All Fields marked with
*
are mandatory.
Name:
*
Steven Smolders
Organization:
*
GIM nv
Email:
*
[email protected]
Document
-"#,#,+/#,#('( )+/#(.,,.&#,,#(''1(."/"'!*.,-.&+
then check here:
'-+-"'.&+"+
'-+-"/,#('.&+-"-1(.++/#,#'!"+
Title:
*
[EO PMOS SWG] Improved way of expressing the timeliness of EO Product acquSource:
*
Work item code:
Category:
*
B (Addition of feature)Reason for
change:
*
Allow better expression of the timeliness of EO product acquisition and processing.
Summary of
change:
*
Addition within the EarthObservationResult/product/ProductInformation class of a new optional property �timeliness� that
specifies the timeliness of the product acquiistion, such as "near real time" or "rush". Possible values are
mission specific and shall refer to mission/ground segment dedicated codeSpace. Example of values are "NRT" or
"NOMINAL"
The current ProcessingInformation/processingMode element is
constrained to a fixed enumeration with values that are not generally applicable and through which the timeliness cannot be correctly expressed. It is proposed to change the type of this element to a mission/ground segment specific codelist . Examples of values are �NRT�, �NOMINAL�, NOMINAL,
REPROCESSED, BACKLOGGED, VALIDATE
Consequences if
not approved:
Clauses affected:
*
Section 8.1.1 and 8.1.4: UML diagrams and tables.