• Tidak ada hasil yang ditemukan

EO PMOS SWG Improved way of expressing the timeliness of EO Product acquisition and processing

N/A
N/A
Protected

Academic year: 2017

Membagikan "EO PMOS SWG Improved way of expressing the timeliness of EO Product acquisition and processing"

Copied!
2
0
0

Teks penuh

(1)

All Fields marked with

*

are mandatory.

Name:

*

Steven Smolders

Organization:

*

GIM nv

Email:

*

[email protected]

Document

-"#,#,+/#,#('( )+/#(.,,.&#,,#(''1(."/"'!*.,-.&+

then check here:

'-+-"'.&+"+

'-+-"/,#('.&+-"-1(.++/#,#'!"+

Title:

*

[EO PMOS SWG] Improved way of expressing the timeliness of EO Product acqu

Source:

*

Work item code:

Category:

*

B (Addition of feature)

Reason for

change:

*

Allow better expression of the timeliness of EO product acquisition and processing.

Summary of

change:

*

Addition within the EarthObservationResult/product/ProductInformation class of a new optional property �timeliness� that

specifies the timeliness of the product acquiistion, such as "near real time" or "rush". Possible values are

mission specific and shall refer to mission/ground segment dedicated codeSpace. Example of values are "NRT" or

"NOMINAL"

The current ProcessingInformation/processingMode element is

constrained to a fixed enumeration with values that are not generally applicable and through which the timeliness cannot be correctly expressed. It is proposed to change the type of this element to a mission/ground segment specific codelist . Examples of values are �NRT�, �NOMINAL�, NOMINAL,

REPROCESSED, BACKLOGGED, VALIDATE

(2)

Consequences if

not approved:

Clauses affected:

*

Section 8.1.1 and 8.1.4: UML diagrams and tables.

Additional

Documents

affected:

('

Supporting

Documentation:

Comments:

Status:

Assigned

Assigned To:

EO PMOS SWG

Disposition:

Referred

Referensi

Dokumen terkait