Ta n j u n g Pr iok Ex pa n sion :

Ka liba r u ( N e w Pr iok ) Pr oj e ct

12

nd

ASEAN Port and Shipping 2014

Present ed by

D a n i Ru sli Ut a m a

President Direct or of PT Pengem bang Pelabuhan I ndonesia

( I ndonesia Port Developer)

A Subsidiary Com pany of I PC

PT Pelabuhan I ndonesia I I ( Persero)

Jakart a, June 2014

(2)

PT PELABUHAN INDONESIA II / IPC

16 Branches 22 Branches Pelindo IV

1. Port of Tanjung Priok 2. Port of Sunda Kelapa 3. Port of Ciw andan, Bant en 4. Port of Cirebon

5. Port of Panjang, Lampung 6. Port of Palembang

7. Port of Pulau Baai, Bengkulu 8. Port of Teluk Bayur, Padang 9. Port of Pangkal Balam 10. Port of Tanjung Pandan 11. Port of Talang Duku, Jambi 12. Port of Pont ianak

IPC Branches IPC New Development Project

A. NEW PRIOK PORT

B. PORT DEVELOPM ENT IN TANJUNG CARAT-SOUTH SUM ATRA

C. SORONG WEST PASIFIC HUB PORT D. KIJING PORT DEVELOPM ENT – WEST

(3)
(4)
(5)

New Priok Tim e line

Project Initiation June 2010

Presidential Degree April 2012

Concession Agreement August 2012

Environmental Assessment Permit December 2012

PROJECT

CONSTRUCTION STARTED

(6)

PORT OF TANJUNG PRIOK (EXISTING)

(7)
(8)
(9)
(10)

Jet t y and CY 1A Progress

Piling Progress

Container Yard 1A 5,688 pcs of 9,185 pcs Jett y 1A 1,534 pcs of 2,106 pcs

(11)
(12)

Piling Progress

Access Road 640 pcs of 917 pcs

(13)

Breakwater Progress

Driving Clust er Bambu: 201,447.00 unit

Install of M att ress Bamboo: 145,631.73 m2

Placing Bat u 50 - 75 kg & 400 kg: 588,226.45 m3

Product & St ocking A-Jack: 21,879 unit

(14)

Breakwater Progress

(15)

Dredging and Reclam at ion Act ivit ies

Dredging Volume: 3,682,713.20 m3

(16)