DAFTAR HARGA BAHAN DAN UPAH

PROPINSI KALIMANTAN SELATAN

NO.

UPAH DAN BAHAN

SATUAN

H A R G A (Rp)

I

TENAGA KERJA

1

Mandor

Orang / hari 78,000.00

2

Kepala Tukang

Orang / hari 78,000.00

3

Tukang batu / kayu / besi / cat

Orang / hari 72,000.00

4

Pekerja

Orang / hari 57,000.00

II.

B A H A N

1

Batu kali / gunung

M3

361,300.00

2

Koral beton

M3

378,600.00

3

Pasir Beton

M3

206,300.00

4

Pasir Urug

M3

211,000.00

5

Pasir pasang kasar/halus

M3

201,000.00

6

Tanah Urug

M3

124,000.00

7

Semen PC 50 kg

Kg

2,200.00

8

Batu Bata

Bj

1,000.00

9

Bata Press / Paving block

Bh

2,200.00

10

Besi beton polos

Kg

22,200.00

11

Besi Beton Ulir

Kg

15,000.00

12

Kawat Beton

Kg

13,280.00

13

Kayu bekisting

M3

2,512.000.00

14

Kayu galam dia. 5 cm panjang 4 m

Btg

4,500.00

15

Kayu galam dia. 10 - 12 cm panjang 2 m

Btg

5,400.00

16

Kayu galam dia. 10 - 12 cm panjang 4 m

Btg

10,000.00

17

Kayu galam dia. 10 - 12 cm panjang 7 m

Btg

46,900.00

18

Balok Ulin

M3

3,982,000.00

19

Papan Ulin

M3

4,555,000.00

20

Balok Lanan / Meranti

M3

5,197,900.00

21

Papan Lanan

M3

5,411,200.00

22

Paku Ulin

M3

32,800.00

23

Paku Kayu

Kg

25,000.00

24

Tanah pupuk / humus

M3

110,000.00

25

Koral Putih

M3

200,000.00

26

Pas. Koral Sikat (terpasang)

M3

250,000.00

27

Tempat duduk konstruksi beton+ulin panjang 180 cm

Buah

2,000,000.00

28

Permainan anak 'Jungkitan'

Buah

2,860,000.00

29

Permainan anak 'Bola Dunia'

Buah

3,640,000.00

30

Permainan anak 'Ayunan'

Buah

2,600,000.00

31

Permainan anak 'Perosotan/Papan Luncur'

Buah

4,680,000.00

32

Lampu Taman/Pedestrian Outdoor (Instalasi terpasang)

Unit

3,500,000.00

33

Lampu Sorot Penerangan Lap. Badminton + Tiang

Unit

2,750,000.00

34

Tiang dan Jaring Net Lap. Badminton

Buah

1,750,000.00

35

Konstruksi Trap tempat duduk beton

M2

750,000.00

36

Konstruksi Floor Hardner Lap. Badminton

M2

35,000.00

37

Konstruksi Kolam Air Mancur

M2

600,000.00

38

Pembuatan & Pembersihan Kolam Ikan

M2

50,000.00

39

Rumpun

200,000.00

40

Rumpun

500,000.00

Glodogan Tiang (Polyalthia Longitolia)

Palem Raja (Roystanea Regia)

(2)

41

Rumpun

350,000.00

NO.

UPAH DAN BAHAN

SATUAN

H A R G A (Rp)

40

Rumpun

250,000.00

41

Rumpun

200,000.00

42

Rumpun

150,000.00

43

Rumpun

150,000.00

44

Rumpun

150,000.00

45

Rumpun

200,000.00

46

Rumpun

100,000.00

47

Rumpun

150,000.00

48

Rumpun

100,000.00

49

Rumpun

30,000.00

50

Rumpun

75,000.00

51

Rumpun

45,000.00

52

Rumpun

30,000.00

53

Rumpun

60,000.00

54

Rumpun

45,000.00

55

Rumpun

40,000.00

56

Rumpun

45,000.00

57

Anggrek

Rumpun

250,000.00

58

M2

30,000.00

Palem Botol (Mascarena Lagenicaulis)

Palem Merah (Chytostaclais Lakka)

Mangga (Mango SP.)

Jambu (Psidium Guajava)

Mengkudu (Moriida Citripolia L.)

Sawo (Achras Zapota)

Angsana (Pteocarpus Indicus Willd)

Ketapang (Terminalia Cattapa L.)

Flamboyan (Delonix Regia Rax.)

Blimbing Wuluh (Averrhoa Blimbi)

Pare-pare (Momordica Charantia)

Teh-tehan (Aclypha Marophylla)

Sirih (Piper Betle)

Lidah Buaya (Aloe Vera)

Krisan (Chrysantheum SP.)

Lili Paris (Chlorophtum SP.)

Daun Beludru (Episcia Cupreatia)

Bayam-bayaman (Coleus SP.)

(3)

3/8 DAFTAR ANALISA PEKERJAAN

1 1 M3 Galian tanah sedalam 1 m Tenaga - Pekerja 0.400 HO X 57,000.00 = 22,800.00 - Mandor 0.040 HO X 78,000.00 = 3,120.00 + Jumlah = 25,920.00 2 1 M3 Urugan kembali Tenaga - Pekerja 0.192 HO X 57,000.00 = 10,944.00 - Mandor 0.019 HO X 78,000.00 = 1,482.00 + Jumlah = 12,426.00 3 1 M3 Urugan pasir 1. Bahan - Pasir urug 1.200 M3 X 211,000.00 = 253,200.00 + Jumlah ( 1 ) = 253,200.00 2. Tenaga - Pekerja 0.300 HO X 57,000.00 = 17,100.00 - Mandor 0.010 HO X 78,000.00 = 780.00 + Jumlah ( 2 ) = 17,880.00 Jumlah ( 1 ) + ( 2 ) = 271,080.00 4 1 M3 Urugan tanah 1. Bahan - Tanah urug 1.200 M3 X 124,000.00 = 148,800.00 + - Jumlah ( 1 ) = 148,800.00 2. Tenaga Pekerja 0.300 HO X 57,000.00 = 17,100.00 Mandor 0.010 HO X 78,000.00 = 780.00 + Jumlah ( 2 ) = 17,880.00 Jumlah ( 1 ) + ( 2 ) = 166,680.00

5 1 M3 Urugan tanah pupuk/humus 1. Bahan - Tanah pupuk/humus 1.000 M3 X 110,000.00 = 110,000.00 + - Jumlah ( 1 ) = 110,000.00 2. Tenaga Pekerja 0.300 HO X 57,000.00 = 17,100.00 Mandor 0.010 HO X 78,000.00 = 780.00 + Jumlah ( 2 ) = 17,880.00 Jumlah ( 1 ) + ( 2 ) = 127,880.00 6 1 M2 Plesteran 1Pc : 2 Ps, tebal 15 mm 1. Bahan - Semen portland 8.520 Kg X 2,200.00 = 18,744.00 - Pasir pasang 0.017 M3 X 201,000.00 = 3,417.00 + Jumlah ( 1 ) = 22,161.00 2. Tenaga - Pembantu tukang 0.200 HO X 57,000.00 = 11,400.00 - Tukang batu 0.150 HO X 72,000.00 = 10,800.00 - Kepala tukang 0.015 HO X 78,000.00 = 1,170.00 - Mandor 0.010 HO X 78,000.00 = 780.00 + Jumlah ( 2 ) = 24,150.00 Jumlah ( 1 ) + ( 2 ) = 46,311.00 7 1 M2 Plesteran 1Pc : 4 Ps, tebal 15 mm 1. Bahan - Semen portland 5.200 Kg X 2,200.00 = 11,440.00 - Pasir pasang 0.020 M3 X 201,000.00 = 4,020.00 + Jumlah ( 1 ) = 15,460.00 2. Tenaga - Pembantu tukang 0.200 HO X 57,000.00 = 11,400.00 - Tukang batu 0.150 HO X 72,000.00 = 10,800.00 - Kepala tukang 0.015 HO X 78,000.00 = 1,170.00 - Mandor 0.010 HO X 78,000.00 = 780.00 + Jumlah ( 2 ) = 24,150.00 Jumlah ( 1 ) + ( 2 ) = 39,610.00

(4)

8 1 M3 membuat beton tumbuk camp.1pc : 3ps : 5kr 1. Bahan - Semen portland 218.000 Kg X 2,200.00 = 479,600.00 - Pasir beton 0.520 M3 X 201,000.00 = 104,520.00 - Koral beton 0.870 M3 X 378,600.00 = 329,382.00 + Jumlah ( 1 ) = 913,502.00 2. Tenaga - Pekerja 1.650 HO X 57,000.00 = 94,050.00 - Tukang batu 0.250 HO X 72,000.00 = 18,000.00 - Kepala tukang 0.025 HO X 78,000.00 = 1,950.00 - Mandor 0.080 HO X 78,000.00 = 6,240.00 + Jumlah ( 2 ) = 120,240.00 Jumlah ( 1 ) + ( 2 ) = 1,033,742.00

9 1 M3 membuat beton camp.1pc : 2ps : 3kr 1. Bahan - Semen portland 232.000 Kg X 2,200.00 = 510,400.00 - Pasir beton 0.520 M3 X 201,000.00 = 104,520.00 - Koral beton 0.780 M3 X 378,600.00 = 295,308.00 + Jumlah ( 1 ) = 910,228.00 2. Tenaga - Pekerja 1.650 HO X 57,000.00 = 94,050.00 - Tukang batu 0.250 HO X 72,000.00 = 18,000.00 - Kepala tukang 0.025 HO X 78,000.00 = 1,950.00 - Mandor 0.080 HO X 78,000.00 = 6,240.00 + Jumlah ( 2 ) = 120,240.00 Jumlah ( 1 ) + ( 2 ) = 1,030,468.00

10 1 M3 Konstruksi kayu ulin 1. Bahan

- Kayu ulin balok 1.1000 m3 X 3,982,000.00 = 4,380,200.00 - Angkur 3.000 Kg X 5,000.00 = 15,000.00 + Jumlah ( 1 ) = 4,395,200.00 2. Tenaga - Pekerja 5.000 HO X 57,000.00 = 285,000.00 - Mandor 0.250 HO X 78,000.00 = 19,500.00 - Tukang kayu 15.000 HO X 72,000.00 = 1,080,000.00 - Kepala tukang 1.500 HO X 78,000.00 = 117,000.00 + Jumlah ( 2 ) = 1,501,500.00 Jumlah ( 1 ) + ( 2 ) = 5,896,700.00

11 1 M2 Pasangan Paving Block 1. Bahan - Paving Block 42.0000 bh X 2,200.00 = 92,400.00 - Pasir Urug 0.1100 m3 X 211,000.00 = 23,210.00 Jumlah ( 1 ) = 115,610.00 2. Tenaga - Pekerja 0.188 HO X 57,000.00 = 10,687.50 - Mandor 0.009 HO X 78,000.00 = 733.20 - Tukang batu 0.188 HO X 72,000.00 = 13,500.00 - Kepala tukang 0.019 HO X 78,000.00 = 1,466.40 + Jumlah ( 2 ) = 26,387.10 Jumlah ( 1 ) + ( 2 ) = 141,997.10

12 Pas. Batu Camp. 1:4 1. Bahan 1.2 m3 Batu belah 15/20 1.2 m3 x 361,300.00 = 433,560.00 Portland Cement (Pc) 163 kg x 2,200.00 = 358,600.00 Pasir beton 0.52 m3 x 206,300.00 = 107,276.00 Jumlah (1) = 899,436.00 2. Tenaga Pekerja 1.5 HO x 57,000.00 = 85,500.00 Mandor 0.075 HO x 78,000.00 = 5,850.00 Tukang Batu 0.75 HO x 72,000.00 = 54,000.00 Kepala Tukang 0.075 HO x 78,000.00 = 5,850.00 + Jumlah (2) = 151,200.00 Jumlah (1) + (2) = 1,050,636.00

(5)

5/8 jumlah = 10,395.00

(6)

RENCANA ANGGARAN BIAYA

PEKERJAAN : PEKERJAAN RUANG TERBUKA HIJAU (RTH)

LOKASI : SAMPING TRIBUN 5 DESEMBER MARABAHAN, KABUPATEN BARITO KUALA

No Uraian Pekerjaan Sat

No Harga Jumlah

Analis Volume Satuan Harga

(Rp) (Rp)

I PEKERJAAN PENDAHULUAN DAN URUGAN, DAN KANSTIN

1.1 Persiapan, pembersihan, dan pengukuran m2 - 3,030.00 2,500.00 7,575,000.00

1.2 Urugan tanah m3 4 4,545.00 166,680.00 757,560,600.00

1.3 Urugan pasir 15 cm di atas tanah m3 3 1,817.00 271,080.00 492,552,360.00

1,257,687,960.00 II PEKERJAAN PERKERASAN

2.1 Paving Block Area Parkir m2 9 1,808.00 141,997.10 256,730,756.80

2.2 Paving Block Pedestrian m2 9 60.00 141,997.10 8,519,826.00

265,250,582.80 III PEKERJAAN SITE FURNITURE

3 Lampu taman standing outdoor (terpasang+instalasi) unit - 3.00 3,500,000.00 10,500,000.00

10,500,000.00 IV PEKERJAAN MASSA FISIK PENDUKUNG

4.1 Pos Jaga (2x2 m) unit - 3.00 14,000,000.00 42,000,000.00

4.2 Kafetaria (5x8)m unit 1.00 140,000,000.00 140,000,000.00

4.3 Tempat duduk taman unit - 3.00 2,000,000.00 6,000,000.00

188,000,000.00 V PEKERJAAN SIRING/PONDASI

5.1 Sloof 20/20 m3 9 6.12 1,030,468.00 6,306,464.16

5.2 Pas. Siring Batu Gunung 1:4 m3 12 51.45 1,050,636.00 54,055,222.20

5.3 Plesteran Spasi Siring Batu Gunung 1:5 m2 6 0.34 46,311.00 15,745.74

5.4 btg 918.72 10,395.00 9,550,094.40

69,927,526.50 VI PEKERJAAN LANSKAP TAMAN

5.1 Urugan tanah pupuk / humus 30 cm m3 - 1,037.00 110,000.00 114,070,000.00

5.2 m2 - 2,121.00 30,000.00 63,630,000.00 5.3 rpn - 7.00 200,000.00 1,400,000.00 5.4 rpn - 5.00 500,000.00 2,500,000.00 5.5 rpn - 6.00 200,000.00 1,200,000.00 5.6 rpn - 50.00 75,000.00 3,750,000.00 5.7 Bambu Cina rpn 230.00 25,000.00 5,750,000.00 192,300,000.00 Pancangan Galam Pondasi Φ 10 - 12 cm pjg = 2 m

Rumput Paetan/Taman (Axomopus Compressus) Glodogan Tiang (Polyalthia Longitolia)

Palem Raja (Roystanea Regia) Angsana (Pteocarpus Indicus Willd) Teh-tehan (Aclypha Marophylla)

(7)

REKAPITULASI BIAYA

PEKERJAAN

: PEKERJAAN RUANG TERBUKA HIJAU (RTH)

LOKASI

: SAMPING TRIBUN 5 DESEMBER MARABAHAN, KABUPATEN BARITO KUALA

NO

URAIAN PEKERJAAN

JUMLAH

I

PEKERJAAN PENDAHULUAN DAN URUGAN, DAN KANSTIN

1,257,687,960.00

II

PEKERJAAN PERKERASAN

265,250,582.80

III

PEKERJAAN SITE FURNITURE

10,500,000.00

IV

PEKERJAAN MASSA FISIK PENDUKUNG

188,000,000.00

V

PEKERJAAN SIRING/PONDASI

69,927,526.50

VI

PEKERJAAN LANSKAP TAMAN

192,300,000.00

JUMLAH BIAYA FISIK PEKERJAAN

Rp 1,983,666,069.30

JUMLAH BIAYA DIBULATKAN

Rp 1,983,666,000.00

TERBILANG = SATU MILYAR SEMBILAN RATUS JUTA DELAPAN PULUH TIGA ENAM RATUS ENAM PULUH ENAM RIBU RUPIAH

Catatan :

Harga ini sudah termasuk biaya persiapan, mobilisasi dan demobilisasi, keuntungan, bea materai dan pungutan resmi lainnya serta PPN Harga didasarkan pada Harga Satuan Kabupaten Batola 2013

(8)

Perhitungan Volume

luas area samping tribun keseluruhan

L

=

3030

m2

urugan tanah

luas area seluruhnya

x

1.5

3030 x

1.5

4545 m3

urugan pasir 15cm di atas tanah

urugan pasir dibawah paving block

(area paving parkir+area paving peedestrian)

x

0.15

(1808+60)x0.15

=

1817

m3

volume siring pondasi

Sloof

=

0.2x0.2x153.12

=

6.1248 m3

Siring

=

(0.3x0.8

x

2.8)

x

153.12

2

=

(0.12x2.8)

x

153.12

=

51.4483 m3

Galam

=

6x153.12

=

918.72 btg

Referensi

Dokumen terkait

TEMPAT PENGUMPUL SEMENTARA (GUDANG BUAH). NO URAIAN PEKERJAAN VOL SAT HARGA UPAH

DAFTAR HARGA SATUAN BAHAN

DAFTAR HARGA BAHAN / UPAH TENAGA KERJA. JENIS

KEGIATAN PENGADAAN PAPAN BILLBOARD PEKERJAAN PENGADAAN PAPAN BILLBOARD LOKASI KEDIRI RAYA TAHUN. ANALISA HARGA BAHAN DAN UPAH TENAGA

BAHAN / MATERIAL DAN UPAH KERJA PERIODE : NOPEMBER 2009 - APRIL

paper r ini akan ini akan disa disajika jikan n gamb gambar ar desa desain, #olume pekerja in, #olume pekerjaan, an, dafta daftar r upa upah h dan dan harga

Daftar Harga Satuan Pekerjaan, Upah Kerja Dan Bahan Yang dimaksud dengan daftar harga satuan pekerjaan adalah jumlah harga bahan dan upah tenaga kerja berdasarkan perhitungan analisa

Mengetahui Pedoman Analisa Harga Satuan Pekerjaan Yang dipakai beserta Bagian - bagiannya AHSP Skema harga satuan pekerjaan, yang dipengaruhi oleh faktor bahan/ material, upah