Open Geospatial Consortium

Document OGC 07-101

CR-Form-v3

CHANGE REQUEST

SensorML CR ?

 rev -  Current version: 1.0 

For HELP on using this form, see bottom of this page or look at the pop-up text over the

symbols.

Proposed change affects:  AS Imp Spec X Best Practices Paper Other

Title:  SensorML change request - Use more ISO terms

Source:  Arliss Whiteside

Work item code:Date:  2007-10-16

Category:C (Changes functional names)

Use one of the following categories:

F (Critical correction)

A (corresponds to a correction in an earlier release)

B (Addition of feature),

C (Functional modification of feature)

D (Editorial modification)

Reason for change:  OGC Implementation Specifications should use all relevant terms already specified in the OGC Abstract Specification, which includes ISO 19111, 19115, 19119, and 19123.

Summary of change:  Change some terms in the SensorML specification to be consistent with terms with the same meanings already specified in the OGC Abstract Specification, including change “Process” to “Operation” throughout specification

Consequences if

not approved: Continued lack of using all relevant terms already specified in the OGC Abstract Specification and used in other Implementation Specifications, producing reader confusion

Clauses affected:  Most

Other specs  Other core specifications 

Affected: Abstract specifications

(2)

OGC 07-101

Change #1: Change “Process” to “Operation”

Specific change: Change the word “Process” to “Operation” throughout the SensorML specification, including in compound names such as ProcessModel and ProcessChain, and edit the surrounding text as needed for consistency

Background: The term “Process” is not used in the OGC Abstract Specification with a meaning similar to its use in SensorML. The term “Operation” is used in ISO 19119 and 19111 (in compound names including CoordinateOperation, SingleOperation,

ConcatenatedOperation, etc.) with essentially the same meaning as “Process” in SensorML.

Explain change: Add following paragraph to Subclause 9.1 (after renumbering suggested in OGC 07-132) in the specification:

“Some of the communities expected to use SensorML would more easily understand the term “Process” instead of “Operation”, so “Process” was used in previous versions of the SensorML specification (in OGC 07-000 and its predecessors). However, the term “Process” is not used in the OGC Abstract Specification with a meaning similar to its use in SensorML. The term “Operation” is used in OGC Abstract Specification topics 12 and 2 (in ISO 19119 and 19111, in compound names including CoordinateOperation) with essentially the same meaning as “Process” in SensorML. Since SensorML is an OGC document (which may be submitted to ISO/TC 211), the term “Process” has thus been changed to “Operation” throughout the SensorML specification, including in compound names such as OperationModel and OperationChain.”

Referensi

Dokumen terkait

ketentuan yang ditetapkan dalam PERPRES 54 Tahun 2010 dan yang dirubah dengan PEMERINTAH KOTA MAKASSAR. DINAS PEKERJAAN UMUM PANITIA PENGADAAN BARANG DAN JASA BIDANG BANGUNAN

Manfaat yang diperoleh dari penelitian ini yaitu mendapatkan informasi tentang efektivitas penambahan jintan hitam dengan suplemen vitamin C dalam ransum terhadap

Tujuan dari penelitian ini adalah untuk mengevaluasi pengaruh pektin dari kulit jeruk terhadap sifat-sifat fisik sherbet yang meliputi overrun, resistensi pelelehan,

Tujuan tersebut seiring dengan UU Sisdiknas yang berbunyi pendidikan anak usia dini (PAUD) adalah suatu upaya pembinaan yang ditunjukan kepada anak sejak lahir

Negara Republik Indonesia melakukan penambahan penyertaan modal Negara pada Asian Development Bank yang keanggotaannya disahkan dengan Undang-Undang Nomor 8 Tahun

Folanda, Erich., “Kebijakan Pemidanaan Terhadap Anak Melalui Sanksi Pidana Kerja Sosial Dalam Rangka Pembaharuan Hukum Pidana Anak Indonesia”, Tesis, Program Studi Magister

bahwa berdasarkan pertimbangan sebagaimana dimaksud dalam huruf a dan untuk melaksanakan ketentuan Pasal 4 ayat (4) Undang-Undang Nomor 19 Tahun 2003 tentang

Pada hari ini Jum’at Tanggal Dua Puluh Sembilan Juli Tahun 2016 (29/07/2016) Kelompok Kerja (Pokja) Pengadaan Barang/ Jasa Konstruksi Bidang Bina Marga