• Tidak ada hasil yang ditemukan

Selanjutnya

N/A
N/A
Protected

Academic year: 2017

Membagikan "Selanjutnya "

Copied!
12
0
0

Teks penuh

(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)

Referensi

Garis besar

Dokumen terkait

(b) if the Borrower shall have failed to furnish to the Bank, within the period of time specified in Section 4.01 (b) (ii) of this Agreement, any of the audit reports

(b) if the Borrower shall have failed to furnish to the Bank, within the period of time specified in Section 4.01 (b) (ii) of this Agreement, any of the audit reports

(a) After satisfaction of conditions precedent, the Borrower may obtain disbursements of funds under the Loan for Local Currency Costs required for the Project

After satisfaction of conditions precedent, the Borrower may obtain disbursements of funds under the Loan for Local Currency Costs required for the Project in

If the government of the Borrower, by statute, decree, rule, regulation , or practice discriminates with respect to A.I.D.-financed procurement against any marine

The Borrower agrees t11at from and after the Effective Date of this Agreemcni; and so long as any cimount remains unpaid on the account of the Loan, ilrn obligation

All commodities which may be imported and paid f or with Credit Foreign Exchange (Devisa Kredit) under regulations of the Borrower in effect on the date of

Last change of status: 05 September 2013 Registration No: 44.. Country/Organization Signature