No Description RAPK PT. PETRONESIA BENIMEL PT. PRASADA SAMYA MUKTI 1 Price Rp 7,462,553,261.00 Rp 3,084,000,000.00 Rp 2,046,000,000.00 2 Scope of Work Supply & Installation Comply Installation Only
3 TOP T/T 90 hari or SKBDN Ussance 90 days
5% DP (Counter bank garansi) atau 5% egineering approval 90% monthly progress 5% retensi 365 hari setelah BAST, counter warranty bond
Comply Comply
4 Warranty 1 Year Comply Comply
5 Delivery time Mid December 2016 Comply Comply
6 Delivery terms DDP Site Comply Comply
7
Supervision Incl. Supervision of Installation & Commissioning
Comply Comply
BAHAN
UPAH
(Rp) (Rp) (Rp) (Rp) 1 3 4 5 6 7 8 I. A A.1Tandon atas / Roof Tank,spesifikasi (PPM-GHB01-BB001/002/003) Set 3 1.380.000 575.000 1.955.000 5.865.000 - Kapasitas : 1000 Liter
- Material : Fiber Reinforced
- Pipa PVC Ø 1" m 10 41.400 20.700 62.100 621.000
- Pipa PVC Ø ¾" m 16 31.050 19.550 50.600 809.600
- Pipa PVC Ø 1¼" m 16 62.100 23.000 85.100 1.361.600
- Pipa PVC Ø ½" m 32 21.850 17.250 39.100 1.251.200
- Fitting & Accessories (Hanger & Support) dll ls 2 74.750 28.750 103.500 207.000 - Gate Valve Ø 1" bh 2 287.500 40.250 327.750 655.500 - Pipa PVC 2 " m 272 34.500 34.500 9.384.000
A.2
-set 1 14.950.000 1.725.000 16.675.000 16.675.000 - Kapasitas : 2000 Liter
-- Material : Fiber Reinforced -- Type : Biological Methode
-- Pipa PVC Ø 4" m 50 294.400 92.000 386.400 19.320.000
- Pipa PVC Ø 3" m 16 228.850 57.500 286.350 4.581.600
- Pipa PVC Ø 2" m 37 90.850 34.500 125.350 4.637.950
- Vent water pipes Ø 1¼" (Pipa PVC Class D (5 Kg/cm2) m 44 62.100 23.000 85.100 3.744.400 - Pipa PVC Ø 4" Septic tank ke drainase Class AW (10 Kg/cm2) m 14 294.400 92.000 386.400 5.409.600 - Fitting & Accessories (Hanger & Support) dll ls 2 74.750 28.750 103.500 207.000 - Clean Out ø4" material SS 304 (ex. San-ei) bh 4 230.000 138.000 368.000 1.472.000 - Vent Cap c/w Ø 1¼" (Insect Screen) bh 2 23.000 23.000 46.000 92.000
A.2
-- Pipa PVC AW Ø 4" m 46 294.400 92.000 386.400 17.774.400 - Roof drain Ø 4̋” (Atap Dak Beton) bh 12 97.750 92.000 189.750 2.277.000 - Fitting & Accessories (Hanger & Support) dll lot 2 74.750 28.750 103.500 207.000 96.552.850 B
* Male Toilet
- WC, Flush Tank set 2 3.450.000 345.000 3.795.000 7.590.000
- Jet Washer bh 2 345.000 57.500 402.500 805.000 - Lavatory bh 1 805.000 230.000 1.035.000 1.035.000 - Urinal bh 2 2.875.000 287.500 3.162.500 6.325.000 - Shower bh 1 1.150.000 86.250 1.236.250 1.236.250 - Floor Drain bh 2 575.000 86.250 661.250 1.322.500 - Sekat Urinal bh 2 1.610.000 86.250 1.696.250 3.392.500 * Female Toilet
- WC, Flush Tank set 2 3.450.000 345.000 3.795.000 7.590.000
- Jet Washer bh 2 345.000 57.500 402.500 805.000 - Lavatory bh 2 805.000 230.000 1.035.000 2.070.000 - Shower bh 1 1.150.000 86.250 1.236.250 1.236.250 - Floor Drain bh 2 575.000 86.250 661.250 1.322.500 * Pantry - Kitchen Sink bh 1 5.175.000 402.500 5.577.500 5.577.500 * Janitor - Faucet bh 1 690.000 86.250 776.250 776.250 - Floor Drain bh 1 575.000 86.250 661.250 661.250 41.745.000 138.297.850
II.
A
*SUB TOTAL PEK. SANITARY *SUB TOTAL PEKERJAAN MEKANIKAL
PEKERJAAN ELEKTRIKAL
PEKERJAAN LAMPU, SAKLAR, STOP KONTAK, DAN PANEL
PEKERJAAN MEKANIKAL (PLUMBING)PEKERJAAN PLUMBING INSTALASI AIR BERSIH
Pipa PVC AW (10 Kg/cm2)
PENGADAAN & PEMASANGAN SANITARY Pengadaan & Instalasi Septic Tank (IPAL)
PEKERJAAN AIR HUJAN
* SUB TOTAL PEK. AIR BERSIH & KOTOR INSTALASI AIR KOTOR & AIR BEKAS
2
PEKERJAAN MEKANIKAL-ELEKTRIKAL ADMINISTRATION BUILDING
PROYEK PLTG 500 MW LOKASI PAYA PASIR, MEDAN
NO
URAIAN PEKERJAAN
SAT VOL
HARGA SATUAN
BAHAN+UPA
H
TOTAL
JUMLAH
BAHAN
UPAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7 8
PEKERJAAN MEKANIKAL-ELEKTRIKAL ADMINISTRATION BUILDING
PROYEK PLTG 500 MW LOKASI PAYA PASIR, MEDAN
NO
URAIAN PEKERJAAN
SAT VOL
HARGA SATUAN
BAHAN+UPA
H
TOTAL
JUMLAH
HARGA
* LAMPU
- LED 2 x 20W Ceiling type w/ louver, flush mounted indoor use
bh
43
345.000 17.250 362.250 15.576.750- LED 2 x 20W Ceiling type w/ louver, flush mounted indoor use,
bh
12
345.000 17.250 362.250 4.347.000with
battery back up
-- LED 2 x 20W Ceilingt type w/ cover, exposed mounted general Purpose bh 2 230.000 17.250 247.250 494.500
- Down light LED 20W
bh
16
172.500 17.250 189.750 3.036.000- Exit Lamp 1x8W
bh
2
230.000 17.250 247.250 494.500- Instalasi kabel NYM 3 x 2.5mm² + EMT conduit
ttk
75
97.750 80.500 178.250 13.368.750* SAKLAR
-- Switch one device 1 way, flush mounted
bh
4
17.250 17.250 34.500 138.000- Switch two device 1 way, flush mounted
bh
8
17.250 17.250 34.500 276.000- Instalasi kabel NYM 3 x 2.5mm² + EMT conduit
ttk
12
97.750 86.250 184.000 2.208.000* STOP KONTAK
-- Receptacle, flush mounted, general porpose indoor type
bh
21
23.000 17.250 40.250 845.250230V, 2Poles+E, 250VA
-- Receptacle, flush mounted, general porpose indoor type
bh
12
23.000 17.250 40.250 483.000230V, 2Poles+E, 200VA (AC)
-- Instalasi kabel NYM 3 x 2.5mm² + EMT conduit
ttk
33
97.750 86.250 184.000 6.072.000* PANEL
-TRLLP-05, 400/230V, 3P, 4W, 50Hz, 25kVA, 10kA
unit
2
14.950.000 103.500 15.053.500 30.107.000include MCCB, MCB, ELCB, indicator lamp, terminal, pengkabelan
77.446.750
B * - Tray ukuran : 200 x 100 m 78 138.000 51.750 189.750 14.800.500 14.800.500 92.247.250230.545.100
TOTAL PEKERJAAN ELEKTRIKALTOTAL : PEK. MEKANIKAL & ELEKTRIKAL
* SUB TOTAL PEKERJAAN KABEL TRAY Komponen dan Accessories lihat gambarPEKERJAAN KABEL TRAY/LADER
BAHAN
UPAH
(Rp) (Rp) (Rp) (Rp) 1 3 4 5 6 7 8 I. A A.1 - Pipa PVC Ø 1" m 15 41.400 20.700 62.100 931.500 - Pipa PVC Ø ½" m 16 31.050 17.250 48.300 772.800 - Pipa PVC Ø ¾" m 10 21.850 19.550 41.400 414.000 - Fitting & Accessories (Hanger & Support) dll ls 2 74.750 28.750 103.500 207.000 - Gate Valve Ø 1" bh 2 287.500 40.250 327.750 655.500A.2
-set 1 14.950.000 1.725.000 16.675.000 16.675.000 - Kapasitas : 450 Liter
-- Material : Fiber Reinforced -- Type : Biological Methode
-- Pipa PVC Ø 4" m 24 294.400 92.000 386.400 9.273.600
- Pipa PVC Ø 2" m 14 90.850 34.500 125.350 1.754.900 - Pipa PVC Ø 2½" m 10 132.250 57.500 189.750 1.897.500 - Vent water pipes Ø 1¼" (Pipa PVC Class D (5 Kg/cm2) m 16 62.100 23.000 85.100 1.361.600 - Pipa PVC Ø 4" Septic tank ke drainase Class AW (10 Kg/cm2) m 14 294.400 57.500 351.900 4.926.600 - Fitting & Accessories (Hanger & Support) dll ls 2 74.750 28.750 103.500 207.000 - Clean Out ø4" material SS 304 (ex. San-ei) bh 3 230.000 138.000 368.000 1.104.000 - Vent Cap c/w Ø 1¼" (Insect Screen) bh 2 23.000 23.000 46.000 92.000
A.2
-- Pipa PVC AW Ø 4" m 48 294.400 57.500 351.900 16.891.200 - Roof drain Ø 4̋” (Atap Dak Beton) bh 6 97.750 92.000 189.750 1.138.500 - Fitting & Accessories (Hanger & Support) dll lot 2 74.750 28.750 103.500 207.000 58.509.700 B
* Toilet
- WC, Flush Tank set 1 3.450.000 345.000 3.795.000 3.795.000
- Jet Washer bh 1 345.000 57.500 402.500 402.500 - Faucet bh 1 690.000 86.250 776.250 776.250 - Floor Drain bh 1 575.000 86.250 661.250 661.250 * Ablution -- Faucet bh 3 690.000 86.250 776.250 2.328.750 - Floor Drain bh 1 575.000 86.250 661.250 661.250 * Pantry -- Kitchen Sink bh 1 5.175.000 402.500 5.577.500 5.577.500 - Floor Drain bh 1 575.000 86.250 661.250 661.250 14.863.750 73.373.450 II. A * LAMPU
- LED 2 x 20W Ceiling type w/ louver, flush mounted indoor use bh 26 345.000 17.250 362.250 9.418.500 - LED 2 x 20W Ceiling type w/ louver, flush mounted indoor use, bh 5 345.000 17.250 362.250 1.811.250
withbattery back up
-- LED 2 x 20W Ceilingt type w/ cover, exposed mounted general bh 7 345.000 17.250 362.250 2.535.750
purpose
-- LED 2 x 20W Ceiling type w/ cover, exposed mounted general bh 2 345.000 17.250 362.250 724.500 purpose, withbattery back up
-- Down light LED 20W bh 3 172.500 17.250 189.750 569.250
- Exit Lamp 1x8W bh 2 3.450.000 17.250 3.467.250 6.934.500
-
Instalasi kabel NYM 3 x 2.5mm² + EMT conduit
ttk 45 230.000 86.250 316.250 14.231.250* SAKLAR
-- Switch one device 1 way, flush mounted bh 5 17.250 17.250 34.500 172.500
PEKERJAAN MEKANIKAL-ELEKTRIKAL CENTRAL CONTROL ROOM BUILDING
PROYEK PLTG 500 MW LOKASI PAYA PASIR, MEDAN
NO
URAIAN PEKERJAAN
SAT VOL
HARGA SATUAN
BAHAN+UPA
H
TOTAL
JUMLAH
HARGA
2PEKERJAAN MEKANIKAL (PLUMBING) PEKERJAAN PLUMBING
INSTALASI AIR BERSIH Pipa PVC AW (10 Kg/cm2)
Pipa PVC Ø 1½" (Tapping pipa dari line Utama)
INSTALASI AIR KOTOR & AIR BEKAS Pengadaan & Instalasi Septic Tank (IPAL)
Pipa PVC Class AW (10 Kg/cm2), Pipa Class D (5 Kg/cm2)
PEKERJAAN AIR HUJAN
* SUB TOTAL PEK. AIR BERSIH & KOTOR PENGADAAN & PEMASANGAN SANITARY
* SUB TOTAL PEKERJAAN SANITARY TOTAL PEKERJAAN MEKANIKAL PEKERJAAN ELEKTRIKAL
BAHAN
UPAH
(Rp) (Rp) (Rp) (Rp)
1 3 4 5 6 7 8
PEKERJAAN MEKANIKAL-ELEKTRIKAL CENTRAL CONTROL ROOM BUILDING
PROYEK PLTG 500 MW LOKASI PAYA PASIR, MEDAN
NO
URAIAN PEKERJAAN
SAT VOL
HARGA SATUAN
BAHAN+UPA
H
TOTAL
JUMLAH
HARGA
2- Switch two device 1 way, flush mounted bh 3 17.250 17.250 34.500 103.500 - Two way single pole switch bh 4 28.750 17.250 46.000 184.000
-
Instalasi kabel NYM 3 x 2.5mm² + EMT conduit
ttk 12 97.750 86.250 184.000 2.208.000* STOP KONTAK
-- Receptacle, flush mounted, general porpose indoor type bh 15 23.000 17.250 40.250 603.750 230V, 2Poles+E, 200VA
-- Receptacle, flush mounted, general porpose indoor type bh 10 23.000 17.250 40.250 402.500 230V, 2Poles+E, 300VA(AC)
--
Instalasi kabel NYM 3 x 4mm² + EMT conduit
ttk 25 97.750 86.250 184.000 4.600.000* PANEL
-TRLLP-02, 400/230V, 3P, 4W, 50Hz, 15kVA, 10kA unit 1 11.500.000 103.500 11.603.500 11.603.500 include MCCB, MCB, ELCB, indicator lamp, terminal, pengkabelan
-TRLLP-02, 400/230V, 3P, 4W, 50Hz, 25kVA, 10kA unit 1 14.950.000 103.500 15.053.500 15.053.500 include MCCB, MCB, ELCB, indicator lamp, terminal, pengkabelan
71.156.250 B * - Tray ukuran : 200 x 100 m 35 138.000 51.750 189.750 6.641.250 6.641.250 77.797.500 151.170.950
SUMPRODUCT
151.170.950
SELISIH
-TOTAL : PEK. MEKANIKAL-ELEKTRIKAL TOTAL PEKERJAAN ELEKTRIKAL * SUB TOTAL PEK. LAMPU, SAKLAR, STOP KONTAK, DAN PANEL PEKERJAAN KABEL TRAY/LADER
Komponen dan Accessories lihat gambar
BAHAN
UPAH
(Rp) (Rp) (Rp) (Rp) 1 3 4 5 6 7 8 II. A * LAMPU- LED 2 x 20W Ceilingt type w/ cover, exposed mounted general Purpose bh 4 345.000 17.250 362.250 1.449.000
- Highbay GP 100W bh 18 3.450.000 63.250 3.513.250 63.238.500
-
Instalasi kabel NYM 3 x 2.5mm² + EMT conduit
bh 22 97.750 86.250 184.000 4.048.000* SAKLAR
- Rotary switch one device 1 way, flush mounted bh 5 17.250 17.250 34.500 172.500
-
Instalasi kabel NYM 3 x 2.5mm² + EMT conduit
ttk 5 97.750 86.250 184.000 920.000* STOP KONTAK
-- Power Outlet C/W Plug, Exposed Mounted, Industrial Type, Outdoor Usedbh 2 2.070.000 92.000 2.162.000 4.324.000 800VA, 3Ph, 4 Poles+E, 63A
--
Instalasi kabel NYM 3 x 2.5mm² + EMT conduit
ttk 2 97.750 86.250 184.000 368.00074.520.000 74.520.000
PEKERJAAN MEKANIKAL-ELEKTRIKAL AIR COMPRESOR
PROYEK PLTG 500 MW LOKASI PAYA PASIR, MEDAN
NO
URAIAN PEKERJAAN
SAT VOL
HARGA SATUAN
BAHAN+UP
AH
TOTAL : PEK. MEKANIKAL-ELEKTRIKAL
TOTAL
JUMLAH
HARGA
2PEKERJAAN ELEKTRIKAL
PEKERJAAN LAMPU, SAKLAR, STOP KONTAK, DAN PANEL
BAHAN UPAH (Rp) (Rp) (Rp) (Rp) 1 3 4 5 6 7 8 I. A A.1 - Pipa PVC Ø 1" m 16 41.400 20.700 62.100 993.600 - Pipa PVC Ø ½" m 12 31.050 17.250 48.300 579.600 - Fitting & Accessories (Hanger & Support) dll ls 2 74.750 28.750 103.500 207.000 - Gate Valve Ø 1" bh 2 287.500 40.250 327.750 655.500 A.2
set 1 14.950.000 1.725.000 16.675.000 16.675.000 - Kapasitas : 100 Liter
- Material : Fiber Reinforced - Type : Biological Methode
- Pipa PVC Ø 4" m 10 294.400 57.500 351.900 3.519.000 - Pipa PVC Ø 2" m 14 90.850 34.500 125.350 1.754.900 - Vent water pipes Ø 1¼" (Pipa PVC Class D (5 Kg/cm2) m 14 62.100 23.000 85.100 1.191.400 - Pipa PVC Ø 4" Septic tank ke drainase Class AW (10 Kg/cm2) m 15 294.400 57.500 351.900 5.278.500 - Fitting & Accessories (Hanger & Support) dll ls 2 74.750 28.750 103.500 207.000 - Clean Out ø4" material SS 304 (ex. San-ei) bh 2 230.000 138.000 368.000 736.000 - Vent Cap c/w Ø 1¼" (Insect Screen) bh 2 23.000 23.000 46.000 92.000 A.2
- Pipa PVC AW Ø 4" m 26 294.400 57.500 351.900 9.149.400 - Roof drain Ø 4̋” (Atap Dak Beton) bh 6 97.750 92.000 189.750 1.138.500 - Fitting & Accessories (Hanger & Support) dll lot 2 74.750 28.750 103.500 207.000 42.384.400 B
* Toilet
- WC, Flush Tank set 1 3.450.000 345.000 3.795.000 3.795.000 - Jet Washer bh 1 345.000 57.500 402.500 402.500 - Faucet bh 1 690.000 86.250 776.250 776.250 - Floor Drain bh 1 575.000 86.250 661.250 661.250 - Kitchen Sink bh 1 5.175.000 86.250 5.261.250 5.261.250 10.896.250 53.280.650 II. A * LAMPU
- LED 2 x 20W Ceiling type w/ louver, flush mounted indoor use bh 2 345.000 17.250 362.250 724.500 - Down light LED 20W bh 2 172.500 17.250 189.750 379.500 - LED 2 x 20W Ceilingt type w/ cover, exposed mounted general Purposebh 1 345.000 17.250 362.250 362.250 - Instalasi kabel NYM 3 x 2.5mm² + EMT conduit ttk 5 97.750 86.250 184.000 920.000
* SAKLAR
-- Switch one device 1 way, flush mounted bh 5 17.250 17.250 34.500 172.500 - Switch one device 2 way, flush mounted bh 1 17.250 17.250 34.500 34.500 - Instalasi kabel NYM 3 x 2.5mm² + EMT conduit ttk 6 97.750 86.250 184.000 1.104.000
* STOP KONTAK
-- Receptacle, exposed mounted, general porpose indoor type bh 3 23.000 17.250 40.250 120.750 230V, 2Poles+E, 250VA
-- Receptacle, exposed mounted, general porpose indoor type bh 1 23.000 17.250 40.250 40.250 230V, 2Poles+E, 200VA(AC)
-- Receptacle, exposed mounted, general porpose indoor type bh 1 23.000 17.250 40.250 40.250 230V, 2Poles+E, 200VA(Exhaust Fan)
-- Instalasi kabel NYM 3 x 4mm² + EMT conduit ttk 5 97.750 86.250 184.000 920.000
* PANEL
-TRLLP-02, 400/230V, 3P, 4W, 50Hz, 15kVA, 10kA unit 1 11.500.000 103.500 11.603.500 11.603.500 include MCCB, MCB, ELCB, indicator lamp, terminal, pengkabelan
16.422.000 16.422.000 69.702.650 PENGADAAN & PEMASANGAN SANITARY
* SUB TOTAL PEKERJAAN SANITARY TOTAL PEKERJAAN MEKANIKAL
PEKERJAAN MEKANIKAL-ELEKTRIKAL BUILDING POS JAGA
PROYEK PLTG 500 MW LOKASI PAYA PASIR, MEDAN
NO URAIAN PEKERJAAN SAT VOL HARGA SATUAN BAHAN+UPA
H
TOTAL JUMLAH
HARGA
TOTAL PEKERJAAN ELEKTRIKAL TOTAL : PEKERJAAN MEKANIKAL & ELEKTRIKAL PEKERJAAN LAMPU, SAKLAR, STOP KONTAK, DAN PANEL
* SUB TOTAL PEK. LAMPU, SAKLAR, STOP KONTAK, DAN PANEL 2
PEKERJAAN MEKANIKAL (PLUMBING) PEKERJAAN PLUMBING
INSTALASI AIR BERSIH
PEKERJAAN ELEKTRIKAL Pipa PVC AW (10 Kg/cm2)
Pipa PVC Ø 1½" (Tapping pipa dari line Utama)
INSTALASI AIR KOTOR & AIR BEKAS Pengadaan & Instalasi Septic Tank (IPAL)
Pipa PVC Class AW (10 Kg/cm2), Pipa Class D (5 Kg/cm2)
PEKERJAAN AIR HUJAN
BAHAN UPAH
(Rp) (Rp) (Rp) (Rp)
1 3 4 5 6 7 8
A
1 Flood light w/ pole mounted, 2 x 120W, 230V, 1PH, 50Hz set 6 805.000 57.500 862.500 5.175.000 GP = Weather proof non hazardous area min. IP 54
2 Flood light w/ pole mounted, 120W, 230V, 1PH, 50Hz bh 6 805.000 57.500 862.500 5.175.000 GP = Weather proof non hazardous area min. IP 54
2 Flood light w/ Bracket mounted, 120W, 230V, 1PH, 50Hz bh 10 805.000 57.500 862.500 8.625.000 GP = Weather proof non hazardous area min. IP 54
5 * bh 15 1.380.000 172.500 1.552.500 23.287.500 * bh 15 920.000 115.000 1.035.000 15.525.000 * bh 15 862.500 57.500 920.000 13.800.000 * lot 15 1.437.500 57.500 1.495.000 22.425.000 * set 15 1.150.000 115.000 1.265.000 18.975.000
6 Support lampu Flood Light c/w aksesories bh 15 287.500 115.000 402.500 6.037.500 7 Kabel instalasi NYFGBY
- Kabel instalasi NYFGBY 3c 6mm² + Pipa Galvanis (underground Cable) m' 2300 46.000 5.750 51.750 119.025.000 - Kabel instalasi NYY 3c 6mm² + Pipa Galvanis (underground Cable) m' 900 28.750 5.750 34.500 31.050.000
8 Sensor Cahaya bh 15 300.000 300.000 4.500.000
273.600.000 B
1 set 9 3.450.000 172.500 3.622.500 32.602.500
GP = Weather proof min. IP 54
2 set 2 2.300.000 172.500 2.472.500 4.945.000
GP = Weather proof min. IP 65 2 * bh 13 4.025.000 287.500 4.312.500 56.062.500 * bh 13 575.000 172.500 747.500 9.717.500 * bh 13 575.000 115.000 690.000 8.970.000 * lot 13 345.000 115.000 460.000 5.980.000 * set 13 172.500 115.000 287.500 3.737.500
3 Kabel instalasi NYFGBY
- Kabel instalasi NYFGBY 3c 6mm² + Pipa Galvanis (underground Cable) m' 1800 46.000 5.750 51.750 93.150.000 - Kabel instalasi NYY 3c 6mm² + Pipa Galvanis (underground Cable) m' 800 28.750 5.750 34.500 27.600.000
4 Sensor Cahaya bh 13 300.000 300.000 3.900.000
246.665.000 C
Indoor Lighting Panel TRL-LP-08, IP54, 400/230V, 50Hz, 35kVA, 10kA unit 1 17.250.000 1.725.000 18.975.000 18.975.000 Include MCCB, MCB, terminal, indicator lamp, Ampere & Voltage meter
terminal, terminasi, grounding, dan pengkabelan
18.975.000 539.240.000 TOTAL PEKERJAAN LAMPU LED PJU & SOROT
* SUB TOTAL LAMPU PJU PEKERJAAN LIGHTING PANEL
* SUB TOTAL LIGHTING PANEL Junction Box + MCB + terminasi kabel
Junction Box + MCB + terminasi kabel
* SUB TOTAL LAMPU SOROT PEKERJAAN LAMPU PJU
Street Light w/ pole (9 m) mounted LED 120W
Floodlight Pole + Pondasi + Junction Box
Tiang Pipa Oktagonal Hotdeep Galvanis 9 Meter Pipa lengkung Ornamen 1,5 m Hot deep galv. Pondasi Finish Grade
Ancur, aksesories tiang, pipa galv, material bantu Stanchion light w/ pole mounted HPS 70W, 220V
Anchor, aksesories tiang, pipa galv, material bantu
TOTAL JUMLAH
HARGA
2
PEKERJAAN LAMPU SOROT
Tiang Lampu Flood Light + Pondasi + Junction Box Tiang Pipa Oktagonal Hotdeep Galvanis 9 Meter Pipa Ornamen T type Hot deep galv. Lampu Sorot Pondasi Finish Grade
PEKERJAAN LAMPU SOROT & PENERANGAN JALAN UMUM (PJU) PROYEK PLTG 500 MW LOKASI PAYA PASIR, MEDAN
NO URAIAN PEKERJAAN SAT VOL
HARGA SATUAN
BAHAN+UPAH
A PEKERJAAN ELEKTRIKAL
1 Panel TR Lokal komponen MG
2 Kabel TR 4 Besar
3 Rak Kabel Three Star
4 Metal Konduit Wahana
5 Lampu Penerangan Umum Scarto
6 Lampu PJU & Sorot Philips
7 Saklar dan Stop Kontak MK
B PEKERJAAN ELEKTRONIK
I PEKERJAAN CCTV
1 Peralatan Utama Samsung
2 Kabel Coaxial Belden
3 AMP
4 4 Besar
5 Metal Konduit Wahana
II PEKERJAAN PUBLIC ADDRESS
1 Peralatan Utama TOA
2 Kabel 4 Besar
3 Metal Konduit Wahana
III PEKERJAAN TELEPHONE
1 Peralatan Utama Panasonic
2 Kabel 4 Besar
3 Metal Konduit Wahana
C PEKERJAAN TATA UDARA
1 Unit AC Panasonci
2 FAN Vanco
3 Pipa Refrigrand Kembla Setara
4 Pipa Drain PVC AW Wavin
5 Turbine Ventilator Circle
D PEKERJAAN PLUMBING
1 Pompa - Pompa Ebara/Grundfos
2 Tangki Pinguin
3 Pipa PVC AW Wavin
4 Gate Valve, Check Valve, Strainer KITZ
5 Saniter Toto
6 Closet Toto
7 Jet Washer Toto
8 Faucet Toto 9 Lavatory Toto 10 Urinal Toto Kabel UTP Kabel NYA PEKERJAAN MEKANIKAL-ELEKTRIKAL
PROYEK PLTG 500 MW LOKASI PAYA PASIR, MEDAN
NO URAIAN MERK YG DITAWARKAN
NO
JUMLAH HARGA
KET
I
Rp
705.489.350
a TOTAL PEKERJAAN ADMIN BUILDING
Rp
221.161.100
b TOTAL PEKERJAAN WAREHOUSE/WORKSHOP
Rp
188.934.650
c TOTAL PEKERJAAN CONTROL & LV ROOM
Rp
151.170.950
d TOTAL PEKERJAAN MASJID
e TOTAL PEKERJAAN GUARD HOUSE
Rp
69.702.650
f TOTAL PEKERJAAN SUBSTATION BUILD
g TOTAL PEKERJAAN SHELTER AIR KOMPRESOR
Rp
74.520.000
h TOTAL PEKERJAAN SHELTER FIRE PUMP
II
Rp
384.870.500
a TOTAL PEKERJAAN ADMIN BUILDING
Rp
169.579.000
b TOTAL PEKERJAAN WAREHOUSE/WORKSHOP
Rp
44.390.000
c TOTAL PEKERJAAN CONTROL & LV ROOM
Rp
84.226.000
d TOTAL PEKERJAAN MOSQUE/MASJID
Rp
9.855.500
e TOTAL PEKERJAAN POS JAGA
Rp
7.544.000
f TOTAL PEKERJAAN SUBSTATION BUILD
Rp
69.276.000
III
Rp
1.119.014.375
a TOTAL PEKERJAAN TELEPON SYSTEM
Rp
51.549.500
b TOTAL PEKERJAAN PUBLIC ADDRESS SYSTEM
Rp
35.800.075
c TOTAL PEKERJAAN HAND TALKS
Rp
7.187.500
d TOTAL PEKERJAAN CCTV SYSTEM
Rp
1.024.477.300
IV
Rp
530.840.000
a TOTAL PEKERJAAN LAMPU SOROT
Rp
269.100.000
b TOTAL PEKERJAAN LAMPU PJU
Rp
242.765.000
c TOTAL PEKERJAAN LIGHTING PANEL
Rp
18.975.000
VI
Rp
300.000.000
300.000.000
Rp
3.040.214.225
Rp
-Rp
3.040.214.225
Rp
3.040.000.000
Rp
PEKERJAAN MEKANIKAL & ELEKTRIKAL
PROYEK PLTG 500 MW LOKASI PAYA PASIR, MEDAN
URAIAN PEKERJAAN
TOTAL
PEKERJAAN MEKANIKAL & ELEKTRIKAL
TOTAL
DI BULATKAN
PPN 10%
PEKERJAAN AC & VENTILASI
PEKERJAAN TELEKOMUNIKASI SISTEM
PEKERJAAN LAMPU PENERANGAN JALAN UMUM
PRELIMINERIS
- PREMILINERIS
BAHAN UPAH
(Rp) (Rp) (Rp) (Rp)
1 3 4 5 6 7 8
A
1 Main Unit PABX Telephone System Set 1 Rp 23.000.000 Rp 127.500 23.127.500 23.127.500
(a) PABX - 6 Analogue Line - 26 Extension : - 1 Digital port - 26 Analog port
2 Main Distribution Frame Set 1 Rp 805.000 Rp 68.500 873.500 873.500
Main Distribution Frame Indoor Used 3 Terminal Box For Telephone (TBT)
Terminal Box Telephone (TBT)
- Wall Mounting, indoor used, Capacity : 5 Pairs Set 1 Rp 345.000 Rp 68.500 413.500 413.500
- Wall Mounting, indoor used, Capacity : 10 Pairs Set 3 Rp 460.000 Rp 68.500 528.500 1.585.500 4 Telephone Set
- Telephone Operating Console Set 1 Rp 575.000 Rp 68.500 643.500 643.500
- Telephone Set Set 26 Rp 172.500 Rp 68.500 241.000 6.266.000 5 Telephone Outlet
Indoor Used, c/w Exposed / flush back box Set 26 Rp 11.500 Rp 68.500 80.000 2.080.000 6 Instalasi kabel m' 600 Rp 3.450 Rp 3.450 6.900 4.140.000 m' 1800 Rp 3.450 Rp 3.450 6.900 12.420.000 51.549.500 B 1 Set 1 Rp 9.200.000 Rp 1.552.500 10.752.500 10.752.500 a) 240W power amplifier; b) Mixer amplifier 240 c) Speaker selector d) Remote intervace e) Remote microphone f) CD Player
2 Main Distribution Fame For Paging (MDFPA) Set 1 Rp 1.150.000 Rp 862.500 2.012.500 2.012.500 Main Distribution Frame Indoor Used
Wall Mounting Type Consist : 100 Extention Terminal
3 Handset Station c/w Accessories Set 1 Rp 230.000 Rp 575.000 805.000 805.000
4 Instalation Cable NYMHY 2c - 1,5 sqmm c/w EMT conduit dia. 20 mm m' 799 Rp 11.500 Rp 5.175 16.675 13.323.325
- set 2 Rp 230.000 Rp 28.750 258.750 517.500 - set 1 Rp 115.000 Rp 17.250 132.250 132.250 - set 10 Rp 172.500 Rp 28.750 201.250 2.012.500 - set 1 Rp 230.000 Rp 28.750 258.750 258.750 - set 1 Rp 172.500 Rp 17.250 189.750 189.750 - set 1 Rp 230.000 Rp 28.750 258.750 258.750 - set 2 Rp 115.000 Rp 17.250 132.250 264.500 - set 13 Rp 172.500 Rp 28.750 201.250 2.616.250 - set 1 Rp 575.000 Rp 17.250 592.250 592.250 - set 1 Rp 230.000 Rp 28.750 258.750 258.750 - set 3 Rp 115.000 Rp 17.250 132.250 396.750 - set - set 7 Rp 172.500 Rp 28.750 201.250 1.408.750 35.800.075 C Set 10 Rp 690.000 Rp 28.750 718.750 7.187.500 1 7.187.500 Administration Building Outdoor Loudspeaker Workshop/Warehouse Building Volume control Terminal Box Loudspeaker (Ceiling) Terminal Box Volume control Loudspeaker (Ceiling) Terminal Box 2 TELEPHONE SYSTEM
*SUB TOTAL TELEPHONE SYSTEM UTC 3 (10c - 0,6 sqmm) c/w EMT conduit dia. 20 mm
Cable, 0.6/1kV (1.2)kV, NYMHY, 3c - 2.5sqmm c/w EMT conduit dia. 20 mm
* SUB TOTAL HAND TALKS PUBLIC ADDRES SYSTEM
Public Address Control Panel (PACP)
LV Building
Terminal Box Volume control Loudspeaker (Ceiling)
Loudspeaker (Ceiling)
HT (Explosion Proof), Merk. Motorola Type :GP338
*SUB TOTAL PUBLIC ADDRESS SYSTEM HANDY TALKY
Industrial Loudspeaker
Guard House
PEKERJAAN MEKANIKAL-ELEKTRIKAL TELECOMMUNICATION & PAGING SYSTEM PROYEK PLTG 500 MW LOKASI PAYA PASIR, MEDAN
NO URAIAN PEKERJAAN SAT VOL
HARGA SATUAN BAHAN+UPA H TOTAL JUMLAH HARGA
BAHAN UPAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7 8
PEKERJAAN MEKANIKAL-ELEKTRIKAL TELECOMMUNICATION & PAGING SYSTEM PROYEK PLTG 500 MW LOKASI PAYA PASIR, MEDAN
NO URAIAN PEKERJAAN SAT VOL
HARGA SATUAN BAHAN+UPA H TOTAL JUMLAH HARGA D 1 set 5 Rp 28.000.000 Rp 635.000 28.635.000 143.175.000 2 set 3 Rp 8.050.000 Rp 635.000 8.685.000 26.055.000 3 set 1 Rp 38.000.000 Rp 635.000 38.635.000 38.635.000 4 set 1 Rp 10.666.250 Rp 2.012.500 12.678.750 12.678.750 5 set 2 Rp 1.380.000 Rp 435.000 1.815.000 3.630.000 6 set 1 Rp 11.488.500 Rp 435.000 11.923.500 11.923.500 7 set 1 Rp 730.250 Rp 419.000 1.149.250 1.149.250 8 lot 1 Rp 2.185.000 Rp 325.000 2.510.000 2.510.000 9 m' 2130 Rp 23.000 Rp 325.000 348.000 741.240.000 10 m' 2130 Rp 18.400 Rp 5.175 23.575 50.214.750 11 m' 1278 Rp 8.050 Rp 5.175 13.225 16.901.550 12 titik 9 Rp 287.500 Rp 23.000 310.500 2.794.500 1.050.907.300 1.145.444.375 Power Cable, 0.6/1kV (1.2)kV, NYMHY, 3c - 2.5sqmm c/w EMT conduit dia. 20
mm
CCTV SYSTEM FOR SECURITY & SURVEILLANCE PTZ Camera
FIX Camera
DVR (Digital Video Recorder)
Display and control unit, LED Monitor 21 inch high resolution, joystick control PTZ Controller
Power Supply 220 Vac, 50 Hz, 1 phase
Pengkabelan utama untuk peralatan utama CCTV di R. Kontrol EX. Proff PTZ Camera
Coaxial Cable c/w EMT conduit dia. 20 mm Pole (galvanis tinggi = 8 m)
*SUB TOTAL CCTV SYSTEM SECURITY & SURVEILLANCE GRAND TOTAL TELECOMUNICATION SYSTEM Kabel Data UTP Cat 6 c/w EMT conduit dia. 20 mm
BAHAN UPAH (Rp) (Rp) (Rp) (Rp) 1 3 4 5 6 7 8 I. A 1 Unit 2 Rp 28.750.000 Rp 920.000 Rp 29.670.000 Rp 59.340.000 - Room : Office#1
- Total Cooling Capacity :6.2 KW (minimum)≈2,35 PK - Type : Ceiling Cassette
- Capacity : 21.000 Btu/h - Electrical spec : 220V/50Hz/1 Phase
2 Unit 1 Rp 28.750.000 Rp 920.000 Rp 29.670.000 Rp 29.670.000 - Room : Office#2
- Total Cooling Capacity :6.5 KW (minimum)≈2,43 PK - Type : Wall Mounted
- Capacity : 26.000 Btu/h - Electrical spec : 380V/50Hz/3 Phase
3 Unit 1 Rp 4.025.000 Rp 460.000 Rp 4.485.000 Rp 4.485.000 - Room : Library
- Total Cooling Capacity :1.8 KW (minimum)≈0,68 PK - Type : Wall Mounted
- Capacity : 26.000 Btu/h - Electrical spec : 380V/50Hz/3 Phase
4 Unit 1 Rp 12.650.000 Rp 460.000 Rp 13.110.000 Rp 13.110.000 - Room : Manager Room
- Total Cooling Capacity :5.7 KW (minimum)≈2,16 PK - Type : Wall Mounted
- Capacity : 21.000 Btu/h - Electrical spec : 220V/50Hz/1 Phase
5 Unit 1 Rp 32.200.000 Rp 920.000 Rp 33.120.000 Rp 33.120.000 - Room : Meeting Room
- Total Cooling Capacity :7.2 KW (minimum)≈2,73 PK - Type : Wall Mounted
- Capacity : 26.000 Btu/h - Electrical spec : 220V/50Hz/1 Phase
6 Unit 2 Rp 12.650.000 Rp 460.000 Rp 13.110.000 Rp 26.220.000 - Room : Lobby & Waiting Room
- Total Cooling Capacity :5.9 KW (minimum)≈2,24 PK - Type : Wall Mounted
- Capacity : 21.000 Btu/h Electrical spec : 220V/50Hz/1 Phase
7 Unit 1 Rp 690.000 Rp 92.000 Rp 782.000 Rp 782.000 - Type : Wall Mounted Fan
- Capacity : 191 L/s - Fan Motor Power Input : 0.048 kW - Electrical spec : 220V/50Hz/1 Phase
8 Unit 1 Rp 621.000 Rp 92.000 Rp 713.000 Rp 713.000 - Type : Ceiling Mounted Fan
- Capacity : 50 L/s - Fan Motor Power Input : 0.060 kW - Electrical spec : 220V/50Hz/1 Phase
PEKERJAAN MEKANIKAL-ELEKTRIKAL(HVAC & EXHAUST FAN)
PROYEK PLTG 500 MW LOKASI PAYA PASIR, MEDAN
NO URAIAN PEKERJAAN SAT VOL HARGA SATUAN BAHAN+UPAH JUMLAH HARGA TOTAL 2
PEKERJAAN HVAC & VENTILASI ADMINISTRATION BUILDING
Air Cooled Ceiling Cassette, Refrigerant with Non CFC
Pengadaan & Pemasangan A/C supporting, accessories, setting, testing dan commisioning. Termasuk Pipa Refiregrant & Pipa drain. Pengadaan & Pemasangan A/C supporting, accessories, setting, testing dan commisioning. Termasuk Pipa Refiregrant & Pipa drain.
Air Cooled Ceiling Cassette, Refrigerant with Non CFC Pengadaan & Pemasangan A/C supporting, accessories, setting, testing dan commisioning. Termasuk Pipa Refiregrant & Pipa drain.
Air Cooled Wall Mounted, Refrigerant with Non CFC Pengadaan & Pemasangan A/C supporting, accessories, setting, testing dan commisioning. Termasuk Pipa Refiregrant & Pipa drain.
Air Cooled Wall Mounted, Refrigerant with Non CFC Pengadaan & Pemasangan A/C supporting, accessories, setting, testing dan commisioning. Termasuk Pipa Refiregrant & Pipa drain.
Air Cooled Ceiling Cassette, Refrigerant with Non CFC Pengadaan & Pemasangan A/C supporting, accessories, setting, testing dan commisioning. Termasuk Pipa Refiregrant & Pipa drain.
Air Cooled Wall Mounted, Refrigerant with Non CFC
EXHAUST FAN UNTUK LOCKER
Pengadaan & Pemasangan E/F supporting, accessories, setting, testing dan commisioning
EXHAUST FAN UNTUK FEMALE TOILET
Pengadaan & Pemasangan E/F supporting, accessories, setting, testing dan commisioning
BAHAN UPAH
(Rp) (Rp) (Rp) (Rp)
1 3 4 5 6 7 8
PEKERJAAN MEKANIKAL-ELEKTRIKAL(HVAC & EXHAUST FAN)
PROYEK PLTG 500 MW LOKASI PAYA PASIR, MEDAN
NO URAIAN PEKERJAAN SAT VOL HARGA SATUAN BAHAN+UPAH JUMLAH HARGA TOTAL 2
9 Unit 1 Rp 621.000 Rp 92.000 Rp 713.000 Rp 713.000 - Type : Ceiling Mounted Fan
- Capacity : 50 L/s - Fan Motor Power Input : 0.060 kW - Electrical spec : 220V/50Hz/1 Phase
10 Unit 1 Rp 621.000 Rp 92.000 Rp 713.000 Rp 713.000 - Type : Wall Mounted Fan
- Capacity : 72 L/s - Fan Motor Power Input : 0.032 kW - Electrical spec : 230V/50Hz/1 Phase
11 Unit 1 Rp 621.000 Rp 92.000 Rp 713.000 Rp 713.000 - Type : Wall Mounted Fan
- Capacity : 40 L/s - Fan Motor Power Input : 0.032 kW - Electrical spec : 230V/50Hz/1 Phase
Rp 169.579.000 B
1 Unit 1 Rp 6.325.000 Rp 460.000 Rp 6.785.000 Rp 6.785.000 - Room : Office
- Total Cooling Capacity : 4.5 KW (minimum)≈ 1,5 PK - Type : Wall Mounted
- Electrical spec : 230V/50Hz/1 Phase
2 Unit 1 Rp 10.925.000 Rp 460.000 Rp 11.385.000 Rp 11.385.000 - Room : Meeting Room
- Total Cooling Capacity : 4.9 KW (minimum)≈ 1,9 PK - Type : Wall Mounted
- Electrical spec : 230V/50Hz/1 Phase
3 Unit 1 Rp 6.325.000 Rp 460.000 Rp 6.785.000 Rp 6.785.000 - Room : Laboratory
- Total Cooling Capacity : 3.3 KW (minimum)≈ 1,2 PK - Type : Wall Mounted
- Electrical spec : 230V/50Hz/1 Phase
4 Unit 1 Rp 575.000 Rp 92.000 Rp 667.000 Rp 667.000 - Type : Wall Mounted Fan
- Capacity : 23.3 L/s - Fan Motor Power Input : 0.032 kW - Electrical spec : 230V/50Hz/1 Phase
5 Unit 1 Rp 575.000 Rp 92.000 Rp 667.000 Rp 667.000 - Type : Wall Mounted Fan
- Capacity : 23.3 L/s - Fan Motor Power Input : 0.032 kW - Electrical spec : 230V/50Hz/1 Phase WAREHOUSE & WORKSHOP BUILDING
EXHAUST FAN UNTUK MALE TOILET
Pengadaan & Pemasangan E/F supporting, accessories, setting, testing dan commisioning
EXHAUST FAN UNTUK CANTEEN
Pengadaan & Pemasangan E/F supporting, accessories, setting, testing dan commisioning
EXHAUST FAN UNTUK PANTRY
Pengadaan & Pemasangan E/F supporting, accessories, setting, testing dan commisioning
* SUB TOTAL ADMINISTRATION BUILDING Air Cooled Wall Mounted, Refrigerant with Non CFC
Pengadaan & Pemasangan A/C supporting, accessories, setting, testing dan commisioning. Termasuk Pipa Refiregrant & Pipa drain.
Air Cooled Wall Mounted, Refrigerant with Non CFC Pengadaan & Pemasangan A/C supporting, accessories, setting, testing dan commisioning. Termasuk Pipa Refiregrant & Pipa drain.
Air Cooled Wall Mounted, Refrigerant with Non CFC Pengadaan & Pemasangan A/C supporting, accessories, setting, testing dan commisioning. Termasuk Pipa Refiregrant & Pipa drain.
EXHAUST FAN UNTUK TOILET MEETING ROOM
Pengadaan & Pemasangan E/F supporting, accessories, setting, testing dan commisioning
EXHAUST FAN UNTUK TOILET
Pengadaan & Pemasangan E/F supporting, accessories, setting, testing dan commisioning
BAHAN UPAH
(Rp) (Rp) (Rp) (Rp)
1 3 4 5 6 7 8
PEKERJAAN MEKANIKAL-ELEKTRIKAL(HVAC & EXHAUST FAN)
PROYEK PLTG 500 MW LOKASI PAYA PASIR, MEDAN
NO URAIAN PEKERJAAN SAT VOL HARGA SATUAN BAHAN+UPAH JUMLAH HARGA TOTAL 2
6 Unit 1 Rp 575.000 Rp 92.000 Rp 667.000 Rp 667.000 - Type : Wall Mounted Fan
- Capacity : 74.7 L/s - Fan Motor Power Input : 0.032 kW - Electrical spec : 230V/50Hz/1 Phase
7 Unit 1 Rp 575.000 Rp 92.000 Rp 667.000 Rp 667.000 - Type : Wall Mounted Fan
- Capacity : 74.7 L/s - Fan Motor Power Input : 0.032 kW - Electrical spec : 230V/50Hz/1 Phase
8 Unit 1 Rp 575.000 Rp 92.000 Rp 667.000 Rp 667.000 - Type : Wall Mounted Fan
- Capacity : 99.6 L/s - Fan Motor Power Input : 0.032 kW - Electrical spec : 230V/50Hz/1 Phase
9 Unit 8 Rp 1.725.000 Rp 287.500 Rp 2.012.500 Rp 16.100.000 - Type : Turbine Ventilator
- Capacity : 987 L/s
Rp 44.390.000 C
1 Unit 1 Rp 5.750.000 Rp 460.000 Rp 6.210.000 Rp 6.210.000 - Room : Suprevisor
- Total Cooling Capacity : 2.2 KW (minimum)≈ 0,8 PK - Type : Wall Mounted
- Electrical spec : 230V/50Hz/1 Phase
2 Unit 1 Rp 5.750.000 Rp 460.000 Rp 6.210.000 Rp 6.210.000 - Room : Praying Room
- Total Cooling Capacity : 2.2 KW (minimum)≈ 0,8 PK - Type : Wall Mounted
- Electrical spec : 230V/50Hz/1 Phase
3 Unit 2 Rp 6.325.000 Rp 460.000 Rp 6.785.000 Rp 13.570.000 - Room : Office
- Total Cooling Capacity : 3.4 KW (minimum)≈ 1,2 PK - Type : Wall Mounted
- Electrical spec : 230V/50Hz/1 Phase
4 Unit 3 Rp 12.650.000 Rp 460.000 Rp 13.110.000 Rp 39.330.000 - Room : Control Room
- Total Cooling Capacity : 5.6 KW (minimum)≈ 2,1 PK - Type : Wall Mounted
- Electrical spec : 230V/50Hz/1 Phase
5 Unit 1 Rp 4.025.000 Rp 460.000 Rp 4.485.000 Rp 4.485.000 Pengadaan & Pemasangan E/F supporting, accessories, setting,
testing dan commisioning
EXHAUST FAN UNTUK CHEMICAL STORAGE
Pengadaan & Pemasangan E/F supporting, accessories, setting, testing dan commisioning
EXHAUST FAN UNTUK LABORATORY EXHAUST FAN UNTUK STORAGE
Pengadaan & Pemasangan E/F supporting, accessories, setting, testing dan commisioning
Air Cooled Wall Mounted, Refrigerant with Non CFC Pengadaan & Pemasangan A/C supporting, accessories, setting, testing dan commisioning. Termasuk Pipa Refiregrant & Pipa drain. Air Cooled Wall Mounted, Refrigerant with Non CFC
Pengadaan & Pemasangan A/C supporting, accessories, setting, testing dan commisioning. Termasuk Pipa Refiregrant & Pipa drain.
Air Cooled Wall Mounted, Refrigerant with Non CFC Pengadaan & Pemasangan A/C supporting, accessories, setting, testing dan commisioning. Termasuk Pipa Refiregrant & Pipa drain. Air Cooled Wall Mounted, Refrigerant with Non CFC
Pengadaan & Pemasangan A/C supporting, accessories, setting, testing dan commisioning. Termasuk Pipa Refiregrant & Pipa drain. TURBIN VENTILATOR UNTUK WAREHOUSE & WORKSHOP
* SUB TOTALWORKSHOP & WAREHOUSE CONTROL BUILDING & LV BUILDING
Air Cooled Wall Mounted, Refrigerant with Non CFC Pengadaan & Pemasangan A/C supporting, accessories, setting, testing dan commisioning. Termasuk Pipa Refiregrant & Pipa drain.
BAHAN UPAH
(Rp) (Rp) (Rp) (Rp)
1 3 4 5 6 7 8
PEKERJAAN MEKANIKAL-ELEKTRIKAL(HVAC & EXHAUST FAN)
PROYEK PLTG 500 MW LOKASI PAYA PASIR, MEDAN
NO URAIAN PEKERJAAN SAT VOL HARGA SATUAN BAHAN+UPAH JUMLAH HARGA TOTAL 2
- Room : Battery Room
- Total Cooling Capacity : 1.6 KW (minimum)≈ 0,6 PK - Type : Wall Mounted
- Electrical spec : 230V/50Hz/1 Phase
6 Unit 2 Rp 5.750.000 Rp 460.000 Rp 6.210.000 Rp 12.420.000 - Room : LV Room
- Total Cooling Capacity : 3.5 KW (minimum)≈ 1,3 PK - Type : Wall Mounted
- Electrical spec : 230V/50Hz/1 Phase
7 Unit 1 Rp 575.000 Rp 92.000 Rp 667.000 Rp 667.000 - Type : Wall Mounted Fan
- Capacity : 12.5 L/s - Fan Motor Power Input : 0.032 kW - Electrical spec : 230V/50Hz/1 Phase
8 Unit 1 Rp 575.000 Rp 92.000 Rp 667.000 Rp 667.000 - Type : Wall Mounted Fan
- Capacity : 20.8 L/s - Fan Motor Power Input : 0.032 kW - Electrical spec : 230V/50Hz/1 Phase
9 Unit 1 Rp 575.000 Rp 92.000 Rp 667.000 Rp 667.000 - Type : Wall Mounted Fan
- Capacity : 25 L/s - Fan Motor Power Input : 0.032 kW - Electrical spec : 230V/50Hz/1 Phase
Rp 84.226.000 D
1 Unit 5 Rp 1.150.000 Rp 287.500 Rp 1.437.500 Rp 7.187.500 - Room : Imam & Prayer area
- Total Cooling Capacity :1.5 KW (minimum)≈0,57 PK
- Type : Wall Mounted - Capacity : 5000 Btu/h - Air Volume : VTA - Power Consumption : VTA
- Electrical spec : 220V/50Hz/1 Phase
2 Unit 4 Rp 575.000 Rp 92.000 Rp 667.000 Rp 2.668.000 - Type : Wall Mounted Fan
- Air Volume : 12.1 L/S - Power Consumption : VTA Total External Static Pressure :
-- Electrical spec : 220V/50Hz/1 Phase
Rp 9.855.500 E
1 Unit 1 Rp 5.750.000 Rp 460.000 Rp 6.210.000 Rp 6.210.000 - Room : Office Room
- Total Cooling Capacity :3.3 KW (minimum)≈1,3 PK EXHAUST FAN UNTUK ABLUTION
Air Cooled Wall Mounted, Refrigerant with Non CFC Pengadaan & Pemasangan A/C supporting, accessories, setting, testing dan commisioning. Termasuk Pipa Refiregrant & Pipa drain.
MOSQUE / MASJID
SIRKULASI FAN UNTUK PRAYING ROOM & MIHRAB Pengadaan & Pemasangan A/C supporting, accessories, setting, testing dan commisioning. Termasuk Pipa Refiregrant & Pipa drain.
EXHAUST FAN UNTUK(Storage, Mihrab, Toilet 1 & 2) Pengadaan & Pemasangan E/F supporting, accessories, setting, testing dan commisioning
GUARD HOUSE / POS JAGA
Air Cooled Wall Mounted, Refrigerant with Non CFC
Pengadaan & Pemasangan A/C supporting, accessories, setting, * SUB TOTAL CONTROL BUILDING & LV BUILDING Pengadaan & Pemasangan E/F supporting, accessories, setting, testing dan commisioning
EXHAUST FAN UNTUK TOILET
Pengadaan & Pemasangan E/F supporting, accessories, setting, testing dan commisioning
EXHAUST FAN UNTUK PANTRY
Pengadaan & Pemasangan E/F supporting, accessories, setting, testing dan commisioning
* SUB TOTALMOSQUE / MASJID
BAHAN UPAH
(Rp) (Rp) (Rp) (Rp)
1 3 4 5 6 7 8
PEKERJAAN MEKANIKAL-ELEKTRIKAL(HVAC & EXHAUST FAN)
PROYEK PLTG 500 MW LOKASI PAYA PASIR, MEDAN
NO URAIAN PEKERJAAN SAT VOL HARGA SATUAN BAHAN+UPAH JUMLAH HARGA TOTAL 2
- Type : Wall Mounted - Capacity : 11.900Btu/hr - Air Volume : VTA - Power Consumption : VTA
- Electrical spec : 220V/50Hz/1 Phase
2 Unit 1 Rp 575.000 Rp 92.000 Rp 667.000 Rp 667.000 - Type : Wall Mounted Fan
- Air Volume : 12.5 L/S - Power Consumption : VTA Total External Static Pressure :
-- Electrical spec : 220V/50Hz/1 Phase
3 Unit 1 Rp 575.000 Rp 92.000 Rp 667.000 Rp 667.000 - Type : Wall Mounted Fan
- Air Volume : 25 L/S - Power Consumption : VTA Total External Static Pressure :
-- Electrical spec : 220V/50Hz/1 Phase
Rp 7.544.000 F
1. Unit 2 Rp 17.250.000 Rp 460.000 Rp 17.710.000 Rp 35.420.000
- Room : Office Room - Type : Wall Mounted - Total Cooling Capacity :2.9 KW (minimum) - Air Volume : VTA
- Power Consumption : VTA External Static Pressure :
-- Electrical spec : 220V/50Hz/1 Phase
2 Unit 1 Rp 17.250.000 Rp 460.000 Rp 17.710.000 Rp 17.710.000
- Room : Panel Room - Type : Wall Mounted - Total Cooling Capacity :2.9 KW (minimum) - Air Volume : VTA
- Power Consumption : VTA External Static Pressure :
-- Electrical spec : 220V/50Hz/1 Phase
3 Unit 1 Rp 9.200.000 Rp 460.000 Rp 9.660.000 Rp 9.660.000
- Room : Control Room - Type : Wall Mounted
- Total Cooling Capacity :4.3 KW (minimum)≈1,63 PK - Air Volume : VTA
- Power Consumption : VTA External Static Pressure :
-- Electrical spec : 220V/50Hz/1 Phase
4 Unit 1 Rp 4.025.000 Rp 460.000 Rp 4.485.000 Rp 4.485.000
- Room : Supervisor Room - Type : Wall Mounted
- Total Cooling Capacity :2.0 KW (minimum)≈0,76 PK - Air Volume : VTA
- Power Consumption : VTA External Static Pressure :
-- Electrical spec : 220V/50Hz/1 Phase EXHAUST FAN UNTUK(Toilet)
Pengadaan & Pemasangan E/F supporting, accessories, setting, testing dan commisioning
EXHAUST FAN UNTUK(Pantry)
Pengadaan & Pemasangan E/F supporting, accessories, setting, testing dan commisioning
* SUB TOTAL POS JAGA
Air Cooled DX-Wall Mounted, Refrigerant with Non CFC Pengadaan & Pemasangan A/C supporting, accessories, setting, testing dan commisioning. Termasuk Pipa Refiregrant & Pipa drain.
Air Cooled DX-Wall Mounted, Refrigerant with Non CFC Pengadaan & Pemasangan A/C supporting, accessories, setting, testing dan commisioning. Termasuk Pipa Refiregrant & Pipa drain.
Air Cooled DX-Wall Mounted, Refrigerant with Non CFC Pengadaan & Pemasangan A/C supporting, accessories, setting, testing dan commisioning. Termasuk Pipa Refiregrant & Pipa drain. SUBSTATION BUILD
Air Cooled DX-Wall Mounted, Refrigerant with Non CFC Pengadaan & Pemasangan A/C supporting, accessories, setting, testing dan commisioning. Termasuk Pipa Refiregrant & Pipa drain.
BAHAN UPAH
(Rp) (Rp) (Rp) (Rp)
1 3 4 5 6 7 8
PEKERJAAN MEKANIKAL-ELEKTRIKAL(HVAC & EXHAUST FAN)
PROYEK PLTG 500 MW LOKASI PAYA PASIR, MEDAN
NO URAIAN PEKERJAAN SAT VOL HARGA SATUAN BAHAN+UPAH JUMLAH HARGA TOTAL 2
5 Unit 1 Rp 575.000 Rp 92.000 Rp 667.000 Rp 667.000
- Type : Propeller Wall Mounted Fan - Air Volume :18.75 L/s
- Power Consumption : VTA Total External Static Pressure :
-- Electrical spec : 220V/50Hz/1 Phase
7 Unit 1 Rp 575.000 Rp 92.000 Rp 667.000 Rp 667.000
- Type : Propeller Wall Mounted Fan - Air Volume :50 L/s
- Power Consumption : VTA Total External Static Pressure :
-- Electrical spec : 220V/50Hz/1 Phase
8 Unit 1 Rp 575.000 Rp 92.000 Rp 667.000 Rp 667.000
- Type : Propeller Wall Mounted Fan - Air Volume :16.7 L/s
- Power Consumption : VTA Total External Static Pressure :
-- Electrical spec : 220V/50Hz/1 Phase
Rp 69.276.000 Rp 384.870.500 GRAND TOTAL : PEKERJAAN HVAC & EXHAUST FAN
* SUB TOTAL SUBSTATION CONTROL ROOM EXHAUST FAN UNTUK(Storage)
Pengadaan & Pemasangan E/F supporting, accessories, setting, testing dan commisioning
EXHAUST FAN UNTUK(Praying Room)
Pengadaan & Pemasangan E/F supporting, accessories, setting, testing dan commisioning
EXHAUST FAN UNTUK(Toilet)
Pengadaan & Pemasangan E/F supporting, accessories, setting, testing dan commisioning
BAHAN
UPAH
(Rp) (Rp) (Rp) (Rp) 1 3 4 5 6 7 8 I. A A.1 - Pipa PVC Ø ¾" m 10 41.400 19.550 60.950 609.500 - Pipa PVC Ø 1" m 56 31.050 20.700 51.750 2.898.000 - Pipa PVC Ø ½" m 22 62.100 17.250 79.350 1.745.700 - Pipa PVC Ø 1¼" m 10 21.850 23.000 44.850 448.500 - Fitting & Accessories (Hanger & Support) dll ls 2 74.750 28.750 103.500 207.000 - Gate Valve Ø 1" bh 2 287.500 40.250 327.750 655.500A.2
-set 1 9.200.000 1.725.000 10.925.000 10.925.000 - Kapasitas : 600 Liter
-- Material : Fiber Reinforced / Type : Biological Methode
-- Pipa PVC Ø 4" m 32 294.400 92.000 386.400 12.364.800
- Pipa PVC Ø 2" m 10 90.850 34.500 125.350 1.253.500
- Pipa PVC Ø 2½" m 10 132.250 57.500 189.750 1.897.500
- Vent water pipes Ø 1¼" (Pipa PVC Class D (5 Kg/cm2) m 16 62.100 23.000 85.100 1.361.600 - Pipa PVC Ø 4" Septic tank ke drainase Class AW (10 Kg/cm2) m 14 294.400 92.000 386.400 5.409.600 - Fitting & Accessories (Hanger & Support) dll ls 2 74.750 28.750 103.500 207.000 - Clean Out ø4" material SS 304 (ex. San-ei) bh 3 230.000 138.000 368.000 1.104.000 - Vent Cap c/w Ø 1¼" (Insect Screen) bh 2 23.000 23.000 46.000 92.000
A.2
-- Pipa PVC AW Ø 4" m 88 294.400 92.000 386.400 34.003.200 - Roof drain Ø 4̋” (Atap Talang Seng) bh 0 97.750 92.000 189.750 -- Fitting & Accessories (Hanger & Support) dll lot 2 74.750 28.750 103.500 207.000 75.389.400 B
* Toilet Workshop
- WC, Flush Tank set 2 3.450.000 345.000 3.795.000 7.590.000
- Jet Washer bh 1 345.000 57.500 402.500 402.500
- Floor Drain bh 1 575.000 86.250 661.250 661.250
- Faucet, Wash Basin bh 1 690.000 86.250 776.250 776.250
- Faucet bh 2 575.000 86.250 661.250 1.322.500
* Laboratory Area
-- Emergency Shower bh 1 862.500 57.500 920.000 920.000
- Floor Drain bh 2 575.000 86.250 661.250 1.322.500
- Faucet, Wash Basin bh 1 690.000 86.250 776.250 776.250
* Toilet Meeting Room
-- Faucet, Wash Basin bh 1 690.000 86.250 776.250 776.250
- WC, Flush Tank set 1 3.450.000 345.000 3.795.000 3.795.000
- Jet Washer bh 1 3.450.000 57.500 3.507.500 3.507.500 - Floor Drain bh 1 575.000 86.250 661.250 661.250 22.511.250 97.900.650 II. A * LAMPU
- LED 2 x 20W Ceiling type w/ louver, flush mounted indoor use bh 13 345.000 17.250 362.250 4.709.250 - LED 2 x 20W Ceiling type w/ louver, flush mounted indoor use, bh 5 345.000 17.250 362.250 1.811.250
with battery back up
-- Down light LED 20W bh 2 172.500 17.250 189.750 379.500
- Highbay GP 100W bh 12 3.450.000 63.250 3.513.250 42.159.000
- Exit Lamp 1x8W bh 2 230.000 17.250 247.250 494.500
-
Instalasi kabel NYM 3 x 2.5mm² + EMT conduit
ttk 34 97.750 86.250 184.000 6.256.000* SAKLAR
-PEKERJAAN MEKANIKAL-ELEKTRIKAL WAREHOUSE/WORKSHOP
PROYEK PLTG 500 MW LOKASI PAYA PASIR, MEDAN
NO URAIAN PEKERJAAN SAT VOL
HARGA SATUAN
BAHAN+UPA
H
Pipa PVC Class AW (10 Kg/cm2), Pipa Class D (5 Kg/cm2)
TOTAL
JUMLAH
HARGA
2PEKERJAAN MEKANIKAL (PLUMBING) PEKERJAAN PLUMBING
INSTALASI AIR BERSIH
Pipa PVC AW (10 Kg/cm2) untukToilet & Laboratory Pipa PVC Ø 1½" (Tapping pipa dari line Utama)
INSTALASI AIR KOTOR & AIR BEKAS Septic Tank (Digabung dengan Admin Building)
PEKERJAAN AIR HUJAN
* SUB TOTAL PEKERJAAN AIR BERSIH & KOTOR PENGADAAN & PEMASANGAN SANITARY
*SUB TOTAL PEK. SANITARY TOTAL PEKERJAAN MEKANIKAL PEKERJAAN ELEKTRIKAL
BAHAN
UPAH
(Rp) (Rp) (Rp) (Rp)
1 3 4 5 6 7 8
PEKERJAAN MEKANIKAL-ELEKTRIKAL WAREHOUSE/WORKSHOP
PROYEK PLTG 500 MW LOKASI PAYA PASIR, MEDAN
NO URAIAN PEKERJAAN SAT VOL
HARGA SATUAN
BAHAN+UPA
H
TOTAL
JUMLAH
HARGA
2- Switch one device 1 way, flush mounted bh 7 17.250 17.250 34.500 241.500 - Rotary switch one device 1 way, flush mounted bh 6 17.250 17.250 34.500 207.000
-
Instalasi kabel NYM 3 x 2.5mm² + EMT conduit
ttk 13 97.750 86.250 184.000 2.392.000* STOP KONTAK
-- Receptacle, flush mounted, general porpose indoor type bh 12 23.000 17.250 40.250 483.000 230V, 2Poles+E, 300VA
-- Receptacle, flush mounted, general porpose indoor type bh 3 23.000 17.250 40.250 120.750 230V, 2Poles+E, 200VA (AC)
-- Receptacle, exposed mounted, general porpose indoor type bh 3 23.000 17.250 40.250 120.750 230V, 2Poles+E, 800VA
-- Power Outlet C/W Plug, Exposed Mounted, Industrial Type bh 2 1.610.000 92.000 1.702.000 3.404.000 Outdoor used, 400V, 3Ph, 4 Poles+E, 63A
--
Instalasi kabel NYM 3 x 4mm² + EMT conduit
ttk 18 97.750 86.250 184.000 3.312.000* PANEL
-TRLLP-06, 400/230V, 3P, 4W, 50Hz, 35kVA, 10kA unit 1 17.250.000 103.500 17.353.500 17.353.500 include MCCB, MCB, ELCB, indicator lamp, terminal, pengkabelan
83.444.000 B * - Tray ukuran : 200 x 100 m 40 138.000 51.750 189.750 7.590.000 7.590.000 91.034.000 188.934.650 TOTAL : PEK. MEKANIKAL & ELEKTRIKAL
TOTAL PEKERJAAN ELEKTRIKAL * SUB TOTAL PEKERJAAN KABEL TRAY * SUB TOTAL PEK. LAMPU, SAKLAR, STOP KONTAK, DAN PANEL PEKERJAAN KABEL TRAY/LADER