PT PEMBANGKITAN JAWA-BALI UNIT PEMBANGKITANMUARA TAWAR
JI.PLTGU MuaraTawar No.1, DesaSegaraJaya, Kec.TarumaJaya, Bekasi Telp.(021) 88990052 (Hunting)Fax.(021) 88990055
PENGUMUMAN
PELELANGAN
UMUM
No. 0348.Pm/600/PGD-UPMT/2014
Dengan ini diumumkan bahwa PT PJS Unit Pembangkitan Muara Tawar akan melaksanakan Pelelangan Umum untuk pengadaan barang/jasa :
REHABILITASI BACKWASH FILTER WASH WATER PUMP
a. Jasa:
1. Penggantian filter backwash
2.
Penormalan system control automatic 1 LOT3.
Individual test dan commissioning4.
Training operation dan maintenanceb. Material:
1. Backwash filter
2.
Motor Listrik 1 SET3.
Sistem Kontrol (Negara asal produk : Eropa atau Amerika)REHABILITASI BACKWASH FILTER DESALINATION SEA WATER
a. Jasa:
5.
Penggantian filter backwash6. Penormalan system control automatic 1 LOT
7.
Individual test dan commissioning 8. Training operation dan maintenanceb. Material:
1. Backwash filter
2.
Motor Listrik 1 SET3.
Sistem Kontrol (Ne~ara asal produk : Eropa atau Amerika)1. HPS: RP. 800.000.000,- (delapan ratus juta rupiah)
2. Persyaratan Peserta
1.1. Perseroan Terbatas (PT) dengan bidang keahlian Mekanikal, Elektrikal
1.2. Perusahaan I Rekanan yang pernah mensuply barang I jasa rehabilitasi backwash filter minimal 1 kali dibuktikan dengan dokumen kontrak I PO beserta dokumen SA Penerimaan barang
3. Persyaratan Pendaftaran
3.1. Menunjukan fotocopy Kompetensi Asosiasi (APTEK I ARDIN I sejenis), TDP, NPWP, PKP, Sukti pelunasan pajak 3 bulan terakhir.
3.2. Fotocopy kontrak IPO pekerjaan sejenis dengan disertai fotocopy SA penyerahan barang.
4. Pelaksanaan Pelelangan
4.1. Pendaftaran Peserta Pelelangan dan Pengambilan Dokumen Lelang Tanqqal 30 Juni s.d 8 Juli 2014
Waktu Pukul 10.00 s.d. 15.00 wib
4.2. Penjelasan Lelang (Aanwijzing)
Tanggal 10 Juli2014Waktu Kamis, Pukul 14.00 wib
Tempat PT PJB Unit Pembangkitan Muara Tawar
Demikian untuk diketahui dan bagi perusahaan yang berminat untuk mengikuti Pelelangan agar segera menyelesaikan persyaratan yang telah ditetapkan.
Pengumuman ini bukan merupakan ikatan yang mengakibatkan kewajiban finansial kepada PT PJB.
Bekasi, 30 Juni 2014
A
~~
GADAAN
BARANG/JASA
t
2!l~
i&I~
'
Pembangkitan Muara TawarDEl AIL PERMINl AAN
NO NAMA BARANG/JASA
A. Supplai barang :
1.
Backwash filter2.
Motor Listrik3.
Sistem Kontrol (Negara asal produk : Eropa atau Amerika)B. Data sheet untuk filter wash water adalah sebagai berikut:
1 TAG NO 19PAAOIAT006
2 SERVICE SEAWATERTO LINE SPRAYTRAVELLING WATER SCREEN
3 QUANTITY No. 1 4 RATING: - CONTINUOUS % 100 GENERAL 5 -SHOCK % 2 x 50 6 LOCATION INDOOR 7 MANUFACTURER SPX
8 MODEL BFSS-D400A3-V with bolted acces cover Viton seals
9 DUTY CONTINUOUS
10 FLUID HANDLED SEAWATER
11 SPECIVICGRAVITY Kg/m3 1025
12 TEMPERATURE Deg C 32.5 (MAX)
13 PRESSURE Barg 3,6
OPERATING 14 FLOWRATE Iiter/min 2060
CONDITIONS 15 BACKWASHING TIME Min 5
16 WATER LOSSDURING BACKWASH M3/h 25 17 PRESSUREDROP:
18 CLEAN CONDITION Barg 0,15
19 MAX (BACKWASHING) Barg 0,35
20 MAX (ALARM) Barg 0,5
21 TYPE 4" NB (DN 100) Automatic Self Cleaning "Compact" Backflushing filter
22 SCREENSIZE Mm 1,6
23 DESIGN PRESSURE Barg 10
24 TEST PRESSURE Barg 15
CONSTRUCTION 25 DESIGN TEMPERATURE DegC 45
26 FLANGED Ansi ANSI B16.5-150 RF
27 WEIGHT EMPTY/IN OPERATION Kg
-28 MOTOR RATING Kw 0,25
29 BASE DIMENSIONS (FLANGE - FLANGE) cm 57
Fabricated 55316 /316L 30 BODY
with SS316L internal parts (valves, shafts)
31 COVER STAINLESSSTEEL316L
32 FILTERELEMENTS 1600 micron SS316l wedge wire element
33 VENT 1" ANSI B16.5-150 RF
MATERIAL 34 CONNECTION 2x3/8" NPT DPG Connections Automatic / Electrical
1 x IP55 / NEMA4 (0.25 KW) Motor
35 ACTUATOR 1 x IP55 / NEMA4 DP Switch
1 x IP55 / NEMA4 Actuated Drain Valve (SS316 valve) 1 x IP55 / NEMA4 Control Panel- 415V - 3PH - 50HZ Supply
.-C. Data sheet untuk backwash filter DSWP adalah sebagai berikut: TAG NO 2 SERVICE 3 QUANTITY 4 RATING: - CONTINUOUS GENERAL 5 - SHOCK 6 LOCATION 7 MANUFACTURER 8 MODEL 9 DUTY 10 FLUID HANDLED 11 SPECIVIC GRAVITY 12 TEMPERATURE 13 PRESSURE OPERATING 14 FLOWRATE CONDITIONS 15 BACKWASHING TIME
16 WATER LOSS DURING BACKWASH 17 PRESSURE DROP: 18 CLEAN CONDITION 19 MAX (BACKWASHING) 20 MAX(ALARM) 21 TYPE 22 FILTERING SURFACE 23 DESIGN PRESSURE 24 TEST PRESSURE CONSTRUCTION 25 DESIGN TEMPERATURE
26 FLANGE JOINTS
27 WEIGHT EMPTY/IN OPERATION 28 MOTOR RATING
29 BASE DIMENSIONS (FLANGE-FLANGE)
30 BODY 31 COVER 32 FILTER ELEMENTS 33 DRAIN 34 VENTING MATERIAL 35 CONNECTION
36 AUTO BACKWASH VALVE
No.
90GBK03AA003
SEAWATER TO DESALINATION PLANT
% 100
% 2x50
INDOOR SPX
BFSS-1000A3-V (WITH BOLTED ACCES COVER VITON SEALS) CONTINUOUS SEAWATER Kg/m' 1025 DegC 32.5 (MAX) Barg 5,2 m'/hour 450 37 ACTUATOR Min 5 M'/h 50 Barg 0,15 Barg 0,35 Barg 0,5
10" NB (DN250)Automatic Self Cleaning "Compact" Backflushing filter Cm' 22624 Barg 10 Barg 15 Deg C 45 Ansi ANSI B16.5-150 RF Kg Kw 0,25 cm 87 Fabricated SS316 / 316L
WITH SS316L INTERNAL PARTS (VALVES,SHAFTS) STAINLESS STEEL 316L
500 micron SS316L Wedge wire element 2,5"ANSI B16.5-150 RF
1"ANSI B16.5-150 RF 2x3/8" NPT DPG Connections
DAROT WITH SOLENOID OPERATED DIAPHRAGM Automatic / Electrical
1xIP55 / NEMA4 (0.25 KW) Motor 1xIP55 / NEMA4 DP Switch
1xIP55 / NEMA4 Actuated Drain Valve (SS316 valve) 1xIP55 / NEMA4 Control Panel -415V - 3PH - 50HZ Supply
D. Supplai jasa :
1. Penggantian backwash filter
2. Pengaktifan kembali sitem control operasi backwash agar dapat beroperasi secara
automatis
3. Individual test dan commissioning
4_ Training operation dan maintenance
Dengan detail pekerjaan Rehabilitasi Backwash FilterWash Water Pump dan Desalination Sea Water
Pump sebagai berikut :
fl
~ bAN. C{-.I,
.
~ f... .,
'" UNIT -:.
'\'"nE1-!BANGK)TAN
I
'
\ MUARA TAWAR
\~'\.* .••
(1) Pembongkaran Filter Existing.
a. Mempersiapkan peralatan teknis yang dibutuhkan, semua peralatan teknis dalam proses ini
disediakan oleh pihak ke-3 pemenang tender.
b. Mempresentasikan rencana dan jadwal pekerjaan pelepasan filter existing, mobilisasi filter
existing dan instalasi filter baru, peralatan yang akan digunakan beserta resiko yang
mungkin terjadi di hadapan direksi pekerjaan.
c. Melakukan mekanisme penggantian filter dengan memperhatikan faktor Keselamatan dan
Kesehatan Kerja.
(2) Mobilisasi Filter Existing ke Gudang UP Muara Tawar.
a. Melakukan pengangkatan filter existing untuk dibawa ke gudang UP Muara Tawar dengan
peralatan teknis.
(3) Pemasangan Backwash Filter Baru.
a. Melakukan pemasangan backwash filter baru beserta kelengkapannya.
(4) Set up Sistem Mechanical, Electrical, dan Control System ke System Operasi Wash Water.
a. Melakukan setting mechanical, electrical, dan intrumentation control ke dalam sistem
pengoperasian wash water pump. Koneksi akan dibantu oleh pihak PJB UP Muara Tawar.
(5) Individual Test.
a. Melakukan pengujian backwash filter.
b. Pelaksana pekerjaan akan melakukan perbaikan jika ada kerusakan ataupun kegagalan
pada saat dilakukan individual test.
(6) Test Commissioning.
a. Melakukan commissioning backwash filter.
b. Pelaksana pekerjaan akan melakukan perbaikan jika terdapat suatu item commissioning
backwash filter mengalami kegagalan, perbaikan dilakukan sampai item pengujian tersebut
dinyatakan berhasll.
c. Jika masih ada kerang/sampah yang masih tersangkut di pipa drain, maka pihak ke-3 harus
bersedia mengganti dimensi pipa drain sarnpai tidak ada kerang/sampah yang tersangkut lagi. (untuk backwash filter DSWP)
d. Dokumentasi setiap proses commissioning.
(7) Pelaporan
a. Membuat report dan dokumentasi terkait proses plug and play dari awal sampai akhir proses
yang disetujui oleh direksi pekerjaan.
(8) Training
Memberikan training kepada personel PT PJB UP Muara Tawar dengan rincian sebagai
berikut:
a. Training untuk Engineer (2 orang) terkait dengan mekanisme dan system backwash filter
baru.
b. Training untuk bidang operasi (5 orang) terkait dengan sistem pengoperasian backwash filter
baru.
c. Training untuk bidang pemeliharaan (3 orang) terkait sistem pemeliharaan backwash filter
baru.