1/8
DAFTAR HARGA BAHAN DAN UPAH
PROPINSI KALIMANTAN SELATAN
NO.
UPAH DAN BAHAN
SATUAN
H A R G A (Rp)
I
TENAGA KERJA
1
Mandor
Orang / hari 78,000.00
2
Kepala Tukang
Orang / hari 78,000.00
3
Tukang batu / kayu / besi / cat
Orang / hari 72,000.00
4
Pekerja
Orang / hari 57,000.00
II.
B A H A N
1
Batu kali / gunung
M3
361,300.00
2
Koral beton
M3
378,600.00
3
Pasir Beton
M3
206,300.00
4
Pasir Urug
M3
211,000.00
5
Pasir pasang kasar/halus
M3
201,000.00
6
Tanah Urug
M3
124,000.00
7
Semen PC 50 kg
Kg
2,200.00
8
Batu Bata
Bj
1,000.00
9
Bata Press / Paving block
Bh
2,200.00
10
Besi beton polos
Kg
22,200.00
11
Besi Beton Ulir
Kg
15,000.00
12
Kawat Beton
Kg
13,280.00
13
Kayu bekisting
M3
2,512.000.00
14
Kayu galam dia. 5 cm panjang 4 m
Btg
4,500.00
15
Kayu galam dia. 10 - 12 cm panjang 2 m
Btg
5,400.00
16
Kayu galam dia. 10 - 12 cm panjang 4 m
Btg
10,000.00
17
Kayu galam dia. 10 - 12 cm panjang 7 m
Btg
46,900.00
18
Balok Ulin
M3
3,982,000.00
19
Papan Ulin
M3
4,555,000.00
20
Balok Lanan / Meranti
M3
5,197,900.00
21
Papan Lanan
M3
5,411,200.00
22
Paku Ulin
M3
32,800.00
23
Paku Kayu
Kg
25,000.00
24
Tanah pupuk / humus
M3
110,000.00
25
Koral Putih
M3
200,000.00
26
Pas. Koral Sikat (terpasang)
M3
250,000.00
27
Tempat duduk konstruksi beton+ulin panjang 180 cm
Buah
2,000,000.00
28
Permainan anak 'Jungkitan'
Buah
2,860,000.00
29
Permainan anak 'Bola Dunia'
Buah
3,640,000.00
30
Permainan anak 'Ayunan'
Buah
2,600,000.00
31
Permainan anak 'Perosotan/Papan Luncur'
Buah
4,680,000.00
32
Lampu Taman/Pedestrian Outdoor (Instalasi terpasang)
Unit
3,500,000.00
33
Lampu Sorot Penerangan Lap. Badminton + Tiang
Unit
2,750,000.00
34
Tiang dan Jaring Net Lap. Badminton
Buah
1,750,000.00
35
Konstruksi Trap tempat duduk beton
M2
750,000.00
36
Konstruksi Floor Hardner Lap. Badminton
M2
35,000.00
37
Konstruksi Kolam Air Mancur
M2
600,000.00
38
Pembuatan & Pembersihan Kolam Ikan
M2
50,000.00
39
Rumpun
200,000.00
40
Rumpun
500,000.00
Glodogan Tiang (Polyalthia Longitolia)
Palem Raja (Roystanea Regia)
41
Rumpun
350,000.00
NO.
UPAH DAN BAHAN
SATUAN
H A R G A (Rp)
40
Rumpun
250,000.00
41
Rumpun
200,000.00
42
Rumpun
150,000.00
43
Rumpun
150,000.00
44
Rumpun
150,000.00
45
Rumpun
200,000.00
46
Rumpun
100,000.00
47
Rumpun
150,000.00
48
Rumpun
100,000.00
49
Rumpun
30,000.00
50
Rumpun
75,000.00
51
Rumpun
45,000.00
52
Rumpun
30,000.00
53
Rumpun
60,000.00
54
Rumpun
45,000.00
55
Rumpun
40,000.00
56
Rumpun
45,000.00
57
Anggrek
Rumpun
250,000.00
58
M2
30,000.00
Palem Botol (Mascarena Lagenicaulis)
Palem Merah (Chytostaclais Lakka)
Mangga (Mango SP.)
Jambu (Psidium Guajava)
Mengkudu (Moriida Citripolia L.)
Sawo (Achras Zapota)
Angsana (Pteocarpus Indicus Willd)
Ketapang (Terminalia Cattapa L.)
Flamboyan (Delonix Regia Rax.)
Blimbing Wuluh (Averrhoa Blimbi)
Pare-pare (Momordica Charantia)
Teh-tehan (Aclypha Marophylla)
Sirih (Piper Betle)
Lidah Buaya (Aloe Vera)
Krisan (Chrysantheum SP.)
Lili Paris (Chlorophtum SP.)
Daun Beludru (Episcia Cupreatia)
Bayam-bayaman (Coleus SP.)
3/8 DAFTAR ANALISA PEKERJAAN
1 1 M3 Galian tanah sedalam 1 m Tenaga - Pekerja 0.400 HO X 57,000.00 = 22,800.00 - Mandor 0.040 HO X 78,000.00 = 3,120.00 + Jumlah = 25,920.00 2 1 M3 Urugan kembali Tenaga - Pekerja 0.192 HO X 57,000.00 = 10,944.00 - Mandor 0.019 HO X 78,000.00 = 1,482.00 + Jumlah = 12,426.00 3 1 M3 Urugan pasir 1. Bahan - Pasir urug 1.200 M3 X 211,000.00 = 253,200.00 + Jumlah ( 1 ) = 253,200.00 2. Tenaga - Pekerja 0.300 HO X 57,000.00 = 17,100.00 - Mandor 0.010 HO X 78,000.00 = 780.00 + Jumlah ( 2 ) = 17,880.00 Jumlah ( 1 ) + ( 2 ) = 271,080.00 4 1 M3 Urugan tanah 1. Bahan - Tanah urug 1.200 M3 X 124,000.00 = 148,800.00 + - Jumlah ( 1 ) = 148,800.00 2. Tenaga Pekerja 0.300 HO X 57,000.00 = 17,100.00 Mandor 0.010 HO X 78,000.00 = 780.00 + Jumlah ( 2 ) = 17,880.00 Jumlah ( 1 ) + ( 2 ) = 166,680.00
5 1 M3 Urugan tanah pupuk/humus 1. Bahan - Tanah pupuk/humus 1.000 M3 X 110,000.00 = 110,000.00 + - Jumlah ( 1 ) = 110,000.00 2. Tenaga Pekerja 0.300 HO X 57,000.00 = 17,100.00 Mandor 0.010 HO X 78,000.00 = 780.00 + Jumlah ( 2 ) = 17,880.00 Jumlah ( 1 ) + ( 2 ) = 127,880.00 6 1 M2 Plesteran 1Pc : 2 Ps, tebal 15 mm 1. Bahan - Semen portland 8.520 Kg X 2,200.00 = 18,744.00 - Pasir pasang 0.017 M3 X 201,000.00 = 3,417.00 + Jumlah ( 1 ) = 22,161.00 2. Tenaga - Pembantu tukang 0.200 HO X 57,000.00 = 11,400.00 - Tukang batu 0.150 HO X 72,000.00 = 10,800.00 - Kepala tukang 0.015 HO X 78,000.00 = 1,170.00 - Mandor 0.010 HO X 78,000.00 = 780.00 + Jumlah ( 2 ) = 24,150.00 Jumlah ( 1 ) + ( 2 ) = 46,311.00 7 1 M2 Plesteran 1Pc : 4 Ps, tebal 15 mm 1. Bahan - Semen portland 5.200 Kg X 2,200.00 = 11,440.00 - Pasir pasang 0.020 M3 X 201,000.00 = 4,020.00 + Jumlah ( 1 ) = 15,460.00 2. Tenaga - Pembantu tukang 0.200 HO X 57,000.00 = 11,400.00 - Tukang batu 0.150 HO X 72,000.00 = 10,800.00 - Kepala tukang 0.015 HO X 78,000.00 = 1,170.00 - Mandor 0.010 HO X 78,000.00 = 780.00 + Jumlah ( 2 ) = 24,150.00 Jumlah ( 1 ) + ( 2 ) = 39,610.00
8 1 M3 membuat beton tumbuk camp.1pc : 3ps : 5kr 1. Bahan - Semen portland 218.000 Kg X 2,200.00 = 479,600.00 - Pasir beton 0.520 M3 X 201,000.00 = 104,520.00 - Koral beton 0.870 M3 X 378,600.00 = 329,382.00 + Jumlah ( 1 ) = 913,502.00 2. Tenaga - Pekerja 1.650 HO X 57,000.00 = 94,050.00 - Tukang batu 0.250 HO X 72,000.00 = 18,000.00 - Kepala tukang 0.025 HO X 78,000.00 = 1,950.00 - Mandor 0.080 HO X 78,000.00 = 6,240.00 + Jumlah ( 2 ) = 120,240.00 Jumlah ( 1 ) + ( 2 ) = 1,033,742.00
9 1 M3 membuat beton camp.1pc : 2ps : 3kr 1. Bahan - Semen portland 232.000 Kg X 2,200.00 = 510,400.00 - Pasir beton 0.520 M3 X 201,000.00 = 104,520.00 - Koral beton 0.780 M3 X 378,600.00 = 295,308.00 + Jumlah ( 1 ) = 910,228.00 2. Tenaga - Pekerja 1.650 HO X 57,000.00 = 94,050.00 - Tukang batu 0.250 HO X 72,000.00 = 18,000.00 - Kepala tukang 0.025 HO X 78,000.00 = 1,950.00 - Mandor 0.080 HO X 78,000.00 = 6,240.00 + Jumlah ( 2 ) = 120,240.00 Jumlah ( 1 ) + ( 2 ) = 1,030,468.00
10 1 M3 Konstruksi kayu ulin 1. Bahan
- Kayu ulin balok 1.1000 m3 X 3,982,000.00 = 4,380,200.00 - Angkur 3.000 Kg X 5,000.00 = 15,000.00 + Jumlah ( 1 ) = 4,395,200.00 2. Tenaga - Pekerja 5.000 HO X 57,000.00 = 285,000.00 - Mandor 0.250 HO X 78,000.00 = 19,500.00 - Tukang kayu 15.000 HO X 72,000.00 = 1,080,000.00 - Kepala tukang 1.500 HO X 78,000.00 = 117,000.00 + Jumlah ( 2 ) = 1,501,500.00 Jumlah ( 1 ) + ( 2 ) = 5,896,700.00
11 1 M2 Pasangan Paving Block 1. Bahan - Paving Block 42.0000 bh X 2,200.00 = 92,400.00 - Pasir Urug 0.1100 m3 X 211,000.00 = 23,210.00 Jumlah ( 1 ) = 115,610.00 2. Tenaga - Pekerja 0.188 HO X 57,000.00 = 10,687.50 - Mandor 0.009 HO X 78,000.00 = 733.20 - Tukang batu 0.188 HO X 72,000.00 = 13,500.00 - Kepala tukang 0.019 HO X 78,000.00 = 1,466.40 + Jumlah ( 2 ) = 26,387.10 Jumlah ( 1 ) + ( 2 ) = 141,997.10
12 Pas. Batu Camp. 1:4 1. Bahan 1.2 m3 Batu belah 15/20 1.2 m3 x 361,300.00 = 433,560.00 Portland Cement (Pc) 163 kg x 2,200.00 = 358,600.00 Pasir beton 0.52 m3 x 206,300.00 = 107,276.00 Jumlah (1) = 899,436.00 2. Tenaga Pekerja 1.5 HO x 57,000.00 = 85,500.00 Mandor 0.075 HO x 78,000.00 = 5,850.00 Tukang Batu 0.75 HO x 72,000.00 = 54,000.00 Kepala Tukang 0.075 HO x 78,000.00 = 5,850.00 + Jumlah (2) = 151,200.00 Jumlah (1) + (2) = 1,050,636.00
5/8 jumlah = 10,395.00
RENCANA ANGGARAN BIAYA
PEKERJAAN : PEKERJAAN RUANG TERBUKA HIJAU (RTH)LOKASI : SAMPING TRIBUN 5 DESEMBER MARABAHAN, KABUPATEN BARITO KUALA
No Uraian Pekerjaan Sat
No Harga Jumlah
Analis Volume Satuan Harga
(Rp) (Rp)
I PEKERJAAN PENDAHULUAN DAN URUGAN, DAN KANSTIN
1.1 Persiapan, pembersihan, dan pengukuran m2 - 3,030.00 2,500.00 7,575,000.00
1.2 Urugan tanah m3 4 4,545.00 166,680.00 757,560,600.00
1.3 Urugan pasir 15 cm di atas tanah m3 3 1,817.00 271,080.00 492,552,360.00
1,257,687,960.00 II PEKERJAAN PERKERASAN
2.1 Paving Block Area Parkir m2 9 1,808.00 141,997.10 256,730,756.80
2.2 Paving Block Pedestrian m2 9 60.00 141,997.10 8,519,826.00
265,250,582.80 III PEKERJAAN SITE FURNITURE
3 Lampu taman standing outdoor (terpasang+instalasi) unit - 3.00 3,500,000.00 10,500,000.00
10,500,000.00 IV PEKERJAAN MASSA FISIK PENDUKUNG
4.1 Pos Jaga (2x2 m) unit - 3.00 14,000,000.00 42,000,000.00
4.2 Kafetaria (5x8)m unit 1.00 140,000,000.00 140,000,000.00
4.3 Tempat duduk taman unit - 3.00 2,000,000.00 6,000,000.00
188,000,000.00 V PEKERJAAN SIRING/PONDASI
5.1 Sloof 20/20 m3 9 6.12 1,030,468.00 6,306,464.16
5.2 Pas. Siring Batu Gunung 1:4 m3 12 51.45 1,050,636.00 54,055,222.20
5.3 Plesteran Spasi Siring Batu Gunung 1:5 m2 6 0.34 46,311.00 15,745.74
5.4 btg 918.72 10,395.00 9,550,094.40
69,927,526.50 VI PEKERJAAN LANSKAP TAMAN
5.1 Urugan tanah pupuk / humus 30 cm m3 - 1,037.00 110,000.00 114,070,000.00
5.2 m2 - 2,121.00 30,000.00 63,630,000.00 5.3 rpn - 7.00 200,000.00 1,400,000.00 5.4 rpn - 5.00 500,000.00 2,500,000.00 5.5 rpn - 6.00 200,000.00 1,200,000.00 5.6 rpn - 50.00 75,000.00 3,750,000.00 5.7 Bambu Cina rpn 230.00 25,000.00 5,750,000.00 192,300,000.00 Pancangan Galam Pondasi Φ 10 - 12 cm pjg = 2 m
Rumput Paetan/Taman (Axomopus Compressus) Glodogan Tiang (Polyalthia Longitolia)
Palem Raja (Roystanea Regia) Angsana (Pteocarpus Indicus Willd) Teh-tehan (Aclypha Marophylla)
REKAPITULASI BIAYA
PEKERJAAN
: PEKERJAAN RUANG TERBUKA HIJAU (RTH)
LOKASI
: SAMPING TRIBUN 5 DESEMBER MARABAHAN, KABUPATEN BARITO KUALA
NO
URAIAN PEKERJAAN
JUMLAH
I
PEKERJAAN PENDAHULUAN DAN URUGAN, DAN KANSTIN
1,257,687,960.00
II
PEKERJAAN PERKERASAN
265,250,582.80
III
PEKERJAAN SITE FURNITURE
10,500,000.00
IV
PEKERJAAN MASSA FISIK PENDUKUNG
188,000,000.00
V
PEKERJAAN SIRING/PONDASI
69,927,526.50
VI
PEKERJAAN LANSKAP TAMAN
192,300,000.00
JUMLAH BIAYA FISIK PEKERJAAN
Rp 1,983,666,069.30
JUMLAH BIAYA DIBULATKAN
Rp 1,983,666,000.00
TERBILANG = SATU MILYAR SEMBILAN RATUS JUTA DELAPAN PULUH TIGA ENAM RATUS ENAM PULUH ENAM RIBU RUPIAH
Catatan :
Harga ini sudah termasuk biaya persiapan, mobilisasi dan demobilisasi, keuntungan, bea materai dan pungutan resmi lainnya serta PPN Harga didasarkan pada Harga Satuan Kabupaten Batola 2013