEST
For Several Training And Coordination to
Location By Request -
Air Transport (1pers x 1 time x 1 day) - trip 5,134,000 - Inland Travel by location (1pers x 1 time x 1 day) - trip 250,000 - Hotel Acomodation (1 pers x 1 time x 3 day) - trip 400,000 - OSA (1 pers x 1 time x 4 day) - trip 160,000 -
77,670,000
TOTAL DUTY TRAVEL CENTRAL KALIMANTAN PROVINCE
VOL UNIT RATE AMOUNT (IDR)
2.3 IN PROVINCE
2.3.6 For Spotcheck Regional For Progres Status South
Kalimantan Province 36,048,000
1 From Kota Surabaya to Kota Samarinda
Air Transport Kota Surabaya to Balikpapan 4 trip 3,400,000 12,886,000 Inland Transport From Kota Balikpapan to
Samarinda 4 trip 350,000 1,400,000
Acomodation 3 m/d 800,000 2,400,000
OSA 12 m/d 170,000 2,040,000
2 From Kota Surabaya to Kota Bontang
Air Transport Kota Surabaya to Balikpapan 2 trip 3,400,000 7,378,000 Inland Transport From Kota Balikpapan to Bontang 4 trip 350,000 1,400,000
Acomodation 4 m/d 800,000 3,360,000
OSA 12 m/d 170,000 2,040,000
3 From Kota Surabaya to Kota Balikpapan
Air Transport 1 trip 3,400,000 2,074,000
Inland Transport From Kota Surabaya to Balikpapan - trip 350,000 -
Acomodation 1 trip 800,000 560,000
OSA 3 m/d 170,000 510,000
2.3.6.1A From City Level to Satker PKP Office For
Coordination Meeting -
From Kota Balikpapan to Kota Samarinda
Inland Transport - trip 350,000 -
OSA - m/d 170,000 -
From Kota Bontang to Kota Samarinda
Inland Transport - trip 350,000 -
OSA - m/d 170,000 -
2.3.6.1B From City Level to Regional For Coordination
Meeting -
1 From Kota Samarinda to Kota Surabaya
Air Transport Kota Surabaya to Balikpapan - trip 3,400,000 - Inland Transport From Kota Balikpapan to
Samarinda - trip 350,000 -
Acomodation - m/d 800,000 -
OSA - m/d 170,000 -
2.3. DUTY TRAVEL EXPENSES EAST KALIMANTAN PROVINCE
NO
AMANDEMENT 6 DESCRIPTION
VOL UNIT RATE AMOUNT (IDR) NO
AMANDEMENT 6 DESCRIPTION
2 From Kota Bontang to Kota Surabaya - trip 3,400,000 - Air Transport Kota Surabaya to Balikpapan - trip 350,000 - Inland Transport From Bontang to Kota Balikpapan - m/d 800,000 -
Acomodation - m/d 170,000 -
OSA
3 From Kota Balikpapan to Kota Surabaya to
Air Transport - trip 3,400,000 -
Inland Transport From Balikpapan to Kota Surabaya - trip 350,000 -
Acomodation - trip 800,000 -
OSA - m/d 170,000 -
2.3.6.2 From Regional To Province For Coordination
Meeting 9,250,000
From Kota Surabaya to Kota Samarinda
Air Transport from Kota Surabaya to Balikpapan 2 trip 3,420,000 6,840,000 Inland Transport from Kota Balikpapan to
Samarinda 3 trip 350,000 1,050,000
OSA 8 m/d 170,000 1,360,000
2.3.6.3
For Several Training And Coordination to Jakarta By
Request 11,380,000
Air Transport (4 times) 3 trip 2,400,000 7,200,000 Inland Travel In Jakarta 2 trip 250,000 500,000
Hotel Acomodation 6 m/d 400,000 2,400,000
OSA 8 trip 160,000 1,280,000
2.3.6.4 TO OTHER PROVINCE BY REQUEST
For Several Training And Coordination to Location
By Request -
Air Transport (3 pers x 1 time x 1 day) - trip 5,134,000 - Inland Travel by location (3 pers x 1 time x 1 day) - trip 250,000 - Hotel Acomodation (3 pers x 1 time x 3 day) - trip 400,000 - OSA (3 pers x 1 time x 4 day) - trip 160,000 - 56,678,000
TOTAL DUTY TRAVEL EAST KALIMANTAN PROVINCE TO JAKARTA
VOL RATE AMOUNT (IDR)
2.4.1 OFFICE RUNNING COST 262,147,671
2.4.1.1 Regional Team Province 31,875,000
a East Java Province (Surabaya) mth1 42.5 750,000 31,875,000
2.4.1.2 230,272,671
a City Level Office at 18 Kota/Kab
Kota Surabaya mth1 41.5 500,000 8,017,618
Kab Tulungagung mth1 39.5 500,000 19,750,000
Kab Sidoarjo mth1 24.0 500,000 4,319,643
Kab Gresik mth1 41.5 500,000 20,750,000
Kota Malang mth1 32.0 500,000 7,377,700
Kota Probolinggo mth1 41.5 500,000 20,750,000
Kab Lombok Timur mth1 35.0 500,000 17,500,000
Kota Bima mth1 32.0 500,000 16,000,000
Kota Mataram mth1 42.5 500,000 21,250,000
Kota Kupang mth1 41.5 500,000 20,750,000
Kab Manggarai Barat mth1 - 500,000 -
Kab Kotabaru mth1 35.0 500,000 17,500,000
Kab Banjar mth1 41.5 500,000 20,750,000
Kota Banjarbaru mth1 - 500,000 -
Kota Banjarmasin mth1 35.0 500,000 5,352,524
Kota Palangkaraya mth1 40.5 500,000 20,250,000
Kota Samarinda mth1 24.0 500,000 2,766,018
Kota Bontang mth1 35.0 500,000 4,357,668
Kota Balikpapan mth1 24.0 500,000 2,831,500
2.4.2 OFFICE SUPPLY & CONSUMABLE 248,685,329
2.4.2.1 Regional Level East Java Province 18,450,000
a East Java Province (Surabaya) mth1 48.5 1,000,000 18,450,000
2.4.2.2 230,235,329
a City Level Office at 18 Kota/Kab
Kota Surabaya mth1 41.5 500,000 20,750,000
2.4. OFFICE OPERATIONAL EXPENSES
NO DESCRIPTION AMANDEMENT NO. 6
UNIT
City Level Office 6 Provinces at 18 Kota/Kab Priority
City Level Office 3 Provinces at 7 Kota/Kab Priority
VOL RATE AMOUNT (IDR)
NO DESCRIPTION AMANDEMENT NO. 6
UNIT
Kab Tulungagung mth1 39.5 500,000 19,750,000
Kab Sidoarjo mth1 24.0 500,000 3,183,352
Kab Gresik mth1 41.5 500,000 20,750,000
Kota Malang mth1 32.0 500,000 1,801,627
Kota Probolinggo mth1 41.5 500,000 20,750,000
Kab Lombok Timur mth1 35.0 500,000 17,500,000
Kota Bima mth1 35.0 500,000 17,500,000
Kota Mataram mth1 39.5 500,000 19,750,000
Kota Kupang mth1 41.5 500,000 20,750,000
Kab Manggarai Barat mth1 - 500,000 -
Kab Kotabaru mth1 35.0 500,000 17,500,000
Kab Banjar mth1 41.5 500,000 20,750,000
Kota Banjarbaru mth1 - 500,000 -
Kota Banjarmasin mth1 35.0 500,000 4,498,950
Kota Palangkaraya mth1 40.5 500,000 20,250,000
Kota Samarinda mth1 24.0 500,000 1,030,400
Kota Bontang mth1 35.0 500,000 1,644,500
Kota Balikpapan mth1 24.0 500,000 2,076,500
2.4.3 526,500,000
2.4.3.1 Regional Level East Java Province 69,750,000
a East Java Province (Surabaya) mth1 46.5 1,500,000 69,750,000
2.4.3.2 456,750,000
a City Level Office at 18 Kota/Kab
Kota Surabaya mth1 41.5 750,000 31,125,000
Kab Tulungagung mth1 39.5 750,000 29,625,000
Kab Sidoarjo mth1 24.0 750,000 18,000,000
Kab Gresik mth1 41.5 750,000 31,125,000
Kota Malang mth1 32.0 750,000 24,000,000
Kota Probolinggo mth1 41.5 750,000 31,125,000
Kab Lombok Timur mth1 35.0 750,000 26,250,000
Kota Bima mth1 35.0 750,000 26,250,000
Kota Mataram mth1 42.5 750,000 31,875,000
Kota Kupang mth1 41.5 750,000 31,125,000
Kab Manggarai Barat mth1 - 750,000 -
Kab Kotabaru mth1 35.0 750,000 26,250,000
COMMUNICATION COST (TELP, FAX & INTERNET)
City Level Office 3 Provinces at 7 Kota/Kab Priority
VOL RATE AMOUNT (IDR)
NO DESCRIPTION AMANDEMENT NO. 6
UNIT
Kab Banjar mth1 41.5 750,000 31,125,000
Kota Banjarbaru mth1 - 750,000 -
Kota Banjarmasin mth1 35.0 750,000 26,250,000
Kota Palangkaraya mth1 40.5 750,000 30,375,000
Kota Samarinda mth1 24.0 750,000 18,000,000
Kota Bontang mth1 35.0 750,000 26,250,000
Kota Balikpapan mth1 24.0 750,000 18,000,000
1,037,333,000
TOTAL OF OFFICE OPERATIONAL EXPENSES
UNIT VOL RATE AMOUNT (IDR)
2.5 134,500,000
2.5.1.1 Regional Level East Java Province
a Desktop Computer (Purchase) Unit 4 6,500,000 26,000,000 b Laptop/Notebook (Purchase) Unit 6 11,500,000 69,000,000 c Printer Laser Jet (Purchase) Unit 2 5,000,000 10,000,000 d Printer Color A3 (Purchase) Unit 1 6,500,000 6,500,000 e Digital Camera (Purchase) Unit 1 3,000,000 3,000,000 f LCD Projector (Purchase) Unit 1 6,000,000 6,000,000
g Handycam (Purchase) Unit 1 5,000,000 5,000,000
h Faximile (Purchase) Unit - 1,500,000 - i Equipment (Purchase) Unit 6 1,500,000 9,000,000
2.5.1.2 City Level Office 3 Provinces at 7 Kota/Kab
Priority 504,000,000
a Laptop/Notebook (Purchase) Unit 18 6,500,000 117,000,000 b Desktop Computer (Purchase) Unit 18 11,500,000 207,000,000 c Printer Color A3 (Purchase) Unit 18 6,500,000 117,000,000 d GPS Navigator, Roll Meter & Survey Equipment (Purchase) Unit 18 3,000,000 54,000,000 Equipment Maintenance Atcost 6 1,500,000 9,000,000 638,500,000
2.5 OFFICE EQUIPMENT EXPENSES
NO DESCRIPTION
TOTAL OF OFFICE EQUIPMENT EXPENSES
AMANDEMENT NO. 6
REGIONAL TEAM OFFICE EAST JAVA PROVINCE
UNIT VOL RATE AMOUNT (IDR)
2.6.1 1,526,475,000
2.6.1.1 Regional Team East Java Province 1 4,665.0 50,000 233,250,000 2.6.1.2 City Level Office at 18 Kota/Kab
Kota Surabaya 1 2,805.0 30,000 84,150,000 Kab Tulungagung 1 2,673.0 30,000 80,190,000 Kab Sidoarjo 1 1,584.0 30,000 47,520,000 Kab Gresik 1 3,069.0 30,000 92,070,000 Kota Malang 1 2,178.0 30,000 65,340,000 Kota Probolinggo 1 2,805.0 30,000 84,150,000 Kab Lombok Timur 1 2,376.0 30,000 71,280,000 Kota Bima 1 2,376.0 30,000 71,280,000 Kota Mataram 1 3,111.5 30,000 93,345,000 Kota Kupang 1 3,069.0 30,000 92,070,000 Kab Manggarai Barat 1 - 30,000 - Kab Kotabaru 1 2,640.0 30,000 79,200,000 Kab Banjar 1 3,069.0 30,000 92,070,000 Kota Banjarbaru 1 - 30,000 - Kota Banjarmasin 1 2,376.0 30,000 71,280,000 Kota Palangkaraya 1 3,432.0 30,000 102,960,000 Kota Samarinda 1 1,584.0 30,000 47,520,000 Kota Bontang 1 2,376.0 30,000 71,280,000 Kota Balikpapan 1 1,584.0 30,000 47,520,000
2.6.2 3,946,370,000
2.6.2.1 Regional Team East Java Province 2 46.0 10,000,000 920,000,000 2.6.2.2 City Level Office at 18 Kota/Kab
Kota Surabaya (No. B1655 NRY) 1 38.0 5,385,000 204,630,000 Kab Tulungagung (No. B1132 ZKM) 1 41.0 5,385,000 220,785,000
VEHICLES (Minimum Y 2012 - Includeddriver, O & M, Insurance etc) for OC Office
OFFICE SPACE (including furniture, AC etc)
DESCRIPTION
AMANDEMENT NO. 6 2.6. RENTAL EXPENSES
NO
UNIT VOL RATE AMOUNT (IDR) DESCRIPTION
AMANDEMENT NO. 6 NO
Kab Sidoarjo (No. B2258 TYG) 1 24.0 5,385,000 129,240,000 Kab Gresik (No. B2704 SYU) 1 45.0 5,385,000 242,325,000 Kota Malang (No. B2900 KOB) 1 27.0 5,385,000 145,395,000 Kota Probolinggo (No. B2048 TYH) 1 41.5 5,385,000 223,477,500 Kab Lombok Timur (No. B2548 TYS) 1 28.0 5,385,000 150,780,000 Kota Bima (No. B1567 ERR) 1 28.0 5,385,000 150,780,000 Kota Mataram (No. B1208 CKK) 1 42.0 5,385,000 226,170,000
Kota Kupang1 27.0 5,385,000
145,395,000Kab Manggarai Barat 1 - 5,385,000 - Kab Kotabaru 1 23.0 5,385,000 123,855,000 Kab Banjar (No. B1845 UYX) 1 43.0 5,385,000 231,555,000
Kota Banjarbaru1 - 5,385,000
-Kota Banjarmasin (No. B2980 BKK) 1 33.0 5,385,000 177,705,000 Kota Palangkaraya (No. B1214 ZKM) 1 45.5 5,385,000 245,017,500 Kota Samarinda (No. B1478 WZO) 1 23.0 5,385,000 123,855,000 Kota Bontang (No. B2504 SYW) 1 30.0 5,385,000 161,550,000 Kota Balikpapan (No. B1604 WZN) 1 23.0 5,385,000 123,855,000
5,472,845,000
TOTAL OF RENTAL EXPENSES