REKAPITULASI RENCANA ANGGARAN BIAYA
PEMBANGUNAN JARINGAN IRIGASI TERSIER COT TRIENG
KOTA LHOKSEUMAWE
NO PEKERJAAN JUMLAH BIAYA (
Rp.) TOTAL JUMLAH BIAYA (Rp.) I PEKERJAAN PERSIAPAN 45,000,000.00 A. Pembersihan Lapangan 4,000,000.00
B. Pemasangan profil dan Pengukuran Awal (MC.0) 30,000,000.00
C. Direksi Keets, Los Kerja dan Gudang 10,000,000.00
D. Pembuatan Papan Nama Proyek 1,000,000.00
II PEKERJAAN SALURAN TERSIER COT TRIENG KIRI 2,793,875,801.07
A. Pembangunan Saluran Tersier (L = 2553 m) 2,762,608,061.35
B. Pekerjaan Box Tersier Tipe - II (2 unit) 10,289,298.54 C. Pekerjaan Box Tersier Tipe - III (2 uit) 10,231,272.39
D. Pekerjaan Box Kuarter (3 unit) 10,747,168.80
III PEKERJAAN SALURAN TERSIER COT TRIENG KANAN 3,134,238,767.67
A. Pembangunan Saluran Tersier (L = 2057 m) 2,846,499,486.39
B. Bangunan Bagi Sadap (4 unit) 152,190,023.45
C. Pekerjaan Gorong-gorong/box culvert (1 unit) 18,542,229.98
D. Pekerjaan Talang Air (1 unit) 91,557,027.84
E. Pintu sorong rangka baja (13 buah) 25,450,000.00
IV PEKERJAAN SALURAN TERSIER COT TRIENG KANAN A 1,141,596,165.16
A. Pembangunan Saluran Tersier (L = 1047 m) 1,123,629,257.95
B. Pekerjaan Box Tersier Tipe - II (3 unit) 14,776,318.11
C. Pekerjaan Box Kuarter (1 unit) 3,190,589.10
V PEKERJAAN SALURAN TERSIER COT TRIENG KANAN B 1,050,547,101.04
A. Pembangunan Saluran Tersier (L = 846 m) 1,035,419,086.41
B. Pekerjaan Box Tersier Tipe - I (1 unit) 11,937,425.52
C. Pekerjaan Box Kuarter ( 1 unit) 3,190,589.10
VI PEKERJAAN SALURAN TERSIER COT TRIENG KANAN C 1,324,717,844.85
A. Pembangunan Saluran Tersier (L = 1080 m) 1,309,589,830.22
B. Pekerjaan Box Tersier Tipe - I (1 unit) 11,937,425.52
C. Pekerjaan Box Kuarter (1 unit) 3,190,589.10
VII PEKERJAAN LAIN-LAIN 35,000,000.00
A. Administrasi, Progress dan Pelaporan 8,000,000.00
B. Pengukuran dan Pembuatan Mutual Check (MC) 20,000,000.00
C. Foto Dokumentasi 2,000,000.00
D. P3K dan Obat -obatan 5,000,000.00
9,524,975,679.78
9,524,970,000.00
Terbilang : " Sembilan Milyar Lima Ratus Dua Puluh Empat Juta Sembilan Ratus Tujuh Puluh Ribu Rupiah"
Lhokseumawe, Desember 2008
Menyetujui,
Kepala Dinas Pekerjaan Umum
PT. Citra Rancang Global
Kota Lhokseumawe
IR. KAMARUZZAMAN
MUSTAFA UMAR ST
Nip. 110045829
Direktur Utama
Mengetahui,
Menyetujui,
Pengguna Anggaran
Pejabat Pembuat Komitmen
Bappeda Kota Lhokseumawe
Bappeda Kota Lhokseumawe
DRS. T. SOFYANSYAH
TAUFIK S.Sos
PEMBINA TK. I/Nip. 010092878
Nip. 010281789
JUMLAH DIBULATKAN
RENCANA ANGGARAN BIAYA
PEMBANGUNAN JARINGAN TERSIER COT TRIENG KIRI (L = 2351 meter) DESA COT TRIENG - KOTA LHOKSEUMAWE
NO URAIAN PEKERJAAN STN VOLUME ANALISA HARGA SATUAN
(Rp.)
JUMLAH HARGA (Rp.) I PEKERJAAN SALURAN IRIGASI
Saluran Tersier Cot Trieng Kiri m 2,351.00
1. Galian tanah m3 1,747.62 Anl A1 27,675.00 48,365,311.55 2. Timbunan tanah m3 3,605.47 Anl D2 99,190.00 357,626,346.12 3. Striping/kupasan m2 8,544.70 Anl B1 2,035.00 17,388,462.06 4. Beton K-175 m3 1,290.83 Anl Supl 1a 1,812,192.10 2,339,227,941.62 2,762,608,061.35
II PEKERJAAN BANGUNAN IRIGASI
A. Pekerjaan Box Tersier Tipe - II Unit 2.00
1. Galian tanah m3 7.09 Anl A1 27,675.00 196,160.40 2. Timbunan tanah m3 4.42 Anl D2 99,190.00 438,419.80 3. Beton K-175 m3 4.66 Anl. Supl 1a 1,812,192.10 8,437,566.42 4. Pas. Batu 1:4 m3 1.66 Anl E2 561,700.00 932,983.70 5. Plasteran 1:2 m2 6.44 Anl G.50h 44,125.50 284,168.22 10,289,298.54
B. Pekerjaan Box Tersier Tipe - III Unit 2.00
1. Galian tanah m3 7.09 Anl A1 27,675.00 196,160.40 2. Timbunan tanah m3 3.84 Anl D2 99,190.00 380,393.65 3. Beton K-175 m3 4.66 Anl. Supl 1a 1,812,192.10 8,437,566.42 4. Pas. Batu 1:4 m3 1.66 Anl E2 561,700.00 932,983.70 5. Plasteran 1:2 m2 6.44 Anl G.50h 44,125.50 284,168.22 10,231,272.39
C. Pekerjaan Box Karter Unit 3.00
1. Galian tanah m3 4.87 Anl A1 27,675.00 134,832.60 2. Timbunan tanah m3 11.85 Anl D2 99,190.00 1,175,401.50 3. Beton K-175 m3 4.20 Anl. Supl 1a 1,812,192.10 7,611,206.82 4. Pas. Batu 1:4 m3 2.49 Anl E2 561,700.00 1,399,475.55 5. Plasteran 1:2 m2 9.66 Anl G.50h 44,125.50 426,252.33 10,747,168.80 31,267,739.73 2,793,875,801.07 Lhokseumawe, Desember 2008 PT. Citra Rancang Global
MUSTAFA UMAR ST Direktur Utama JUMLAH ( I + II ) JUMLAH I JUMLAH II (A+B+C) Jumlah A Jumlah C Jumlah B
RENCANA ANGGARAN BIAYA
PEMBANGUNAN JARINGAN TERSIER COT TRIENG KANAN (2057 meter) DESA COT TRIENG - KOTA LHOKSEUMAWE
NO URAIAN PEKERJAAN STN VOLUME ANALISA HARGA SATUAN
(Rp.)
JUMLAH HARGA (Rp.) I PEKERJAAN SALURAN IRIGASI
Saluran Tersier Cot Trieng Kanan m 2,057.00
1. Pembongkaran Saluran dan Bangunan Lama m 1,243.00 Ls 10,000.00 12,430,000.00 2. Galian tanah m3 1,488.83 Anl A1 27,675.00 41,203,370.25 3. Timbunan tanah m3 3,972.34 Anl D2 99,190.00 394,015,908.65 4. Striping/kupasan m2 78.75 Anl B1 2,035.00 160,256.25 5. Beton K-175 m3 1,323.64 Anl Supl 1a 1,812,192.10 2,398,689,951.24 2,846,499,486.39
II PEKERJAAN BANGUNAN IRIGASI
A. Bangunan Bagi Sadap unit 4.00
1. Galian tanah m3 99.80 Anl A1 27,675.00 2,762,092.31 2. Timbunan tanah m3 105.17 Anl D2 99,190.00
3. Beton K-175 m3 49.30 Anl. Supl 1a 1,812,192.10 89,345,057.35 4. Beton K-225 m3 11.94 Anl. Supl 1b 3,590,848.48 42,863,958.25 5. Pas. Batu 1:4 m3 28.72 Anl E2 561,700.00 16,133,428.25 6. Plasteran 1:2 m2 24.60 Anl G.50h 44,125.50 1,085,487.30 152,190,023.45
B. Pekerjaan Gorong-gorong/box culvert unit 1.00
1. Galian tanah m3 8.80 Anl A1 27,675.00 243,540.00 2. Beton K-225 m3 2.80 Anl. Supl 1b 3,590,848.48 10,054,375.73 3. Pas. Batu 1:4 m3 12.36 Anl E2 561,700.00 6,942,612.00 4. Plasteran 1:2 m2 29.50 Anl G.50h 44,125.50 1,301,702.25 18,542,229.98
C. Pekerjaan Talang Air unit 1.00
1. Galian tanah m3 123.89 Anl A1 27,675.00 3,428,655.75 2. Pas. Batu 1:4 m3 56.88 Anl E2 561,700.00 31,949,496.00 3. Plasteran 1:2 m2 132.16 Anl G.50h 44,125.50 5,831,626.08 4. Beton tumbuk 1:3:5 m3 11.04 Anl G.44 657,610.00 7,263,170.93 5. Beton K-175 m3 0.43 Anl. Supl 1a 1,812,192.10 784,679.18 6. Beton K-225 m3 9.90 Anl. Supl 1b 3,590,848.48 35,549,399.90 7. Cerucuk Kayu m 30.00 Ls 125,000.00 3,750,000.00 8. Perancah Ls 1.00 Ls 3,000,000.00 3,000,000.00 91,557,027.84
D. Pintu sorong rangka baja BH 13.00
1. Pintu Uk. B = 1.3 H = 0.8 BH 1.00 Ls 2,500,000.00 2,500,000.00 2. Pintu Uk. B = 1.0 H = 0.65 BH 1.00 Ls 2,200,000.00 2,200,000.00 3. Pintu Uk. B = 0.9 H = 0.55 BH 1.00 Ls 2,100,000.00 2,100,000.00 4. Pintu Uk. B = 0.8 H = 0.55 BH 1.00 Ls 2,000,000.00 2,000,000.00 5. Pintu Uk. B = 0.8 H = 0.5 BH 4.00 Ls 1,900,000.00 7,600,000.00 6. Pintu Uk. B = 0.5 H = 0.5 BH 4.00 Ls 1,800,000.00 7,200,000.00 7. Pintu Uk. B = 0.5 H = 0.8 BH 1.00 Ls 1,850,000.00 1,850,000.00 25,450,000.00 287,739,281.27 3,134,238,767.67 Lhokseumawe, Desember 2008 PT. Citra Rancang Global
MUSTAFA UMAR ST Direktur Utama JUMLAH I JUMLAH II (A+B+C+D) JUMLAH TOTAL ( I + II ) Jumlah A Jumlah B Jumlah C Jumlah D
RENCANA ANGGARAN BIAYA
PEMBANGUNAN JARINGAN TERSIER COT TRIENG KANAN A (L = 1047 meter) DESA COT TRIENG - KOTA LHOKSEUMAWE
NO URAIAN PEKERJAAN STN VOLUME ANALISA HARGA SATUAN
(Rp.)
JUMLAH HARGA (Rp.) I PEKERJAAN SALURAN IRIGASI
Saluran Tersier Cot Trieng Kanan A m 1,047.00
1. Galian tanah m3 430.40 Anl A1 27,675.00 11,911,320.00 2. Timbunan tanah m3 1,534.23 Anl D2 99,190.00 152,180,273.70 3. Striping/kupasan m2 4,418.76 Anl B1 2,035.00 8,992,166.43 4. Beton K-175 m3 524.53 Anl Supl 1a 1,812,192.10 950,545,497.83 1,123,629,257.95
II PEKERJAAN BANGUNAN IRIGASI
A. Box Tersier TIPE-II unit 3.00
1. Galian tanah m3 10.63 Anl A1 27,675.00 294,240.60 2. Timbunan tanah m3 6.63 Anl D2 99,190.00
3. Beton K-175 m3 6.98 Anl. Supl 1a 1,812,192.10 12,656,349.63 4. Pas. Batu 1:4 m3 2.49 Anl E2 561,700.00 1,399,475.55 5. Plasteran 1:2 m2 9.66 Anl G.50h 44,125.50 426,252.33 14,776,318.11
B. Box Kuarter unit 1.00
1. Galian tanah m3 1.62 Anl A1 27,675.00 44,944.20 2. Timbunan tanah m3 3.95 Anl D2 99,190.00
3. Beton K-175 m3 1.40 Anl. Supl 1a 1,812,192.10 2,537,068.94 4. Pas. Batu 1:4 m3 0.83 Anl E2 561,700.00 466,491.85 5. Plasteran 1:2 m2 3.22 Anl G.50h 44,125.50 142,084.11 3,190,589.10 17,966,907.21 1,141,596,165.16 Lhokseumawe, Desember 2008 PT. Citra Rancang Global
MUSTAFA UMAR ST Direktur Utama JUMLAH I Jumlah B JUMLAH ( I + II ) Jumlah A JUMLAH II (A+B)
RENCANA ANGGARAN BIAYA
PEMBANGUNAN JARINGAN TERSIER COT TRIENG KANAN B (L = 846 meter) DESA COT TRIENG - KOTA LHOKSEUMAWE
NO URAIAN PEKERJAAN STN VOLUME ANALISA HARGA SATUAN
(Rp.) JUMLAH HARGA (Rp.) I PEKERJAAN SALURAN IRIGASI
Saluran Tersier Cot Trieng Kanan B m 846.00
1. Galian tanah m3 158.51 Anl A1 27,675.00 4,386,764.25 2. Timbunan tanah m3 2,277.60 Anl D2 99,190.00 225,915,144.00 3. Striping/kupasan m2 3,952.14 Anl B1 2,035.00 8,042,604.90 4. Beton K-175 m3 439.84 Anl Supl 1a 1,812,192.10 797,074,573.26 1,035,419,086.41
II PEKERJAAN BANGUNAN IRIGASI
A. Box Tersier TIPE-I unit 1.00
1. Galian tanah m3 3.18 Anl A1 27,675.00 88,117.20 2. Timbunan tanah m3 3.25 Anl D2 99,190.00
3. Beton K-175 m3 5.69 Supl 1a 1,812,192.10 10,307,748.66 4. Pas. Batu 1:4 m3 2.49 Anl E2 561,700.00 1,399,475.55 5. Plasteran 1:2 m2 3.22 Anl G.50h 44,125.50 142,084.11 11,937,425.52
B. Box Kuarter unit 1.00
1. Galian tanah m3 1.62 Anl A1 27,675.00 44,944.20 2. Timbunan tanah m3 3.95 Anl D2 99,190.00
3. Beton K-175 m3 1.40 Supl 1a 1,812,192.10 2,537,068.94 4. Pas. Batu 1:4 m3 0.83 Anl E2 561,700.00 466,491.85 5. Plasteran 1:2 m2 3.22 Anl G.50h 44,125.50 142,084.11 3,190,589.10 15,128,014.62 1,050,547,101.04 Lhokseumawe, Desember 2008 PT. Citra Rancang Global
MUSTAFA UMAR ST Direktur Utama JUMLAH I Jumlah A Jumlah B JUMLAH II (A+B) JUMLAH ( I + II )
RENCANA ANGGARAN BIAYA
PEMBANGUNAN JARINGAN TERSIER COT TRIENG KANAN B (L = 1080 meter) DESA COT TRIENG - KOTA LHOKSEUMAWE
NO URAIAN PEKERJAAN STN VOLUME ANALISA HARGA SATUAN
(Rp.) JUMLAH HARGA (Rp.) I PEKERJAAN SALURAN IRIGASI
Saluran Tersier Cot Trieng Kanan C m 1,080.00
1. Galian tanah m3 100.18 Anl A1 27,675.00 2,772,481.50 2. Timbunan tanah m3 2,906.32 Anl D2 99,190.00 288,277,880.80 3. Striping/kupasan m2 5,101.11 Anl B1 2,035.00 10,380,758.85 4. Beton K-175 m3 556.32 Anl Supl 1a 1,812,192.10 1,008,158,709.07 1,309,589,830.22
II PEKERJAAN BANGUNAN IRIGASI
A. Box Tersier TIPE-I unit 1.00
1. Galian tanah m3 3.18 Anl A1 27,675.00 88,117.20 2. Timbunan tanah m3 3.25 Anl D2 99,190.00
3. Beton K-175 m3 5.69 Supl 1a 1,812,192.10 10,307,748.66 4. Pas. Batu 1:4 m3 2.49 Anl E2 561,700.00 1,399,475.55 5. Plasteran 1:2 m2 3.22 Anl G.50h 44,125.50 142,084.11 11,937,425.52
B. Box Kuarter unit 1.00
1. Galian tanah m3 1.62 Anl A1 27,675.00 44,944.20 2. Timbunan tanah m3 3.95 Anl D2 99,190.00
3. Beton K-175 m3 1.40 Supl 1a 1,812,192.10 2,537,068.94 4. Pas. Batu 1:4 m3 0.83 Anl E2 561,700.00 466,491.85 5. Plasteran 1:2 m2 3.22 Anl G.50h 44,125.50 142,084.11 3,190,589.10 15,128,014.62 1,324,717,844.85 Lhokseumawe, Desember 2008 PT. Citra Rancang Global
MUSTAFA UMAR ST Direktur Utama JUMLAH I Jumlah A Jumlah B JUMLAH II (A+B) JUMLAH ( I + II )