(1)

SULIT /CONFIDENTTA L

ADDENDUM TO THE LOAN AGREEMENT BETWEEN

THE REPUBUC OF I NDONESIA AND THE BRUNEI INVESTMENT AGENCY

WHEREAS

1.

The Republic of Indonesia and the Brunei Investment Agency entered into the abovementioned Loan

Agreement on 25tll February 1988 in which the Government of His Majesty the Sultan and Yang

Di-Pertuan of Brunei Darussalam agreed, subject to the terms contained in the said Loan Agreement, to

make available to the Government of the Republic of Indonesia a Loan facility of US$100,000,000 (US

Dollars One Hundred Million only) ("the Loan") for the purpose of the financing of economically viable

projects which benefit the economic infrastructure of the Republic of Indonesia;

2.

The Republic of Indonesia has made fourteen instalment repayments, the last repayment being made

on 25 May 1998, in accordance with the repayment periods set out in Schedule 1 hereto;

3.

Due to the economic and financial constrains faced by the Republic of Indonesia, the Republic of

Indonesia has made a request to the Brunei Investment Agency to consider postponing the 15th to the

21" instalment repayments of the principal sum falling due under the said Loan Agreement for the

penod 25th August 1998 to 25th February 2000 totaling a sum of US$6,930,693.07 (US Dollars Six

Million Nine Hundred and Thirty Thousand Six Hundred and Ninety Three and Seven Cents Only).

NOW IT IS AGREED between the Parties hereto as follows:

1.

Clause 5 of the said Loan Agreement is amended to the extent that the Borrower will pay the 15

1'

to

the 21ot Instalment repayments of the principal sum falling due under the said Loan Agreement for the

period 25t11 August 1998 to 25th February 2000 in a form of diminishing Instalment beginning from 25t11

May 2000 until 25 February 2020 in accordance with the revised repayment schedule annexed hereto

as Schedule 2.

2.

All the other terms and conditions of the said Loan Agreement save as amended herein shall stand

unamended and remain in full force and effect.

IN WITNESS WHEREOF this Addendum has been executed in duplicate by the authorised representatives of

the Parties hereto this

2S...

March, 2000.

SIGNED

For and on behalf of

THE BRUNEI INVESTMENT AGENCY

IN THE PRESENCE OF

SIGNED

For and on behalf of

THE REPUBUC OF INDONESIA

IN THE PRESENCE OF

)

)

)

)

)

Signed

... ,-. ... = ... .

(Haji Muhd. Syaippudin bin Haji Abdullah)

Managing Director

Brunei Investment Agency

Ministry of Finance

Brunei Darussalam

Signed

( Haji Yakob bin Haj i

Director, Asset

m[L L セ[LョーュLf^ョエ G@

Brunei Investment

Ministry of Finance

Brunei Darussalam

Signed

( H.E. Mr. Rahardjo

ッ[LLN[ッョ セ N。ッ ャ ゥo@

Ambassador Extraordinary and Plen

Embassy of Republic of Indonesia

b。ョ、。セョ@

Begawan

Signed

...

...

セ@

..

,.

... .

( Mr. Ridwfiin Yahya)

Minister/Deputy Chief of Mission

Embassy of the Republic of

Bandar Seri Begawan

(2)

2 3 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

LOAN

USS:-DATE 25-Fel>-95 25-May-95 25-Aug-95 25-Nov-95 25-Fei>-96 25-May-98 25-Au0-96 25-Nov-98 25-Fel>-97 25-May-97 25-Aug-97 25-Nov-97 25-Fel>-98 25-Mey-98 25-Aug-98 25-Nov-98 25-Fel>-99 25-May-99 25-Aug-99 25-Nov-99 25-Fel>-2000 25-May-2000 25-Aul!-2000 25-Nov-2000 25-Fei>-2001 25-May-200 1 25-Aug-2001 25-Nov-2001 25-Fel>-2002 25-May-2002 25-Aug-2002 25-Nov-2002 25-Fcl>-2003 25-May-2003 25-Aug-2003 25-Nov-2003 25-Fel>-2004 25-May-2004 25-Aug-2004 25-Nov-2004 25-Fel>-2005 25-May-2005 25-AUI!-2005 25-Nov-2005 25-Feb-2006 25-May-2006 25-Aug-2006 25-Nov-2006 25-Feb-2007 25-May-2007 SUB TOTAL

SULTT/CONFlDENTIAL

LOAN REPAYMENT IN ACCORDANCE WITH THE LOAN AGREEMENT

MADE ON 25 FEBRUARY 1988 BETWEEN THE REPUBLIC OF

INDONESIA AND THE BRUNEI INVESTMENT AGENCY

100.000.000.00

BALANCE OF LOAN BIF

100.000,000 00 99,009,900.99 98,019,801 .98 97,029,702.97 96,039,603.96 95,049,504 95 94.059,405.94 93,069,306.93 92,079.207 92 91 ,089.108.91 90,099,009.90 89,108,910.89 88.118,811 .88 87.128,712.87 86,136.613.86 85,148,514.85 84,158,415 84 83,168,316 83 82,178,217 82 81,188.118.81 80,198,019.80 79,207,920.79 78,217,821 78 77,227,72277 76,237,623.78 75,247.524.75 74.257,425.74 73,267,326.73 72.277,227.72 71 .287,128.71 70,297,029 70 69,306,930.69 68.316.831 .68 67.326.732 67 66,336,633.66 65.346,534.65 64,356,435 64 63.366.336.63 62.376.237 62 61,386,138.61 60,396,039.60 59.405.940.59 58,415,841 .58 57,425,742.57 56 .• 35,643.56 55,445,544.55 54,455,445.54 53,465.346 53 52,475,247.52 51,485,148 51 92 92 90 92 92 92 89 92 92 92 92 92 89 92 92 92 89 92 92 92 90 92 92 92 89 92 92 92 89 92 92 92 89 92 92 92 90 92 92 92 89 92 92 92 89 92 92 92 89

INTEREST P.A ·•

PRINCIPAL PAYMENT 990.099.01 990,099.01 990,099 01 990.099.01 990,099.01 990,099.01 990.099.01 990,099 01 990,099,01 990,099.01 990,099 01 990.099,01 990,099.01 990,099.01 990.099.01 990,099.01 990,099.01 990,099.01 990,099.01 990.099.01 990,099.01 990,099.01 990.09901 990,099.01 990,09901 990,09901 990,099.01 990,099.01 990,099.01 990,099.01 990,099.01 990,099.01 990.099.01 990,099.01 990,099.01 990,099.01 990,099 01 990.099,01 990.099.01 990,099.01 990,099.01 990,099.01 990,099 01 990,099.01 990,09901 990,099.01 990,099.01 990,09901 990,099.01 990,09901 49,504,950.50

NUMBER OF 0.00% REPAYMENTS

INTEREST PAYMENT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 000 0.00 0.00 000 0.00 0 .00 000 000 0.00 000 0.00 0.00 0.00 0.00 0.00 000 0.00 0.00 0.00 0.00 0.00 000 0.00 000 0.00 0.00 000 0.00 0.00 000 0.00 0.00 000 0.00 000 0.00 TOTAL REPAYMENT 990,099.01 990.09901 990,099.01 990,09901 990.099.01 990,099.01 990.09901 990.099.01 990,099.01 990.09901 990,099 01 990.099.01 990,099.01 990,099.01 990,099.0 1 990,099 0 1 990.099.01 990,09901 990.099 01 990.099.01 990,099.01 990.099 01 990,099.01 990,099.01 990,099 01 990.099.01 990,099.01 990,099.01 990,099.01 990,099.01 990,099 01 990,099.01 990.099.01 990.099 01 990.099.01 990,099.01 990,099 01 990.099.01 990.09901 990,099.01 990,099.01 990,099.01 990,099.01 990,099.01 990,099 01 990,099.01 990,099.01 990,099.01 990,099.01 990,099 01 49,504,950.50

SUUT

/CON F l DENTI/\L

SCHEDULE 1

(3)

SUB TOTAL CIF

51 25-Aug-2007 52 25-Nov-2007 53 25-Feb-2008 54 25-May-2008 55 25-Aug-2008 56 25-Nov-2008 57 25-F.,b-2009 58 RU ᄋ mセケMRPPY@

59 25-Aug-2009 60 25-Nov-2009 61 25-Feb-2010 82 25-May-2010 63 25-Aug-201 0 64 25-Nov-2010 65 25-Feb-201 1

66 26-May-2011 67 25-Aug-201 1 68 25-Nov-201 I 69 25-Feb-2012 70 25-May-2012 71 25-Aug-2012 72 25-Nov-2012 73 25-Feb-2013 74 25-May-2013 75 25-Aug-2013 76 25-Nov-2013 77 25-Feb-2014 78 25-May-2014 79 25-Aug-2014 80 25-Nov-2014 81 25-Feb-2015 82 25-Msy-2015 83 25-Aug-2015 54 25-Nov-2015 85 25-Feb-2016 80 25-May-2016 87 25-Aug-2016 88 25-Nov-2016 89 25-Fet>-2017 90 25-May-20 17 91 25-Aug-2017 92 25-Nov-2017 93 25-Feb-2018 94 25-May-2018 95 25-Aug-2018 96 25-NOV-2018 97 25-Fet>-2019 98 25-May-20 19 99 25-Aug-2019 100 25-Nov-20 19 101 25-Feb-2020

GRAND TOTAL

SU LIT/CONFIOENTIAL

SCHEDULE 1 (cont.)

LOAN REPAYMENT IN ACCORDANCE WITH THE LOAN AGREEMENT

MADE ON 25 FEBRUARY 1988 BETWEEN THE REPUBLIC OF

INDONESIA AND THE BRUNE/INVESTMENT AGENCY

49,504,950.50 0.00 49,504,950.50

50,495,049 50 92 990,099.01 0 .00 990,099.0 1 49,504,950 49 92 990,099 01 0.00 990.099.01 48,514,851 48 92 990,099.0 1 0.00 990,099 Oi 47,524,752 47 90 990,099.01 000 990,099 01 46,534,&53.46 92 990.09901 0.00 990,099.01 45.544,554 45 92 990,099.01 0.00 990.099 0 1 44.554,455.44 92 990,099.01 000 990,099.01 43,554,356 43 89 990,099.01 0.00 990,099.01 42.574.257.42 92 990,099.01 000 990,099 01

41,564,158.41 92 990.099.01 0.00 99009901 40.594,059.40 92 990,099.01 000 990.099.01 39,603.960.39 92 990.099.01 0.00 990,099.01 38,613,861.38 92 990.099.01 0.00 990,099 01 37,623,762.37 89 990,099.01 0.00 990,099.01 36,633,663.36 92 990,099.01 0.00 990,099.0 1 35.643,564.35 89 990.099.01 0.00 990.099 01 34,653.465 34 92 990,099.01 0.00 990.099.01 33.663,366 33 92 990,099.01 0.00 990,099 0 1 32,673,267 32 92 990,099 01 000 990,099.01 31,683,168 31 90 990,099.01 0.00 990,099.01 30,693,069 30 92 990,099.01 000 990,099 01 29,702,970.29 92 990,099.01 000 990,099.01 28.712,87 1 28 92 990,099.01 0.00 990.099.01 27,722,772.27 89 990,099.01 0.00 990,099.01 26,732.673.26 92 990,099.01 0.00 990,099.01 25,742.574.25 92 990,099.01 000 990.099.0 1 24,752,475 24 92 990.099.01 0.00 990,099.0 1 23,762,376.23 89 990,099.01 000 990,099 0 1 22,772,277 22 92 990,099.01 0 .00 990,099.01 21 ,782,178.21 92 990,099.01 0.00 990,099.0 1 20,792,079.20 92 990,099.01 000 990,099 01 19,801.980 19 89 990.09901 0.00 990,099.01 18,811 ,881 .18 92 990,099 01 0.00 990,099 01 17,821,782 17 92 990.099.01 0.00 990,099,01 16,831,683,16 92 990,099.01 0.00 990.099.01 15,641,564.15 90 990.099.01 0.00 990,099.01 14,851,485 14 92 990,099.01 0.00 990,099.01 13,861.386.13 92 990,099.01 0.00 990.099.0 1 12,871 ,287.12 92 990,099.01 0.00 990,099.01 11,881,188.11 89 990,099.0 1 0.00 990,099 01 10,891,089.10 92 990,099.01 0.00 990,099.01 9,900,990.09 92 990,099.0 1 0.00 990,099.01 8,910,891 .08 92 990,099.01 0.00 990,099.01 7,920.792.07 89 990.099.01 0.00 990,099.01 6,930,693.06 92 990,099.01 000 990,099.01 5,940,594 05 92 990,099.0 1 0.00 990,099 01 4,950,495.04 92 990,099.01 0.00 990,099.01 3.960.396.03 89 990.099.01 0.00 990,099.01 2,970.297.02 92 990,099.0 1 0.00 990,099.01 1,980,198.01 92 990,099.0 1 0.00 990,099.01 990,099 00 92 990,099.00 000 990,099 00

100,000,000.00

o.oo

100,000,000.00

セ@

(4)

SU LIT/CON f<rDENTIAL

SCHEDULE 2

REVISED LOAN REPAYMENT IN ACCORDANCE WITH THE ADDENDUM

TO THE LOAN AGREEMENT BETWEEN THE REPUBLIC OF

INDONESIA AND THE BRUNE/INVESTMENT AGNECY

Balance

Principal

Balance of

Instalment

of Loan B/F

Repayments

Loan C/F

No.

Dates

US$

US$

US$

15

25-Aug-1998

-16

25-Nov-1998

-17

25-F eb-1999

-18

25-May-1999

-19

25-Aug-1999

-20

25-Nov-1999

.

21

25-Feb-2000

.

22

25-May-2000

86,138,613.86

1,292,079.21

84,846,534.65

23

25-Aug-2000

84,846,534.65

1,292,079.21

83,554,455.44

24

25-Nov-2000

83,554,455.44

1,292,079.21

82,262,376.23

25

25-Feb-2001

82,262,376.23

1,292,079.21

80,970,297 02

26

25-May-2001

80,970,297.02

1,076,732.67

79,893,564.35

27

25-Aug-2001

79,893,564.35

1,076,732.67

78,816,831 .68

28

25-Nov-2001

78,816,831 .68

1,076,732.67

77,740,099.01

29

25-Feb-2002

77,740,099.01

1,076,732.67

76,663,366.34

30

25-May-2002

76,663,366.34

1,076,732.67

75.586,633.67

31

25-Aug-2002

75,586,633.67

1,076,732.67

74,509,901 .00

32

25-Nov-2002

74,509,901.00

1,076,732.67

73,433,168.33

33

25-Feb-2003

73,433,168.33

1,076,732.67

72,356,435.66

34

25-May-2003

72,356,435.66

1,076,732.67

71,279,702.99

35

25-Aug-2003

71 ,279,702.99

1,076,732.67

70,202,970.32

36

25-Nov-2003

70,202,970.32

1,076,732.67

69,126,237.65

37

25-Feb-2004

69,126,237.65

1,076.732.67

68,049,504.98

38

25-May-2004

68,049,504.98

1,076,732.67

66,972,772.31

39

25-Aug-2004

66,972,772.31

1,076,732.67

65,896,039.64

40

25-Nov-2004

65,896,039.64

1,076,732.67

64,819,306.97

41

25-Feb-2005

64,819,306.97

1,076,732.67

63,742,574.30

42

25-May-2005

63,742,574.30

1,076,732.67

62,665,841 .63

43

25-Aug-2005

62,665,841 .63

1,076,732 67

61,589,108.96

44

25-Nov-2005

61 ,589, 108.96

1,033,663.37

60,555,445.59

45

25-Feb-2006

60,555,445.59

1,033,663.37

59,521 ,782.22

46

25-May-2006

59,521 ,782.22

1,033,663.37

58,488,118.85

47

25-Aug-2006

58,488,118.85

1,033,663.37

57,454,455.48

48

25-Nov-2006

57,454,455.48

1,033,663.37

56,420,792.1 1

49

25-Feb-2007

56,420,792.11

1,033,663.37

55,387,128.74

so

25-May-2007

55,387,128.74

1,033.663 37

54,353,465.37

51

25-Aug-2007

54,353,465.37

1,033,663.37

53,319,802.00

52

25-Nov-2007

53,319,802.00

1,033,663.37

52,286,138.63

53

25-Feb-2008

52,286,138.63

1,033,663.37

51,252,475.26

54

25-May-2008

51,252,475.26

1,033,663.37

50,218,811 .89

55

25-Aug-2008

50,218,811.89

1,033,663.37

49,185,148.52

56

25-Nov-2008

49,185,148.52

1,033,663.37

48,151,485.15

57

25-Feb-2009

48,151 ,485.15

1 ,033,663.37

47,117,821 .78

58

25-May-2009

47,117,821 .78

1.033,663.37

46,084,158.41

59

25-Aug-2009

46,084,158.41

1,033,663.37

45,050,495.04

60

25-Nov-2009

45,050,495.04

1 ,033,663.37

44,016,831 .67

61

25-Feb-201 0

44,016,831 .67

1,033,663.37

42,983,168.30

62

25-May-201 0

42,983,168.30

1,033,663.37

41 ,949,504.93

SUB-TOTAL

B/F

44,189,108.93

.L

SU LI T/CONFIDENTIA L

(5)

SUU

f/ CONFIDENTIAL

SCHEDULE 2 (cont.)

Balance

Principal

Balance of

Instalment

of Loan B/F

Repaym ents

Lo an C/F

No.

Dates

US$

US$

US$

Carried forward

44,189,108.93

41 ,949,504 93

63

25-Aug-201 0

41 ,949,504 93

1 ,033,663.37

40,915,841 .56

64

25-Nov-2010

40,915,841 56

1 ,033,663.37

39,882,178.19

65

25-Feb-2011

39,882,178.19

1,033,663.37

38,848.514.82

66

25-May-2011

38,848,514 82

1,095,874.59

37,752,640.23

67

25-Aug-2011

37,752.640.23

1,095,874.59

36,656,765.64

68

25-Nov-2011

36,656,765.64

1,095,874.59

35,560,891 .05

69

25-Feb-2012

35,560,891 .05

1,095,874 59

34,465,016.46

70

25-May-2012

34,465,016 46

1,095,874 59

33,369,141 87

71

25-Aug-2012

33,369,141 87

1,095,874.59

32,273,267.28

72

25-Nov-2012

32,273,267.28

1.095,874.59

31 ,177,392.69

73

25-Feb-2013

31,177,392.69

1,095,874.59

30,081,518.10

74

25-May-2013

30,081 ,518.10

1,095.874.59

28,985,643.51

75

25-Aug-2013

28,985,643.51

1,095,874.59

27,889,768.92

76

25-Nov-2013

27,889,768.92

1,095,874.59

26,793,894.33

77

25-Feb-2014

26,793,894.33

1,095,874 59

25,698,019.7 4

78

25-May-2014

25,698,019.74

1,095.874.59

24.602,14515

79

25-Aug-2014

24,602,1 45.15

1,095,874 59

23,506,270.56

80

25-Nov-2014

23,506,270 56

1,095,874.59

22,410,395.97

81

25-Feb-2015

22,410,395.97

1,095,874 59

21 ,314,521.38

82

25-May-2015

21,314,521.38

1,095,874.59

20,218,646.79

83

25-Aug-2015

20,218,646.79

1.095,874 .59

19,122,772.20

84

25-Nov-2015

19,122,772.20

1,095,874.59

18,026,897.61

85

25-Feb-2016

18,026,897.61

1,095,874.59

16,931 ,023.02

86

25-May-2016

16,931 ,023.02

1,095,874 59

15,835,1 48.43

87

25-Aug-2016

15,835,1 48 43

1,095,874.59

14,739,273.84

88

25-Nov-2016

14,739,273.84

1 ,052,805 28

13,686,468.56

89

25-Feb-2017

13,686,468 56

1,052,805.28

12,633,663.28

90

25-May-2017

12,633,663.28

1,052,805.28

11 .580,858.00

91

25-Aug-2017

11,580,858.00

1 ,052,805.28

10,528,052.72

92

25-Nov-2017

10,528,052.72

1 ,052,805.28

9,475,247.44

93

25-Feb-2018

9 ,475,247.44

1 ,052,805.28

8,422,442.16

94

25-May-2018

8,422,442.16

1 ,052,805.27

7,369,636.89

95

25-Aug-2018

7,369,636.89

1 ,052,805.27

6 ,316,831 .62

96

25-Nov-2018

6 ,316,831 .62

1,052,805.27

5,264,026.35

97

25-Feb-2019

5,264,026.35

1 ,052,805.27

4,211 ,221 .08

98

25-May-2019

4,211,221 .08

1 ,052,805.27

3,158,415.81

99

25-Aug-2019

3,158,415.81

1 ,052,805.27

2,105.610.54

100

25-Nov-2019

2 ,105,610.54

1 ,052,805.27

1,052,805.27

101

25-Feb-2020

1,052,805.27

1 ,052,805.27

0.00

GRAND TOTAL

86,138,613.86

;;:.

-セ@

(

Referensi

Dokumen terkait

Menurut Wijiyono (2009) terjadinya kenaikan kandungan unsur hara fosfor diduga disebabkan oleh adanya laju dekomposisi yang tinggi menyebabkan pelepasan unsur hara P lebih

lama dan bergantung pada komposisi tanahnya sendiri, bisa mengandung mineral yang cukup tinggi. Diantara karakteristik fisik air tanah adalah larutan sedimen, suhu

Dengan demikian hasil penelitian menunjukan bahwa penggunaan animasi gambar powerpoint pada materi pemantulan cahaya dan pembiasan cahaya dapat meningkatkan prestasi

Hasil penelitian juga menunjukkan bahwa responden yang menilai lingkungan kerja dalam kategori mendukung dan kinerjanya berada pada kategori kurang baik sebanyak 7

Berdasarkan Peraturan Presiden Nomor 70 Tahun 2012 tentang Perubahan Atas Peraturan Presiden Nomor 54 Tahun 2012 tentang Pedoman Pengadaan Barang dan Jasa Pemerintah, Panitia

Namun demikian yang menjadi kekhasan dalam resolusi penyelesaian konflik anarkisme agama di Maluku adalah representasi maupun revitalisasi kearifan lokal berupa pela gandong

Dasar pemikiran perlunya pembaharuan pendidikan anak usia dini (AUD), perkembangan politik dan kebijakan pemerintah dibidang PAUD, dan perkembangan kehidupan

Catatan : Agar membawa dokumen perusahaan asli sesuai dalam isian kualifikasi serta menyerahkan rekaman/copy-nyaM. Demikian undangan dari kami dan atas perhatiannya