Ta n j u n g Pr iok Ex pa n sion :
Ka liba r u ( N e w Pr iok ) Pr oj e ct
12
ndASEAN Port and Shipping 2014
Present ed by
D a n i Ru sli Ut a m a
President Direct or of PT Pengem bang Pelabuhan I ndonesia
( I ndonesia Port Developer)
A Subsidiary Com pany of I PC
PT Pelabuhan I ndonesia I I ( Persero)
Jakart a, June 2014
PT PELABUHAN INDONESIA II / IPC
16 Branches 22 Branches Pelindo IV
1. Port of Tanjung Priok 2. Port of Sunda Kelapa 3. Port of Ciw andan, Bant en 4. Port of Cirebon
5. Port of Panjang, Lampung 6. Port of Palembang
7. Port of Pulau Baai, Bengkulu 8. Port of Teluk Bayur, Padang 9. Port of Pangkal Balam 10. Port of Tanjung Pandan 11. Port of Talang Duku, Jambi 12. Port of Pont ianak
IPC Branches IPC New Development Project
A. NEW PRIOK PORT
B. PORT DEVELOPM ENT IN TANJUNG CARAT-SOUTH SUM ATRA
C. SORONG WEST PASIFIC HUB PORT D. KIJING PORT DEVELOPM ENT – WEST
New Priok Tim e line
Project Initiation June 2010
Presidential Degree April 2012
Concession Agreement August 2012
Environmental Assessment Permit December 2012
PROJECT
CONSTRUCTION STARTED
PORT OF TANJUNG PRIOK (EXISTING)
Jet t y and CY 1A Progress
Piling Progress
Container Yard 1A 5,688 pcs of 9,185 pcs Jett y 1A 1,534 pcs of 2,106 pcs
Piling Progress
Access Road 640 pcs of 917 pcs
Breakwater Progress
Driving Clust er Bambu: 201,447.00 unit
Install of M att ress Bamboo: 145,631.73 m2
Placing Bat u 50 - 75 kg & 400 kg: 588,226.45 m3
Product & St ocking A-Jack: 21,879 unit
Breakwater Progress
Dredging and Reclam at ion Act ivit ies
Dredging Volume: 3,682,713.20 m3