DAFTAR BIAYA SEWA PERALATAN PER JAM KERJA

BIAYA

No.

URAIAN

KO

HP

KAP.

HARGA

SEWA

KET.

DE

ALAT

ALAT/JAM

(di luar PPN)

1. ASPHALT MIXING PLANT E01 150.0 50.0 T/Jam 1,917,000,000 2,955,944.16

2. ASPHALT FINISHER E02 47.0 6.0 Ton 385,000,000 150,308.34

3. ASPHALT SPRAYER E03 15.0 800.0 Liter 126,000,000 61,726.40

4. BULLDOZER 100-150 HP E04 140.0 - 950,000,000 388,025.89

5. COMPRESSOR 4000-6500 L\M E05 80.0 - 82,000,000 124,399.18

6. CONCRETE MIXER 0.3-0.6 M3 E06 15.0 500.0 Liter 38,000,000 42,684.62

7. CRANE 10-15 TON E07 150.0 15.0 Ton 800,000,000 365,230.26

8. DUMP TRUCK 3-4 M3 E08 100.0 6.0 Ton 206,000,000 174,831.57

9. DUMP TRUCK E09 125.0 8.0 Ton 300,000,000 224,057.33

10. EXCAVATOR 80-140 HP E10 80.0 0.5 M3 640,000,000 250,769.93

11. FLAT BED TRUCK 3-4 M3 E11 100.0 4.0 M3 158,000,000 163,960.97

12. GENERATOR SET E12 175.0 125.0 KVA 135,000,000 242,564.64

13. MOTOR GRADER >100 HP E13 125.0 - 545,000,000 279,542.69

14. TRACK LOADER 75-100 HP E14 90.0 1.6 M3 600,000,000 252,886.09

15. WHEEL LOADER 1.0-1.6 M3 E15 105.0 1.5 M3 600,000,000 269,648.59

16. THREE WHEEL ROLLER 6-8 T E16 55.0 8.0 Ton 252,000,000 134,961.73

17. TANDEM ROLLER 6-8 T. E17 50.0 8.0 Ton 350,000,000 151,568.37

18. TIRE ROLLER 8-10 T. E18 60.0 10.0 Ton 370,000,000 176,583.26

19. VIBRATORY ROLLER 5-8 T. E19 75.0 7.0 Ton 415,000,000 203,920.56

20. CONCRETE VIBRATOR E20 10.0 - 20,000,000 37,596.78

21. STONE CRUSHER E21 220.0 30.0 T/Jam 665,000,000 420,024.55

22. WATER PUMP 70-100 mm E22 6.0 - 19,000,000 30,173.94

23. WATER TANKER 3000-4500 L. E23 100.0 4,000.0 Liter 140,000,000 159,884.49

24. PEDESTRIAN ROLLER E24 11.0 0.98 Ton 75,000,000 47,458.33

25. TAMPER E25 5.0 0.17 Ton 28,000,000 36,006.56

26. JACK HAMMER E26 3.0 - 28,000,000 33,771.56

27. FULVI MIXER E27 75.0 - 153,000,000 134,891.11

28. CONCRETE PUMP E28 100.0 8.00 M3 170,000,000 164,102.56

29. TRAILER 20 TON E29 175.0 20.00 Ton 360,000,000 288,065.40

30. PILE DRIVER + HAMMER E30 25.0 2.50 Ton 118,000,000 71,089.63

31. CRANE ON TRACK 35 TON E31 125.0 35.0 Ton 850,000,000 335,736.02

32. WELDING SET E32 40.0 250.0 Amp 22,100,000 66,133.58

33. BORE PILE MACHINE E33 150.0 2,000.0 Meter 2,180,000,000 644,725.91

34. ASPHALT LIQUID MIXER E34 5.0 1,000.0 Liter 16,000,000 26,013.35

35. TRAILLER 15 TON E35 150.0 15.0 Ton 266,000,000 249,076.47

36. GRASS CUTTER E36 3.0 32.0 Cc 3,000,000 21,077.44

37. JUMBO BREAKER E37 80.0 0.5 M3 608,000,000 243,522.86

38. ASPHALT CUTTER E38 - - - 29,000,000 40,600.00

40 PONTON E39

40.

Referensi

Dokumen terkait

modified to derive the soil water status in the top layer (top 30 cm) of the soil profile. This is a simple book keeping-bucket type- water tight model which is based on law

Range merupakan jarak dari data pada level yang satu terhadap data pada level di atas atau

Hasil skrining kandungan kimia herb a bandotan (Ageratum conyzoides Linn.) menunjukkan adanya golongan senyawa: minyak atsiri, terpenoid bebas, alkaloid, flavonoid

Secara umum senyawa yang digunakan sebagai obat untuk menyembuhkan penyakit atau luka pada kulit tidak boleh bersifat fototoksik (perubahan senyawa menjadi toksik apabila

Uji efek kombinasi antara kafein topikal menggunakan metode iontoforesis dengan termosauna terhadap penurunan berat badan pada pasien penderita obesitas menggunakan

Aset dalam penyelesaian dinyatakan sebesar biaya perolehan dan disajikan sebagai bagian dari aset tetap. Akumulasi biaya perolehan akan dipindahkan ke akun aset tetap

Konflik yang terjadi antara dua orang atau lebih dengan nilai, tujuan dan.. keyakinan

% handles structure with handles and user data (see GUIDATA) % varargin command line arguments to home (see VARARGIN) set(imshow('D:\Unair\Bem SainTek\Logo\images2.jpeg'));